CN104265328A - 地铁隧道变化断面二衬施工便调式台车 - Google Patents

地铁隧道变化断面二衬施工便调式台车 Download PDF

Info

Publication number
CN104265328A
CN104265328A CN201410487043.7A CN201410487043A CN104265328A CN 104265328 A CN104265328 A CN 104265328A CN 201410487043 A CN201410487043 A CN 201410487043A CN 104265328 A CN104265328 A CN 104265328A
Authority
CN
China
Prior art keywords
door frame
fixed
fixing
hinged
subway tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410487043.7A
Other languages
English (en)
Inventor
王飞
尹建勋
赵德刚
陈宝军
宋勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Priority to CN201410487043.7A priority Critical patent/CN104265328A/zh
Publication of CN104265328A publication Critical patent/CN104265328A/zh
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04—Lining with building materials
    • E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102—Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

地铁隧道断面变化二衬施工便调式台车,是在固定门架底面固定门架底梁,在两端固定门架上固定升降滑槽,升降滑柱穿过升降滑槽连接行走轮,升降滑柱上固定升降油缸并铰连在固定门架上,减速机驱动轮通过驱动链条链接行走轮并放置在行走轨道上,固定滑柱外套装移动滑箱,下面安装滑动轮并放置在固定门架上,在固定滑柱与移动滑箱之间铰连平移油缸,在移动滑箱上安装顶模板并与侧墙模板铰连,在两端的固定门架与侧墙模板之间铰连脱模油缸。本发明不需要大型机械设备配合作业,可根据地铁隧道断面的变化,自行独立的随机调节施工台车的宽度,以适应铁隧道断面变化的施工要求,台车调整便捷快速,使用操作人员少,安全隐患小,成本低,工作效率高。

