CN104169074B - The processing method of storage body sheet stock and processing unit (plant) - Google Patents

The processing method of storage body sheet stock and processing unit (plant) Download PDF

Info

Publication number
CN104169074B
CN104169074B CN201380008055.0A CN201380008055A CN104169074B CN 104169074 B CN104169074 B CN 104169074B CN 201380008055 A CN201380008055 A CN 201380008055A CN 104169074 B CN104169074 B CN 104169074B
Authority
CN
China
Prior art keywords
mentioned
band
feeding
sheet stock
silver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201380008055.0A
Other languages
Chinese (zh)
Other versions
CN104169074A (en
Inventor
小柳美奉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kashiwara Seitai Co Ltd
Original Assignee
Kashiwara Seitai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kashiwara Seitai Co Ltd filed Critical Kashiwara Seitai Co Ltd
Publication of CN104169074A publication Critical patent/CN104169074A/en
Application granted granted Critical
Publication of CN104169074B publication Critical patent/CN104169074B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B31MAKING ARTICLES OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER; WORKING PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31BMAKING CONTAINERS OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31B50/00Making rigid or semi-rigid containers, e.g. boxes or cartons
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B31MAKING ARTICLES OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER; WORKING PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31BMAKING CONTAINERS OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31B50/00Making rigid or semi-rigid containers, e.g. boxes or cartons
    • B31B50/74Auxiliary operations
    • B31B50/81Forming or attaching accessories, e.g. opening devices, closures or tear strings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B31MAKING ARTICLES OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER; WORKING PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31BMAKING CONTAINERS OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31B70/00Making flexible containers, e.g. envelopes or bags
    • B31B70/74Auxiliary operations
    • B31B70/81Forming or attaching accessories, e.g. opening devices, closures or tear strings
    • B31B70/84Forming or attaching means for filling or dispensing contents, e.g. valves or spouts
    • B31B70/85Applying patches or flexible valve inserts, e.g. applying film-like valves

Landscapes

  • Making Paper Articles (AREA)

Abstract

The present invention provides processing method and the processing unit (plant) of a kind of storage body sheet stock, and it is conducive to making the processing high speed of the accessory of the bonding lamellar being installed on above-mentioned storage body sheet stock on storage body sheet stock along its length continuous print silver.Accessory (13) is bonded on storage body sheet stock continuous print silver (12) along its length.Accessory (13) is by as continuous print band (14) feeding along its length, when being cut into each accessory (13) and being bonded on silver (12), first, thickness direction at silver (12) configures band (14), along the length direction feeder belt (14) of silver (12).When carrying (14) to stopped with the relative movement of silver (12), cut off the part of the forward end of band (14), be bonded on silver (12).

