CN104195942A - Bridge bottom face overhauling structure - Google Patents

Bridge bottom face overhauling structure Download PDF

Info

Publication number
CN104195942A
CN104195942A CN201410411732.XA CN201410411732A CN104195942A CN 104195942 A CN104195942 A CN 104195942A CN 201410411732 A CN201410411732 A CN 201410411732A CN 104195942 A CN104195942 A CN 104195942A
Authority
CN
China
Prior art keywords
bridge
track
intermediate plate
connecting rod
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410411732.XA
Other languages
Chinese (zh)
Inventor
何学友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jinfeng Construction Co Ltd
Original Assignee
Sichuan Jinfeng Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jinfeng Construction Co Ltd filed Critical Sichuan Jinfeng Construction Co Ltd
Priority to CN201410411732.XA priority Critical patent/CN104195942A/en
Publication of CN104195942A publication Critical patent/CN104195942A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a bridge bottom face overhauling structure. The bridge bottom face overhauling structure comprises a track, a hanging basket, connecting rods, a sliding device and a plurality of pull rings. The track is arranged at the bottom of a bridge. The track comprises a fixed section, vertical sections and horizontal sections, wherein the vertical sections are arranged on the two sides of the fixed section and extend downwards, the horizontal sections extend inwards from the bottom, and the fixed section is fixed to the bottom of the bridge. The sliding device comprises a middle plate, a plurality of rotating shafts arranged on the two sides of the middle plate, and wheels arranged on the rotating shafts. The sliding device is arranged in the track, and the wheels make contact with the horizontal sections. The hanging basket is connected with one end of each connecting rod, and the other end of each connecting rod is connected with the middle plate. The pull rings are evenly arranged at the bottom of the bridge. The bridge bottom face overhauling structure is simple in structure, low in cost and capable of being suitable for bridges of various structures.

Description

Bridge bottom surface maintenance structure
Technical field
The present invention relates to the realm of building construction, relate in particular to a kind of bridge bottom surface maintenance structure.
Background technology
Bridge, after operation a period of time, need to be reinforced and overhaul its bottom, to ensure that bridge can safe operation.
Current, mainly adopt bridge inspection vehicle or boats and ships that the bottom of bridge is reinforced or overhauled.But bridge inspection vehicle is costly, and be unsuitable for having on the bridge floors such as oblique pull lock bridge the bridge of obstruction; Boats and ships go for oblique pull lock etc. the bridge bottom maintenance of obstruction, but the height of bridge is had to certain requirement, and boats and ships are only suitable for and on-water bridge, and can not be used for the similar land route bridge that is erected at intermountain.
Summary of the invention
Object of the present invention is to overcome the deficiencies in the prior art, provides a kind of cost low, simple in structure, and bridge bottom surface maintenance structure applied widely.
Object of the present invention is achieved through the following technical solutions:
Bridge bottom surface maintenance structure, comprises track, hanging basket, connecting rod, carriage and draw ring; Track is arranged at bridge bottom, the horizontal segment that track comprises canned paragraph, is arranged at canned paragraph both sides and extends internally to the vertical section of downward-extension, from vertical section bottom, and canned paragraph is fixed on bridge bottom; Carriage comprises intermediate plate, is arranged at multiple rotating shafts of intermediate plate both sides, is arranged at the roller in rotating shaft, and carriage is arranged in track, and roller contacts with horizontal segment; Hanging basket is connected with one end of connecting rod, and the other end of connecting rod is connected with intermediate plate; Multiple draw rings are evenly arranged in bridge bottom.
In use, staff overhauls and reinforces bridge bottom in hanging basket, coordinates with draw ring by the rod member of buckle, can hanging basket be slidably reciprocated in orbit by pulling, thereby the diverse location of bridge bottom is overhauled.
One group of roller is set respectively in the intermediate plate left and right sides, and two groups of rollers can effectively increase the stability of this structure, prevent that hanging basket from rocking.
The present invention is simple in structure, and cost is low, goes for the bridge of various structures.
Further, described carriage also comprises the fixed head being connected with intermediate plate bottom; One end of four described connecting rods is connected with four jiaos of described hanging basket respectively, and the other end of described connecting rod is connected with described intermediate plate by fixed head.
Further, four jiaos of four described connecting rods and described fixed head are connected.
Further, described track also comprises the T-shaped embedded body being connected with canned paragraph upper surface, and T-shaped embedded body is embedded in bridge bottom in advance.
T-shaped embedded body is set, can makes track more reliable with being connected of bridge bottom.And be embedded in bridge bottom by track in the time of bridge construction, can avoid later stage track to install time, the bolt between track and bridge bottom is connected the problem that bridge is damaged.
In sum, advantage of the present invention and beneficial effect are:
1. the present invention is simple in structure, and cost is low, goes for the bridge of various structures;
2. one group of roller is set respectively in the intermediate plate left and right sides, and two groups of rollers can effectively increase the stability of this structure, prevent that hanging basket from rocking;
3. T-shaped embedded body is set, can makes track more reliable with being connected of bridge bottom; And be embedded in bridge bottom by track in the time of bridge construction, can avoid later stage track to install time, the bolt between track and bridge bottom is connected the problem that bridge is damaged.
Brief description of the drawings
In order to be illustrated more clearly in embodiments of the invention, will be briefly described describing the required accompanying drawing of using in the embodiment of the present invention below.Apparent, the accompanying drawing in the following describes is only some embodiment that record in the present invention, for a person skilled in the art, in the situation that not paying creative work, can also, according to accompanying drawing below, obtain other accompanying drawing.
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of carriage;
Fig. 3 is the structural representation of track;
Wherein, the component title that Reference numeral is corresponding is as follows:
1-track, 2-hanging basket, 3-connecting rod, 4-carriage, 5-draw ring, 101-canned paragraph, 102-vertical section, 103-horizontal segment, 104-T type embedded body, 401-intermediate plate, 402-rotating shaft, 403-roller, 404-fixed head.
Detailed description of the invention
In order to make those skilled in the art understand better the present invention, below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out to clear, complete description.Apparent, embodiment described below is only the part in the embodiment of the present invention, instead of all.The embodiment recording based on the present invention, other all embodiment that those skilled in the art obtain in the situation that not paying creative work, all in the scope of protection of the invention.
Embodiment 1:
As shown in Fig. 1 ~ Fig. 3, bridge bottom surface maintenance structure, comprises track 1, hanging basket 2, connecting rod 3, carriage 4 and draw ring 5; Track 1 is arranged at bridge bottom, the horizontal segment 103 that track 1 comprises canned paragraph 101, is arranged at canned paragraph 101 both sides and extends internally to the vertical section 102 of downward-extension, from vertical section 102 bottoms, and canned paragraph 101 is fixed on bridge bottom; Carriage 4 comprises intermediate plate 401, is arranged at multiple rotating shafts 402 of intermediate plate 401 both sides, is arranged at the roller 403 in rotating shaft 402, and carriage 4 is arranged in track 1, and roller 403 contacts with horizontal segment 103; Hanging basket 2 is connected with one end of connecting rod 3, and the other end of connecting rod 3 is connected with intermediate plate 401; Multiple draw rings 5 are evenly arranged in bridge bottom.
In use, staff overhauls and reinforces bridge bottom in hanging basket 2, coordinates with draw ring 5 by the rod member of buckle, can hanging basket 2 be slidably reciprocated on track 1 by pulling, thereby the diverse location of bridge bottom is overhauled.
Embodiment 2:
As shown in figures 1 and 3, the present embodiment is on the basis of embodiment 1, and described carriage 4 also comprises the fixed head 404 being connected with intermediate plate 401 bottoms; One end of four described connecting rods 3 is connected with four jiaos of described hanging basket 2 respectively, and the other end of described connecting rod 3 is connected with described intermediate plate 401 by fixed head 404.
Embodiment 3:
As shown in figures 1 and 3, the present embodiment is on the basis of embodiment 2, and four jiaos of four described connecting rods 3 and described fixed head 404 are connected.
Embodiment 4:
As shown in Figure 3, the present embodiment is on the basis of above-mentioned any one embodiment, and described track also comprises the T-shaped embedded body 104 being connected with canned paragraph 101 upper surfaces, and T-shaped embedded body 104 is embedded in bridge bottom in advance.
As mentioned above, just can realize preferably the present invention.

Claims (4)

1. bridge bottom surface maintenance structure, is characterized in that:
Comprise track (1), hanging basket (2), connecting rod (3), carriage (4) and draw ring (5);
Track (1) is arranged at bridge bottom, the horizontal segment (103) that track (1) comprises canned paragraph (101), is arranged at canned paragraph (101) both sides and extends internally to the vertical section (102) of downward-extension, from vertical section (102) bottom, canned paragraph (101) is fixed on bridge bottom;
Carriage (4) comprises intermediate plate (401), is arranged at multiple rotating shafts (402) of intermediate plate (401) both sides, is arranged at the roller (403) in rotating shaft (402), carriage (4) is arranged in track (1), and roller (403) contacts with horizontal segment (103);
Hanging basket (2) is connected with one end of connecting rod (3), and the other end of connecting rod (3) is connected with intermediate plate (401);
Multiple draw rings (5) are evenly arranged in bridge bottom.
2. bridge according to claim 1 bottom surface maintenance structure, is characterized in that:
Described carriage (4) also comprises the fixed head (404) being connected with intermediate plate (401) bottom;
One end of four described connecting rods (3) is connected with four jiaos of described hanging basket (2) respectively, and the other end of described connecting rod (3) is connected with described intermediate plate (401) by fixed head (404).
3. bridge according to claim 2 bottom surface maintenance structure, is characterized in that:
Four jiaos of four described connecting rods (3) and described fixed head (404) are connected.
4. bridge according to claim 1 bottom surface maintenance structure, is characterized in that:
Described track also comprises the T-shaped embedded body (104) being connected with canned paragraph (101) upper surface, and T-shaped embedded body (104) is embedded in bridge bottom in advance.
CN201410411732.XA 2014-08-21 2014-08-21 Bridge bottom face overhauling structure Pending CN104195942A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410411732.XA CN104195942A (en) 2014-08-21 2014-08-21 Bridge bottom face overhauling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410411732.XA CN104195942A (en) 2014-08-21 2014-08-21 Bridge bottom face overhauling structure

Publications (1)

Publication Number Publication Date
CN104195942A true CN104195942A (en) 2014-12-10

Family

ID=52081295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410411732.XA Pending CN104195942A (en) 2014-08-21 2014-08-21 Bridge bottom face overhauling structure

Country Status (1)

Country Link
CN (1) CN104195942A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457627A (en) * 2018-12-26 2019-03-12 中铁七局集团第三工程有限公司 A kind of hanging basket for bridge construction that rail mounted is laid with
CN113089476A (en) * 2021-04-06 2021-07-09 贵州省质安交通工程监控检测中心有限责任公司 Magnetic power rail device for bridge support
CN113106860A (en) * 2021-04-06 2021-07-13 贵州省质安交通工程监控检测中心有限责任公司 Electromagnetic power bridge support monitoring track system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020054259A (en) * 2000-12-27 2002-07-06 최성문 Bridge inspection device and construction method
KR20100066161A (en) * 2008-12-09 2010-06-17 이병주 Bridge inspecting system using inspection moving car
CN101892736A (en) * 2010-08-10 2010-11-24 中建三局东方装饰设计工程有限公司 High altitude moving hanging basket construction method
CN203200655U (en) * 2013-03-22 2013-09-18 武汉二航路桥特种工程有限责任公司 Bridge construction auxiliary hanging basket convenient and fast to use
CN203755153U (en) * 2014-03-29 2014-08-06 杨彦亮 Simply supported plate bridge bottom plate maintenance construction moving operation platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020054259A (en) * 2000-12-27 2002-07-06 최성문 Bridge inspection device and construction method
KR20100066161A (en) * 2008-12-09 2010-06-17 이병주 Bridge inspecting system using inspection moving car
CN101892736A (en) * 2010-08-10 2010-11-24 中建三局东方装饰设计工程有限公司 High altitude moving hanging basket construction method
CN203200655U (en) * 2013-03-22 2013-09-18 武汉二航路桥特种工程有限责任公司 Bridge construction auxiliary hanging basket convenient and fast to use
CN203755153U (en) * 2014-03-29 2014-08-06 杨彦亮 Simply supported plate bridge bottom plate maintenance construction moving operation platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457627A (en) * 2018-12-26 2019-03-12 中铁七局集团第三工程有限公司 A kind of hanging basket for bridge construction that rail mounted is laid with
CN113089476A (en) * 2021-04-06 2021-07-09 贵州省质安交通工程监控检测中心有限责任公司 Magnetic power rail device for bridge support
CN113106860A (en) * 2021-04-06 2021-07-13 贵州省质安交通工程监控检测中心有限责任公司 Electromagnetic power bridge support monitoring track system

Similar Documents

Publication Publication Date Title
CN105002831A (en) Wheel-rail type loading and traveling cable crane
CN104762882A (en) Bridge segment lifting device and method
CN104195942A (en) Bridge bottom face overhauling structure
CN103896127A (en) Connecting structure of construction hoist and building climbing formwork frame
CN203998646U (en) Walking tower crane traveling gear
CN209081290U (en) Bailey truss pylon and distributing earth anchor CABLEWAY ERECTION SYSTEM that can be traversing
CN104196259A (en) Device for maintaining suspended stretch-across section of building
CN205257792U (en) Bridge crane with triangular support girder
CN204873574U (en) Hoist girder construction of stretching out and drawing back
CN204715212U (en) A kind of guiding device for mobile formwork girder whole lateral moving
CN201793331U (en) Translational crane for steel pipes
CN204551280U (en) Bridge subsection hanging apparatus
CN204675659U (en) A kind of light hoisting gear
CN202465115U (en) Double main beam gantry crane
CN102730169B (en) The traversing auxiliary device of ship launching
CN202429913U (en) Movable crane
CN202611219U (en) Rail-mounted cradle suspension mechanism
CN203782573U (en) Drag runway structure for erecting steel pipe arch bridge
CN204022292U (en) The connection structure of bridging crane main beam and end carriage
CN202609884U (en) Mobile sit-on-the-fence frame hanging basket suspension mechanism
CN201914902U (en) U-shaped hanging basket
CN202322176U (en) Self-detachable type gantry trolley
CN205555903U (en) Bridge crane
CN202201642U (en) Multi-pivot suspension crane
CN202465111U (en) Large shipbuilding gantry crane with anemobiagraph

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141210