CN104264900A - Giant multi-corbel steel tube frame column and manufacture method thereof - Google Patents

Giant multi-corbel steel tube frame column and manufacture method thereof Download PDF

Info

Publication number
CN104264900A
CN104264900A CN201410461857.3A CN201410461857A CN104264900A CN 104264900 A CN104264900 A CN 104264900A CN 201410461857 A CN201410461857 A CN 201410461857A CN 104264900 A CN104264900 A CN 104264900A
Authority
CN
China
Prior art keywords
steel
welding
steel column
column
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410461857.3A
Other languages
Chinese (zh)
Other versions
CN104264900B (en
Inventor
王晓波
李峰
付鹏
王永康
张富强
张清荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201410461857.3A priority Critical patent/CN104264900B/en
Publication of CN104264900A publication Critical patent/CN104264900A/en
Application granted granted Critical
Publication of CN104264900B publication Critical patent/CN104264900B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a giant multi-corbel steel tube frame column. The giant multi-corbel steel tube frame column comprises a steel column, annular horizontal reinforced ribs, H-shaped corbels, box girder corbels and belt truss corbels, wherein the annular horizontal reinforced ribs are welded at the positions in the steel column, wherein the H-shaped corbels, the box girder corbels, and the belt truss corbels are respectively joined with the steel column at the positions, and a hole is annularly formed in each annular horizontal reinforced rib; the H-shaped corbels are vertically welded on the upper part, the middle part and the lower part of the steel column; the box girder corbels are vertically welded on the middle part of the steel column; and the belt truss corbels are vertically welded on the lower part of the steel column, and the belt truss corbels on each side form a V shape through two box-type components. Through the adoption of the giant multi-corbel steel tube frame column, the performance of the structure is maximally improved simultaneously when the bearing force of a steel plate shear wall column is guaranteed; and meanwhile, the steel column mechanism is simplified, the processing efficiency of a factory is improved, and the processing period is shortened. The invention further discloses a manufacture method of the steel tube frame column, and is suitable for industrial production.

Description

A kind of huge many brackets steel framework post and preparation method thereof
Technical field
The invention belongs to the preparation method of a kind of steel work and steel work, be specially and relate to a kind of huge many brackets steel framework post being applied to mega steel frame structure and preparation method thereof.
Background technology
Wuhan is centrally located at ground, Wang Jiadun central business district, Wuhan City, Hubei Province 16.Overall floorage is 355760 square metres, and 4 layers, underground, podium 4 layers, high building 88 layers, overall height is 438 meters.Structure types is huge post framework-Core Walls Structure-cantilever truss structure system.B1 is mainly used in business, hotel's shipping and equipment, and interlayer is that hotel's logistics is used, and two layers, underground is for apartment property shipping, parking and the equipment of handling official business, and F3/B3 and four layers, underground are for stopping and equipment.Podium 4 layers is primarily of the formation such as market, conference centre.High building part is made up of entrance hall, conference centre, senior office, apartment, hotel, sightseeing facility and refuge story.
Based on the serial global design of center, Wuhan high building, various piece is needed to connect, adopt mega-frame-Core Walls Structure-cantilever truss structure system, it is the one of mega-structure system, this just needs to design to meet the requirements, and have the structural column of enough support forces, need the realization considering factory process technique simultaneously.
Summary of the invention
Goal of the invention: in order to solve the problems of the prior art, the invention provides a kind of huge many brackets steel framework post and preparation method thereof.
Technical scheme: to achieve these goals, one of the present invention huge many brackets steel framework post, comprising: steel column, annular horizontal stiffening rib, H type bracket, corbel in box beam, endless belt truss bracket; Described steel column comprises: top steel column, middle part steel column and bottom steel column, and three steel columns are welded into the main body of colossal column mutually; Described annular horizontal stiffening rib is welded in the inside of steel column of H type bracket, corbel in box beam, endless belt truss bracket and steel column intersection, and every block annular horizontal stiffening rib annular has hole; The vertical welding equipment of described H type bracket, in the upper, middle and lower of steel column, is respectively from top to down: large H type bracket, little H type bracket, middle H type bracket; The vertical welding equipment of described corbel in box beam, in the middle part of steel column, is box-type section; The vertical welding equipment of described endless belt truss bracket is in the bottom of steel column, and every side ring band truss bracket is converted into V-arrangement by two box-type members.
Huge many brackets steel framework post of the present invention, material adopts Q345B, and radius-thickness ratio is all greater than 33, meets the requirement that specification adopts cold coiling technique, steel pipe processing adopts compacting and rolls the method combined, to reduce surface of steel plate Indentation Damage and to suppress the excessive situation of internal stress.
The invention also discloses a kind of preparation method of huge many brackets steel framework post, the concrete steps of the method are as follows:
(1) part blanking cutting, blanking adopts material to be the steel plate of Q345B, and radius-thickness ratio all requires to be greater than 33; Adopt numerical control vertical bar cutting machine to carry out precise blanking cutting, diameter of steel tube should be reduced 2-3mm before processing and launch to carry out unfolding and cutting; By computer lofting in this step, huge many brackets steel framework post is divided into corresponding part component;
(2) steel plate pressure head precompressed: steel pipe adopts compacting and rolls the method combined, puts into hydraulic press and carries out volume pressure by steel plate; Install according to the linear making pressing mold of the curved surface of Taper Pipe, adopt hydraulic press to carry out steel plate both ends pressure head, steel plate end compacting number of times at least presses three times, first presses once within the scope of the 150mm of steel plate end, then weight secondary within the scope of 300mm;
(3) surplus and groove is cut after pre-bending;
(4) steel pipe segment joint machine-shaping;
(5) cylinder section joint longitudinal joint interior welds: after steel pipe column molding, leave certain longitudinal joint gap, first carry out interior welds;
(6) cylinder section joint longitudinal joint outside weldings: after steel pipe column interior welds completes, carry out outside weldings;
(7) cylinder section joint postwelding roll extrusion rectification again;
(8) arrange assembling jig frame: set up moulding bed template, the horizontal absolute altitude error of template upper surface must not be greater than 1mm, overproofly must revise;
(9) cylinder section saves inner stiffening diaphragm assembly welding;
(10) cylinder section joint docking spreading and girth welding: this structural iron tubing string is welded by three sections, after one section of steel pipe column is made, makes another two sections of steel pipe columns by method same above, finally the section of completing joint docking spreading and girth welding;
(11) steel column end face carries out end mill processing;
(12) stiffening rib, H type bracket, corbel in box beam, endless belt truss bracket installation site line in annular is marked in steel column location;
(13) stiffening rib, H type bracket, corbel in box beam, endless belt truss bracket installation site line in assembly welding annular: stiffening rib in all annulars of assembly welding, H type bracket, corbel in box beam, endless belt truss bracket;
(14) assembling all the other H type brackets, corbel in box beam, endless belt truss bracket installation site line is stood up;
(15) integral solder and detection.
Preparation method of the present invention, solves the problem of factorial praluction, greatly accelerates the progress of making, shortens the duration, and reasonably manufacturing process steps decreases assembling, the difficulty of welding and workload simultaneously, convenient making, and minimizing is done over again, and improves work efficiency.
In the present invention, steel pipe vertical seam welding method is: before welding, butt welded seam both sides 100mm scope carries out preheating, preheating adopts the preheating of ceramic electric heating plate, preheat temperature 100 ~ 150 DEG C, barrel soldering adopts automatic welding of cylinder body connect center or carry out with on automatic welding moulding bed, and in cylindrical shell, outside all adopts automatic submerged arc welding to weld.
In the present invention, steel column cylindrical shell antidote is: correct and adopt plate bending rolls and flame heating to correct, and when error occurs bigger than normal, upper plate bending rolls adopts rolling process repeatedly to correct.
Median septum assembling and welding method of the present invention is: after the welding of cylindrical shell segment joint is corrected, and installs the diaphragm of putting more energy in cylindrical shell, namely weld after installation by figure paper size advanced person row, and welding adopts the weldering of CO2 gas shielded to be symmetrically welded, and postwelding carries out local and corrects.
The method of middle cylinder body butt joint ring of the present invention seam welding is: the cylinder section joint welding internal partition is carried out docking spreading on horizontal moulding bed, then adopts barrel soldering center on roller moulding bed, carry out the submerged arc welding of circumferential weld, postwelding carries out local and corrects.
In the present invention, steel column end face end mill processing method is: the machine of steel column end face adopts mechanical driver unit to carry out facing cut processing, by the end face machine to steel column, makes the guarantee of steel column both ends of the surface parallel and mutually vertical with steel column axial line.
In the present invention, floor bracket assembling and welding method is: floor bracket is installed and must carry out assembling location and welding on assembly platform; welding adopts the weldering of CO2 gas shielded to be symmetrically welded, the strict control relative position of bracket and the distance of verticality and High-strength bolt hole group and casing center line.
Beneficial effect: tool of the present invention has the following advantages:
1, a kind of huge pattern of many brackets steel framework post of the present invention and the design of sectional dimension, while guarantee steel plate shear force wall post bearing capacity, improve the performance of structure to greatest extent, simplify steel column mechanism simultaneously, improve factory process efficiency, shorten the process-cycle.
2, preparation method of the present invention, solves the problem of factorial praluction, greatly accelerates the progress of making, shorten the duration, reasonably manufacturing process steps decreases assembling, the difficulty of welding and workload simultaneously, convenient making, minimizing is done over again, and improves work efficiency.
3, overall reasonably assembling sequence, welding sequence and welding method in the present invention, further ensure the quality of the shearing wall column produced.
accompanying drawing explanation
Fig. 1 is the schematic diagram of huge many brackets steel framework post of the present invention.
Fig. 2 is the axonometric drawing of huge many brackets steel framework post of the present invention.
Fig. 3 is the top view of huge many brackets steel framework post of the present invention.
Fig. 4 is left view in huge many brackets steel framework post of the present invention.
Fig. 5 is elevation in huge many brackets steel framework post of the present invention.
Detailed description of the invention
Embodiment
The huge many brackets steel framework of one as Figure 1-4 post, comprising: steel column 1, annular horizontal stiffening rib 2, H type bracket 3, corbel in box beam 4, endless belt truss bracket 5; Described steel column 1 comprises: top steel column 11, middle part steel column 12 and bottom steel column 13, three steel columns are welded into colossal column mutually; Described annular horizontal stiffening rib 2 totally 8 pieces, the steel column 1 being welded in bracket 3,4,5 and steel column 1 intersection at a certain distance with quantity is inner, and every 8, block annular horizontal stiffening rib 2 circular openings hole; The vertical welding equipment of described H type bracket 3, in the top of steel column 1, middle part, bottom, by the section constitution of three kinds of different sizes, comprising: large H type bracket 31, little H type bracket 32, middle H type bracket 33; The vertical welding equipment of described corbel in box beam 4, in the middle part of steel column 1, is box-type section; The vertical welding equipment of described endless belt truss bracket 5 is in the bottom of steel column 1, and every side ring band truss bracket 5 is converted into certain angle by two box-type members and forms, V-shaped.
The invention also discloses a kind of preparation method of huge many brackets steel framework post, the concrete steps of the method are as follows:
(1) part blanking cutting: by computer lofting, huge many brackets steel framework post is divided into corresponding part component;
(2) steel plate pressure head precompressed: steel pipe adopts compacting and rolls the method combined, puts into hydraulic press and carries out volume pressure by steel plate;
(3) surplus and groove is cut after pre-bending;
(4) steel pipe segment joint machine-shaping;
(5) cylinder section joint longitudinal joint interior welds: after steel pipe column molding, leave certain longitudinal joint gap, first carry out interior welds;
(6) cylinder section joint longitudinal joint outside weldings: after steel pipe column interior welds completes, carry out outside weldings;
(7) cylinder section joint postwelding roll extrusion rectification again;
(8) arrange assembling jig frame: set up moulding bed template, the horizontal absolute altitude error of template upper surface must not be greater than 1mm, overproofly must revise;
(9) cylinder section saves inner stiffening diaphragm assembly welding;
(10) cylinder section joint docking spreading and girth welding: this structural iron tubing string is welded by three sections, after one section of steel pipe column is made, makes another two sections of steel pipe columns by method same above, finally the section of completing joint docking spreading and girth welding;
(11) steel column end face carries out end mill processing;
(12) stiffening rib, H type bracket, corbel in box beam, endless belt truss bracket installation site line in annular is marked in steel column location;
(13) stiffening rib, H type bracket, corbel in box beam, endless belt truss bracket installation site line in assembly welding annular: stiffening rib in all annulars of assembly welding, H type bracket, corbel in box beam, endless belt truss bracket;
(14) assembling all the other H type brackets, corbel in box beam, endless belt truss bracket installation site line is stood up;
(15) integral solder and detection;
For strengthening the quality of steel framework post processing and fabricating, its technological work main points and technical measures as follows:
(1) blanking cutting: adopt numerical control vertical bar cutting machine to carry out precise blanking cutting, because steel pipe column steel plate is thicker, change at the elongation per unit length of pressing process light plate, the diameter processing rear cylinder body directly can be caused bigger than normal, launch to carry out unfolding and cutting so diameter of steel tube should be reduced 2-3mm before processing;
(2) pre-bending pressure head: install according to the linear making pressing mold of the curved surface of Taper Pipe, hydraulic press is adopted to carry out steel plate both ends pressure head, steel plate end compacting number of times at least presses three times, first press once within the scope of the 150mm of steel plate end, then weight secondary within the scope of 300mm, to reduce the elasticity of steel plate, prevent head from losing circle, check with model after compacting;
(3) shell rolling: shell rolling adopts the machine-shaping of special steel pipe numerical control plate bending roll.Counterpart misalignment allowable variation≤1.5mm, pipe end ovality allowable variation≤3mm;
(4) steel pipe vertical seam welding: before welding, butt welded seam both sides 100mm scope carries out preheating, preheating adopts the preheating of ceramic electric heating plate, preheat temperature 100 ~ 150 DEG C, barrel soldering adopts automatic welding of cylinder body connect center or carry out with on automatic welding moulding bed, and in cylindrical shell, outside all adopts automatic submerged arc welding to weld;
(5) cylindrical shell is corrected: all need to adopt special sample to carry out checking the shaping of cylindrical shell in cylindrical shell process with after machine-shaping and longitudinal seam welding, processing model adopts 2-3mm corrosion resistant plate to make, and often saves the inspection model that cylindrical shell application is no less than three positions and checks.When indivedual tube coupling does not reach above requirement, must correct, correct and adopt plate bending rolls and flame heating to correct.Time as bigger than normal in error appearance, upper plate bending rolls adopts rolling process repeatedly to correct;
(6) dividing plate assembly welding: after the welding of cylindrical shell segment joint is corrected, installs the diaphragm of putting more energy in cylindrical shell, namely welds after installation by figure paper size advanced person row, welding adopts the weldering of CO2 gas shielded to be symmetrically welded, and postwelding carries out local and corrects.
(7) cylindrical shell butt joint ring seam welding: the cylinder section joint welding internal partition is carried out docking spreading on dedicated leveling moulding bed, then adopts barrel soldering center to carry out the submerged arc welding of circumferential weld on roller moulding bed, postwelding carries out local and corrects;
(8) steel column end face end mill processing: the machine of steel column end face adopts mechanical driver unit to carry out facing cut processing, by the end face machine to steel column, make the guarantee of steel column both ends of the surface parallel and mutually vertical with steel column axial line, accurately control the length dimension of steel column simultaneously;
(9) floor bracket assembly welding: floor bracket is installed and must carry out assembling location and welding on dedicated set assembling platform; welding adopts the weldering of CO2 gas shielded to be symmetrically welded, the strict control relative position of bracket and the distance of verticality and High-strength bolt hole group and casing center line.
The tolerance that in the preparation method of the present embodiment, rational assemble method and assembling sequence can cause each parts machining or cumulative limit are repaired in time, thus ensure the total quality of structure, therefore, adopt which kind of assemble method and assembling sequence particularly important to the quality of engineering.

Claims (8)

1. huge many brackets steel framework post, is characterized in that: comprising: steel column (1), annular horizontal stiffening rib (2), H type bracket (3), corbel in box beam (4), endless belt truss bracket (5);
Described steel column (1) comprising: top steel column (11), middle part steel column (12) and bottom steel column (13), and three steel columns are welded into the main body of colossal column mutually;
Described annular horizontal stiffening rib (2) is welded in the inside of steel column (1) of H type bracket (3), corbel in box beam (4), endless belt truss bracket (5) and steel column (1) intersection, and every block annular horizontal stiffening rib (2) annular has hole;
The vertical welding equipment of described H type bracket (3), in the upper, middle and lower of steel column (1), is respectively from top to down: large H type bracket (31), little H type bracket (32), middle H type bracket (33);
The vertical welding equipment of described corbel in box beam (4), in the middle part of steel column (1), is box-type section;
The vertical welding equipment of described endless belt truss bracket (5) is in the bottom of steel column (1), and every side ring band truss bracket (5) is converted into V-arrangement by two box-type members.
2. a preparation method for huge many brackets steel framework post, is characterized in that: the concrete steps of the method are as follows:
(1) part blanking cutting, blanking adopts material to be the steel plate of Q345B, and radius-thickness ratio all requires to be greater than 33; Adopt numerical control vertical bar cutting machine to carry out precise blanking cutting, diameter of steel tube should be reduced 2-3mm before processing and launch to carry out unfolding and cutting;
(2) steel plate pressure head precompressed: install according to the linear making pressing mold of the curved surface of Taper Pipe, hydraulic press is adopted to carry out steel plate both ends pressure head, steel plate end compacting number of times at least presses three times, first presses once within the scope of the 150mm of steel plate end, then weight secondary within the scope of 300mm;
(3) surplus and groove is cut after pre-bending;
(4) steel pipe segment joint machine-shaping;
(5) cylinder section joint longitudinal joint interior welds;
(6) cylinder section joint longitudinal joint outside weldings;
(7) cylinder section joint postwelding roll extrusion rectification again;
(8) assembling jig frame is set;
(9) cylinder section saves inner stiffening diaphragm assembly welding;
(10) cylinder section joint docking spreading and girth welding;
(11) steel column end face carries out end mill processing;
(12) stiffening rib, H type bracket, corbel in box beam, endless belt truss bracket installation site line in annular is marked in steel column location;
(13) stiffening rib, H type bracket, corbel in box beam, endless belt truss bracket installation site line in assembly welding annular;
(14) assembling all the other H type brackets, corbel in box beam, endless belt truss bracket installation site line is stood up;
(15) integral solder and detection.
3. the preparation method of a kind of huge many brackets steel framework post according to claim 2, it is characterized in that: in described method, steel pipe vertical seam welding method is: before welding, butt welded seam both sides 100mm scope carries out preheating, preheating adopts the preheating of ceramic electric heating plate, preheat temperature 100 ~ 150 DEG C, barrel soldering adopts automatic welding of cylinder body connect center or carry out with on automatic welding moulding bed, and in cylindrical shell, outside all adopts automatic submerged arc welding to weld.
4. the preparation method of a kind of huge many brackets steel framework post according to claim 2, it is characterized in that: in described method, steel column cylindrical shell antidote is: correct and adopt plate bending rolls and flame heating to correct, when error occurs bigger than normal, upper plate bending rolls adopts rolling process repeatedly to correct.
5. the preparation method of a kind of huge many brackets steel framework post according to claim 2; it is characterized in that: described method median septum assembling and welding method is: after the welding of cylindrical shell segment joint is corrected; diaphragm of putting more energy in cylindrical shell is installed by figure paper size advanced person row; namely weld after installation; welding adopts the weldering of CO2 gas shielded to be symmetrically welded, and postwelding carries out local and corrects.
6. the preparation method of a kind of huge many brackets steel framework post according to claim 2, it is characterized in that: the method for described method middle cylinder body butt joint ring seam welding is: the cylinder section joint welding internal partition is carried out docking spreading on horizontal moulding bed, then adopt barrel soldering center on roller moulding bed, carry out the submerged arc welding of circumferential weld, postwelding carries out local and corrects.
7. the preparation method of a kind of huge many brackets steel framework post according to claim 2, it is characterized in that: in described method, steel column end face end mill processing method is: the machine of steel column end face adopts mechanical driver unit to carry out facing cut processing, by the end face machine to steel column, make the guarantee of steel column both ends of the surface parallel and mutually vertical with steel column axial line.
8. the preparation method of a kind of huge many brackets steel framework post according to claim 2; it is characterized in that: in described method, floor bracket assembling and welding method is: floor bracket is installed and must carry out assembling location and welding on assembly platform; welding adopts the weldering of CO2 gas shielded to be symmetrically welded, the strict control relative position of bracket and the distance of verticality and High-strength bolt hole group and casing center line.
CN201410461857.3A 2014-09-12 2014-09-12 A kind of huge many brackets steel framework post and preparation method thereof Active CN104264900B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410461857.3A CN104264900B (en) 2014-09-12 2014-09-12 A kind of huge many brackets steel framework post and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410461857.3A CN104264900B (en) 2014-09-12 2014-09-12 A kind of huge many brackets steel framework post and preparation method thereof

Publications (2)

Publication Number Publication Date
CN104264900A true CN104264900A (en) 2015-01-07
CN104264900B CN104264900B (en) 2016-08-24

Family

ID=52156462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410461857.3A Active CN104264900B (en) 2014-09-12 2014-09-12 A kind of huge many brackets steel framework post and preparation method thereof

Country Status (1)

Country Link
CN (1) CN104264900B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105382491A (en) * 2015-11-26 2016-03-09 上海建工(江苏)钢结构有限公司 Machining, manufacturing and inspection method of arc-shaped steel pipe column
CN107035069A (en) * 2017-06-08 2017-08-11 浙江东南网架股份有限公司 A kind of major-diameter thick-wall steel pipe column and preparation method thereof
CN107178149A (en) * 2017-06-27 2017-09-19 中国建筑第八工程局有限公司 Fork-shaped steel reinforced concrete combining structure and its construction method
CN109604980A (en) * 2018-11-08 2019-04-12 武汉船用机械有限责任公司 A kind of manufacturing method of long cylindrical mould structural member
CN113958141A (en) * 2021-10-30 2022-01-21 中冶(上海)钢结构科技有限公司 Spatial position positioning method for special-shaped bracket of tubular column
CN114633114A (en) * 2022-03-03 2022-06-17 中国一冶集团有限公司 Special-shaped reducing circular tube butt joint and machining and manufacturing method
CN114714051A (en) * 2022-04-19 2022-07-08 中国一冶集团有限公司 Manufacturing method of cow leg column
CN115095081A (en) * 2022-06-28 2022-09-23 中建三局集团有限公司 Manufacturing method and structure of section steel column with arc-shaped plates and giant diagonal bracing
CN118143496A (en) * 2024-05-09 2024-06-07 四川欧贝机械科技有限公司 Welding device for high-tightness large-caliber pipe

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0813691A (en) * 1994-06-23 1996-01-16 Nkk Corp Steel pipe column with box section
JP2008308876A (en) * 2007-06-14 2008-12-25 Nippon Steel & Sumikin Metal Products Co Ltd Square steel tube for core of beam-column joint, and its manufacturing method
KR20090042121A (en) * 2007-10-24 2009-04-29 최진욱 Concrete filled steel tube and it's manufacturing method
CN102493600A (en) * 2011-11-18 2012-06-13 江苏沪宁钢机股份有限公司 Cross-box-shaped composite steel column and manufacturing method thereof
CN202483069U (en) * 2011-11-18 2012-10-10 江苏沪宁钢机股份有限公司 Cross round tube combination steel column
CN203429888U (en) * 2013-07-24 2014-02-12 江苏沪宁钢机股份有限公司 Large 'mesh'-shaped thick plate combined box column
CN204081262U (en) * 2014-09-12 2015-01-07 江苏沪宁钢机股份有限公司 A kind of huge many brackets steel framework post

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0813691A (en) * 1994-06-23 1996-01-16 Nkk Corp Steel pipe column with box section
JP2008308876A (en) * 2007-06-14 2008-12-25 Nippon Steel & Sumikin Metal Products Co Ltd Square steel tube for core of beam-column joint, and its manufacturing method
KR20090042121A (en) * 2007-10-24 2009-04-29 최진욱 Concrete filled steel tube and it's manufacturing method
CN102493600A (en) * 2011-11-18 2012-06-13 江苏沪宁钢机股份有限公司 Cross-box-shaped composite steel column and manufacturing method thereof
CN202483069U (en) * 2011-11-18 2012-10-10 江苏沪宁钢机股份有限公司 Cross round tube combination steel column
CN203429888U (en) * 2013-07-24 2014-02-12 江苏沪宁钢机股份有限公司 Large 'mesh'-shaped thick plate combined box column
CN204081262U (en) * 2014-09-12 2015-01-07 江苏沪宁钢机股份有限公司 A kind of huge many brackets steel framework post

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105382491A (en) * 2015-11-26 2016-03-09 上海建工(江苏)钢结构有限公司 Machining, manufacturing and inspection method of arc-shaped steel pipe column
CN105382491B (en) * 2015-11-26 2017-05-31 上海建工(江苏)钢结构有限公司 The processing and fabricating and the method for inspection of arc-shaped steel tubing string
CN107035069A (en) * 2017-06-08 2017-08-11 浙江东南网架股份有限公司 A kind of major-diameter thick-wall steel pipe column and preparation method thereof
CN107178149A (en) * 2017-06-27 2017-09-19 中国建筑第八工程局有限公司 Fork-shaped steel reinforced concrete combining structure and its construction method
CN109604980A (en) * 2018-11-08 2019-04-12 武汉船用机械有限责任公司 A kind of manufacturing method of long cylindrical mould structural member
CN113958141A (en) * 2021-10-30 2022-01-21 中冶(上海)钢结构科技有限公司 Spatial position positioning method for special-shaped bracket of tubular column
CN114633114A (en) * 2022-03-03 2022-06-17 中国一冶集团有限公司 Special-shaped reducing circular tube butt joint and machining and manufacturing method
CN114714051A (en) * 2022-04-19 2022-07-08 中国一冶集团有限公司 Manufacturing method of cow leg column
CN115095081A (en) * 2022-06-28 2022-09-23 中建三局集团有限公司 Manufacturing method and structure of section steel column with arc-shaped plates and giant diagonal bracing
CN118143496A (en) * 2024-05-09 2024-06-07 四川欧贝机械科技有限公司 Welding device for high-tightness large-caliber pipe
CN118143496B (en) * 2024-05-09 2024-08-06 四川欧贝机械科技有限公司 Welding device for high-tightness large-caliber pipe

Also Published As

Publication number Publication date
CN104264900B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN104264900B (en) A kind of huge many brackets steel framework post and preparation method thereof
CN204081262U (en) A kind of huge many brackets steel framework post
CN104264789B (en) The connection node of crossing net lattice structure, jig frame special and preparation method thereof
CN105604187A (en) Beam-column node connecting device for assembled steelwork
CN102535642B (en) Assembling type node of spatial freeform curved latticed shell steel structure and assembling method of assembling type node
CN204703182U (en) Crab-bolt stock
CN106351462B (en) Temporary steel pipe support prestress reinforcing structure and construction method thereof
CN100484700C (en) Automatic manufacturing technique of large sized steel pipe
CN203853406U (en) Tool used for correcting welding joint of pressure steel pipe
CN202655402U (en) Device for adjusting roundness of penstock and supporting penstock
CN203867158U (en) Cantilever type scaffold structure with positioning plug for fixation
CN203334547U (en) Field butt joint structure of concrete filled steel tubular column
CN106736271A (en) A kind of preparation method of rolling/compacting rectangle steel tubing string
CN104278800A (en) Assembly type steel pipe concrete column connection structure
CN201560398U (en) Inner steel mould for accurately positioning tower column cable sleeves of cable-stayed bridge
CN109083401B (en) Template erection method and template structure for joint of cylindrical beam and frame beam
CN104196172A (en) Crescent-shaped truss and manufacturing method thereof
CN108661301B (en) Modular assembly platform for vertical frames of well frames and use method
CN104060689A (en) Triangular section bending component, special molding bed and processing method thereof
CN204139694U (en) Inner wall belt strengthens the steel pipe king-post of structure
CN203145481U (en) Manufacturing and positioning device of variable-angle steel pipe column splicing ear plate
CN103334584B (en) Template regulating system for sliding form system
CN103243910B (en) Hydraulic pressure controlled reinforced concrete structure bed die vertical supporting system and construction method thereof
CN202780329U (en) Three-dimensional adjusting structure for butt-jointing welding pieces
CN101837387A (en) Automated manufacturing method and production line design of large-scale steel tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 214200 Baijia village, Zhangzhu Town, Yixing City, Wuxi City, Jiangsu Province

Patentee after: JIANGSU HUNING STEEL MECHANISM Co.,Ltd.

Address before: 214200 Baijia village, Zhangzhu Town, Yixing City, Suzhou City, Jiangsu Province

Patentee before: JIANGSU HUNING STEEL MECHANISM Co.,Ltd.