Description

The processing method of storage body sheet stock and processing unit (plant)
Technical field
The present invention relates to processing method and the processing unit (plant) of storage body sheet stock.
Background technology
In the prior art, when manufacturing the host body of sheet stock, it is mostly accessory is being arranged on storage body sheet The processing of sheet stock is carried out under state on material.Such as, patent documentation 1 is to install as accessory on the collecting bag of coffee etc. The check-valves of sheet stock, patent documentation 2 is to install as accessory to use relative to the reinforcement around handle aperture on handbag Sheet stock.As the host body being mounted with check-valves, it is possible to exemplify various article are received collecting bag, to gas, Liquid carry out the fluids such as balloon, the toy received keep bag, can be using the fluid enclosed as delaying that bed course, buffer body use Rush body etc..
Accessory is being arranged on accessory to be installed, the occasion on continuous print silver along its length, such as patent literary composition Offer shown in 1,2, in the way of intersecting with above-mentioned length direction, each accessory is inserted in above silver from the side of silver Or below and be fixed.In more detail, will separate with banding continuous print accessory on the side of silver, will separate 11 ground of accessory transfer from the side of silver, and be fixed.But, in this method, need difference out tape Cut off operation, the transfer operation of band, these 3 operations of fixed work order of band, carry out the set-up time shortening, raising speed also deposit In limit.
In patent documentation 3, disclose following apparatus and method, in these apparatus and method, will be with banding continuous print Accessory is arranged in the thickness direction of silver, and the length direction along silver is intermittently fed, by the partial cut of the forward end of band Become each accessory, be bonded on silver (Fig. 8~Figure 10 of patent documentation 3).But, continuous with banding as being intermittently fed this The feed unit of accessory, employ roller.
Although this roller uses in various devices as the feed unit with isometric size shape body is many, but to enter at a high speed The occasion of the feeding in the ranks having a rest, the actual amount of feeding deviates from design load, it is difficult to improve machining accuracy.
Prior art literature
Patent documentation
Patent documentation 1: No. 2626703 publications of Japanese Patent No.
Patent documentation 2: No. 3134083 publications of Japanese Patent No.
Patent documentation 3: No. 2691881 publications of Japanese Patent No.
Summary of the invention
Invent problem to be solved
The problem of the present invention is to provide a kind of precision that can improve processing and for the favourable host body of high speed With processing method and the processing unit (plant) of sheet stock, in this processing method, when at storage body sheet stock continuous print bar along its length On sheet during the accessory of the bonding lamellar being installed on above-mentioned storage body sheet stock, above-mentioned accessory is connected along its length Continuous band cuts into each above-mentioned accessory, is bonded on above-mentioned silver.
For solving the technological means of problem
The present invention be used for improve storage body sheet stock processing method, the processing method of this storage body sheet stock, comprise with Lower operation, i.e. to be installed in above-mentioned storage body sheet when bonding on storage body sheet stock along its length continuous print silver During the accessory of the lamellar on material, above-mentioned accessory continuous print band along its length is cut into each above-mentioned accessory, and by it It is bonded on above-mentioned silver.It to be intended to, and comprises band feeding operation and bonding process;In this band feeding operation, above-mentioned The thickness direction of silver configures above-mentioned band, along the above-mentioned band of length direction feeding of above-mentioned silver;In this bonding process, above-mentioned Carry under the state that the movement relative with above-mentioned silver stopped, by the partial cut of the forward end of above-mentioned band, be bonded in above-mentioned On silver.
The present invention is not because being along the above-mentioned band of direction feeding intersected with the length direction of above-mentioned silver, but feeding is along it The band of length direction feeding, so, actually need not insert the operation of the accessory being cut off from the side of silver.Especially It is in the occasion that the length direction of accessory is implemented as the width carried, it is possible to shorten the band amount of feeding of every 1 time, it is possible to The operation shorter as the time required for making above-mentioned band feeding operation is implemented.
It addition, in the occasion along the above-mentioned band of direction feeding intersected with the length direction of above-mentioned silver, it has at silver The side of the bag making device of self with the state stretched out be configured to cut off above-mentioned band go forward side by side advance to processing unit (plant), deposit In the danger that necessary area change is big, but in the present invention, because being the feeding band along the length direction feeding of silver, so, The part stretched out to side for the device of silver processing from bag making device etc. can be eliminated, or reduce the part stretched out, for The miniaturization of device entirety also is able to make contributions.
So, as the shortened belt amount of feeding, make band feeding operation required for the occasion implemented of time shorter operation, Need feeding with high precision band.As concrete example, if as a example by the check-valves of collecting bag, then its length is 5~about 10cm, And its width is 2~about 3cm.It addition, check-valves carrys out structure by 2 to the 4 synthetic resin material that coincidence length is different Become, and, the non-woven fabrics of filter is also deployed on a part for inside sometimes, in uneven thickness.If by the roller etc. carried The such accessory little and in uneven thickness of rotary unit feeding, the most particularly the amount of feeding little and also will be to enter at a high speed The occasion given, feeding is extremely difficult accurately.
Therefore, in the present invention, by moving it when band having been carried out and having kept by feeding holding body, even if It is the band of uneven thickness, it is also possible to correctly control short feeding length and carry out feeding.More specifically, above-mentioned band feeding Operation, comprise by feeding keep body above-mentioned band is kept operation, remain above-mentioned band make like this feeding keep body edge Operation that the length direction of above-mentioned band advances, keep holding that body carries out by above-mentioned band from by above-mentioned feeding after above-mentioned movement The operation of release, and make above-mentioned feeding keep the operation that body retreats toward the position before above-mentioned movement along the length direction carried.
And, in the occasion comprising following operation, i.e. when above-mentioned feeding keeps body to discharge above-mentioned band, by fixing holding Above-mentioned band is kept by body, and, when the feeding clipping above-mentioned band keeps body to advance, from the holding of above-mentioned fixing holding body Above-mentioned band is discharged, because the state that band is often kept is maintained, thus it is possible to improve the precision of the amount of feeding further.
Further, cut-out operation and bonding process are comprised;In this cut-out operation, above-mentioned band is sent into along the length with above-mentioned band The direction that degree direction is intersected cuts off the shearing device of above-mentioned band, is cut off its front end, separates above-mentioned accessory;In this bonding work In sequence, above-mentioned accessory overlapped on above-mentioned silver and carry out bonding;Above-mentioned shearing device, possesses cutting knife and is configured in State the holding body of at least any one party before and after cutting knife, be when having been carried out keeping to above-mentioned band by above-mentioned holding body by Above-mentioned cutting knife carries out the device cut off, by starting above-mentioned bonding process before completing in above-mentioned cut-out operation, even if cutting off With time fixing, accessory is also held stably, and can carry out cutting off and fixing in the short time.
More specifically, above-mentioned accessory can be implemented as the check-valves of a kind of sheet stock, the non-return of this sheet stock Valve possesses valve stream between the multi-disc sheet stock that through-thickness is overlapping, it is allowed to host body inside and outside between fluid flow into With flow out in any one party and do not allow to carry out the opposing party.It addition, above-mentioned band is the width with band and above-mentioned valve stream Parallel mode is arranged the band of multiple above-mentioned check-valves at the length direction of band, above-mentioned band feeding operation can with to be pacified The identical length of the width of the amount of the number of the above-mentioned check-valves being contained on 1 above-mentioned host body is by the above-mentioned feeding that brings to the front. Further, above-mentioned cut-out operation is the program of the side of the rear side separating above-mentioned check-valves from the front end of above-mentioned band, above-mentioned bonding Operation can be implemented as the operation being bonded on above-mentioned storage body sheet stock the front side of above-mentioned check-valves by heat-sealing.Because So cut off the side of the rear side of check-valves, the front side of check-valves is sealed, thus it is possible to carry out cutting off operation simultaneously At least some of and bonding process at least some of, it is possible to seek to process reliably and high speed.
It addition, the present invention is the invention of processing unit (plant) of improvement storage body sheet stock, this storage body sheet stock add frock Put and possess adhering device and shearing device;This adhering device, bonding on storage body sheet stock along its length continuous print silver The accessory of the lamellar being installed on above-mentioned storage body sheet stock;This shearing device, by above-mentioned accessory along its length Continuous print band cuts into each above-mentioned accessory.The present invention provides the processing unit (plant) of a kind of storage body sheet stock, this storage body sheet The processing unit (plant) of material be possess the thickness direction at above-mentioned silver configure above-mentioned band, by above-mentioned band along the length direction of above-mentioned silver The band feed arrangement of feeding;Above-mentioned shearing device, the movement relative with above-mentioned silver at above-mentioned band stopped, will The partial cut of the forward end of above-mentioned band, separates above-mentioned accessory;Above-mentioned adhering device, carried out by above-mentioned shearing device Before above-mentioned cut-out completes, above-mentioned accessory is bonded on above-mentioned silver.
The effect of invention
The present invention provides processing method and the processing unit (plant) of a kind of storage body sheet stock, the processing side of this storage body sheet stock Method and processing unit (plant), be bonded in above-mentioned storage body sheet stock the accessory of the lamellar on storage body sheet stock to be installed in Time along its length on continuous print silver, above-mentioned accessory continuous print band along its length is being cut into each above-mentioned accessory also When being bonded in above-mentioned silver, raising and high speed to seeking machining accuracy are favourable.
Accompanying drawing explanation
Fig. 1 is the axonometric chart of the structure of the processing unit (plant) of the storage body sheet stock representing embodiments of the present invention.
Fig. 2 is the figure of the processing method representing the processing unit (plant) utilizing this storage body sheet stock, and (A) is saying of the 1st operation Bright figure, (B) is the explanatory diagram of the 2nd operation, and (C) is the explanatory diagram of the 3rd operation, (D) be the 4th operation explanatory diagram.
Fig. 3 be (A) be in the processing method of the storage body sheet stock of embodiments of the present invention use conduct attached The upward view of the check-valves of product, (B) is the central sectional elevation of this check-valves, and (C) is the change of the interim fixing seal representing (A) The upward view of the check-valves of more example.
Fig. 4 be (A) be the sectional view representing state that be mounted with the host body of this check-valves, that check-valves opens, (B) Being the sectional view of the state representing that be mounted with the host body of this check-valves, closure of check ring, (C) is represent (A) interim The modification of fixing seal want portion's sectional view.
Detailed description of the invention
Hereinafter, with reference to the accompanying drawings embodiments of the present invention are illustrated.
The host body processing unit (plant) of host body this embodiment of > of < band check-valves is applied to manufacturing as shown in Figure 3 The check-valves of sheet stock, coffee bean etc. is released the band check-valves that the agricultural product of gas are received as shown in Fig. 4 (A) The device of accommodation bag.This accommodation bag, is by above-mentioned check-valves is arranged on storage body sheet stock 11 as accessory 13 Come up the accommodation bag of bag.Although the shape of this accommodation bag, being configured to carry out various change and implement, but in this instance, it is So-called back of the body out pocket, 1 side at storage body sheet stock 11 installs the check-valves as accessory 13, when bag, a side Side and the side of the opposing party when carrying out bonding by heat-sealing etc., as the check-valves of accessory 13 be bonded in dual-side it Between.
Implement although this accessory 13 also is able to carry out various change, but in this instance, quilt as shown in Fig. 3 (B) Being configured to clip the state of 1 plate valve sheet stock 16 between 2 main body sheet stocks 15, as shown in Fig. 3 (A), both sides is by side seal 17 Bonding.It addition, in the various figures, although overlapping under the state that each sheet stock contacts the most actually, but in the drawings, in order to make Obtain the relation between each sheet stock easy to understand, make the thickness of sheet stock, sheet stock interval each other be described than actual the earth.
This accessory 13, becomes valve path between the side seal 17 of both sides, by valve block material 16 be adjacent to faced by body sheet On material 15, carry out the opening and closing of valve.One end (left end of Fig. 3, Fig. 4) of valve path becomes inflow entrance, the other end (right side of Fig. 3, Fig. 4 End) become flow export, at the filter 19 of the inflow entrance configuration fabric grade of nonwoven.As shown in Fig. 4 (A), if fluid is from inflow entrance Flow into, then valve path is opened, and fluid flows out from flow export, even if as Fig. 4 (B) as shown in fluid will from flow export countercurrently, Valve is also switched off, will not be from inflow entrance adverse current.This accessory 13 carrys out bag because configure inflow entrance in the inside of accommodation bag, so, Although the gas such as occurred from coffee bean can being made to flow out to outside, but fluid from outside being sharp to the inflow within accommodation bag Prevent with check-valves effect.It addition, in order to the inside of check-valves is not fused, such as figure because of heat-sealing during above-mentioned bag Shown in 3, the main body sheet stock 15 of a side applies heat-resistant inks 20, prevents it from melting.
The processing unit (plant) of this embodiment, is in order to the accessory 13 as above-mentioned check-valves is temporarily fixed at host body With the device being utilized on sheet stock 11 along its length continuous print silver 12, by implementing its processing method, it is possible to by attached Product 13 are temporarily fixed on storage body sheet stock 11.
< about processing unit (plant) summary and silver 12, carry this processing unit (plant) of 14 >, as it is shown in figure 1, be equipped with band feeding dress Put 21, shearing device 31 and adhering device 41 as main device.Thus device, accessory 13 is separated from band 14, peace It is contained on silver 12.
Silver 12, is as the raw-material sheet stock being processed to storage body sheet stock 11, can use one kind or two or more The monomer of synthetic resin made membrane, the sheet stock of duplexer, the composite system of synthetic resin and metal forming, paper, non-woven fabrics etc. The various sheet stock such as sheet stock, its material is not specifically limited.But, implementing interim fixing occasion by heat-sealing, preferably by holding The thermoplastic film of the polyethylene etc. easily carrying out the fever sensation of the face envelope of its at least one party is constituted.Though it is not illustrated, this silver 12 leads to Often it is wound into web-like to supply, is sent by feed arrangement from volume, the length of the storage body sheet stock 11 of each feeding 1 amount Be intermittently fed.
In the stopping of the feeding having a rest here, the processing unit (plant) work of this embodiment, at the side of a side of silver 12 Every predetermined distance, accessory 13 is fixed temporarily.This predetermined distance, such as when pacifying on each storage body sheet stock 11 When filling 1 accessory 13, become the interval of the length of the storage body sheet stock 11 of 1 amount, when at each storage body sheet stock 11 On to install 2 accessories 13 at equal intervals time, become the interval of the length of the storage body sheet stock 11 of half amount.So, it is stipulated that Interval is set accordingly with the processing content for silver 12, as described later, even if not being the feeding of interval, but does not stops Continuous print feeding only, it is possible to implement.
This accessory 13, is the component temporarily fixed in the way of the outside of accommodation bag is gone out by flow export.Accessory 13, It is mounted in the way of storage body sheet stock 11 somewhat highlights by its one end.
Band 14, is the band being formed continuously accessory 13 along its length.Its material is general by the check-valves of lamellar Raw material constitute, although without particular limitation of, but implementing interim fixing occasion by heat-sealing, preferably by easily carrying out it extremely The thermoplastic film of the polyethylene etc. of the fever sensation of the face envelope of a few side is constituted.The orientation of accessory 13, with the width of accessory 13 Direction is in and is formed with the mode on the length direction of 14, and each side seal 17 is to configure in the way of with the width extension of 14. It addition, the side seal 17 of 1 accessory 13 is continuously formed at the side seal 17 of width with adjacent accessory 13.This band 14 is also It is wound into web-like, band feed arrangement 21 sends off and on.It addition, in this instance, from sending of volume, although be also by bringing into Carry out carrying 14 tensionings to device 21, but also can be sent by other feed arrangement.It addition, in the drawings, although it is at silver The superimposed thereon band 14 of 12, but also can overlap below silver 12.And, it is possible to configuration silver 12 and band along the vertical direction 14, the most upward or lower section feeding, one side is processed, additionally one side, it is possible to along inclined direction configuring, its position relationship can be free Ground change.Accordingly, with respect to the explanation of the present invention, it is only limitted to represent relative position relationship the most up and down, should not be understood Become to determine absolute position.
< about overall arrangement >, arranges from the upstream toward downstream with 14 and brings in the processing unit (plant) of this embodiment To device 21, shearing device 31, adhering device 41, between shearing device 31 and adhering device 41, band 14 is overlapping with silver 12.
<, about band feed arrangement 21 > band feed arrangement 21, possesses and is configured in the fixing holding body 22 of upstream and is joined Put the feeding in side downstream and keep body 24.
Fixing keep body 22, be the component of sandwich band 14 from thickness direction, although it is big to be configured to cross section in the drawings Cause square bar-shaped, but may also be other polygon prism shape, or the roll that cross section is circular, or in the both sides of thickness direction not Same shape.Further, in FIG, body 24 is kept as feeding, although illustrate and protect in the width continuous print feeding with 14 Hold body but it also may be that a position of a part or the feeding that clamps of multiple position with 14 is kept body, as long as The feeding kept with 14 can be kept body, then can suitably change and implement.
This fixing holding body 22, is clamped by fixing working body 23 and is discharged.
In this instance, although fixing working body 23 is by as the gas making the fixing holding body 22 of a side (top) move up and down Cylinder is implemented, but the opposing party (lower section) also can be made to move up and down, or makes both move up and down.Additionally, it is possible to replaced gas by electric magnet Cylinder clamps and discharges.And, it is possible to replace clamping that band 14 is kept by the attraction of air.
Feeding keeps body 24, is to be carried out the holding with 14 by feeding working body 25 identically with above-mentioned fixing holding body 22 With the component of release, above-mentioned fixing holding body 22, the explanation of fixing working body 23 can be directly applied for feeding and keep body 24, enter To working body 25.Difference is, fixing holding body 22 (upstream side and downstream) forwards, backwards is motionless, but feeding keeps body 24 by entering Move forwards, backwards to moving body 26.Specifically, feeding keeps body 24 and feeding working body 25 can use by crank-piston mechanism Deng the rotary motion of motor etc. being transformed into the fluid pressure devices such as the device of linear motion, cylinder, utilizing the dress of electric magnet etc. Put.Amount of movement, is the transverse width (length between side seal 17 and side seal 17) of 1 accessory 13, specifically, although be 2~about 3cm, but it is not limited to this.
< about shearing device 31 > shearing device 31, is the portion of forward end by the band 14 sent here by band feed arrangement 21 Cut device disconnected, that separate as 1 accessory 13.This shearing device 31, possesses cutting knife 34 and at least appointing before and after it Anticipate the position of a side (the being before and after two side in this instance) holding body 32 to keeping with 14.Holding body 32, with above-mentioned Fixing keep body 22 in the same manner by hold working body 33 carry out with 14 holding and the component of release, above-mentioned fixing holding body 22, the explanation of fixing working body 23 also is able to directly be suitable at holding body 32, holding working body 33.Different points is, because bar Sheet 12 is close at thickness direction, therefore, it is compact shape, the most in this instance, in order to press from both sides before and after cutting knife 34 Hold, between retained part front and back, be recessed into groove.
Cutting knife 34, is the cutting knife cut off in the width direction by the band 14 kept by holding body 32.Specifically, it is by adjacent Accessory 13 side seal 17 and side seal 17 between cut off cutting knife, in this instance, although have employed and made by cutter working body 35 The structure that cutting knife 34 moves to the side of the opposing party along the width (Fig. 1's is lateral) with 14 from the side of a side, but also may be used Being to make the cutter with the length more than with the width of 14 mobile cut off to the thickness direction (above-below direction of Fig. 1) with 14 Structure.About cutter working body 35, without particular limitation of, can suitably select to be made motor etc. by crank-piston mechanism etc. Rotary motion to the device of linear motion conversion, the fluid pressure device such as cylinder, utilize the device etc. of electric magnet etc. to use.
< about adhering device 41 > adhering device 41, be by accessory 13 welding that has been partitioned from silver 12 Device, possesses the sealed mould 42 and Zhi Chengmo 43 making accessory 13 melt.As making its means melted, usually add hot melt Change but it also may be other fusing means of Ultrasonic melting grade.It addition, except heat-sealing, it is also possible to it is to utilize gluing of bonding agent Connect.Sealed mould 42 is moved to the thickness direction of accessory 13 by seal operation body 44.At seal operation body 44, can use and handle Hold the working body that other working body of working body 33 grade is same.
Accessory 13, although fully fixed eventually through back of the body patch by the bag of the following storage body sheet stock 11 carried out, But the interim fixing seal 18 utilizing this adhering device 41 to implement is fixed in advance, to prevent accessory 13 in bag operation Skew.
The fixed position of interim fixing seal 18, although can suitably select to change, but as shown in Fig. 3 (A), can be attached Interim fixing seal 18 is formed on the side seal 17 of the front of the direction of feed of genus product 13, particularly front.It addition, at Fig. 3 (A) in, arrow represents the direction of feed of accessory 13 (that is, with 14), thereby, it is possible to do not hinder the valve of accessory 13 to obtain functionally Must be with the consistent flow of design of check-valves.
Additionally, it is possible to as shown in Fig. 3 (C), Fig. 4 (C), be not by side seal 17, but right by interim fixing seal 18 Main body sheet stock 15 with 14 is fixed with storage body sheet stock 11.Thus, even if this bag is used after bag completes Occasion, the check-valves entirety as accessory 13 becomes to be difficult to leave from storage body sheet stock 11, it is possible to reduce by the content of bag Thing imprudence causes the danger that check-valves is twisted.At that time, although filter 19 also is able to fix together, it is desirable that increase heat resistant oils The area of application etc. of ink 20 so that filter 19 is not heat-sealed.Thus, when discharging gas, one side is able to maintain that main body sheet stock 15 have been fixed on the state on storage body sheet stock 11, and one side only filter 19 easily extends, significantly well by interior The gas in portion is discharged to outside.
Below < processing method >, referring especially to Fig. 2, the processing method utilizing this device is illustrated.
Shown in < the 1st operation > such as Fig. 2 (A), if the sensors such as photocell 27 read waits shape on band 14 by printing The labelling become, the most a series of manufacturing procedure works.
First, feeding working body 25 body 24 is kept to close the feeding being in going-back position, at thickness direction to band 14 Carry out clamping etc., it is kept.In this case, fixing holding body 22 is opened.
< the 2nd operation > then, as shown in Fig. 2 (B), is being kept body 24 to 14 states kept by feeding Under, feeding moving body 26 make feeding keep body 24 to advance along the length direction of band.Feeding keeps the advance amount of body 24, with attached The transverse width of 1 amount of product 13 is roughly equal.During it addition, advance at this, fixing holding body 22 discharges band 14.This embodiment party In formula, because the feeding with 14 is carried out not by the rotation of the rotary units such as roller, but kept body 24 to band by feeding The feeding with 14 is carried out, thus it is possible to carry out the control of the correct amount of feeding under 14 states kept.Particularly attached Under 1 of genus product 13 this short amount of feeding of 2~about 3cm of amount, if band 14 is in uneven thickness, then roller etc. is being utilized to revolve The danger that the amount of feeding becomes unstable is there is in the case of turning under unit, but in this embodiment, it is possible to eliminate this such Problem.
< the 3rd operation > then, as shown in Fig. 2 (C), carry out by feeding working body 25 make feeding keep body 24 from band 14 from Come discharged operation, made fixing to keep body 22 to band 14 operations kept with by holding work by fixing working body 23 Making body 33 uses holding body 32 to 14 operations kept.Although these releases and holding also can be carried out simultaneously, it is desirable that After at least any one party in the holding carried out by fixing holding body 22 and the holding carried out by holding body 32 is carried out, carry out Above-mentioned feeding keeps the release of body 24.Thus, often maintain with 14 states being kept, it is possible to carry out correct control.
< the 4th operation > is last, as shown in Fig. 2 (D), maintains the hold mode carried out by fixing working body 23 constant, Carry out being made the feeding of release conditions keep body 24 to retreat the operation to going-back position, carried out by cutting knife 34 by feeding moving body 26 Cut-out operation with 14 and the bonding process carried out by adhering device 41.Because so keep advance and the retrogressing of body 24 in feeding Between carry out cutting off operation and bonding process, thus it is possible to carry out high efficiency processing, it is possible to shorten process time.Particularly By make the fixed position para-position in advance with accessory 13 of the position of the band 14 on the width of silver 12 go forward side by side traveling to, When manufacturing procedure, it is not necessary to the location of the width of accessory 13.
The cut-out operation of the band 14 carried out by cutting knife 34, makes above-mentioned cutter working body 35 work, by with 14 forward end Partial cut, separate 1 accessory 13.Specifically, the side seal 17 of the rear side on accessory 13 being partitioned from And (position shown in reference number C in Fig. 1) cuts off between the side seal 17 of the front side of follow-up accessory 13.
The bonding process carried out by adhering device 41, is to be overlapped by the accessory 13 of cut-off front end on silver 12 also Carry out bonding program, seal operation body 44 between sealed mould 42 and Zhi Chengmo 43, clip accessory 13 and silver 12 is carried out Bonding.Although this cuts off operation and bonding process can simultaneously be carried out, it is desirable that fully cut by cutting knife 34 at accessory 13 Before Duan, be the most also in clip between sealed mould 42 with Zhi Chengmo 43 accessory 13 and silver 12 state (although bonding Also can be without, but the state that is closed of two moulds 42,43).Because so accessory 13 by from band 14 separated before by Sealed mould 42 and Zhi Chengmo 43 keeps when being positioned at accessory 13 and silver 12, so, it is achieved correctly Position under bonding.
What thus bonding process was carried out is fixing, because being (the particularly front, front side on the accessory 13 being partitioned from The position of the side seal 17 of side is the most preferable), so, even if relative to 2~the accessory 13 of this short width of 3cm, it is also possible to big Cause simultaneously to carry out above-mentioned cut-out operation and bonding process.
What thus bonding process was carried out is fixing, although push and shove sealed mould 42 from that side of accessory 13 to carry out heat welded Processing, but also can push and shove sealed mould 42 from that side of silver 12 on the contrary and carry out the processing of heat welded.But, from accessory 13 those sides are pushed and shoved sealed mould 42 and are carried out the processing of heat welded, are favourable in the following areas, i.e. even if for silver The occasion that the thickness of sheet stock, material etc. have been changed, if accessory 13 is identical, then also is able to be set for by mutually synthermal Heat-sealing.
After bonding process completes, the silver 12 securing accessory 13 is sent to the follow-up operation for bag.Separately On the one hand, return to the state of (A) of initial Fig. 2 with 14, after, repeated relative to the processing of next accessory 13.Separately Outward, when bag, content can not be loaded, only make bag complete, it is possible in bag operation load content, at bag when completing Become the state that content has been received.Additionally, it is possible to not bag, but for the moment silver 12 is coiled into web-like etc. and carries out keeping Transfer.
< modification > in embodiment above, silver 12 at least the period that bonding process is carried out with band 14 Relation in relatively stop.Particularly in stable work, although also can be in whole operations of (A)~(D) until Fig. 2 The feeding of lower stopping silver 12, but seeking the occasion of high speed, the feeding of silver 12 only can be stopped when bonding process.Separately Outward, in bonding process, by as one man making adhering device 41 main processing unit (plant) such as grade advance with the amount of feeding of silver 12, become Relatively stopped silver 12 and the state of accessory 13, it is possible to high speed further.
In embodiment above, although the check-valves of sheet stock has been used as accessory 13, but can be right by being used for The bottom surface of collecting bag, portable hole carry out the various article such as the sheet stock strengthened, portable handle and are used as accessory.The most attached Product 13 and be continuously provided their material of band 14, can suitably change synthetic resin material, metal forming, paper, non-woven fabrics, Knitted fabric, the monomer of fabric, their composite etc. are implemented, it is possible to containing playing various functions, work in them Medicament, chemicals, additionally, it is possible between multi-disc sheet stock configuration play various functions, the material of effect.Additionally, it is possible to To be the accessory 13 being mainly attached from the viewpoint of design is, or the accessory 13 of the mechanical properties such as imparting intensity, Should not limit the invention according to the purpose of additional accessory 13, thus obtained action effect and understand.
The position of intensive aspect is installed, although in example above, be located at the position by side of silver but it also may in being Centre part, the position of the width of silver is free to set, even if changing the occasion of setting, it is also possible to with upper The speed that the example stated is identical operates.
Description of reference numerals:
11 storage body sheet stocks
12 silvers
13 accessories (check-valves)
14 bands
15 main body sheet stocks
16 valve block material
17 side seals
18 interim fixing seals
21 band feed arrangements
22 fixing holding bodies
23 fix working body
24 feedings keep body
25 feeding working bodies
26 feeding moving bodys
31 shearing devices
32 holding body
33 hold working body
34 cutting knifes
35 cutter working bodies

Claims (5)

1. a processing method for storage body sheet stock, wants when bonding on storage body sheet stock along its length continuous print silver During the accessory of the lamellar being installed on above-mentioned storage body sheet stock,
By carrying out length direction along above-mentioned silver from upstream toward downstream feeding above-mentioned accessory continuous print band along its length Band feeding operation, described band is sent into shearing device and adhering device, above-mentioned shearing device by above-mentioned band along the length with this band The direction that degree direction is intersected cuts off;
The movement relative with above-mentioned silver at above-mentioned band stopped, carry out upper the front end cut-out of above-mentioned band State the cut-out operation that accessory separates, and above-mentioned accessory overlap is bonded in the bonding process on above-mentioned silver, this collecting The processing method of body sheet stock is characterised by:
The processing method of this storage body sheet stock uses the fixing holding body of upstream side, is arranged in the downstream of above-mentioned fixing holding body Feeding keep body, be arranged in above-mentioned feeding keep body downstream above-mentioned shearing device, be arranged under above-mentioned shearing device The above-mentioned adhering device of trip;
Above-mentioned shearing device, the holding body of both sides before and after possessing cutting knife and being arranged in above-mentioned cutting knife;Existed by above-mentioned holding body Under the state before and after above-mentioned cutting knife, above-mentioned band kept, above-mentioned cutting knife cut off;
The processing method of this storage body sheet stock carries out following first operation~the 4th operation by these devices:
First operation, is kept body to keep above-mentioned band by the above-mentioned feeding being in going-back position;
Second operation, discharges above-mentioned band at above-mentioned fixing holding body, and is kept body to keep above-mentioned band by above-mentioned feeding State under, make above-mentioned feeding keep body advanced downstream, thus make above-mentioned band carry out the relative advance relative to above-mentioned silver, And proceed the relative advance relative to above-mentioned silver of the above-mentioned band, until the above-mentioned band above-mentioned shearing device of feeding and above-mentioned Adhering device;
3rd operation, above-mentioned band relatively advancing the stage stopped relative to above-mentioned silver, carries out above-mentioned feeding holding simultaneously The operation that above-mentioned band is discharged by body, the operation above-mentioned band kept by above-mentioned fixing holding body, by above-mentioned holding body to upper State the operation that band carries out keeping, or, carrying out the operation that above-mentioned band kept by above-mentioned fixing holding body and by above-mentioned After at least any one operation in the operation that above-mentioned band is kept by holding body, carry out being kept body by upper by above-mentioned feeding State the operation of band release, and period kept by above-mentioned band before and after above-mentioned cutting knife in above-mentioned holding body, proceed by handle The front side on above-mentioned accessory being partitioned from carries out bonding above-mentioned bonding process with above-mentioned silver;
4th operation, is being maintained hold mode by above-mentioned fixing holding body and is being maintained the state of hold mode by above-mentioned holding body Under, carry out making the above-mentioned feeding of release conditions keep body to back to the operation of above-mentioned going-back position and above-mentioned cut-out operation.
The processing method of storage body sheet stock the most according to claim 1, it is characterised in that: complete in above-mentioned cut-out operation Before, above-mentioned bonding process is started.
The processing method of storage body sheet stock the most according to claim 1 and 2, it is characterised in that: above-mentioned accessory is sheet The check-valves of material system, possesses valve stream, it is allowed to use above-mentioned storage body sheet between the multi-disc sheet stock that through-thickness is overlapping Material formed host body inside and outside between fluid flow in and out in any one party and do not allow to flow into and flow The opposing party in going out;
Above-mentioned band, is arranged on multiple in the way of the width that makes band is parallel with above-mentioned valve stream on the length direction of band State check-valves;
Above-mentioned band feeding operation, with the width phase with the amount of the number of the above-mentioned check-valves being installed on 1 above-mentioned host body Same length is by the above-mentioned feeding that brings to the front;
Above-mentioned cut-out operation, separates the side of the rear side of above-mentioned check-valves from the front end of above-mentioned band;Above-mentioned bonding process, passes through The front side of above-mentioned check-valves is bonded on above-mentioned storage body sheet stock by heat-sealing.
4. the processing unit (plant) of a storage body sheet stock, it is characterised in that the processing unit (plant) of above-mentioned storage body sheet stock uses power Profit requires the processing method of the storage body sheet stock described in 1 or 2, wherein:
The fixing holding body that possesses upstream side, the feeding in the downstream being arranged in above-mentioned fixing holding body keep body, be arranged in above-mentioned Feeding keeps the above-mentioned shearing device in the downstream of body, is arranged in the adhering device in the downstream of above-mentioned shearing device;
Above-mentioned shearing device, the movement relative with above-mentioned silver at above-mentioned band stopped, forward by above-mentioned band The partial cut of end, separates above-mentioned accessory;
Above-mentioned adhering device, before the above-mentioned cut-out carried out by above-mentioned shearing device completes, is bonded in above-mentioned accessory State on silver.
5. the processing unit (plant) of a storage body sheet stock, it is characterised in that the processing unit (plant) of above-mentioned storage body sheet stock uses power Profit requires the processing method of the storage body sheet stock described in 3, wherein:
The fixing holding body that possesses upstream side, the feeding in the downstream being arranged in above-mentioned fixing holding body keep body, be arranged in above-mentioned Feeding keeps the above-mentioned shearing device in the downstream of body, is arranged in the adhering device in the downstream of above-mentioned shearing device;
Above-mentioned shearing device, the movement relative with above-mentioned silver at above-mentioned band stopped, forward by above-mentioned band The partial cut of end, separates above-mentioned accessory;
Above-mentioned adhering device, before the above-mentioned cut-out carried out by above-mentioned shearing device completes, is bonded in above-mentioned accessory State on silver.
CN201380008055.0A 2013-02-22 2013-02-22 The processing method of storage body sheet stock and processing unit (plant) Active CN104169074B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/054590 WO2014128934A1 (en) 2013-02-22 2013-02-22 Processing method and processing device for container body sheet

Publications (2)

Publication Number Publication Date
CN104169074A CN104169074A (en) 2014-11-26
CN104169074B true CN104169074B (en) 2016-12-07

Family

ID=50614527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201380008055.0A Active CN104169074B (en) 2013-02-22 2013-02-22 The processing method of storage body sheet stock and processing unit (plant)

Country Status (5)

Country Link
EP (1) EP2829390B1 (en)
JP (1) JP5451949B1 (en)
CN (1) CN104169074B (en)
ES (1) ES2579755T3 (en)
WO (1) WO2014128934A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6084955B2 (en) * 2014-10-06 2017-02-22 株式会社New IWASHO Film conveying device with check valve and packaging bag manufacturing device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4925439A (en) * 1988-07-07 1990-05-15 Lemo M. Lehmacher & Sohm Gmbh Apparatus for stacking and possibly blocking plastic bags
CN1064625C (en) * 1995-05-31 2001-04-18 株式会社森艾化研 Check valve and package bag with check valve and apparatus for making it
CN1754784A (en) * 2004-09-30 2006-04-05 艾尔派克公司 Fluid container and method and device for manufacturing the fluid container

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2239237A1 (en) * 1972-08-09 1974-02-21 Heinz Bildner METHOD OF MANUFACTURING COVERTS WITH LAMINATING STRIPS
JPS55142638A (en) * 1979-04-26 1980-11-07 Ouji Seitai Kk Preparation of check valve type both end sewing machine sewing bag having auxiliary adding piece
SE466952B (en) * 1990-09-13 1992-05-04 Tetra Pak Holdings Sa DEVICE FOR APPLICATION OF A MATERIAL BRAKE ON A PACKAGING MATERIAL RANGE
JPH0790615B2 (en) * 1992-02-06 1995-10-04 株式会社柏原製袋 Inserting device for flat body such as flat valve for plastic sheet bag making
JPH06263225A (en) * 1993-03-15 1994-09-20 Ishikawa Kikai:Kk Intermittent feeding device
JP3134083B2 (en) 1993-04-02 2001-02-13 株式会社藤田機械 Conveying device for reinforcing sheet in bag making machine
JP2626703B2 (en) 1994-03-29 1997-07-02 株式会社柏原製袋 Continuous packaging method for gas generating substances
JP2000288863A (en) * 1999-04-06 2000-10-17 Isel Co Ltd Feeder
JP3340101B2 (en) * 1999-11-17 2002-11-05 株式会社ヤマガタグラビヤ Method and apparatus for sticking a sheet piece to a continuous long base material

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4925439A (en) * 1988-07-07 1990-05-15 Lemo M. Lehmacher & Sohm Gmbh Apparatus for stacking and possibly blocking plastic bags
CN1064625C (en) * 1995-05-31 2001-04-18 株式会社森艾化研 Check valve and package bag with check valve and apparatus for making it
CN1754784A (en) * 2004-09-30 2006-04-05 艾尔派克公司 Fluid container and method and device for manufacturing the fluid container

Also Published As

Publication number Publication date
CN104169074A (en) 2014-11-26
WO2014128934A1 (en) 2014-08-28
EP2829390B1 (en) 2016-04-06
ES2579755T3 (en) 2016-08-16
JPWO2014128934A1 (en) 2017-02-02
JP5451949B1 (en) 2014-03-26
EP2829390A4 (en) 2015-05-20
EP2829390A1 (en) 2015-01-28

Similar Documents

Publication Publication Date Title
CN102897334B (en) Automatic electric detonator packaging machine
ES2887210T3 (en) Methods and apparatus to facilitate the processing of a plastic film
US9527663B2 (en) Machine for making filter bags for infusion products
CN101490333A (en) Rfid tag, and method and device for the production thereof
CN104169074B (en) The processing method of storage body sheet stock and processing unit (plant)
CA2507493A1 (en) Bag making apparatus
IE39315B1 (en) Improvements in or relating to bag forming machines
CN103662961A (en) Folding device for absorbable article
CN104273645A (en) Constructing and setting apparatus used for automatically cutting slices on material pack formed by materials in tobacco processing industry
JP2008013234A (en) Packaging apparatus
ATE464230T1 (en) AUTOMATIC MACHINE AND METHOD FOR PACKAGING PRINTED PRODUCTS IN PLASTIC FILM
JP6134472B2 (en) Cutter device for packaging bag
KR101620086B1 (en) Automatic packing machine
CN204110392U (en) Syringe automatic packaging machine
JP2015016900A (en) Bag-making filling/packaging method and bag-making filling machine
CN105269859A (en) Preparation method for unilateral zipper bags provided with sealing strips
US3185609A (en) Machine for cutting and sealing a web of thermoplastic material
CN209209099U (en) A kind of saqima automatic packaging production line
JP6123798B2 (en) Packaging sheet fusing device
KR101884187B1 (en) Apparatus and method for manufacturing vinyl bag
JPH09300486A (en) Continuously bag-making method for bag having corner cut off and with side face gusset, and bag making machine therefor
JPH0248932A (en) Bag making machine
EP3426561B1 (en) Machine for making filter bags with infusion products
CN213006600U (en) Counting and cutting machine for bagged springs of mattress
JPH0579571B2 (en)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant