CN104234268A - Prefabricated row type shear wall - Google Patents
Prefabricated row type shear wall Download PDFInfo
- Publication number
- CN104234268A CN104234268A CN201410480674.6A CN201410480674A CN104234268A CN 104234268 A CN104234268 A CN 104234268A CN 201410480674 A CN201410480674 A CN 201410480674A CN 104234268 A CN104234268 A CN 104234268A
- Authority
- CN
- China
- Prior art keywords
- wall
- reinforcing bar
- hole
- shear wall
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
技术领域 technical field
本发明涉及建筑预制构件,是一种预制排孔式剪力墙。 The invention relates to a building prefabricated component, which is a prefabricated hole-row shear wall.
背景技术 Background technique
建筑业使用的预制构件已经发展至较多品种。目前对剪力墙的预制已经有公开的报道,它仍然是沿用叠合板式剪力墙的结构,墙体中间设置排孔,墙体侧面设有连接钢筋;施工时,在排孔内安装钢筋捆绑后浇筑混凝土,这种预制剪力墙的不足是:墙体上下端的钢筋需要不同的结构和捆扎方式,施工难度大,预制的剪力墙只是一种两个混凝土板的叠合形式,它需要在现场施工时,再将钢筋埋入排孔内捆扎后浇筑混凝土,由于一个孔内通常需要埋入多根钢筋,以增强剪力墙的强度及承载力,在施工时需要按照设计要求布设钢筋捆扎后浇筑混凝土,而现场施工中对各孔中的钢筋布设需要花费较多的时间,特别是需要多个技术人员现场指导,施工效率低,预制剪力墙的施工质量较难保证。 The prefabricated components used in the construction industry have developed into many varieties. At present, there have been public reports on the prefabrication of shear walls. It still uses the structure of laminated slab shear walls. A row of holes is set in the middle of the wall, and connecting steel bars are set on the side of the wall; during construction, steel bars are installed in the row of holes. Concrete is poured after bundling. The disadvantage of this kind of prefabricated shear wall is that the steel bars at the upper and lower ends of the wall need different structures and binding methods, and the construction is difficult. The prefabricated shear wall is just a superimposed form of two concrete slabs. When it is necessary to construct on site, bury the steel bars in the row of holes and bind them before pouring concrete. Since a hole usually needs to embed multiple steel bars to enhance the strength and bearing capacity of the shear wall, it needs to be laid out according to the design requirements during construction. Concrete is poured after the steel bars are bundled, and it takes a lot of time to lay out the steel bars in each hole during the on-site construction, especially the on-site guidance of multiple technical personnel is required, the construction efficiency is low, and the construction quality of the prefabricated shear wall is difficult to guarantee.
发明内容 Contents of the invention
本发明的目的是提供一种预制排孔式剪力墙,它能够解决现有技术的不足。 The purpose of the present invention is to provide a prefabricated perforated shear wall, which can solve the deficiencies of the prior art.
本发明为实现上述目的,通过以下技术方案实现:一种预制排孔式剪力墙,包括预制墙体,墙体内开设数个通孔,每个通孔内均安装第一钢筋和第二钢筋,第一钢筋和第二钢筋之间固定横筋,墙体的高度方向一端的一个侧壁上开设凹槽,凹槽与通孔相连通,墙体宽度方向两侧外端分别固定第一方环筋和第二方环筋,第一方环筋和第二方环筋的两端分别与各自的墙体侧面固定。通孔的高度方向上部内壁上开设横向通孔,横向通孔位于第一钢筋和第二钢筋之间,第一钢筋和第二钢筋外周分别安装第一套管和第二套管,第一套管和第二套管间安装连接板,连接板中部与限位板连接,限位板两端分别与各自的横向通孔活动配合。第一钢筋和第二钢筋的上端面高于墙体的上端面,第一钢筋和第二钢筋的下端面与墙体的下端面位于同一水平面内。通孔是圆孔或方孔。第一套管和第二套管内壁设置环状斜齿,环状斜齿的齿尖面向第一钢筋或第二钢筋的高度方向下方。第一方环筋和第二方环筋的两端头位于墙体的外边沿处。 In order to achieve the above object, the present invention is achieved through the following technical solutions: a prefabricated hole-row shear wall, comprising a prefabricated wall, several through holes are opened in the wall, and the first steel bar and the second steel bar are installed in each through hole. Reinforcing bar, the horizontal bar is fixed between the first reinforcing bar and the second reinforcing bar, a groove is provided on a side wall at one end of the height direction of the wall, the groove communicates with the through hole, and the outer ends of the two sides of the wall in the width direction are respectively fixed to the first square. Ring reinforcement and the second square ring reinforcement, the two ends of the first square ring reinforcement and the second square ring reinforcement are respectively fixed with respective wall sides. A horizontal through hole is provided on the upper inner wall in the height direction of the through hole, and the horizontal through hole is located between the first steel bar and the second steel bar. A connecting plate is installed between the pipe and the second casing, the middle part of the connecting plate is connected with the limiting plate, and the two ends of the limiting plate are respectively movably matched with respective transverse through holes. The upper end surfaces of the first steel bar and the second steel bar are higher than the upper end surface of the wall body, and the lower end surfaces of the first steel bar and the second steel bar are located in the same horizontal plane as the lower end surface of the wall body. The through holes are round or square. Ring-shaped helical teeth are arranged on the inner walls of the first sleeve and the second sleeve, and the tips of the ring-shaped helical teeth face downward in the height direction of the first steel bar or the second steel bar. The two ends of the first square ring reinforcement and the second square ring reinforcement are located at the outer edge of the wall.
本发明所述的剪力墙,在工厂中预制后在施工中安装,施工时不用模板,将上、下层墙体上下端钢筋捆扎即可,施工方便、快捷。在施工中直接将上下层剪力墙钢筋捆扎后浇筑混凝土,剪力墙的设计强度、剪力及弯矩力等技术性能均能在工厂预制是得到准确保证。由于现场施工时,不需要布置钢筋,使施工效率大幅提高。本发明还具有预制剪力墙的强度、承重能力及刚性能得到好的保障、预制剪力墙的使用寿命大幅提高等优点。本发明所述剪力墙可用于各种高层建筑。 The shear wall of the present invention is installed during construction after being prefabricated in a factory. No formwork is used during construction, and only the upper and lower ends of the upper and lower walls are bound. The construction is convenient and fast. During the construction, the steel bars of the upper and lower shear walls are directly bundled and then the concrete is poured. The design strength, shear force and bending moment force of the shear wall can be accurately guaranteed in the factory prefabrication. Since there is no need to arrange steel bars during on-site construction, the construction efficiency is greatly improved. The invention also has the advantages that the strength, load-bearing capacity and rigidity of the prefabricated shear wall are well guaranteed, and the service life of the prefabricated shear wall is greatly improved. The shear wall of the invention can be used in various high-rise buildings.
附图说明 Description of drawings
附图1是本发明所述剪力墙实施例之一的结构示意图;附图2是附图1中A-A剖视结构示意图;附图3是附图1中A-A剖视结构中通孔为方孔的示意图;附图4是本发明所述剪力墙的实施例之二结构示意图;附图5是附图4中B-B剖视结构示意图;附图6是附图4中B-B剖视后通孔为方形孔的结构示意图;附图7是附图4中I部放大结构示意图。 Accompanying drawing 1 is the structural representation of one of shear wall embodiment of the present invention; Accompanying drawing 2 is the schematic diagram of A-A sectional structure among the accompanying drawings 1; Accompanying drawing 3 is that in the accompanying drawing 1, the through hole is square The schematic diagram of the hole; Accompanying drawing 4 is the second structural representation of the embodiment of the shear wall of the present invention; Accompanying drawing 5 is the B-B sectional structure schematic diagram in the accompanying drawing 4; The hole is a schematic diagram of the structure of a square hole; accompanying drawing 7 is a schematic diagram of the enlarged structure of part I in accompanying drawing 4.
