CN104264865A - 装配式防火墙 - Google Patents
装配式防火墙 Download PDFInfo
- Publication number
- CN104264865A CN104264865A CN201410500084.5A CN201410500084A CN104264865A CN 104264865 A CN104264865 A CN 104264865A CN 201410500084 A CN201410500084 A CN 201410500084A CN 104264865 A CN104264865 A CN 104264865A
- Authority
- CN
- China
- Prior art keywords
- wall
- column
- support column
- firewall
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Building Environments (AREA)
Abstract
本发明提供一种装配式防火墙,包括多个基础,还包括多个竖直布置的支撑柱,以及多个墙体梁和底部设有第一凹槽的墙顶梁;基础为现浇杯口式结构,支撑柱由下往上依次由基底柱、中柱或边柱组成;中柱相对的两个侧面设有用于安装墙体梁的工字形槽;边柱的一个侧面设有第二凹槽;墙体梁的两端分别与相邻的两个支撑柱的中部连接;墙顶梁的两端分别与相邻的两个支撑柱的柱顶连接;还包括与支撑柱外壁连接的墙板。本发明的防火墙施工方便,提高了支撑柱的整体性,保证安装方便及节点整体性,减少了节点数量及安装工序,提高了整体结构的安全可靠性,提高了工作效率,缩短工期,且有利于现场安全文明施工的管理。
Description
【技术领域】
本发明涉及变电站变压器技术领域,特别涉及一种装配式防火墙。
【背景技术】
变电站主变防火墙通常采用框架+填充墙结构。这种结构施工时脚手架及模板工程量大,相对于防火墙本体工程量比重偏高,且施工工期长,施工占地范围大,影响主变安装,对周围环境影响较大。
因此,设计一种安全可靠、施工方便、现场安装工期短的防火墙结构显得十分必要。
【发明内容】
有鉴于此,为克服现有技术的不足,本发明提供一种安全可靠、施工方便、现场安装工期短的装配式防火墙。
为实现上述目的,本发明提供的装配式防火墙,其特征在于:包括多个基础,还包括多个竖直布置的支撑柱,以及多个水平布置的墙体梁和底部设有第一凹槽的墙顶梁;
所述基础为现浇杯口式结构,所述支撑柱由下往上依次由基底柱、中柱或边柱组成,所述基底柱置于基础的杯口内,基底柱的横截面为矩形;所述中柱相对的两个侧面设有用于安装墙体梁的工字形槽;所述边柱的一个侧面设有用于安装墙体梁或墙顶梁的第二凹槽;
所述墙体梁为预制钢筋混凝土结构;所述墙体梁的两端分别与相邻的两个支撑柱的中部连接;
所述墙顶梁为为预制钢筋混凝土结构;所述墙顶梁的两端分别与相邻的两个支撑柱的柱顶连接;
还包括与支撑柱外壁连接的墙板,所述墙板包括由上往下依次连接的第一墙板和多个第二墙板,所述第一墙板还与墙顶梁的底部连接。
作为优选方案,所述第一墙板的顶部设有第一凸缘,第一墙板的底部设有第一卡槽,每个第二墙板的顶部设有第二凸缘,每个第二墙板的底部设有第二卡槽;所述第一凸缘置于第一凹槽内,第二凸缘至于第一卡槽内。
进一步地,还包括多个水平方向布置且与支撑柱连接的地梁,所述一个地梁的两端分别置于相邻两个基础的杯口处;所述杯口的口沿部还设有焊接钢筋网。
更进一步地,所述支撑柱柱顶预留用于节点现浇的墙顶梁高度空间,支撑柱柱顶的纵向钢筋预留按锚固要求的锚固长度。
与现有技术相比,本发明的装配式防火墙至少具有以下优点:
(a)基础与支撑柱连接采用杯口基础方案,受力合理,施工方便。
(b)综合结构的特点及施工安装要求,支撑柱采用整体预制结构,提高支撑柱的整体性,支撑柱与梁节点部位采用预留钢筋、湿连接节点等形式与墙体梁和墙顶梁连接,保证安装方便及节点整体性,减少节点数量及安装工序。
(c)墙体梁预制后直接置于基础顶面,预制、施工均很方便,方案成熟合理。
(d)墙顶梁采用分段预制,节点处现浇构件,整体性强,安装方便。梁柱节点区域后浇,以方便梁、柱钢筋锚固,保证梁柱的整体性,提高结构的安全可靠性。
(e)工厂化加工制作,现场安装,提高工作效率,缩短工期,且有利于现场安全文明施工管理。结构构件预制一次成型,外观质量达到清水混凝土标准,安装工艺美观,投运后,后期免维护。
【附图说明】
图1是本发明装配式防火墙的结构示意图。
图2是本发明装配式防火墙一个局部结构示意图。
图3是本发明装配式防火墙的另一个局部结构示意图
图4是本发明墙顶梁截面结构示意图。
图5是本发明中柱与墙体梁连接的横截面结构示意图。
图6是本发明边柱与墙体梁连接的横截面结构示意图。
图7是本发明的墙顶梁与中柱、边柱连接的结构示意图。
图8是本发明墙板、墙顶梁的连接结构示意图。
图中:基础1,杯口11,支撑柱2,基底柱21、中柱22,工字形槽220,边柱23,第二凹槽230,墙体梁3,墙顶梁4,第一凹槽40,墙板5,第一墙板51,第一卡槽510,第一凸缘511,第二墙板52,第二卡槽520,第二凸缘521,焊接钢筋网6,地梁7。
【具体实施方式】
为了更好地理解本发明,以下将结合附图和具体实例对本发明进行详细的说明。
如图所示,装配式防火墙,其特征在于:包括多个基础1,还包括多个竖直布置的支撑柱2,以及多个水平布置的墙体梁3和底部设有第一凹槽40的墙顶梁4;
基础1为现浇杯口式结构,支撑柱2由下往上依次由基底柱21、中柱22或边柱23组成,基底柱21置于基础1的杯口11内,基底柱21的横截面为矩形;中柱22相对的两个侧面设有用于安装墙体梁3的工字形槽220;边柱23的一个侧面设有用于安装墙体梁3或墙顶梁4的第二凹槽230;墙体梁3为预制钢筋混凝土结构;墙体梁3的两端分别与相邻的两个支撑柱2的中部连接;墙顶梁4为为预制钢筋混凝土结构;墙顶梁4的两端分别与相邻的两个支撑柱2的柱顶连接;
还包括与支撑柱2外壁连接的墙板5,墙板5包括由上往下依次连接的第一墙板51和多个第二墙板52,第一墙板51还与墙顶梁4的底部连接。
第一墙板51的顶部设有第一凸缘511,第一墙板51的底部设有第一卡槽510,每个第二墙板52的顶部设有第二凸缘521,每个第二墙板52的底部设有第二卡槽520;第一凸缘511置于第一凹槽40内,第二凸缘521至于第一卡槽510内。还包括多个水平方向布置且与支撑柱2连接的地梁7,一个地梁7的两端分别置于相邻两个基础1的杯口11处;杯口11的口沿部还设有焊接钢筋网6。
支撑柱2柱顶预留用于节点现浇的墙顶梁4高度空间,支撑柱2柱顶的纵向钢筋预留按锚固要求的锚固长度。
本发明的构件做法如下:
(1)支撑柱的做法:
支撑柱采用基底柱~墙顶全段整体预制方式,支撑柱高约9m,基底柱~±0.000采用矩形截面;中柱:±0.000~墙顶以上采用工字型截面,边柱:±0.000~墙顶以上采用槽型截面;工字型及槽型支撑柱凹槽用于安装梁、墙板。支撑柱柱顶预留顶梁高范围用于节点现浇,支撑柱柱顶纵向钢筋按锚固要求预留锚固长度,现浇节点时锚入梁内。
(2)支撑柱与基础连接方式
基础采用现浇杯口式结构,支撑柱下端的基底柱插入杯口后用细石混凝土浇灌。
(3)梁支撑柱节点处理方式
防火墙在2个标高处设置预制梁,分别为墙体梁和墙顶梁,两种梁分别采用两种施工方式。
墙体梁采用预制钢筋混凝土结构,安装于基础杯口处。支撑柱安装就位、基础回填后,将预制墙体梁置于基础杯口上。墙体梁计算时按简支梁考虑,不参与结构的整体计算,仅作为墙板的支撑。
墙顶梁以支撑柱为节点采用分段预制梁,安装时梁、支撑柱钢筋按抗震要求锚固至节点区,梁、支撑柱节点混凝土在以上工作完成后浇筑。
(4)墙板做法
墙板采用预制钢筋混凝土墙板,厚度取180mm,采用预制钢筋混凝土板结构。墙板施工时吊装至支撑柱顶,对准支撑柱中柱或边柱预留插槽装入设计位置并调整竖直后填缝固定。墙板及墙顶梁的底部均预留凹槽,墙板的底部预留凸缘,安装时凸缘插入凹槽内,并采用防火泥进行填充,以保证墙和墙之间、墙和梁之间的密封性能。安装时要求保证施工精度,构件之间不发生碰撞,防止对结构产生损伤。
本发明防火墙的施工工艺如下:
1、支撑柱的吊装
支撑柱采用轮胎式25吨吊车(或以上吨位吊车)单点起吊就位安装,吊点设置在距顶端1/3的位置。
2、防火墙杯口型基础施工
工程开工后,首先进行防火墙杯口型基础施工,基础质量应满足施工图纸和混凝土结构工程施工质量验收规范(GB50204)的要求。
基础完工后,杯底应进行找平。用1∶2水泥砂浆或细石混凝土按设计杯底进行找平。
3、防火墙构件预制加工
防火墙构件(包括支撑柱、墙板、墙体梁、墙顶梁)均采用定制钢模板加工制作而成,其加工制作工艺如下:
(1)清洁模具。将模具的内外用小铲刀铲净,保持模具清洁,用胶带堵住模具气嘴,在模具内壁以及底面均匀刷薄层脱模剂。
(2)裁剪玻璃网格布和焊接钢网。对于不同规格的模具,裁剪玻璃网格布的长宽均应比模具小50mm。
(3)配料。按照配料表分别称取普通硅酸盐水泥、砂,水,纤维,减水剂等。
(4)干料搅拌。把称量好除水之外的所有物料加入到搅拌机内,干搅1~1.5min。
(5)加水搅拌。把称好的水加入到搅拌机内一起搅拌3min以上,使物料混合均匀。
(6)送料、分料。下料的速度以及分料由红外摄像探头监控,下料期间搅拌机应一直搅拌,直到搅拌机内的物料下完为止。
(7)混凝土通过下料口流入模具,布料分层进行振动密实,每层厚度150mm为宜,每层振动3min,最后一层振动完成后,对表面进行抹光。
(8)拆模前的养护。把成型好的构件放入蒸汽房中养护(温度20~30℃,相对湿度大于80%),一直养护到规定的时间送往脱模工段,养护时间不少于10h,可根据实际情况调整。
(9)脱模。养护好的构件拖入到脱模工段脱模。
(10)拆模后的养护。脱模后放置30min,然后放入蒸汽室内温度保持不低于55℃,湿度大于85%以上养护72h,然后即可检验入库。
(11)检验,入库。产品入库前进行以下检验:尺寸,颜色,表面平整度,棱角缺失等。
4、防火墙支撑柱安装
(1)防火墙支撑柱采用吊车进行吊装。支撑柱采用轮胎式25吨吊车(或以上吨位吊车)单点起吊就位安装,吊点设置在距顶端1/3的位置。
(2)支撑柱的就位和临时固定。支撑柱起吊后,让支撑柱的基底柱移至杯口上空后渐渐插入杯口。支撑柱的基底柱插入杯口后,当支撑柱的基底柱接近杯底时,先进行悬空对位,用木楔块从支撑柱的四边插入杯口,并用撬棍撬动支撑柱的基底柱,使支撑柱身安装中心线对准杯口安装中心线,并使支撑柱身基本保持垂直,即可落钩,将支撑柱的基底柱放置杯底,并复查中线对位。复查无误后,同时在支撑柱的两侧面对面均匀打紧四周楔块,并通过缆风绳使支撑柱临时固定。
(3)支撑柱的校正。支撑柱的校正有三个内容:平面位置校正、垂直度校正、标高校正。标高校正在基础准备中杯底超平已进行。平面位置校正在吊装时支撑柱与杯口对位时进行。校正支撑柱子垂直度需用两台经纬仪从支撑柱的相邻两面同时观测。测出的实际偏差值大于允许偏差时,应进行校正。垂直度偏差较小时,可以用敲打楔块法校正,当垂直度偏差较大时,可以用千斤顶校正及缆风绳校正。
(4)固定。防火墙支撑柱校正完后,加紧木楔,固定缆风绳,使防火墙支撑柱形成稳定体系。并应立即进行二次浇灌。在支撑柱的基底柱与杯口的空隙中浇筑比支撑柱身混凝土强度等级高一级的细石混凝土。浇筑分两次进行,第一次浇至楔块底面(即杯深的2/3),待此混凝土强度达到25%设计强度后,拔出楔块,再浇筑混凝土至杯口。待第二次浇筑的混凝土强度达到70%设计强度以后,方可进行下一步吊装作业。
5、防火墙地梁施工
地梁采用预制,安装前进行基础回填,回填完成后将预制地梁支于基础的杯口处,并将地梁的梁端与支撑柱之间75mm空隙采用细石混凝土浇筑。
6、防火墙墙板安装
(1)墙板采用吊车两点起吊,然后将每档墙板由下至上逐块安装到防火墙支撑柱的卡槽内。
(2)安装时,应保持墙板水平,轻挪轻放,防止凹槽边角在吊装过程中破损。墙板就位后,应调整校核其水平度、垂直度,然后用1∶3水泥砂浆将预留槽填缝密实。
7、防火墙墙顶梁安装
(1)墙板安装完成后,即进行墙顶梁安装。安装时,墙顶梁的两端搁置在支撑柱上,搁置长度每边超出支撑柱边100mm。
(2)墙顶梁就位后,通过顶部预留的150mm高度的凹槽,从露出箍筋的中间穿插钢筋,并绑扎,梁支撑柱钢筋按抗震要求锚固。
(3)支撑柱顶预埋铁需按要求进行预埋。叠合层混凝土在以上工作完成后浇筑。使墙顶梁与支撑柱形成一整体,至此装配式防火墙结构施工完成。
8、防火墙填缝勾缝
防火墙抗风支撑柱凹槽侧面缝隙采用1:3水泥砂浆填缝。墙板拼缝、墙板与支撑柱的接缝、压顶与墙板及支撑柱的接缝使用黑色硅硐耐候密封胶勾缝。
9、墙板、支撑柱、压顶涂刷混凝土保护液
防火墙构件安装完后,表面涂刷混凝土保护液,以便提高混凝土的耐久性,并保持表面色泽一致。
10、质量验评
防火墙施工完后,应进行质量验评和质量检查验收。
以上所述实施示例仅表达了本发明的部分实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。
Claims (5)
1.一种装配式防火墙,其特征在于:包括多个基础(1),还包括多个竖直布置的支撑柱(2),以及多个水平布置的墙体梁(3)和底部设有第一凹槽(40)的墙顶梁(4);
所述基础(1)为现浇杯口式结构,所述支撑柱(2)由下往上依次由基底柱(21)、中柱(22)或边柱(23)组成,所述基底柱(21)置于基础(1)的杯口(11)内,基底柱(21)的横截面为矩形;所述中柱(22)相对的两个侧面设有用于安装墙体梁(3)的工字形槽(220);所述边柱(23)的一个侧面设有用于安装墙体梁(3)或墙顶梁(4)的第二凹槽(230);
所述墙体梁(3)为预制钢筋混凝土结构;所述墙体梁(3)的两端分别与相邻的两个支撑柱(2)的中部连接;
所述墙顶梁(4)为为预制钢筋混凝土结构;所述墙顶梁(4)的两端分别与相邻的两个支撑柱(2)的柱顶连接;
还包括与支撑柱(2)外壁连接的墙板(5),所述墙板(5)包括由上往下依次连接的第一墙板(51)和多个第二墙板(52),所述第一墙板(51)还与墙顶梁(4)的底部连接。
2.根据权利要求1所述的装配式防火墙,其特征在于:所述第一墙板(51)的顶部设有第一凸缘(511),第一墙板(51)的底部设有第一卡槽(510),每个第二墙板(52)的顶部设有第二凸缘(521),每个第二墙板(52)的底部设有第二卡槽(520);所述第一凸缘(511)置于第一凹槽(40)内,第二凸缘(521)至于第一卡槽(510)内。
3.根据权利要求1或2所述的装配式防火墙,其特征在于:还包括多个水平方向布置且与支撑柱(2)连接的地梁(7),所述一个地梁(7)的两端分别置于相邻两个基础(1)的杯口(11)处;所述杯口(11)的口沿部还设有焊接钢筋网(6)。
4.根据权利要求1或2所述的装配式防火墙,其特征在于:所述支撑柱(2)柱顶预留用于节点现浇的墙顶梁(4)高度空间,支撑柱(2)柱顶的纵向钢筋预留按锚固要求的锚固长度。
5.根据权利要求3所述的装配式防火墙,其特征在于:所述支撑柱(2)柱顶设有用于节点现浇的的墙顶梁(4)高度空间,支撑柱(2)柱顶的纵向钢筋预留按锚固要求的锚固长度。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410500084.5A CN104264865A (zh) | 2014-09-23 | 2014-09-23 | 装配式防火墙 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410500084.5A CN104264865A (zh) | 2014-09-23 | 2014-09-23 | 装配式防火墙 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104264865A true CN104264865A (zh) | 2015-01-07 |
Family
ID=52156428
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410500084.5A Pending CN104264865A (zh) | 2014-09-23 | 2014-09-23 | 装配式防火墙 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104264865A (zh) |
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105178353A (zh) * | 2015-06-05 | 2015-12-23 | 天津送变电工程公司 | 一种冬施条件下围墙的半逆作法施工工艺 |
| CN106368489A (zh) * | 2016-10-19 | 2017-02-01 | 中国能源建设集团云南省电力设计院有限公司 | 一种主变压器爆炸火灾防护墙 |
| CN106948485A (zh) * | 2017-05-15 | 2017-07-14 | 丰和营造集团股份有限公司 | 一种自保温房屋结构 |
| CN107476649A (zh) * | 2017-08-18 | 2017-12-15 | 国网上海市电力公司 | 一种装配式围墙施工方法 |
| CN108505777A (zh) * | 2017-10-26 | 2018-09-07 | 安徽华电工程咨询设计有限公司 | 装配式变电站新型主变防火墙结构 |
| CN109024650A (zh) * | 2018-08-30 | 2018-12-18 | 重庆华硕建设有限公司 | 一种基础的施工方法 |
| CN109403351A (zh) * | 2018-12-18 | 2019-03-01 | 中建地下空间有限公司 | 一种自卡柱式接头可装配式预制地下连续墙 |
| CN109811933A (zh) * | 2019-02-18 | 2019-05-28 | 河南工业大学 | 一种生态复合墙体及其施工工艺 |
| CN110238962A (zh) * | 2019-06-10 | 2019-09-17 | 山东通发实业有限公司 | 一种新型预制混凝土内墙的制作方法 |
| CN110439146A (zh) * | 2019-07-26 | 2019-11-12 | 江苏禾吉新材料科技有限公司 | 一种装配式墙体 |
| CN110453725A (zh) * | 2019-05-12 | 2019-11-15 | 四川迈铁龙科技有限公司 | 轨道交通装配式内墙 |
| CN111794591A (zh) * | 2020-07-20 | 2020-10-20 | 中铁建工集团有限公司 | 一种全预制混凝土装配式围墙及其施工方法 |
| CN113833115A (zh) * | 2021-09-01 | 2021-12-24 | 广州市房屋开发建设有限公司 | 一种混凝土柱和木结构柱的连接节点及其施做方法 |
| CN114197959A (zh) * | 2021-12-26 | 2022-03-18 | 福建省高华建设工程有限公司 | 一种生态智能组合的围墙 |
| CN119956968A (zh) * | 2025-03-04 | 2025-05-09 | 中方元建设工程集团有限公司 | 一种预制主变防火墙的施工方法 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201695755U (zh) * | 2010-05-26 | 2011-01-05 | 河南省电力公司三门峡供电公司 | 一种混凝土装配式围墙 |
| CN202090628U (zh) * | 2011-05-13 | 2011-12-28 | 四川电力送变电建设公司 | 变电站用预制装配式围墙 |
| CN202249009U (zh) * | 2011-08-04 | 2012-05-30 | 创银(天津)建材有限公司 | 一种装配式围墙 |
| CN203394170U (zh) * | 2013-08-16 | 2014-01-15 | 四川电力建设三公司 | 装配式围墙 |
| CN203821961U (zh) * | 2014-05-12 | 2014-09-10 | 黄贺明 | 一种装配式围墙 |
| CN204139369U (zh) * | 2014-09-23 | 2015-02-04 | 国家电网公司 | 装配式防火墙 |
-
2014
- 2014-09-23 CN CN201410500084.5A patent/CN104264865A/zh active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201695755U (zh) * | 2010-05-26 | 2011-01-05 | 河南省电力公司三门峡供电公司 | 一种混凝土装配式围墙 |
| CN202090628U (zh) * | 2011-05-13 | 2011-12-28 | 四川电力送变电建设公司 | 变电站用预制装配式围墙 |
| CN202249009U (zh) * | 2011-08-04 | 2012-05-30 | 创银(天津)建材有限公司 | 一种装配式围墙 |
| CN203394170U (zh) * | 2013-08-16 | 2014-01-15 | 四川电力建设三公司 | 装配式围墙 |
| CN203821961U (zh) * | 2014-05-12 | 2014-09-10 | 黄贺明 | 一种装配式围墙 |
| CN204139369U (zh) * | 2014-09-23 | 2015-02-04 | 国家电网公司 | 装配式防火墙 |
Cited By (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105178353B (zh) * | 2015-06-05 | 2017-01-11 | 天津送变电工程公司 | 一种冬季施工条件下围墙的半逆作法施工工艺 |
| CN105178353A (zh) * | 2015-06-05 | 2015-12-23 | 天津送变电工程公司 | 一种冬施条件下围墙的半逆作法施工工艺 |
| CN106368489B (zh) * | 2016-10-19 | 2019-03-08 | 中国能源建设集团云南省电力设计院有限公司 | 一种主变压器爆炸火灾防护墙 |
| CN106368489A (zh) * | 2016-10-19 | 2017-02-01 | 中国能源建设集团云南省电力设计院有限公司 | 一种主变压器爆炸火灾防护墙 |
| CN106948485A (zh) * | 2017-05-15 | 2017-07-14 | 丰和营造集团股份有限公司 | 一种自保温房屋结构 |
| CN106948485B (zh) * | 2017-05-15 | 2023-02-21 | 丰和营造集团股份有限公司 | 一种自保温房屋结构 |
| CN107476649A (zh) * | 2017-08-18 | 2017-12-15 | 国网上海市电力公司 | 一种装配式围墙施工方法 |
| CN108505777A (zh) * | 2017-10-26 | 2018-09-07 | 安徽华电工程咨询设计有限公司 | 装配式变电站新型主变防火墙结构 |
| CN109024650A (zh) * | 2018-08-30 | 2018-12-18 | 重庆华硕建设有限公司 | 一种基础的施工方法 |
| CN109403351A (zh) * | 2018-12-18 | 2019-03-01 | 中建地下空间有限公司 | 一种自卡柱式接头可装配式预制地下连续墙 |
| CN109811933A (zh) * | 2019-02-18 | 2019-05-28 | 河南工业大学 | 一种生态复合墙体及其施工工艺 |
| CN110453725A (zh) * | 2019-05-12 | 2019-11-15 | 四川迈铁龙科技有限公司 | 轨道交通装配式内墙 |
| CN110238962A (zh) * | 2019-06-10 | 2019-09-17 | 山东通发实业有限公司 | 一种新型预制混凝土内墙的制作方法 |
| CN110439146A (zh) * | 2019-07-26 | 2019-11-12 | 江苏禾吉新材料科技有限公司 | 一种装配式墙体 |
| CN111794591A (zh) * | 2020-07-20 | 2020-10-20 | 中铁建工集团有限公司 | 一种全预制混凝土装配式围墙及其施工方法 |
| CN113833115A (zh) * | 2021-09-01 | 2021-12-24 | 广州市房屋开发建设有限公司 | 一种混凝土柱和木结构柱的连接节点及其施做方法 |
| CN114197959A (zh) * | 2021-12-26 | 2022-03-18 | 福建省高华建设工程有限公司 | 一种生态智能组合的围墙 |
| CN119956968A (zh) * | 2025-03-04 | 2025-05-09 | 中方元建设工程集团有限公司 | 一种预制主变防火墙的施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105863275B (zh) | 装配式环筋扣合混凝土剪力墙体系施工方法 | |
| CN110512719B (zh) | 一种高层住宅大跨度间隔式连廊高空支模钢平台施工工法 | |
| CN112854745A (zh) | 一种装配式建筑铝合金模板施工工艺 | |
| CN113089491A (zh) | 一种大悬臂预应力混凝土盖梁的施工方法 | |
| CN115323924B (zh) | 一种公铁两用跨江a型斜拉桥主塔施工方法 | |
| CN104261232B (zh) | 附着于异形断面的升降装置及其安装方法 | |
| CN112627387A (zh) | 预制外墙板不出筋式侧连方法 | |
| CN109457814B (zh) | 基于贝雷架结构的高耸及大直径建筑物顶盖施工方法 | |
| CN108005387A (zh) | 一种装配式墙板与短肢剪力墙现浇主体同步施工方法 | |
| CN110184941A (zh) | 一种桥梁主塔施工方法 | |
| CN110939051A (zh) | 一种地铁隐盖梁施工方法 | |
| CN208023601U (zh) | 一种互扣式的预制桩基承台侧模 | |
| CN107476583A (zh) | 一种混凝土装配式楼房建造施工方法 | |
| CN105201107A (zh) | 一种地下车库叠合板式剪力墙施工方法 | |
| CN103061508A (zh) | 一种三角形滑模装置及施工方法 | |
| CN116290456A (zh) | 一种装配式建筑施工工艺 | |
| CN101555709B (zh) | 一种复合保温隔热混凝土剪力墙的安装工艺 | |
| CN115897944A (zh) | 一种用于室外的装配式烟道及其施工方法 | |
| CN204139369U (zh) | 装配式防火墙 | |
| CN106930527A (zh) | 三维仿真型钢复合悬挑支模高空大跨度预应力梁施工工艺 | |
| CN110067321A (zh) | 一种装配式剪力墙柔性连接装置及其施工方法 | |
| CN118958659A (zh) | 一种后浇带顶板免支撑模板体系施工方法 | |
| CN218813833U (zh) | 一种装配式筏板基础 | |
| CN118997001A (zh) | 一种独塔斜拉桥钢混结合段施工方法 | |
| CN116044137B (zh) | 一种适用于大断面竖井混凝土结构墙体的悬挑式模架施工方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150107 |
|
| RJ01 | Rejection of invention patent application after publication |