Description

地铁隧道变化断面二衬施工便调式台车
技术领域
本发明涉及一种地铁二衬施工台车,具体是一种地铁隧道变化断面二衬施工便调式台车,属于路桥施工机械领域。 
背景技术
随着城市地铁的快速发展,地下基础设施越来越健全,功能越来越多,设计越来越精美,根据不断改进的施工技术要求,它的隧道断面在不断的发生变化,所以在铁隧道变化断面二衬施工时,就需要将浇注混凝土的模板根据断面变化要求随时变大或缩小。目前针对变化断面常用的二衬施工方案有两种:一种是现场用大量钢管作为支撑架,再用方木来固定木板作混凝土表面模板,这种施工方法需要大量的材料和施工技术人员,还需要吊车、挖机等机械的配合施工,当断面发生变化时就必须对所用钢管、木板、方木进行更换或重新加工,严重浪费材料,加大劳动成本,而且工作效率低,另外以木板制作的模板其间隙不严实容易出现混凝土漏浆,严重时出现涨模,造成不必要的损失;另一种是利用整体模板二衬台车施工,这种方法虽可以提高工作效率,但是在断面发生变化时就需要将二衬台车的面板和支架折开,根据断面的变化重新加入调节块,但由于隧道空间小,机械配合难度大,只能用人工来操作,所以施工人员劳动强度加大,严重的制约了后续的工作进度。目前在地铁隧道多断面二衬施工领域还没有一种理想的二衬施工台车,即能保证施工质量,又能根据隧道断面变化而做适应性调整的二衬施工台车。 
发明内容
本发明的目地是为了克服目前所用地铁隧道断面变化二衬施工设备所存在的缺陷,而公开一种地铁隧道断面变化二衬施工便调式台车。 
本发明是通过以下技术方案实现的: 
将两根门架底梁分别固定在若干个固定门架底面两侧连接成一个整体,门架底梁下固定若干个加固丝杠并放置在行走轨道上,在前后两端固定门架的两侧门柱上分别固定升降滑槽,升降滑柱穿过升降滑槽和行走支架连接,行走支架底面安装行走轮,升降滑柱上部固定升降油缸,升降油缸上部铰连在固定门架上,在每个行走支架的内侧分别固定减速机,减速机输出端安装驱动轮,驱动轮通过驱动链条链接行走轮,行走轮放置在行走轨道上,在每个固定门架上面两侧分别设有固定滑柱,固定滑柱外套装移动滑箱,移动滑箱下面安装平移支座,平移支座下面设有滑动轮,滑动轮放置在对应的固定门架上,在固定滑柱与移动滑箱之间铰连平移油缸,在两侧移动滑箱上分别安装顶模板,两侧顶模板分别通过模板铰轴与侧墙模板铰连,在两侧顶模板之间设有固定模板,在前后两端的固定门架立柱与侧墙模板之间分别铰连脱模油缸与若干个加固丝杠,在门架底梁上设置液压控制箱。
本发明不需要吊车及挖掘机等大型机械设备配合作业,可根据地铁隧道断面的变化,自行独立的随机调节施工台车的宽度,以适应铁隧道断面变化的施工要求,台车调整便捷快速,使用操作人员少,降低了施工人员的安全隐患,节约了施工成本,保证了施工质量,提高了工作效率。 
附图说明
附图1是本发明的主视结构示意图。 
附图2是本发明的左视结构示意图。 
附图标记说明如下:    
固定门架1,门架底梁2,顶模板3,侧墙模板4,固定模板5,模板铰轴6,加固丝杠7,减速机8,驱动轮9,驱动链条10,行走支架11,行走轮12,行走轨道13,平移油缸14,平移支座15,滑动轮16,固定滑柱17,移动滑箱18,脱模油缸19,升降油缸20,升降滑柱21,升降滑槽22,操作控制箱23。
具体实施方式
以下结合附图对本发明做进一步详细叙述: 
将两根门架底梁(2)分别固定在若干个固定门架(1)底面两侧连接成一个整体,门架底梁(2)下固定若干个加固丝杠(7)并放置在行走轨道(13)上,在前后两端固定门架(1)的两侧门柱上分别固定升降滑槽(22),升降滑柱(21)穿过升降滑槽(22)和行走支架(11)连接,行走支架(11)底面安装行走轮(12),升降滑柱(21)上部固定升降油缸(20),升降油缸(20)上部铰连在固定门架(1)上,在每个行走支架(11)的内侧分别固定减速机(8),减速机(8)输出端安装驱动轮(9),驱动轮(9)通过驱动链条(10)链接行走轮(12),行走轮(12)放置在行走轨道(13)上,在每个固定门架(1)上面两侧分别设有固定滑柱(17),固定滑柱(17)外套装移动滑箱(18),移动滑箱(18)下面安装平移支座(15),平移支座(15)下面设有滑动轮(16),滑动轮(16)放置在对应的固定门架(1)上,在固定滑柱(17)与移动滑箱(18)之间铰连平移油缸(14),在两侧移动滑箱(18)上分别安装顶模板(3),两侧顶模板(3)分别通过模板铰轴(6)与侧墙模板(4)铰连,在两侧顶模板(3)之间设有固定模板(5),在前后两端的固定门架(1)立柱与侧墙模板(4)之间分别铰连脱模油缸(19)与若干个加固丝杠(7),在门架底梁(2)上设置液压控制箱(23)。
利用本发明工作时,通过操作控制箱开启所有的升降油缸,升降油缸上升迫使连接的升降滑柱延升降滑槽下行,行走支架上的行走轮下行压在行走轨道上使台车整体上升;关闭升降油缸,然后启动减速机,驱动轮通过驱动链条带动行走轮转动前行,行走到指定位置后关闭减速机;开启所有的平移油缸,根据断面大小使移动滑箱延着固定滑柱伸缩,同时使连接在移动滑箱下的平移支座及滑动轮在对应的固定门架上面移动,固定在移动滑箱上面的顶模板也随着移动到指定的位置;再开启脱模油缸使侧墙模板推拉到要求的位置后关闭,最后将侧墙模板和固定门架之间的加固丝杠调节到位并拧紧即可。 

Claims (2)

1.地铁隧道变化断面二衬施工便调式台车,其特征是通过以下技术方案实现的:
将两根门架底梁(2)分别固定在若干个固定门架(1)底面两侧连接成一个整体,门架底梁(2)下固定若干个加固丝杠(7)并放置在行走轨道(13)上,在前后两端固定门架(1)的两侧门柱上分别固定升降滑槽(22),升降滑柱(21)穿过升降滑槽(22)和行走支架(11)连接,行走支架(11)底面安装行走轮(12),升降滑柱(21)上部固定升降油缸(20),升降油缸(20)上部铰连在固定门架(1)上,在每个行走支架(11)的内侧分别固定减速机(8),减速机(8)输出端安装驱动轮(9),驱动轮(9)通过驱动链条(10)链接行走轮(12),行走轮(12)放置在行走轨道(13)上,在每个固定门架(1)上面两侧分别设有固定滑柱(17),固定滑柱(17)外套装移动滑箱(18),移动滑箱(18)下面安装平移支座(15),平移支座(15)下面设有滑动轮(16),滑动轮(16)放置在对应的固定门架(1)上,在固定滑柱(17)与移动滑箱(18)之间铰连平移油缸(14),在两侧移动滑箱(18)上分别安装顶模板(3),两侧顶模板(3)分别通过模板铰轴(6)与侧墙模板(4)铰连,在两侧顶模板(3)之间设有固定模板(5),在前后两端的固定门架(1)立柱与侧墙模板(4)之间分别铰连脱模油缸(19)与若干个加固丝杠(7),在门架底梁(2)上设置液压控制箱(23)。
2.根据权利要求1所述的地铁隧道变化断面二衬施工便调式台车,其特征是在于:将两根门架底梁(2)分别固定在六个固定门架(1)底面两侧,门架底梁(2)下固定四个加固丝杠(7),在前后两端的固定门架(1)立柱与侧墙模板(4)之间分别铰连两个加固丝杠(7)。
CN201410487043.7A 2014-09-23 2014-09-23 地铁隧道变化断面二衬施工便调式台车 Pending CN104265328A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410487043.7A CN104265328A (zh) 2014-09-23 2014-09-23 地铁隧道变化断面二衬施工便调式台车

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410487043.7A CN104265328A (zh) 2014-09-23 2014-09-23 地铁隧道变化断面二衬施工便调式台车

Publications (1)

Publication Number Publication Date
CN104265328A true CN104265328A (zh) 2015-01-07

Family

ID=52156886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410487043.7A Pending CN104265328A (zh) 2014-09-23 2014-09-23 地铁隧道变化断面二衬施工便调式台车

Country Status (1)

Country Link
CN (1) CN104265328A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986829A (zh) * 2015-02-10 2016-10-05 池州恒毅设备制造有限公司 一种砼衬砌钢模台车及其加工工艺
CN105986828A (zh) * 2015-02-10 2016-10-05 池州恒毅设备制造有限公司 一种全液压砼衬砌钢模台车
CN107060823A (zh) * 2017-04-11 2017-08-18 中铁二十局集团第三工程有限公司 隧道锚段二衬混凝土施工无拆卸台车
CN107142957A (zh) * 2017-06-10 2017-09-08 李国耀 一种城市综合管廊步履式循环施工系统及其方法
CN109162638A (zh) * 2018-10-12 2019-01-08 东华理工大学 一种用于地质勘探的智能凿岩设备
CN110318781A (zh) * 2019-07-26 2019-10-11 中交隧道工程局有限公司 一种隧道二衬模板台车
CN110552720A (zh) * 2019-10-15 2019-12-10 湖南五新隧道智能装备股份有限公司 一种自铺轨行走装置及隧道衬砌台车
CN111364300A (zh) * 2020-03-26 2020-07-03 成都鑫都建设工程有限公司 一种地铁轨道多功能施工车
CN112171865A (zh) * 2020-09-25 2021-01-05 广东欣龙隧道装备股份有限公司 一种方便立模和脱模的台车及使用方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0734790A (ja) * 1993-07-26 1995-02-03 Saga Kogyo Kk ロープ式ケレン装置
CN201074518Y (zh) * 2007-09-10 2008-06-18 中铁八局集团第一工程有限公司 一种变断面隧道衬砌台车
CN102383810A (zh) * 2011-11-30 2012-03-21 中铁五局(集团)有限公司 连续变截面隧道衬砌模板台车
CN202325547U (zh) * 2011-11-30 2012-07-11 中铁五局(集团)有限公司 连续变截面隧道衬砌模板台车
CN202768019U (zh) * 2012-09-04 2013-03-06 湖南五新重型装备有限公司 一种用于小城门断面的隧道衬砌台车
CN202991062U (zh) * 2012-12-06 2013-06-12 中铁十二局集团有限公司 多断面衬砌台车
CN203515607U (zh) * 2013-10-23 2014-04-02 唐文明 隧道加宽断可调式钢模台车
CN204152523U (zh) * 2014-09-23 2015-02-11 中铁二十一局集团轨道交通工程有限公司 地铁隧道变化断面二衬施工便调式台车

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0734790A (ja) * 1993-07-26 1995-02-03 Saga Kogyo Kk ロープ式ケレン装置
CN201074518Y (zh) * 2007-09-10 2008-06-18 中铁八局集团第一工程有限公司 一种变断面隧道衬砌台车
CN102383810A (zh) * 2011-11-30 2012-03-21 中铁五局(集团)有限公司 连续变截面隧道衬砌模板台车
CN202325547U (zh) * 2011-11-30 2012-07-11 中铁五局(集团)有限公司 连续变截面隧道衬砌模板台车
CN202768019U (zh) * 2012-09-04 2013-03-06 湖南五新重型装备有限公司 一种用于小城门断面的隧道衬砌台车
CN202991062U (zh) * 2012-12-06 2013-06-12 中铁十二局集团有限公司 多断面衬砌台车
CN203515607U (zh) * 2013-10-23 2014-04-02 唐文明 隧道加宽断可调式钢模台车
CN204152523U (zh) * 2014-09-23 2015-02-11 中铁二十一局集团轨道交通工程有限公司 地铁隧道变化断面二衬施工便调式台车

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986829A (zh) * 2015-02-10 2016-10-05 池州恒毅设备制造有限公司 一种砼衬砌钢模台车及其加工工艺
CN105986828A (zh) * 2015-02-10 2016-10-05 池州恒毅设备制造有限公司 一种全液压砼衬砌钢模台车
CN107060823A (zh) * 2017-04-11 2017-08-18 中铁二十局集团第三工程有限公司 隧道锚段二衬混凝土施工无拆卸台车
CN107060823B (zh) * 2017-04-11 2024-05-14 中铁二十一局集团第三工程有限公司 隧道锚段二衬混凝土施工无拆卸台车
CN107142957A (zh) * 2017-06-10 2017-09-08 李国耀 一种城市综合管廊步履式循环施工系统及其方法
CN107142957B (zh) * 2017-06-10 2019-01-22 李国耀 一种城市综合管廊步履式循环施工系统及其方法
CN109162638A (zh) * 2018-10-12 2019-01-08 东华理工大学 一种用于地质勘探的智能凿岩设备
CN110318781A (zh) * 2019-07-26 2019-10-11 中交隧道工程局有限公司 一种隧道二衬模板台车
CN110552720A (zh) * 2019-10-15 2019-12-10 湖南五新隧道智能装备股份有限公司 一种自铺轨行走装置及隧道衬砌台车
CN111364300A (zh) * 2020-03-26 2020-07-03 成都鑫都建设工程有限公司 一种地铁轨道多功能施工车
CN112171865A (zh) * 2020-09-25 2021-01-05 广东欣龙隧道装备股份有限公司 一种方便立模和脱模的台车及使用方法

Similar Documents

Publication Publication Date Title
CN102230383B (zh) 全液压隧道仰拱栈桥式移动模架
WO2019085819A1 (zh) 一种连掘工作面锚杆锚索支护工艺与装备
CN203515600U (zh) 一种三变钢模台车
CN204152523U (zh) 地铁隧道变化断面二衬施工便调式台车
CN107060823B (zh) 隧道锚段二衬混凝土施工无拆卸台车
CN201679506U (zh) 陡坡斜井衬砌施工用大吨位衬砌台车辅助牵引装置
CN103982200A (zh) 全断面内滑轨移动钢模台车
CN204041080U (zh) 一种内通式针梁衬砌台车
CN104018855B (zh) 一种内通式针梁衬砌台车
CN206352309U (zh) 一种大跨度框构管廊液压内模自走行系统装置
CN206092012U (zh) 地铁深埋隧道钢筋混凝土管片拆除作业车
CN102330559A (zh) 一种整体液压钢模板台车
CN104533461B (zh) 一种隧道施工台车横向移动装置
CN201496071U (zh) 栈桥式全圆针梁台车
CN106368718B (zh) 地铁深埋隧道钢筋混凝土管片拆除作业车
CN205908300U (zh) 水沟电缆槽移动台车
CN105781594A (zh) 一种隧道施工防水板自动铺设装置
CN218206795U (zh) 用于隧道内无轨式养护除尘的检测台车
CN104763447A (zh) 一种贝雷片组合式钢模台车
CN111828040A (zh) 一种360°旋转数控机械臂布料智能衬砌台车及其施工方法
CN204002842U (zh) 全断面内滑轨移动钢模台车
CN107060831A (zh) 一种用于隧道沟槽施工装置
CN104564099A (zh) 隧道施工钢筋绑扎所用自走式模架
CN206607460U (zh) 一种可自行移动钢轨的铺设装置
CN105422139A (zh) 一种隧道水沟电缆槽台车

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150107