CN104180474B - Method, device and new blower fan system that new fan filter screen set use time is controlled - Google Patents

Method, device and new blower fan system that new fan filter screen set use time is controlled Download PDF

Info

Publication number
CN104180474B
CN104180474B CN201410369600.5A CN201410369600A CN104180474B CN 104180474 B CN104180474 B CN 104180474B CN 201410369600 A CN201410369600 A CN 201410369600A CN 104180474 B CN104180474 B CN 104180474B
Authority
CN
China
Prior art keywords
time
blower fan
new blower
filter screen
new
Prior art date
Application number
CN201410369600.5A
Other languages
Chinese (zh)
Other versions
CN104180474A (en
Inventor
吴学伟
杨华生
Original Assignee
珠海格力电器股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 珠海格力电器股份有限公司 filed Critical 珠海格力电器股份有限公司
Priority to CN201410369600.5A priority Critical patent/CN104180474B/en
Publication of CN104180474A publication Critical patent/CN104180474A/en
Application granted granted Critical
Publication of CN104180474B publication Critical patent/CN104180474B/en

Links

Abstract

The invention discloses a kind of method of new fan filter screen set use time control, device and new blower fan system.Wherein the method comprises the following steps:Obtain new blower fan use air pollution grade in current slot;The conversion factor of new blower fan use time is obtained according to air pollution grade;Conversion run time of the new blower fan in current slot is calculated according to conversion factor;Run time is sued for peace for the conversion of conversion run time to new blower fan in current slot and new blower fan, obtains total conversion run time of new blower fan;When total conversion run time is more than or equal to the filter screen replacement time, sends new blower fan filter screen replacement and remind.Its screen pack use time calculations incorporated specifically used environment of new blower fan, Time Calculation is accurate.Avoid changing the waste that screen pack causes device too early in the case where air quality is good, when also avoiding use environment difference, screen pack is changed not in time and causes new blower fan air filtration effect poor, the problem that influence is used.

Description

Method, device and new blower fan system that new fan filter screen set use time is controlled
Technical field
The present invention relates to household appliance technical field, more particularly to a kind of method, the dress of new fan filter screen set use time control Put and new blower fan system.
Background technology
From outdoor introducing fresh air during new blower fan work, by supply chamber after filter screen filtration, room air being improved with this Quality.And the screen pack in new blower fan belongs to consumptive material, it is necessary to regularly replace.
The use time of screen pack is relevant with air quality, i.e., outdoor dust is more, and screen pack needs the more frequency changed It is numerous.But usual way is to have a use time substantially in the specification of new blower fan, user according to use time voluntarily more Renew the screen pack of blower fan.But in actual conditions, the air quality of various regions is different, even same place is in the different time periods (such as Various Seasonal, evening on daytime, fine day rainy day etc.) difference is also very big.Therefore, user oneself is to the filter screen replacement time Estimation it is very inaccurate, if having changed waste screen pack early, change evening and cause filter effect to be deteriorated, influence the defeated of new blower fan Go out effect.
The content of the invention
Based on this, it is necessary to carry out single setting to screen pipe use time in new blower fan in conventional art, cause Filter screen replacement time inaccurate problem in new blower fan, there is provided a kind of accurate to calculate the new of filter screen replacement time in new blower fan Method, device and new blower fan system that fan filter screen set use time is controlled.
Method to realize filter screen replacement time control in a kind of new blower fan that the object of the invention is provided, including following step Suddenly:
Obtain new blower fan use air pollution grade in current slot;
The conversion factor of new blower fan use time is obtained according to the air pollution grade;
Conversion run time of the new blower fan in current slot is calculated according to the conversion factor;
Run time is carried out for the conversion of conversion run time to new blower fan in current slot and the new blower fan Summation, obtains total conversion run time of the new blower fan;
When total conversion run time is more than or equal to the filter screen replacement time, sends new blower fan filter screen replacement and carry Wake up.
The embodiment of a kind of method controlled as new fan filter screen set use time, the new blower fan is by interconnection Net obtains the air pollution grade using ground.
The embodiment of a kind of method controlled as new fan filter screen set use time, the time segment length is half Hour.
The embodiment of a kind of method controlled as new fan filter screen set use time, makes in the new blower fan of acquisition It is further comprising the steps of before the step of air pollution grade of the land used in current slot:
The corresponding relation of storage air pollution grade and the conversion factor of the new blower fan use time is to the new blower fan Memory chip in.
The embodiment of a kind of method controlled as new fan filter screen set use time, it is described when total conversion fortune When the row time is more than or equal to the filter screen replacement time, sends new blower fan filter screen replacement and remind, comprise the following steps:
Judge total conversion run time whether more than or equal to the filter screen replacement time;
If so, then send new blower fan filter screen replacement reminding, and shown on the line control machine of the new blower fan;
If it is not, not dealing with then, the new blower fan normally runs.
The embodiment of a kind of method controlled as new fan filter screen set use time, it is further comprising the steps of:
The new blower fan filter screen replacement is reminded the intelligence for being sent to user eventually by the new blower fan by Cloud Server End.
The device of a kind of new fan filter screen set use time control based on same inventive concept, including class of pollution information Acquisition module, conversion factor acquisition module, Time Calculation module, total time computing module and filter screen replacement judge module, its In:
The class of pollution data obtaining module, for obtain new blower fan use air pollution in current slot Grade;
The conversion factor acquisition module, the conversion for obtaining new blower fan use time according to the air pollution grade Coefficient;
The Time Calculation module, for calculating folding of the new blower fan in current slot according to the conversion factor Calculate run time;
The total time computing module, for the conversion run time to new blower fan in current slot and the fresh air Run time is sued for peace for the conversion of machine, obtains total conversion run time of the new blower fan;
The filter screen replacement judge module, for being more than or equal to the filter screen replacement time when total conversion run time When, send new blower fan filter screen replacement and remind.
A kind of embodiment of the device controlled as new fan filter screen set use time, the class of pollution information is obtained Modulus block obtains the air pollution grade using ground by internet.
A kind of embodiment of the device controlled as new fan filter screen set use time, the time period is half small When.
A kind of embodiment of the device controlled as new fan filter screen set use time, also including memory module, institute Memory module is stated in the memory chip of the new blower fan, for storing air pollution grade with the new blower fan use time The corresponding relation of conversion factor.
A kind of embodiment of the device controlled as new fan filter screen set use time, the filter screen replacement judges Module includes time judging submodule and the first sending submodule, wherein:
The time judging submodule, during for whether judging total conversion run time more than or equal to filter screen replacement Between;
First sending submodule, for the judged result according to the time judging submodule, when total conversion When run time is more than or equal to the filter screen replacement time, sends new blower fan filter screen replacement and remind the line control machine for arriving the new blower fan On shown.
A kind of embodiment of the device controlled as new fan filter screen set use time, the filter screen replacement judges Module also includes the second sending submodule, is reminded to Cloud Server, and by institute for sending the new blower fan filter screen replacement State Cloud Server and send the filter screen replacement prompting to the intelligent terminal of user.
A kind of new blower fan system based on identical inventive concept, including order communication connection new blower fan, Cloud Server and Intelligent terminal;The new blower fan includes the device of foregoing new fan filter screen set use time control;And
The sensors sense environmental information that the new blower fan is installed using itself, the cloud is sent to by the environmental information Server, and receive the control instruction that the Cloud Server is returned;
The environmental information that new blower fan described in the cloud server sends, intelligent end is transferred to by the environmental information End, and the control instruction that the intelligent terminal sends is received, the control instruction is sent to the new blower fan;
User checks the environmental information by the intelligent terminal, and sends control instruction to the Cloud Server;
The environmental information is included more than the one or two kinds of in concentration, the concentration and concentration of formaldehyde of PM10 of PM2.5 Combination.
Beneficial effects of the present invention include:The method of new fan filter screen set use time control of the invention, device and new Blower fan system, by determining the conversion run time of new blower fan according to actual new blower fan running environment and actual run time, And the upper limit for converting run time is set, notify user more when the run time of new blower fan reaches the conversion run time upper limit Change screen pack.This screen pack use time computational methods combines the specifically used environment of new blower fan, and Time Calculation is accurate.Avoid Change the waste that screen pack causes device too early in the case where new blower fan use environment air quality is good, also avoid when new blower fan During use environment difference, screen pack is changed not in time and causes new blower fan air filtration effect poor, the problem that influence is used.
Brief description of the drawings
Fig. 1 is a kind of flow chart of a specific embodiment of the method for new fan filter screen set use time control of the present invention;
Fig. 2 is a kind of flow of the another specific embodiment of the method for new fan filter screen set use time control of the present invention Figure;
Fig. 3 is a kind of flow of the still another embodiment of the method for new fan filter screen set use time control of the present invention Figure;
Fig. 4 is that a kind of composition of a specific embodiment of the device of new fan filter screen set use time control of the present invention is illustrated Figure;
Fig. 5 is that a kind of another specific embodiment of the device of new fan filter screen set use time control of the present invention constitutes signal Figure;
Fig. 6 be a kind of screen pack of a specific embodiment of the device of new fan filter screen set use time control of the present invention more Change the composition schematic diagram of judge module;
Fig. 7 is a kind of system unit connection diagram of a specific embodiment of new blower fan system of the present invention.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with accompanying drawing to of the invention The specific embodiment of the method, device and new blower fan system of new blower fan filter screen replacement time control is illustrated.Should manage Solution, the specific embodiments described herein are merely illustrative of the present invention, is not intended to limit the present invention.
The method of the new blower fan filter screen replacement time control of one embodiment of the invention, as shown in figure 1, including following step Suddenly:
S100, obtains air pollution grade of the new blower fan using ground in current slot.Due to the filtering in new blower fan The service life of net has direct relation with air quality when using, therefore, new blower fan is obtained in this method first and uses ground Air pollution grade.The air pollution grade can be divided according to the general air quality criteria for classifying, such as 1,2,3, 4th, 5,6 grades, excellent, good air quality, slight pollution, intermediate pollution, serious pollution and severe contamination are corresponded to respectively.
Wherein, the mode for obtaining air pollution grade can be realized by the new blower fan of networking, by new blower fan directly by mutual Network and the Current air pollution grade on ground is used from weather station acquisition.
The described time period is the frequency of the acquisition air pollution grade for setting in advance.Time period is such as set for half an hour When, then think that air pollution grade is constant in half an hour after acquisition, until next time obtains new air pollution etc. Level information.
Herein it should be noted that the length of time period can be selected according to concrete configuration, such as networking effect is good, and newly When the chip functions calculated in blower fan are powerful, then the shorter time period may be selected;Opposite then optional longer time section. Half an hour generally may be selected as a time period, because the class of pollution of air will not become substantially within half an hour Change, and the precision that screen pack use time higher judges can be reached.
S200, the conversion factor of new blower fan use time is obtained according to the air pollution grade.Air pollution is more serious When, the up time of screen pack is shorter, and the frequency of filter screen replacement is higher.Therefore, set for different air pollution grades Put different new blower fan use time conversion systems.As new blower fan screen pack in air pollution grade 1 can add up to use 3 Month, and air pollution grade when being 2 screen pack can only add up to use 1.5 months, therefore folding of air pollution grade when being 2 is set Calculation coefficient is 2 times of conversion factor when air pollution grade is 1 grade.
S300, conversion run time of the new blower fan in current slot is calculated according to the conversion factor.With reference to The description of preceding step S200, the conversion use time of screen pack is different, the class of pollution under different air pollution grades When higher, the conversion run time of screen pack is more long.Therefore, with the conversion run time comprising different conversion factors in this method As the standard for investigating screen pack time used.Such use state to more can truly reflect screen pack, to changing It is more accurate that the time of filter screen judges.
As a kind of embodiment, can be according to formula:Conversion run time=real time section run time * conversions system Number, calculates conversion run time of the new blower fan in current run time section.Conversion operation can be carried out at the end of each time period The cumulative calculation of time.
S400, the conversion of conversion run time to new blower fan in current slot and new blower fan run time Sued for peace, obtained total conversion run time of the new blower fan.
Herein it should be noted that each time period calculate total conversion run time as subsequent time period conversion Run time, carries out run time conversion, and added up in each time period.When new blower fan does not run, the time is not carried out It is accumulative.And initial conversion run time be 0.Described is initially the moment that each new screen pack is started working.
S500, when total conversion run time is more than or equal to the filter screen replacement time, sends new fan filter screen set more Change prompting.When total conversion run time reaches the filter screen replacement time, then prompting is sent, remind user's cleaning in time or change Screen pack, to reach the good purpose for crossing air filtering.
Herein it should be noted that the filter screen replacement time be according to screen pack actually can normally run when Between determine.As screen pack when air pollution grade is 1 can cumulative activation 100 days, then can be set the filter screen replacement time is 100 days.And screen pack is that 1 grade of damage rate is double relative to gas level when gas level is 2 grades, then be in gas level At 2 grades, it is 50 days that screen pack can add up to use 50 days, i.e. running time, and its conversion factor is 2, when obtaining conversion operation Between also be 100 days.
The method of the new fan filter screen set use time control of the embodiment of the present invention, by according to actual new fan operation Environment and actual run time determine the conversion run time of new blower fan, and set the upper limit of conversion run time, in new blower fan Run time reach conversion the run time upper limit when notify user change screen pack.This screen pack use time computational methods The specifically used environment of new blower fan is combined, Time Calculation is accurate.Avoid in the good situation of new blower fan use environment air quality It is lower to change the waste that screen pack causes device too early, also avoid, when new blower fan use environment difference, screen pack being changed not in time and being made It is poor into new blower fan air filtration effect, the problem that influence is used.
Herein it should be noted that after user's replacing screen pack, run time clearing is always converted in the conversion of new blower fan. And after new screen pack brings into operation, re-start time cumulation calculating.
Wherein in an embodiment for the method for new fan filter screen set use time control, in step S100, obtain new Before the step of blower fan uses air pollution grade of the ground in current slot, as shown in Fig. 2 further comprising the steps of:
S010, the corresponding relation of storage air pollution grade and the conversion factor of the new blower fan use time to it is described newly In the memory chip of blower fan.Different grades of air quality grade is stored in the chip of new blower fan in advance, so as to new blower fan Directly used when the conversion run time of new fan filter screen set is determined according to air quality grade.Such as can embodiment party as one kind Formula, can be set the conversion factor of new blower fan run time as shown in table 1, and memory of the storage to new blower fan in the form of the table of comparisons In chip.The corresponding relation that other modes that can read store air pollution grade and conversion factor can certainly be chosen.
The conversion factor table of comparisons of table 1
Air pollution grade 1 2 3 4 5 6
Conversion factor 1 2 4 6 8 10
Such as table 1 as can be seen that be in this method using gas level be 1 grade as referring to, and others air pollution grade Lower relative conversion factor is bigger.Certainly, in other embodiments, it is also possible to which the air pollution grade of other grades is used as measurement With reference to.Such as using 6 grades as refer to when, then during other grades, conversion factor can be less than 1, will not enumerate herein.But need Bright, when selecting different air pollution grades as referring to, the corresponding filter screen replacement time will also convert accordingly, make The replacing construction of screen pack is corresponding with the actual life of screen pack.
Wherein in an embodiment for the method for new fan filter screen set use time control, step S500, when described total When conversion run time is more than or equal to the filter screen replacement time, sends new blower fan filter screen replacement and remind, comprise the following steps:
Whether S510, judge total conversion run time more than or equal to the filter screen replacement time.
S520, if so, then send new blower fan filter screen replacement reminding, and is shown on the line control machine of the new blower fan Show.When reaching the filter screen replacement time, display needs to change the information of screen pack on the line control machine of new blower fan, so as to user Screen pack is changed in cleaning in time.It is preferred that as a kind of embodiment, can show on line control machine when reaching the time Control line control machine to send caution sound while showing and need screen pack and further remind user.As another embodiment, Also can control to temporarily cease the new blower fan of operation simultaneously, to remind user to change screen pack.And in certain hour out of service Restarting afterwards runs new blower fan.
S530, if it is not, not dealing with then, the new blower fan normally runs.During without reaching the filter screen replacement time, then newly Blower fan normally runs.No longer excessive explanation herein.
Wherein in an embodiment for the method for new fan filter screen set use time control, as shown in figure 3, also include with Lower step:
The new blower fan filter screen replacement is reminded the intelligence for being sent to user by S600, the new blower fan by Cloud Server Can terminal.New blower fan be connected with Cloud Server communication, when the operation of new blower fan reaches the filter screen replacement time, transmission clean or Person changes the message of screen pack on the intelligent terminal of the user corresponding with new blower fan, so as to user according to information at Reason.Certain user also can be used intelligent terminal to send control command to new blower fan, controls new blower fan out of service or continues to transport OK, or operation power of new blower fan etc. is adjusted.It is more convenient to be controlled by intelligent terminal.
Herein it should be noted that user is passed through when being controlled to new blower fan using intelligent terminal, it is necessary to preset Cloud Server searches new blower fan, sets up and the communication connection between new blower fan.And the control that user is sent by intelligent terminal Order is sent to corresponding new blower fan by Cloud Server.Described intelligent terminal includes smart mobile phone, IPAD etc. herein.
In addition, it is necessary to explanation, user is changed after screen pack, on the line control machine or intelligent terminal of new blower fan Click has been changed, and eliminates the reminder message for changing screen pack.And recalculate the use time of the screen pack after changing.
Based on same inventive concept, the embodiment of the present invention provides a kind of device of new fan filter screen set use time control, Because the principle of this device solve problem is similar to the method that a kind of foregoing new fan filter screen set use time is controlled, therefore, should The implementation of system can be realized according to the specific steps of preceding method, repeat part and repeat no more.
The device of the new fan filter screen set use time control of one embodiment of the invention, as shown in figure 4, including the class of pollution Data obtaining module 100, conversion factor acquisition module 200, Time Calculation module 300, total time computing module 400 and screen pack Change judge module 500.Wherein:The class of pollution data obtaining module 100, for obtain new blower fan use when current Between air pollution grade in section;The conversion factor acquisition module 200, for obtaining fresh air according to the air pollution grade The conversion factor of machine use time;The Time Calculation module 300, exists for calculating the new blower fan according to the conversion factor Conversion run time in current slot;The total time computing module 400, for new blower fan in current slot Run time is sued for peace for the conversion of conversion run time and the new blower fan, when the total conversion for obtaining the new blower fan runs Between;The filter screen replacement judge module 500, for being more than or equal to the filter screen replacement time when total conversion run time When, send new blower fan filter screen replacement and remind.
The device of the new fan filter screen set use time control of the embodiment of the present invention, by according to actual new fan operation Environment and actual run time determine the conversion run time of new blower fan, and set the upper limit of conversion run time, in new blower fan Run time reach conversion the run time upper limit when notify user change screen pack.This screen pack use time computational methods The specifically used environment of new blower fan is combined, Time Calculation is accurate.Avoid in the good situation of new blower fan use environment air quality It is lower to change the waste that screen pack causes device too early, also avoid, when new blower fan use environment difference, screen pack being changed not in time and being made It is poor into new blower fan air filtration effect, the problem that influence is used.
Wherein in an embodiment for the device of new fan filter screen set use time control, the class of pollution information is obtained Modulus block obtains the air pollution grade using ground by internet.
Wherein in an embodiment for the device of new fan filter screen set use time control, the time period is half small When.Using half an hour as the time period of collection air pollution class information, timely acquisition air pollution grade is ensure that Situation of change, while again will not because gathered data excessively frequently caused by data amount of calculation it is excessive.
Wherein in an embodiment for the device of new fan filter screen set use time control, as shown in figure 5, also including depositing Storage module 600, the memory module in the memory chip of the new blower fan, for storing air pollution grade with the fresh air The corresponding relation of the conversion factor of machine use time.
Wherein in an embodiment for the device of new fan filter screen set use time control, as shown in fig. 6, screen pack is more Changing judge module 500 includes the sending submodule 520 of time judging submodule 510 and first.Time judging submodule 510, is used for Judge total conversion run time whether more than or equal to the filter screen replacement time;First sending submodule 520, for according to institute The judged result of time judging submodule is stated, when total conversion run time is more than or equal to the filter screen replacement time, is sent New blower fan filter screen replacement is reminded onto the line control machine of the new blower fan and shown.
Wherein in an embodiment for the device of new fan filter screen set use time control, filter screen replacement judge module 500 also include the second sending submodule 530, are reminded to Cloud Server for sending the new blower fan filter screen replacement, and pass through The Cloud Server sends the filter screen replacement and reminds the intelligent terminal for arriving user.
Based on same inventive concept, a kind of new blower fan system is also provided, as shown in fig. 7, comprises order communication connection is new Blower fan 101, Cloud Server 102 and intelligent terminal 103.New blower fan 101 includes foregoing new fan filter screen set use time control The device of system.And various sensors, the sensors sense environmental information that new blower fan is installed using itself, by institute are installed in new blower fan State environmental information and be sent to the Cloud Server, and receive the control instruction that the Cloud Server is returned.Described herein and ring What environment information was obtained including the concentration of PM2.5, the concentration of PM10 and concentration of formaldehyde etc. by the sensor of new blower fan itself institute band Heat transfer agent.
Wherein, the environmental information that new blower fan described in cloud server sends, intelligent end is transferred to by the environmental information End, and the control instruction that the intelligent terminal sends is received, the control instruction is sent to the new blower fan;User passes through The intelligent terminal checks the environmental information, and sends control instruction to the Cloud Server.The intelligent terminal includes intelligence Energy mobile phone, IPAD etc..And intelligent terminal is communicated with Cloud Server by wireless network and is connected.The wireless network can be WIFI。
The complete operation to this system is illustrated below.
First, the various sensor informations of new aerator supervision itself, including PM2.5, PM10, carbon dioxide, formaldehyde isoconcentration.
Then, new blower fan is all kinds of negative according to output control blower fan, electrostatic precipitation, anion generator, the auxiliary heat for detecting etc. Load is acted, to reach the purpose of purification of air.This process is essentially identical with traditional new blower fan function.
Finally, unit information (heat transfer agent of each sensor) is sent to Cloud Server by new blower fan by network, while Receive the control instruction and idsplay order of Cloud Server.
In addition, after the information of the new blower fan of cloud server, can simultaneously will send information to the intelligent terminal of user, user Can be used intelligent terminal that control instruction is sent to new blower fan by Cloud Server, control new blower fan according to the control instruction of user Operation.
Herein it should be noted that this new blower fan system equally has what foregoing new fan filter screen set use time was controlled What device had judges whether the screen pack in new blower fan reaches the function of filter screen replacement time.Can in time feed back and more renew Fan filter screen set information is to user.While reducing consumptive material waste, it is ensured that the air filtration effect of new blower fan.
Embodiment described above only expresses several embodiments of the invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Shield scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (11)

