CN104264591A - 在线路高差较大区域顶桥的施工方法 - Google Patents
在线路高差较大区域顶桥的施工方法 Download PDFInfo
- Publication number
- CN104264591A CN104264591A CN201410593594.1A CN201410593594A CN104264591A CN 104264591 A CN104264591 A CN 104264591A CN 201410593594 A CN201410593594 A CN 201410593594A CN 104264591 A CN104264591 A CN 104264591A
- Authority
- CN
- China
- Prior art keywords
- rail track
- iron
- crossbeam
- bridge
- formation level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Railway Tracks (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及一种在线路高差较大区域顶桥的施工方法,包括在低路基铁路线路两侧预制低路侧框架桥,在高路基铁路线路两侧预制高路基侧框架桥以及在低路基铁路线路和高路基铁路线路的两侧分别修建深基础桩,每侧两组,每组包括多个与铁路同向排列的深基础桩;本发明至少具有以下优点:在线路高差较大区域顶桥施工时,利用900H型钢纵梁加固体系的稳定性,选用低路侧框架桥和高路侧框架桥并相向顶进的工艺,使得框架桥顶程缩短一半,节约了工期,最大限度的保证了既有铁路线路的安全行车,同时也降低了施工成本。
Description
技术领域
本发明涉及一种铁路线路工程施工方法,尤其涉及一种在线路高差较大区域顶桥的施工方法。
背景技术
随着城市化建设的快速进行,许多新的道路设施应运而生。有些新建的道路设施必须从既有的铁路线路下面穿过,下穿铁路线路时就必须修建框架桥,使铁路线路位于框架桥的顶面,道路则位于框架桥的下面与铁路线路正交或斜交。
目前在线路高差较大区域顶桥的施工方法主要为两种,一种为纵挑横抬法线路加固,框架桥相向顶进施工;一种为便梁加固高低箱顶进的方法。其中:纵挑横抬法线路加固,框架桥相向顶进施工的方法,线路悬空距离较小,抵御意外事件的能力差,且在线路高差较大的条件下,顶进时存在较大安全隐患;例如发生塌方,就必须拦停列车进行应急抢险,这样就会影响铁路线路的正常运营,造成恶劣影响;便梁加固高低箱顶进的方法虽然可以使线路整体悬空,但却限制了便梁的加固范围,一般情况下,便梁加固范围不大于24m,特殊情况下最大只能加固到36m,这就极大的限制了公路的规模;同时,高低箱顶进施工又存在顶进工期较长,施工成本较高的缺点。
有鉴于上述的缺陷,本设计人,积极加以研究创新,以期创设一种在线路高差较大区域顶桥的施工方法,使其更具有产业上的利用价值。
发明内容
为解决上述技术问题,本发明的目的是为了弥补在高差较大的双股、多股线路的线路加固及桥体顶进施工中,尤其线间距不足且顶进过程中容易出现塌方的工程中的技术不足,并为了最大限度保证既有铁路线路安全行车,发明了一种在线路高差较大区域顶桥的施工方法。
本发明的在线路高差较大区域顶桥的施工方法,包括下列步骤:
S1:在低路基铁路线路侧预制低路基侧框架桥,在高路基铁路线路侧预制高路基侧框架桥;
S2:在低路基铁路线路和高路基铁路线路的两侧分别修建深基础桩,每侧两组,每组包括多个与铁路同向排列的深基础桩;
S3:将轨枕空隙间的石碴挖至能穿过I45b横梁工字钢;并调整好既有轨枕之间的间距;在低路基铁路线路和高路基铁路线路下方的每个轨枕空隙间穿设I45b横梁工字钢,使I45b横梁工字钢垂直地穿越低路基铁路线路和高路基铁路线路并横跨在铁路两侧的深基础桩上,待全部I45b横梁工字钢穿设好后,将四角的深基础桩上的I45b横梁工字钢与深基础桩之间的空隙用木板和木楔子将其填满;
S4:在非电气化铁路中用夹板和螺栓将两根900H型钢固接于一体,再用扣板和U型螺栓将900H型钢与I45b横梁工字钢固接于一体;
或在电气化铁路中,900H型钢纵梁采用封闭点内利用滑轨将900H型钢移至深基础桩上方;
S5:在铁轨和900H型钢之间设置方木;
S6:低路基侧横梁I45b工字钢通过U形卡子联成一个整体,其端头顶在抗移桩冠梁上,高路基侧I45b横梁工字钢与低路基侧900H型钢纵梁用I14工字钢焊接;
S7:高路基侧框架桥和低路基侧框架桥相向顶进就位。
进一步的,高路基侧横梁工字钢用I45b工字钢与低路基侧900H型钢纵梁焊接。
进一步的,在低路基铁路线路坡脚10米外侧预制低路基侧框架桥,在高路基铁路线路坡脚10米外侧预制高路基侧框架桥。
借由上述方案,本发明至少具有以下优点:在线路高差较大区域顶桥施工时,利用900H型钢纵梁加固体系的稳定性,选用低路侧框架桥和高路侧框架桥并相向顶进的工艺,使得框架桥顶程缩短一半,节约了工期,最大限度的保证了既有铁路线路的安全行车,同时也降低了施工成本。
上述说明仅是本发明技术方案的概述,为了能够更清楚了解本发明的 技术手段,并可依照说明书的内容予以实施,以下以本发明的较佳实施例并配合附图详细说明如后。
附图说明
图1是本发明在线路高差较大区域顶桥的施工方法中的线路加固平面布置图;
图2为本发明在线路高差较大区域顶桥的施工方法中的线路加固纵断面图;
图3为本发明在线路高差较大区域顶桥的施工方法中的抗横移加固纵断面图;
图中:
1、低路基铁路线路;2、高路基铁路线路;3、深基础桩;4、900H型钢;5、铁轨;6、I45b横梁工字钢;7、高路基侧框架桥;8、低路基侧框架桥8;9、方木9;10、I14工字钢。
具体实施方式
下面结合附图和实施例,对本发明的具体实施方式作进一步详细描述。以下实施例用于说明本发明,但不用来限制本发明的范围。
参见图1至图3,本发明一较佳实施例所述的一种在线路高差较大区域顶桥的施工方法,包括(一)、在低路基铁路线路1侧预制低路基侧框架桥,在高路基铁路线路2侧预制高路基侧框架桥7;(二)、在低路基铁路线路1和高路基铁路线路2的两侧分别修建深基础桩3,每侧两组,每组包括多个与铁路同向排列的深基础桩3;(三)、将轨枕空隙间的石碴挖至能穿过I45b横梁工字钢6;并调整好既有轨枕之间的间距;在低路基铁路线路1和高路基铁路线路2下方的每个轨枕空隙间穿设I45b横梁工字钢6,使I45b横梁工字钢6垂直地穿越低路基铁路线路1和高路基铁路线路2并横跨在铁路两侧的深基础桩3上,待全部I45b横梁工字钢6穿设好后,将四角的深基础桩3上的I45b横梁工字钢6与深基础桩3之间的空隙用木板和木楔子将其填满;(四)在非电气化铁路中:用夹板和螺栓将两根900H型钢4固接于一体,再用扣板和U型螺栓将900H型钢4与I45b横梁工字钢6固接于一体;
或在电气化铁路中,900H型钢4纵梁采用封闭点内利用滑轨将900H型钢 4移至深基础桩3上方;(五)、在铁轨5和900H型钢4之间设置方木9,其目的是防止在低路基铁路线路1和高路基铁路线路2顶进过程中导致既有线路线路横移(六)、低路基侧横梁I45b工字钢6端头顶在抗移桩冠梁上,整个线路I45b横梁工字钢6都通过U形卡子联成一个整体,通过抗移桩梁的作用使I45b横梁工字钢6不发生移动,高路基侧I45b横梁工字钢6与低路基侧900H型钢4纵梁用I14工字钢10焊接,将其作为高路基侧抗衡移桩使用,继而保证整个线路不会发生大的横向移动;(七)待高路基侧框架桥7和低路基侧框架桥8相向顶进就位后,将线路加固体系拆除,恢复线路。
优选的,高路基侧横梁工字钢用I45b工字钢与低路基侧900H型钢4纵梁焊接。
在低路基铁路线路1坡脚10米外侧预制低路基侧框架桥,在高路基铁路线路2坡脚10米外侧预制高路基侧框架桥7。在具体实施中,深基础桩3的性能参数要随桥体的大小和土质情况进行设计。
以上所述仅是本发明的优选实施方式,并不用于限制本发明,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本发明的保护范围。
Claims (3)
1.一种在线路高差较大区域顶桥的施工方法,其特征在于,包括下列步骤:
S1:在低路基铁路线路侧预制低路基侧框架桥,在高路基铁路线路侧预制高路基侧框架桥;
S2:在低路基铁路线路和高路基铁路线路的两侧分别修建深基础桩,每侧两组,每组包括多个与铁路同向排列的深基础桩;
S3:将轨枕空隙间的石碴挖至能穿过I45b横梁工字钢;并调整好既有轨枕之间的间距;在低路基铁路线路和高路基铁路线路下方的每个轨枕空隙间穿设I45b横梁工字钢,使I45b横梁工字钢垂直地穿越低路基铁路线路和高路基铁路线路并横跨在铁路两侧的深基础桩上,待全部I45b横梁工字钢穿设好后,将四角的深基础桩上的I45b横梁工字钢与深基础桩之间的空隙用木板和木楔子将其填满;
S4:在非电气化铁路中用夹板和螺栓将两根900H型钢固接于一体,再用扣板和U型螺栓将900H型钢与I45b横梁工字钢固接于一体;
或在电气化铁路中,900H型钢纵梁采用封闭点内利用滑轨将900H型钢移至深基础桩上方;
S5:在铁轨和900H型钢之间设置方木;
S6:低路基侧横梁I45b工字钢通过U形卡子联成一个整体,其端头顶在抗移桩冠梁上,高路基侧I45b横梁工字钢与低路基侧900H型钢纵梁用I14工字钢焊接;
S7:高路基侧框架桥和低路基侧框架桥相向顶进就位。
2.根据权利要求1所述的在线路高差较大区域顶桥的施工方法,其特征在于:高路基侧横梁工字钢用I45b工字钢与低路基侧900H型钢纵梁焊接。
3.根据权利要求1所述的在线路高差较大区域顶桥的施工方法,其特征在于:在低路基铁路线路坡脚10米外侧预制低路基侧框架桥,在高路基铁路线路坡脚10米外侧预制高路基侧框架桥。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410593594.1A CN104264591B (zh) | 2014-10-30 | 2014-10-30 | 在线路高差较大区域顶桥的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410593594.1A CN104264591B (zh) | 2014-10-30 | 2014-10-30 | 在线路高差较大区域顶桥的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104264591A true CN104264591A (zh) | 2015-01-07 |
CN104264591B CN104264591B (zh) | 2016-05-11 |
Family
ID=52156155
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410593594.1A Active CN104264591B (zh) | 2014-10-30 | 2014-10-30 | 在线路高差较大区域顶桥的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104264591B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114059455A (zh) * | 2021-12-28 | 2022-02-18 | 中铁六局集团石家庄铁路建设有限公司 | 基于下穿重载铁路的立交桥施工方法 |
CN114837225A (zh) * | 2022-06-17 | 2022-08-02 | 中铁七局集团有限公司 | 一种多股道不同高差既有线架空加固法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4477467B2 (ja) * | 2004-10-13 | 2010-06-09 | 鉄建建設株式会社 | 橋梁の構造およびその架け替え方法 |
CN102359069A (zh) * | 2011-07-05 | 2012-02-22 | 中铁十局集团有限公司 | 下穿铁路框架桥小夹角大高度斜顶进施工既有线加固方法 |
CN102758387A (zh) * | 2011-04-27 | 2012-10-31 | 中铁六局集团有限公司 | H型钢线路加固施工方法 |
CN103643640A (zh) * | 2013-12-19 | 2014-03-19 | 中铁六局集团天津铁路建设有限公司 | 一种先顶进后加固线路的框架桥顶进施工方法 |
CN102926299B (zh) * | 2012-11-19 | 2014-07-16 | 房士杰 | 一种铁路架空固定装置及采用此装置增建铁路桥涵的方法 |
-
2014
- 2014-10-30 CN CN201410593594.1A patent/CN104264591B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4477467B2 (ja) * | 2004-10-13 | 2010-06-09 | 鉄建建設株式会社 | 橋梁の構造およびその架け替え方法 |
CN102758387A (zh) * | 2011-04-27 | 2012-10-31 | 中铁六局集团有限公司 | H型钢线路加固施工方法 |
CN102359069A (zh) * | 2011-07-05 | 2012-02-22 | 中铁十局集团有限公司 | 下穿铁路框架桥小夹角大高度斜顶进施工既有线加固方法 |
CN102926299B (zh) * | 2012-11-19 | 2014-07-16 | 房士杰 | 一种铁路架空固定装置及采用此装置增建铁路桥涵的方法 |
CN103643640A (zh) * | 2013-12-19 | 2014-03-19 | 中铁六局集团天津铁路建设有限公司 | 一种先顶进后加固线路的框架桥顶进施工方法 |
Non-Patent Citations (1)
Title |
---|
彭涛: "下穿10股既有铁路的大型框架结构顶进设计", 《铁道建筑技术》, no. 2, 31 December 2012 (2012-12-31) * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114059455A (zh) * | 2021-12-28 | 2022-02-18 | 中铁六局集团石家庄铁路建设有限公司 | 基于下穿重载铁路的立交桥施工方法 |
CN114837225A (zh) * | 2022-06-17 | 2022-08-02 | 中铁七局集团有限公司 | 一种多股道不同高差既有线架空加固法 |
CN114837225B (zh) * | 2022-06-17 | 2023-10-27 | 中铁七局集团有限公司 | 一种多股道不同高差既有线架空加固法 |
Also Published As
Publication number | Publication date |
---|---|
CN104264591B (zh) | 2016-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102758387B (zh) | H型钢线路加固施工方法 | |
CN101838955B (zh) | 一种既有线路横抬加固方法及结构 | |
CN102979041B (zh) | 下穿铁路道岔群顶进大跨度箱桥施工的软架空加固顶进法 | |
CN106049209B (zh) | 一种用于铁路无砟轨道支撑层拆换的临时钢轨支撑装置 | |
CN206538637U (zh) | 一种用于既有铁路的线路加固装置 | |
CN103938538B (zh) | 铁路桥梁疏散平台 | |
CN104562863B (zh) | 一种两用铁路双轨道 | |
CN106192620B (zh) | 一种铁路无砟轨道支撑层及下部结构拆换方法 | |
CN204940141U (zh) | 框架桥顶进过程中既有线路的加固体系 | |
JP2009052306A (ja) | 橋桁の架替工法 | |
CN103437254A (zh) | 框架桥顶进铁路岔区线路加固装置 | |
RU168549U1 (ru) | Страховочный пакет для железнодорожного пути | |
CN104264591B (zh) | 在线路高差较大区域顶桥的施工方法 | |
CN107268352A (zh) | 用于隧道换底操作的线路架空装置 | |
KR101187282B1 (ko) | 2주식교대 구조를 이용한 철도 교량 시공방법 | |
CN108166395A (zh) | 一种跨越营业线修建梁桥的施工方法 | |
CN108252218A (zh) | 一种大跨度提篮拱桥钢拱肋外包混凝土底模滑移装置 | |
CN103882802A (zh) | 一种公路跨越铁路的桥梁防护结构 | |
CN104164838A (zh) | 轻型组合式移梁台车 | |
CN102900027A (zh) | 一种上跨既有线下穿既有桥梁的贝雷梁的拆除方法 | |
CN107642032B (zh) | 一种便梁限位装置及其施工方法 | |
CN205893837U (zh) | 一种用于铁路无砟轨道支撑层拆换的临时钢轨支撑装置 | |
CN204825527U (zh) | 一种本线d梁整体纵移施工结构 | |
CN107604823B (zh) | 一种通过铁路过渡运梁的施工方法 | |
CN207079430U (zh) | 用于隧道换底操作的线路架空装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |