CN104227445A - High-efficiency fixture and method for drilling press fit holes in large-tonnage ball socket - Google Patents

High-efficiency fixture and method for drilling press fit holes in large-tonnage ball socket Download PDF

Info

Publication number
CN104227445A
CN104227445A CN201410444607.9A CN201410444607A CN104227445A CN 104227445 A CN104227445 A CN 104227445A CN 201410444607 A CN201410444607 A CN 201410444607A CN 104227445 A CN104227445 A CN 104227445A
Authority
CN
China
Prior art keywords
socket
ball
fixture
chuck
tonnage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410444607.9A
Other languages
Chinese (zh)
Inventor
征大生
刘松明
陈祥
冯汛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RUGAO DASHENG LINE EQUIPMENT CO Ltd
Original Assignee
RUGAO DASHENG LINE EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RUGAO DASHENG LINE EQUIPMENT CO Ltd filed Critical RUGAO DASHENG LINE EQUIPMENT CO Ltd
Priority to CN201410444607.9A priority Critical patent/CN104227445A/en
Publication of CN104227445A publication Critical patent/CN104227445A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine

Abstract

The invention relates to a high-efficiency fixture for drilling press fit holes in a large-tonnage ball socket. The high-efficiency fixture comprises a fixture body, a flange shaft and a manual self-centering chuck; the manual self-centering chuck is fixed to a flange plate of the flange shaft through a bolt. The high-efficiency fixture has the advantages that the large head of the ball socket faces downwards manually or mechanically, the ball socket is conveyed upwards and is clamped by the chuck, workpiece clamping time can be saved in production and waiting time can be reduced to a great extent; moreover, when the large ball socket is machined, a common chuck can meet the clamping requirement, and a large chuck is not required to be specially purchased; a motor drives a driving pulley to rotate, the driving pulley drives a driven pulley through a belt, a drum also rotates because the driven pulley is in key connection with the drum, the chuck is finally driven to rotate, a workpiece can also rotate, and as a drill bit and the workpiece rotate simultaneously as main movement, the coaxiality is high when the press fit holes are drilled, and the deviation of the drilled holes is avoided.

Description

A kind of large-tonnage ball-and-socket the pressure of the drill connects hole High efficient clamp and method thereof
Technical field
The present invention relates to a kind of High efficient clamp, especially a kind of large-tonnage ball-and-socket the pressure of the drill connects hole High efficient clamp and method thereof.
Background technology
At present, when processing the crimping hole of ball-and-socket, because ball-and-socket one end diameter is larger, need the chuck size of clamping ball-and-socket larger, need when clamping claw opening to open greatly, when clamping workpiece, need the stroke of chuck jaws to be moved back often the major part of ball-and-socket could be loaded into, waste time and energy during clamping, when starting to add man-hour, because the size of chuck is large, weight is large, chuck from turn to the start-up time that smooth rotation needs about 3min, the time that workman waits for is longer; When the pressure of the drill connects hole, by drill bit to workpiece feeding, if tool setting is not aimed at or inside workpiece uneven microstructure internal stress, easily there is larger deviation in boring, and the degree of depth of boring is larger, and deviation is larger.Therefore, just must develop and a kind ofly can raise the efficiency and reduce High efficient clamp and the method thereof of borehole throw, through retrieval, not find the same or analogous devices and methods therefor with the present invention.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind ofly can raise the efficiency and reduce High efficient clamp and the method thereof of borehole throw.
For solving the problems of the technologies described above, technical scheme of the present invention is: a kind of large-tonnage ball-and-socket the pressure of the drill connects hole High efficient clamp, and its innovative point is: comprise
One clamp body, this clamp body has the through cavity of a vertical direction, has the step surface of a block bearing assembly in the middle part of this cavity, and this step surface is placed with bearing assembly;
One flange shaft, this flange shaft is the axis body of a flanged dish in top, and axis body and ring flange central coaxial are provided with the centre bore holding large-tonnage ball-and-socket small end and pass through; Described flange shaft is arranged in the cavity of clamp body by bearing assembly, and the axis body bottom of flange shaft is connected with drive motors by belt transmission;
One manual self-centering chuck, this manual self-centering chuck is bolted on the ring flange of flange shaft.
Further, described fixture also comprises an annular upper end lid, and this annular upper end lid to be bolted on ring flange and to be positioned at bottom manual self-centering chuck.
Further, be provided with a drill bit directly over described clamp body, drill bit and cavity are coaxially arranged.
Further, described drill bit is indexable staight shank shallow hole drilling.
A kind of method adopting described fixture processing large-tonnage ball-and-socket the pressure of the drill to connect hole, its innovative point is: by the back side of ball-and-socket from fixture, ball-and-socket major part passes down through manual self-centering chuck clamping, and drive ball-and-socket to rotate with the rotating speed of 240r/min by drive motors, have one to rotate the drill bit of contrary still coaxial rotating with ball-and-socket directly over ball-and-socket simultaneously, its rotating speed is 100r/min ~ 250r/min, subsequently drill bit come downwards to ball-and-socket afterbody start boring.
The invention has the advantages that: apparatus of the present invention are passed through by ball-and-socket artificial or machinery is large upside down, then upwards carry and clamped by chuck, the clamping workpiece time can be saved aborning, and the stand-by period can be reduced significantly, and when machining large ball-and-socket, general chuck also can meet clamping requirement, and without the need to purchasing large-scale chuck specially;
By driven by motor driver pulley rotation, drive pulley is by belt drive driven pulley, because driven pulley is connected by key with rotating cylinder, so rotating cylinder also rotates, the final chuck that drives also rotates, and workpiece also can rotate, rotate as main motion owing to adopting drill bit and workpiece simultaneously, it is that axiality is high that the pressure of the drill connects hole, and avoid the phenomenon that deviation appears in boring, yield rate is very high;
The relative normal drill bit of indexable staight shank shallow hole drilling is compared linear velocity and can be reached 80m/s, and drilling efficiency can be made to improve 2 ~ 3 times.
Accompanying drawing explanation
Fig. 1 is the structural representation that apparatus of the present invention large-tonnage ball-and-socket the pressure of the drill connects hole High efficient clamp.
Detailed description of the invention
A kind of large-tonnage ball-and-socket the pressure of the drill as shown in Figure 1 connects hole High efficient clamp, comprises clamp body, flange shaft 3, manual self-centering chuck.
Clamp body has the through cavity 1 of a vertical direction, there is in the middle part of this cavity 1 step surface of a block bearing assembly 2, this step surface is placed with bearing assembly 2, flange shaft 3 is the axis body of a flanged dish in top, and axis body and ring flange central coaxial are provided with the centre bore holding large-tonnage ball-and-socket small end and pass through; Described flange shaft 3 is arranged in the cavity 1 of clamp body by bearing assembly 2, the axis body bottom of flange shaft 3 is connected with drive motors by belt transmission, manual self-centering chuck is bolted on the ring flange of flange shaft 3, ring flange has one group and is distributed in the end cap connecting hole that chuck connecting hole on disk body and a group are distributed in chuck connecting hole periphery ringwise ringwise, fixture also comprises an annular upper end lid 5, and this annular upper end lid 5 to be bolted on ring flange and to be positioned at bottom manual self-centering chuck.
Be provided with a drill bit directly over apparatus of the present invention clamp body, drill bit and cavity 1 are coaxially arranged, and drill bit is indexable staight shank shallow hole drilling, and indexable staight shank shallow hole drilling is here only exemplary effect certainly, can also be the drill bit of other models.
A kind of method adopting described fixture processing large-tonnage ball-and-socket the pressure of the drill to connect hole, by the back side of ball-and-socket from fixture, ball-and-socket major part passes down through manual self-centering chuck clamping, and drive ball-and-socket to rotate with the rotating speed of 240r/min by drive motors, have one to rotate the drill bit of contrary still coaxial rotating with ball-and-socket directly over ball-and-socket simultaneously, its rotating speed is 100r/min ~ 250r/min, subsequently drill bit come downwards to ball-and-socket afterbody start boring.
Following table is the operating efficiency contrast table adopting indexable staight shank shallow hole drilling and normal drill bit.
? Aperture (mm) Bit diameter (mm) Finished product/8h (individual)
Indexable staight shank shallow hole drilling 24 22 452
Normal drill bit 24 22 149
 
? Aperture (mm) Bit diameter (mm) Finished product/8h (individual)
Indexable staight shank shallow hole drilling 30 28 358
Normal drill bit 30 28 122
? Aperture (mm) Bit diameter (mm) Finished product/8h (individual)
Indexable staight shank shallow hole drilling 34 32 297
Normal drill bit 34 32 103
Its operation principle is: apparatus of the present invention are passed through by ball-and-socket artificial or machinery is large upside down, then upwards carry and clamped by chuck, the clamping workpiece time can be saved aborning, and the stand-by period can be reduced significantly, and when machining large ball-and-socket, general chuck also can meet clamping requirement, and without the need to purchasing large-scale chuck specially;
By driven by motor driver pulley rotation, drive pulley is by belt drive driven pulley, because driven pulley is connected by key with rotating cylinder, so rotating cylinder also rotates, the final chuck that drives also rotates, and workpiece also can rotate, rotate as main motion owing to adopting drill bit and workpiece simultaneously, it is that axiality is high that the pressure of the drill connects hole, and avoid the phenomenon that deviation appears in boring, yield rate is very high.

Claims (5)

1. large-tonnage ball-and-socket the pressure of the drill connects a hole fixture, it is characterized in that: comprise
One clamp body, this clamp body has the through cavity of a vertical direction, has the step surface of a block bearing assembly in the middle part of this cavity, and this step surface is placed with bearing assembly;
One flange shaft, this flange shaft is the axis body of a flanged dish in top, and axis body and ring flange central coaxial are provided with the centre bore holding large-tonnage ball-and-socket small end and pass through; Described flange shaft is arranged in the cavity of clamp body by bearing assembly, and the axis body bottom of flange shaft is connected with drive motors by belt transmission;
One manual self-centering chuck, this manual self-centering chuck is bolted on the ring flange of flange shaft.
2. large-tonnage ball-and-socket the pressure of the drill according to claim 1 connects hole fixture, it is characterized in that: described fixture also comprises an annular upper end lid, and this annular upper end lid to be bolted on ring flange and to be positioned at bottom manual self-centering chuck.
3. large-tonnage ball-and-socket the pressure of the drill according to claim 1 connects hole fixture, and it is characterized in that: be provided with a drill bit directly over described clamp body, drill bit and cavity are coaxially arranged.
4. large-tonnage ball-and-socket the pressure of the drill according to claim 1 connects hole fixture, it is characterized in that: described drill bit is indexable staight shank shallow hole drilling.
5. one kind adopts fixture processing large-tonnage ball-and-socket the pressure of the drill described in claim 1 to connect the method in hole, it is characterized in that: by the back side of ball-and-socket from fixture, ball-and-socket major part passes down through manual self-centering chuck clamping, and drive ball-and-socket to rotate with the rotating speed of 240r/min by drive motors, have one to rotate the drill bit of contrary still coaxial rotating with ball-and-socket directly over ball-and-socket simultaneously, its rotating speed is 100r/min ~ 250r/min, subsequently drill bit come downwards to ball-and-socket afterbody start boring.
CN201410444607.9A 2014-09-03 2014-09-03 High-efficiency fixture and method for drilling press fit holes in large-tonnage ball socket Pending CN104227445A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410444607.9A CN104227445A (en) 2014-09-03 2014-09-03 High-efficiency fixture and method for drilling press fit holes in large-tonnage ball socket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410444607.9A CN104227445A (en) 2014-09-03 2014-09-03 High-efficiency fixture and method for drilling press fit holes in large-tonnage ball socket

Publications (1)

Publication Number Publication Date
CN104227445A true CN104227445A (en) 2014-12-24

Family

ID=52216817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410444607.9A Pending CN104227445A (en) 2014-09-03 2014-09-03 High-efficiency fixture and method for drilling press fit holes in large-tonnage ball socket

Country Status (1)

Country Link
CN (1) CN104227445A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3805394A (en) * 1972-03-22 1974-04-23 B Marberg Hole pitch indicator for drilling bowling ball
CN201644549U (en) * 2010-03-22 2010-11-24 四川煌盛管业有限公司 Electric smelting pipe coiling device
CN101954592A (en) * 2010-06-10 2011-01-26 无锡华联精工机械有限公司 Rotary main shaft structure of pipe fitting numeric control drilling machine
CN202129479U (en) * 2011-06-28 2012-02-01 浙江机电职业技术学院 Spherical part drilling device
CN102886544A (en) * 2012-10-17 2013-01-23 杭州明美机械有限公司 Single spindle drilling machine with work piece turning device
CN204108684U (en) * 2014-09-03 2015-01-21 如皋市大生线路器材有限公司 A kind of large-tonnage ball-and-socket the pressure of the drill connects hole High efficient clamp

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3805394A (en) * 1972-03-22 1974-04-23 B Marberg Hole pitch indicator for drilling bowling ball
CN201644549U (en) * 2010-03-22 2010-11-24 四川煌盛管业有限公司 Electric smelting pipe coiling device
CN101954592A (en) * 2010-06-10 2011-01-26 无锡华联精工机械有限公司 Rotary main shaft structure of pipe fitting numeric control drilling machine
CN202129479U (en) * 2011-06-28 2012-02-01 浙江机电职业技术学院 Spherical part drilling device
CN102886544A (en) * 2012-10-17 2013-01-23 杭州明美机械有限公司 Single spindle drilling machine with work piece turning device
CN204108684U (en) * 2014-09-03 2015-01-21 如皋市大生线路器材有限公司 A kind of large-tonnage ball-and-socket the pressure of the drill connects hole High efficient clamp

Similar Documents

Publication Publication Date Title
CN202292174U (en) Clamping and centering device of ring-shaped workpieces
US20170209969A1 (en) Lathe Chuck for Aluminum Alloy Hubs
US10399195B2 (en) Stationary fixture for machining of aluminum alloy wheel
CN204108684U (en) A kind of large-tonnage ball-and-socket the pressure of the drill connects hole High efficient clamp
CN105618802A (en) Centering elastic internal-expanding clamp
CN104227445A (en) High-efficiency fixture and method for drilling press fit holes in large-tonnage ball socket
CN104084615A (en) Machining method of ring support
CN204108646U (en) A kind of Novel bearing-ring top wire hole numerical control machine tool
US20170209940A1 (en) Lathe Chuck for Aluminum Alloy Hubs
CN202239328U (en) Wheel spoke punched central hole positioning device
CN105773254A (en) Turning fixture for no-stop workpiece clamping
CN204748019U (en) A carousel machine for processing festival fork bearing hole
CN206393436U (en) Suitable for the driving device of workpiece automatic loading/unloading
CN103624288A (en) Hub processing method
CN204975395U (en) Can transversely have more drilling machines by automatic rotating workpiece
CN205519727U (en) Aluminum alloy wheel hub boring grab
CN102211214B (en) Strong drilling machine
CN204711289U (en) With the lathe of Electric drill-bit
CN203900525U (en) Lathe pneumatic chuck
CN203863355U (en) Drilling and tapping device
CN104139284B (en) A kind of method processing middle conical ring of synchronizer
CN102649167B (en) Drill chuck with lubricating device
CN102847973A (en) Multifacet drill boring device and machining method utilizing same
CN203437954U (en) Machining center workpiece and tool clamp
CN206997822U (en) Oil field shaft mouth big four processing machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141224