具体实施方式 Detailed ways
对照附图对本发明做进一步说明。 The present invention will be further described with reference to the accompanying drawings.
本发明的一种预制排孔式剪力墙,包括预制墙体1,墙体1内开设数个通孔4,每个通孔4内均安装第一钢筋5和第二钢筋6,第一钢筋5和第二钢筋6之间固定横筋7,墙体1的高度方向一端的一个侧壁上开设凹槽8,凹槽8与通孔4相连通,墙体1宽度方向两侧外端分别固定第一方环筋2和第二方环筋3,第一方环筋2和第二方环筋3的两端分别与各自的墙体侧面固定。 A prefabricated hole-row shear wall of the present invention comprises a prefabricated wall body 1, several through holes 4 are opened in the body of wall 1, and a first steel bar 5 and a second steel bar 6 are installed in each through hole 4. The transverse bar 7 is fixed between the steel bar 5 and the second steel bar 6, and a groove 8 is provided on a side wall at one end of the height direction of the body of wall 1, and the groove 8 communicates with the through hole 4, and the outer ends on both sides of the body of wall 1 in the width direction are The first square ring rib 2 and the second square ring rib 3 are fixed, and the two ends of the first square ring rib 2 and the second square ring rib 3 are respectively fixed to the respective wall sides.
本发明所述通孔4的高度方向上部内壁上开设横向通孔13,横向通孔13位于第一钢筋5和第二钢筋6之间,第一钢筋5和第二钢筋6外周分别安装第一套管9和第二套管10,第一套管9和第二套管10间安装连接板11,连接板11中部与限位板12连接,限位板12两端分别与各自的横向通孔13活动配合,这种结构可使剪力墙在工厂内预制成完整构件,施工时,直接吊装在建筑物上,排孔内的钢筋布置完全能达到设计要求,并适合在施工时捆扎上下层剪力墙钢筋,进一步保证施工时对设计方案的完整体现,进而提高了剪力墙的强度、刚度及承载能力等种设计性能。 A horizontal through hole 13 is provided on the upper inner wall of the through hole 4 in the height direction of the present invention, and the horizontal through hole 13 is located between the first reinforcing bar 5 and the second reinforcing bar 6, and the first reinforcing bar 5 and the second reinforcing bar 6 are respectively installed with first The sleeve pipe 9 and the second sleeve pipe 10, the connection plate 11 is installed between the first sleeve pipe 9 and the second sleeve pipe 10, the middle part of the connection plate 11 is connected with the limit plate 12, and the two ends of the limit plate 12 are respectively connected with the respective transverse channels. Hole 13 is movable, this structure allows the shear wall to be prefabricated into a complete component in the factory, and directly hoisted on the building during construction. The arrangement of steel bars in the row of holes can fully meet the design requirements and is suitable for binding during construction. The upper and lower shear wall reinforcements further ensure the complete reflection of the design scheme during construction, thereby improving the strength, stiffness and bearing capacity of the shear wall and other design properties.
本发明进一步的方案是:所述第一钢筋5和第二钢筋6的上端面高于墙体1的上端面,第一钢筋5和第二钢筋6的下端面与墙体1的下端面位于同一水平面内,便于上下层剪力墙对接,并能提高墙体质量。所述通孔4是圆孔或方孔。 A further solution of the present invention is: the upper end faces of the first steel bar 5 and the second steel bar 6 are higher than the upper end face of the wall 1, and the lower end faces of the first steel bar 5 and the second steel bar 6 are located at the lower end face of the wall body 1. In the same horizontal plane, it is convenient for the docking of the upper and lower shear walls, and can improve the quality of the wall. The through hole 4 is a round hole or a square hole.
本发明进一步的优选方案是:所述第一套管9和第二套管10内壁设置环状斜齿14,环状斜齿14的齿尖面向第一钢筋5或第二钢筋6的高度方向下方,它进一步限定钢筋位置,不使其向上窜动。 A further preferred solution of the present invention is: the inner walls of the first sleeve 9 and the second sleeve 10 are provided with annular helical teeth 14, and the tooth tips of the annular helical teeth 14 face the height direction of the first steel bar 5 or the second steel bar 6 Below, it further restricts the position of the reinforcement so that it does not move upwards.
本发明所述的第一方环筋2和第二方环筋3的两端头位于墙体1的外边沿处,使其能够增加其对墙体宽度的连接强度。 Both ends of the first square ring rib 2 and the second square ring rib 3 in the present invention are located at the outer edge of the wall 1, so that the connection strength to the width of the wall can be increased.
本发明所述实施例之一的剪力墙在施工时,下层墙体上端伸出的钢筋与上层剪力墙的钢筋下端直接搭接在一起,通过凹槽处捆扎后浇筑,两个墙体之间连接整齐,连接固牢,墙体的抗弯矩能力强,使整体建筑物墙体的刚性强度大。本发明所述实施例之二的剪力墙施工时的优点在具备实施例之一的所有上述效果的同时,还具有施工速度快、剪力墙的抗弯矩强度高,承载能力强,能够准确保证剪力墙的设计技术性能完全达到要求。 During the construction of the shear wall according to one of the embodiments of the present invention, the steel bars protruding from the upper end of the lower wall and the lower end of the upper shear wall are directly lapped together, and then poured after binding through the groove, the two walls The connection between them is neat, the connection is firm, and the wall has a strong ability to resist bending moments, so that the rigidity of the wall of the whole building is high. The advantage of the shear wall construction of the second embodiment of the present invention is that while having all the above-mentioned effects of the first embodiment, it also has the advantages of fast construction speed, high bending moment strength of the shear wall, strong bearing capacity, and can Accurately ensure that the design technical performance of the shear wall fully meets the requirements.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410480674.6A CN104234268B (en) | 2014-07-02 | 2014-09-19 | A kind of prefabricated round type shear wall |
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2014103109646 | 2014-07-02 | ||
| CN201410310964.6 | 2014-07-02 | ||
| CN201410310964 | 2014-07-02 | ||
| CN201410480674.6A CN104234268B (en) | 2014-07-02 | 2014-09-19 | A kind of prefabricated round type shear wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104234268A true CN104234268A (en) | 2014-12-24 |
| CN104234268B CN104234268B (en) | 2016-05-11 |
Family
ID=52201208
Family Applications (3)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410480674.6A Active CN104234268B (en) | 2014-07-02 | 2014-09-19 | A kind of prefabricated round type shear wall |
| CN201410480728.9A Active CN104234269B (en) | 2014-07-02 | 2014-09-19 | A kind of construction method of prefabricated round type shear wall |
| CN201420540230.2U Withdrawn - After Issue CN204059665U (en) | 2014-07-02 | 2014-09-19 | A kind of prefabricated round type shear wall |
Family Applications After (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410480728.9A Active CN104234269B (en) | 2014-07-02 | 2014-09-19 | A kind of construction method of prefabricated round type shear wall |
| CN201420540230.2U Withdrawn - After Issue CN204059665U (en) | 2014-07-02 | 2014-09-19 | A kind of prefabricated round type shear wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (3) | CN104234268B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104234268B (en) * | 2014-07-02 | 2016-05-11 | 山东万斯达建筑工业化研究院有限公司 | A kind of prefabricated round type shear wall |
| CN110206190B (en) * | 2019-06-10 | 2020-12-22 | 安徽松之梦科技有限公司 | Prefabricated reinforced concrete shear wall |
| CN110468997A (en) * | 2019-08-09 | 2019-11-19 | 中南大学 | A kind of assembled RC shear wall structure and its construction method that U-shaped cuff vertically connects |
Citations (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NL6717275A (en) * | 1966-12-19 | 1968-06-20 | ||
| DE1963328A1 (en) * | 1968-12-20 | 1970-07-09 | Roher Bohm Ltd | Foamed plastic casing with fire-resistant drawstring |
| FR2538830A1 (en) * | 1983-01-04 | 1984-07-06 | Lecocq Raymond | Compofacade |
| CN2260118Y (en) * | 1994-09-05 | 1997-08-20 | 刘新振 | Combined prefabricated wall panel structure |
| CN2934421Y (en) * | 2006-08-02 | 2007-08-15 | 张明辰 | Wall made of concrete hollow panel |
| CN201214836Y (en) * | 2008-01-24 | 2009-04-01 | 温习旺 | Wall board |
| US7765765B1 (en) * | 2006-06-30 | 2010-08-03 | Perronne Eugene R | Method of assembling polystyrene forms for building foundations |
| CN102433945A (en) * | 2011-08-30 | 2012-05-02 | 东南大学 | Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure |
| CN102535738A (en) * | 2012-02-14 | 2012-07-04 | 黄昆 | A prefabricated house wall panel and a fully prefabricated house using the wall panel and its installation method |
| CN202380609U (en) * | 2011-12-23 | 2012-08-15 | 宝钢建筑系统集成有限公司 | Pre-split-joint light wall plate capable of realizing industrial production |
| CN102936929A (en) * | 2012-11-29 | 2013-02-20 | 东南大学 | Prefabricated assembling whole type shear wall connected with staggered-height vertical steel bar |
| CN202866043U (en) * | 2012-09-07 | 2013-04-10 | 初明进 | Connection structure of precast concrete walls |
| CN203188402U (en) * | 2013-04-24 | 2013-09-11 | 山东万斯达建筑科技有限公司 | Supporting device for pouring shear wall |
| CN103850363A (en) * | 2014-03-11 | 2014-06-11 | 朱彤 | Prefabricated through-hole assembled reinforced concrete shear wall and its construction method |
| CN204059665U (en) * | 2014-07-02 | 2014-12-31 | 山东万斯达建筑工业化研究院有限公司 | A kind of prefabricated round type shear wall |
-
2014
- 2014-09-19 CN CN201410480674.6A patent/CN104234268B/en active Active
- 2014-09-19 CN CN201410480728.9A patent/CN104234269B/en active Active
- 2014-09-19 CN CN201420540230.2U patent/CN204059665U/en not_active Withdrawn - After Issue
Patent Citations (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NL6717275A (en) * | 1966-12-19 | 1968-06-20 | ||
| DE1963328A1 (en) * | 1968-12-20 | 1970-07-09 | Roher Bohm Ltd | Foamed plastic casing with fire-resistant drawstring |
| FR2538830A1 (en) * | 1983-01-04 | 1984-07-06 | Lecocq Raymond | Compofacade |
| CN2260118Y (en) * | 1994-09-05 | 1997-08-20 | 刘新振 | Combined prefabricated wall panel structure |
| US7765765B1 (en) * | 2006-06-30 | 2010-08-03 | Perronne Eugene R | Method of assembling polystyrene forms for building foundations |
| CN2934421Y (en) * | 2006-08-02 | 2007-08-15 | 张明辰 | Wall made of concrete hollow panel |
| CN201214836Y (en) * | 2008-01-24 | 2009-04-01 | 温习旺 | Wall board |
| CN102433945A (en) * | 2011-08-30 | 2012-05-02 | 东南大学 | Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure |
| CN202380609U (en) * | 2011-12-23 | 2012-08-15 | 宝钢建筑系统集成有限公司 | Pre-split-joint light wall plate capable of realizing industrial production |
| CN102535738A (en) * | 2012-02-14 | 2012-07-04 | 黄昆 | A prefabricated house wall panel and a fully prefabricated house using the wall panel and its installation method |
| CN202866043U (en) * | 2012-09-07 | 2013-04-10 | 初明进 | Connection structure of precast concrete walls |
| CN102936929A (en) * | 2012-11-29 | 2013-02-20 | 东南大学 | Prefabricated assembling whole type shear wall connected with staggered-height vertical steel bar |
| CN203188402U (en) * | 2013-04-24 | 2013-09-11 | 山东万斯达建筑科技有限公司 | Supporting device for pouring shear wall |
| CN103850363A (en) * | 2014-03-11 | 2014-06-11 | 朱彤 | Prefabricated through-hole assembled reinforced concrete shear wall and its construction method |
| CN204059665U (en) * | 2014-07-02 | 2014-12-31 | 山东万斯达建筑工业化研究院有限公司 | A kind of prefabricated round type shear wall |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104234268B (en) | 2016-05-11 |
| CN204059665U (en) | 2014-12-31 |
| CN104234269A (en) | 2014-12-24 |
| CN104234269B (en) | 2016-04-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103306402B (en) | Non-superimposition beam type fabricated frame-shear wall connection structure and construction method thereof | |
| CN204326335U (en) | A kind of prefabricated reinforced concrete floor and superposed beam one assembly connection structure | |
| CN103741792B (en) | Overall assembling frame system and construction method | |
| CN104032869B (en) | A kind of Prefabricated stacking floor and precast construction method thereof | |
| CN106049732B (en) | A kind of honeycomb hole profiled steel plate two-way laminated floor | |
| CN204059601U (en) | A steel bar connection structure of prefabricated concrete components | |
| CN108678220B (en) | A concrete shear wall with integrated steel formwork installation | |
| CN106968381A (en) | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection | |
| CN103790379A (en) | Method for constructing connection joint between flat slab and post cap in reverse construction method | |
| CN203768810U (en) | Prefabricated bridge deck space steel pipe concrete truss combined beam | |
| CN206844707U (en) | A kind of Reinforced Concrete Reinforcement component | |
| CN104234268B (en) | A kind of prefabricated round type shear wall | |
| CN105178354A (en) | Tian-shaped beam column cap and beamless slab structure system | |
| CN103397721B (en) | Steel plate precast concrete double-plate shear wall | |
| CN104895221B (en) | Assembled shaped steel confined concrete shear wall structure | |
| CN201010998Y (en) | A steel tube concrete beam-column joint structure | |
| CN206693469U (en) | A kind of precast floor slab connecting node | |
| CN206562760U (en) | A kind of new concrete building wall template | |
| CN204703191U (en) | A connection structure between prefabricated piles and roof slabs that doubles as structural exterior walls | |
| CN204418503U (en) | Prestressed concrete overlapped slab and superimposed monolithic shear wall | |
| CN104032855A (en) | Assembly-type cross-shaped mixed coupled wall and construction method thereof | |
| CN103437498B (en) | Profiled steel sheet combination beam with continuous hanging rib reinforcing web plate for punching and manufacturing and mounting method | |
| CN214656368U (en) | A vertical connecting device suitable for steel-concrete composite girder deck and steel girder body | |
| CN203487665U (en) | Steel plate precast concrete double-plate shear wall | |
| CN207017516U (en) | The embedded laminated floor slab of T-steel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP02 | Change in the address of a patent holder | ||
| CP02 | Change in the address of a patent holder |
Address after: 250419 No. 66 Huayang Road, Jiyang Town, Jiyang County, Jinan City, Shandong Province Patentee after: SHANDONG ONE STAR BUILDING INDUSTRIALIZATION RESEARCH INSTITUTE CO.,LTD. Address before: 250014 Shandong Province, Ji'nan City Lixia District liberation road No. 27 building wansida Patentee before: SHANDONG ONE STAR BUILDING INDUSTRIALIZATION RESEARCH INSTITUTE CO.,LTD. |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A prefabricated perforated shear wall Granted publication date: 20160511 Pledgee: Lu Xiaoshan Pledgor: Shandong Wanda Technology Co.,Ltd.|SHANDONG ONE STAR BUILDING INDUSTRIALIZATION RESEARCH INSTITUTE CO.,LTD.|Zhang Bo Registration number: Y2025980014757 |