1. a kind of method that new fan filter screen set use time is controlled, it is characterised in that comprise the following steps:
Obtain new blower fan use air pollution grade in current slot;
The conversion factor of new blower fan use time is obtained according to the air pollution grade;
Conversion run time of the new blower fan in current slot is calculated according to the conversion factor;
Run time is sued for peace for the conversion of conversion run time to new blower fan in current slot and the new blower fan, Obtain total conversion run time of the new blower fan;
When total conversion run time is more than or equal to the filter screen replacement time, sends new blower fan filter screen replacement and remind;
The time period is the frequency of the acquisition air pollution grade for setting in advance;
The new blower fan obtains the air pollution grade using ground by internet.
2. the method that new fan filter screen set use time according to claim 1 is controlled, it is characterised in that the time period Length is half an hour.
3. the method that new fan filter screen set use time according to claim 1 is controlled, it is characterised in that in the acquisition It is further comprising the steps of before the step of new blower fan uses air pollution grade of the ground in current slot:
Note of the corresponding relation of storage air pollution grade and the conversion factor of the new blower fan use time to the new blower fan In recalling chip.
4. the method that new fan filter screen set use time according to claim 3 is controlled, it is characterised in that described when described When total conversion run time is more than or equal to the filter screen replacement time, sends new blower fan filter screen replacement and remind, comprise the following steps:
Judge total conversion run time whether more than or equal to the filter screen replacement time;
If so, then send new blower fan filter screen replacement reminding, and shown on the line control machine of the new blower fan;
If it is not, not dealing with then, the new blower fan normally runs.
5. the method that new fan filter screen set use time according to claim 1 is controlled, it is characterised in that also including following Step:
The new blower fan filter screen replacement is reminded the intelligent terminal for being sent to user by the new blower fan by Cloud Server.
6. a kind of device of new fan filter screen set use time control, it is characterised in that including class of pollution data obtaining module, Conversion factor acquisition module, Time Calculation module, total time computing module and filter screen replacement judge module, wherein:
The class of pollution data obtaining module, for obtain new blower fan use the air pollution in current slot etc. Level;
The conversion factor acquisition module, the conversion system for obtaining new blower fan use time according to the air pollution grade Number;
The Time Calculation module, for calculating conversion fortune of the new blower fan in current slot according to the conversion factor The row time;
The total time computing module, for the conversion run time to new blower fan in current slot and the new blower fan Run time is sued for peace for conversion, obtains total conversion run time of the new blower fan;
The filter screen replacement judge module, for when it is described it is total conversion run time be more than or equal to the filter screen replacement time when, New blower fan filter screen replacement is sent to remind;
The time period is the frequency of the acquisition air pollution grade for setting in advance;
The class of pollution data obtaining module obtains the air pollution grade using ground by internet.
7. the device that new fan filter screen set use time according to claim 6 is controlled, it is characterised in that the time period It is half an hour.
8. the device that new fan filter screen set use time according to claim 6 is controlled, it is characterised in that also including storage Module, the memory module makes for storing air pollution grade in the memory chip of the new blower fan with the new blower fan With the corresponding relation of the conversion factor of time.
9. the device that new fan filter screen set use time according to claim 8 is controlled, it is characterised in that the screen pack Changing judge module includes time judging submodule and the first sending submodule, wherein:
The time judging submodule, for judging total conversion run time whether more than or equal to the filter screen replacement time;
First sending submodule, for the judged result according to the time judging submodule, when total conversion operation When time is more than or equal to the filter screen replacement time, sends new blower fan filter screen replacement and remind the line control machine to the new blower fan enterprising Row display.
10. the device that new fan filter screen set use time according to claim 6 is controlled, it is characterised in that the filtering Net changes judge module also includes the second sending submodule, is reminded to cloud service for sending the new blower fan filter screen replacement Device, and the filter screen replacement prompting to the intelligent terminal of user is sent by the Cloud Server.
11. a kind of new blower fan systems, it is characterised in that new blower fan, Cloud Server and intelligent terminal including order communication connection; The new blower fan includes the device of the new fan filter screen set use time control described in any one of claim 6 to 10;And
The sensors sense environmental information that the new blower fan is installed using itself, the cloud service is sent to by the environmental information Device, and receive the control instruction that the Cloud Server is returned;
The environmental information that new blower fan described in the cloud server sends, intelligent terminal is transferred to by the environmental information, and The control instruction that the intelligent terminal sends is received, the control instruction is sent to the new blower fan;
User checks the environmental information by the intelligent terminal, and sends control instruction to the Cloud Server;
The environmental information includes one or more kinds of groups in concentration, the concentration and concentration of formaldehyde of PM10 of PM2.5 Close.
CN201410369600.5A 2014-07-30 2014-07-30 Method, device and new blower fan system that new fan filter screen set use time is controlled CN104180474B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410369600.5A CN104180474B (en) 2014-07-30 2014-07-30 Method, device and new blower fan system that new fan filter screen set use time is controlled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410369600.5A CN104180474B (en) 2014-07-30 2014-07-30 Method, device and new blower fan system that new fan filter screen set use time is controlled

Publications (2)

Publication Number Publication Date
CN104180474A CN104180474A (en) 2014-12-03
CN104180474B true CN104180474B (en) 2017-05-31

Family

ID=51961696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410369600.5A CN104180474B (en) 2014-07-30 2014-07-30 Method, device and new blower fan system that new fan filter screen set use time is controlled

Country Status (1)

Country Link
CN (1) CN104180474B (en)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105588259B (en) * 2014-12-05 2018-03-30 青岛海信日立空调系统有限公司 A kind of VMC and control method, control device
CN104633848B (en) * 2014-12-31 2017-02-22 小米科技有限责任公司 Remaining using time length determining method and device
CN104841214A (en) * 2015-06-02 2015-08-19 江苏新安电器有限公司 Monitoring device and monitoring method for filter screen life of purifier
CN105066288B (en) * 2015-07-14 2019-05-21 完美(广东)日用品有限公司 Physical measurement device in a kind of air
CN105180386B (en) * 2015-08-14 2018-04-17 珠海格力电器股份有限公司 The data analysing method and device of new blower fan system
CN105091250B (en) * 2015-09-17 2018-03-06 北京金山安全软件有限公司 The expired reminding method of clarifier filter screen and device and clarifier
CN105180368A (en) * 2015-09-18 2015-12-23 珠海汉朗环境科技有限公司 Air purifier and replacement reminding method and device of filter net of air purifier
CN105363297A (en) * 2015-11-25 2016-03-02 佛山市城市森林净化科技有限公司 Method for judging life of air purifier filter screen
CN105717011A (en) * 2016-02-01 2016-06-29 九阳股份有限公司 Method for determining utilization rate of purification device of air purifier
CN106123231A (en) * 2016-06-30 2016-11-16 北京小米移动软件有限公司 Absorbent paper replacing options and device
CN106247532B (en) * 2016-08-03 2020-12-11 美的集团武汉制冷设备有限公司 Air purifier control method and device
CN106247536A (en) * 2016-08-10 2016-12-21 深圳市霍尔新风科技有限公司 A kind of air cleaner and the monitoring method in filter screen life-span thereof
CN106274384B (en) * 2016-08-15 2018-11-23 深圳市永兴元科技股份有限公司 Reminding method, air conditioning for automobiles and the Cloud Server of screen replacing
CN106545962B (en) * 2016-10-31 2019-10-25 北京艾瑞克林科技有限公司 A kind of control method of new blower and its air output and exhaust air rate
CN106843107A (en) * 2017-01-24 2017-06-13 深圳企管加企业服务有限公司 Ventilation equipment Internet of Things monitoring method and system
US10387278B2 (en) * 2017-03-31 2019-08-20 Cisco Technology, Inc. Method to display real-time module OIR time
CN106969467A (en) * 2017-04-01 2017-07-21 青岛海尔空调器有限总公司 A kind of air-conditioning automatically cleaning control method and device
CN106958922A (en) * 2017-04-12 2017-07-18 浙江地球村环保科技有限公司 A kind of method and system for detecting the new blower fan screen net life-span
CN107420983A (en) * 2017-06-23 2017-12-01 青岛海尔空调器有限总公司 Air conditioner room unit and its control method with purification function
CN107420982A (en) * 2017-06-23 2017-12-01 青岛海尔空调器有限总公司 Air conditioner room unit and its control method with purification function
CN107514750B (en) * 2017-08-23 2020-09-08 四川虹美智能科技有限公司 Filter screen replacement reminding method, device and system
CN107543787A (en) * 2017-08-31 2018-01-05 广东美的环境电器制造有限公司 The determination method and device of filter screen service life, clarifier, computer-readable storage medium
CN107606742B (en) * 2017-08-31 2019-12-03 广东美的环境电器制造有限公司 The determination method and device of strainer service life, clarifier, storage medium
CN107606743B (en) * 2017-09-16 2020-04-24 青岛海尔空调器有限总公司 Method and device for reminding replacement of air conditioner purification filter element
CN107606750B (en) * 2017-09-16 2020-08-25 青岛海尔空调器有限总公司 Method and device for reminding replacement of air conditioner purification filter element
CN108050649B (en) * 2017-11-03 2019-08-27 珠海格力电器股份有限公司 Air conditioning filter network detecting method, device, storage medium and air-conditioning
CN107990504A (en) * 2017-12-01 2018-05-04 珠海格力电器股份有限公司 Information processing method, device and air-conditioning equipment for air-conditioning equipment
CN110260371B (en) * 2018-03-12 2021-01-19 宁波方太厨具有限公司 Intelligent control method for range hood based on multiple sensors
CN109520076B (en) * 2018-11-19 2021-02-09 广东美的制冷设备有限公司 Service time prompting method of air conditioner component, air conditioner, terminal and medium
CN110470029A (en) * 2019-07-22 2019-11-19 青岛海尔空调器有限总公司 For controlling the self-cleaning method and device of air-conditioning, air-conditioning

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1235060A (en) * 1998-05-07 1999-11-17 三星电子株式会社 Method for determining filter replacement time of air
CN102938023A (en) * 2012-11-15 2013-02-20 创天昱科技(深圳)有限公司 Effective utilization time integrating method and device for filter screen in air purifier
CN103123159A (en) * 2013-01-24 2013-05-29 广东志高空调有限公司 Air conditioner sleeping function control method based on cloud computing technology
CN103743056A (en) * 2014-01-14 2014-04-23 赵磊 Fresh air ventilator with PM (particulate matter) 2.5 filtering function

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6406367B1 (en) * 2000-12-26 2002-06-18 Carrier Corporation Indoor air quality control

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1235060A (en) * 1998-05-07 1999-11-17 三星电子株式会社 Method for determining filter replacement time of air
CN102938023A (en) * 2012-11-15 2013-02-20 创天昱科技(深圳)有限公司 Effective utilization time integrating method and device for filter screen in air purifier
CN103123159A (en) * 2013-01-24 2013-05-29 广东志高空调有限公司 Air conditioner sleeping function control method based on cloud computing technology
CN103743056A (en) * 2014-01-14 2014-04-23 赵磊 Fresh air ventilator with PM (particulate matter) 2.5 filtering function

Also Published As

Publication number Publication date
CN104180474A (en) 2014-12-03

Similar Documents

Publication Publication Date Title
US10454702B2 (en) Systems and methods for managing a programmable thermostat
CN203116234U (en) Air conditioner remote control system
US10198703B2 (en) Method and system for prioritizing control strategies minimizing real time energy consumption of built environment
CN104374046B (en) The cleaning based reminding method and system of filter screen of air conditioner
US20160154417A1 (en) Optimizing and Controlling the Energy Consumption of a Building
JP2018033140A (en) Position prediction for power saving in mobile device
CN105423499B (en) The monitoring method and device and air purifier of clarifier
CN107003019B (en) System and method for predicting HVAC filter replacement
CN104267626B (en) A kind of household appliance control method and system
US8131403B2 (en) System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
US20130345957A1 (en) Ranking nearby destinations based on visit likelihoods and predicting future visits to places from location history
CN103167414B (en) Meteorological information service system and its implementation of perception is participated in based on smart mobile phone
US8483669B2 (en) Mobile sensor network
CN105229389B (en) Air exchange system and control device
CN102591284B (en) Sewage treatment engineering monitoring system based on wireless sensor network
CN105743169B (en) A kind of high in the clouds remote control electric automobile charging station system and method
CN103927616B (en) Collector associates the method with electric energy meter rotation
JP2012533727A (en) Energy management system and method
CN103983304A (en) Watercourse water quality monitoring system and method
CN105363298A (en) Ventilation apparatus having detection function of filter direct and method for filter dirt detection
CA2928722C (en) Filtration monitoring system
US20110153525A1 (en) Method and system for managing power consumption using geolocation information
CA2895686C (en) Controlling electrically-powered trash compactors and receptacles
CN201993809U (en) Integrated energy source management system
JP6052451B2 (en) Air conditioning controller

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant