CN104165739A - Method for testing pressure by adoption of vertical and automatic heat collector flow channel pressure test machine - Google Patents
Method for testing pressure by adoption of vertical and automatic heat collector flow channel pressure test machine Download PDFInfo
- Publication number
- CN104165739A CN104165739A CN201410386205.8A CN201410386205A CN104165739A CN 104165739 A CN104165739 A CN 104165739A CN 201410386205 A CN201410386205 A CN 201410386205A CN 104165739 A CN104165739 A CN 104165739A
- Authority
- CN
- China
- Prior art keywords
- heat collector
- pressure
- collector runner
- water
- controller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a method for testing pressure by the adoption of a vertical and automatic heat collector flow channel pressure test machine. The method comprises the five steps of water injection, pressure boosting, pressure maintaining, interrupting and pressure relief. The adopted vertical and automatic heat collector flow channel pressure test machine comprises a support and a control box arranged on one side of the support, the support is at least provided with one test station, and a water injection system and a pressure boosting system are arranged in the control box. In the water injection stage, the water injection system and the pressure boosting system inject water into a water collector flow channel at the same time, the working time of a pressure boosting water pump is greatly shortened, high-flow water injection is faster, it is easily ensured that water of which a water outlet pipe is full flows out of the water outlet pipe, air in the heat collector flow channel is thoroughly exhausted, the problem that air is reserved in the heat collector flow channel is eliminated, and heat collector flow channel pressure test working efficiency and pressure test leakage detection reliability can be greatly improved; a valve capable of being slowly closed is adopted on the water outlet pipe, so that water hammer is weakened or eliminated, and the service life of the vertical heat collector flow channel pressure test machine is prolonged.
Description
Technical field
The present invention relates to a kind of pressure-measuring method that whether has leakage to check to pipeline, more particularly, relate to a kind of vertical automatic pressure test device pressure-measuring method that whether has leakage to check to heat collector runner.
Background technology
Heat collector runner is the vitals of flat-plate solar collector, the collector plate core of heat collector runner and absorber plate composition flat-plate solar collector.Heat collector runner is to be made up of with some combs that weld mutually with collector collector, the heat collector runner being welded by collector and some combs need to check, determine without holding plate with suction again after leaking and be assembled into collector plate core, thereby the quality of flat-plate solar collector is effectively guaranteed.Otherwise, if the quality that makes flat-plate solar collector is had a greatly reduced quality because heat collector runner exists to leak, even cannot use, be unfavorable for improving the product percent of pass of flat-plate solar collector, also bring huge loss to user.
At present, in sun power industry, the pressure testing of heat collector runner adopts manual type in the majority, and small part adopts pressure testing equipment.Artificial pressure testing exists that labour intensity is large, workman's fatiguability, cost of labor are high, pressure test pressure and dwell time all cannot ensure for a long time, and security incident and product quality accident easily occur, and this kind of mode belongs to superseded ranks already.In view of all drawbacks of artificial pressure testing, Some Enterprises has been manufactured experimently pressure testing equipment, but this kind equipment is because design time has problems, and causes reliability extreme difference, even so sun power industry has developed into industry in large scale, but this kind equipment does not still obtain extensive popularization.Mainly there is following defect in the method that adopts the vertical pressure testing equipment of traditional heat collector runner to carry out pressure testing:
There is " water hammer " problem in the method that 1, adopts the vertical pressure testing equipment of traditional heat collector runner to carry out pressure testing, easily pipeline and the pipe fitting of the vertical pressure testing equipment to heat collector runner cause damage, have a strong impact on the serviceable life of equipment.
2, adopting the vertical pressure testing equipment of traditional heat collector runner to carry out the method for pressure testing can only be by pressure piping to water filling in heat collector runner, flow in inflow heat collector runner is little, water injection time is long, working time and the wearing and tearing of booster water pump are greatly increased, and causing the needed time of pressure testing long, the work pressure test efficiency of equipment is low.
If 3, find to leak at water filling, supercharging, packing stage, can not carry out in time pressure release, interrupt pressure testing process, extend operation hours, the inefficiency of equipment pressure testing.
4, adopting the vertical pressure testing equipment of traditional heat collector runner to carry out the method for pressure testing can only be by pressure piping to water filling in heat collector runner, flow in input heat collector runner is little, the water filling stage can not ensure that outlet pipeline full-section pipe-flow goes out current, cause exhaust not smooth, in heat collector runner, there is the problem of " choking with resentment ", water discharging valve on outlet pipeline has been closed, can not injected water on the position of " choking with resentment " due to the generation of the problem of choking with resentment in heat collector runner, and water filling pressure testing is carried out in the position that cannot choke with resentment to this generation, the position that some these generations are choked with resentment exists leaks and cannot be examined out, greatly reduce the reliability of pressure test leak-detecting.
Summary of the invention
The object of the invention is to overcome above-mentioned defect of the prior art, provide in a kind of pressure testing process and produce without problem of water hammer, and eliminate the problem that produces " choking with resentment " and " water hammer " in heat collector runner, can significantly improve the reliability of work pressure test efficiency and pressure test leak-detecting, be convenient to subsequent handling and carry out the method that the vertical automatic pressure test device of employing heat collector runner of assembling product carries out pressure testing.
For achieving the above object, technical scheme provided by the invention is as follows:
A kind of method that adopts the vertical automatic pressure test device of heat collector runner to carry out pressure testing, the vertical automatic pressure test device of this heat collector runner comprises support, be installed in the control box of support one side, described support includes at least one test station, also comprise be installed in control box and with inlet pipeline waterflood system and the pressure charging system being communicated with in parallel of test station and be installed in test on station outlet pipeline for eliminate water hammer can slowly closing valve, also comprise a controller, be installed in the pressure transducer on described inlet pipeline, pressure transducer is connected with the signal input part communication of controller, can the valve of slowly closing and the signal output part communication of controller be connected, comprise the following steps:
One, water filling, the heat collector runner of required test is arranged on test station, starting outfit, controller control waterflood system and pressure charging system are simultaneously to heat collector runner Inner water filling, valve that now can slowly closing is in opening, in the time that outlet pipeline flows out with full packages water, waterflood system is closed simultaneously;
Two, supercharging, after valve that can slowly closing and waterflood system are closed, pressure charging system continues to water filling in heat collector runner, heat collector runner internal pressure progressively rises, system enters pressurization stages, set needed pressure test pressure by controller, when the pressure in pressure transducer detects heat collector runner reaches the pressure test pressure of setting, controller output control signal quits work pressure charging system;
Three, pressurize, sets the needed dwell time, enters packing stage, check and whether leak everywhere and observe heat collector runner internal pressure and whether reduce simultaneously, if heat collector runner without leaking, skips to the 5th step, if heat collector runner leaks, then carry out the 4th step;
Four, interrupt, directly open can slowly closing valve carry out pressure release, heat collector runner internal pressure declines, and unloads this heat collector runner, this heat collector runner is underproof heat collector runner;
Five, pressure release, in the time reaching the dwell time of setting, open can slowly closing valve carry out pressure release, heat collector runner internal pressure declines, and unloads this heat collector runner, this heat collector runner is qualified heat collector runner.
Described test station comprises the first drive unit, the second drive unit, water supply connector, water out adapter, the first sealing adaptor and the second sealing adaptor that are installed on support, described water supply connector or the first sealing adaptor and the first drive unit are in transmission connection, described water out adapter or the second sealing adaptor and the second drive unit are in transmission connection, described water supply connector is communicated with inlet pipeline, and water out adapter is communicated with outlet pipeline.
When heat collector runner is arranged on test station, the first drive unit and the second drive unit advance, heat collector runner is compressed, thereby water supply connector, water out adapter, the first sealing adaptor and the second sealing adaptor are tightly connected with the corresponding water inlet of heat collector runner or water delivering orifice respectively.
While unloading heat collector runner, the first drive unit and the second drive unit retreat, and heat collector runner is unclamped, then heat collector runner is unloaded.
Furthermore, the bottom of reserve tank is equiped with blowdown apparatus, and this blowdown apparatus is by the blow-off pipe being connected with reserve tank, and the second solenoid valve being installed on blow-off pipe forms, and the second solenoid valve is connected with controller communication.
Preferably, the described dwell time is set as 10~300s.
Compared with prior art, beneficial effect of the present invention is:
On described support, include at least one test station, also comprise be installed in control box and with inlet pipeline waterflood system and the pressure charging system being communicated with in parallel of test station and be installed in test on station outlet pipeline for eliminate water hammer can slowly closing valve, also comprise a controller, be installed in the pressure transducer on described inlet pipeline, pressure transducer is connected with the signal input part communication of controller, can the valve of slowly closing and the signal output part communication of controller be connected.The water filling stage can be simultaneously by waterflood system and pressure charging system to the water filling of heat collector runner, greatly shorten the time of water filling, large flow water inlet is quicker, easily the air of heat collector runner is thoroughly discharged, eliminate and in heat collector runner, produce the problem of choking with resentment, can significantly improve the work efficiency of heat collector runner pressure testing and the reliability of pressure test leak-detecting; On outlet pipeline, adopt can slowly closing valve, can eliminate water hammer, guarantee carrying out smoothly of heat collector runner pressure testing, and extend the serviceable life of the vertical pressure testing equipment of heat collector runner.
Brief description of the drawings
Fig. 1 is the schematic diagram that the vertical automatic pressure test device of employing heat collector runner of the present invention carries out the vertical automatic pressure test device of heat collector of the method employing of pressure testing;
Fig. 2 is the stereographic map that the vertical automatic pressure test device of employing heat collector runner of the present invention carries out the vertical automatic pressure test device of single station heat collector of the method employing of pressure testing;
Fig. 3 is the stereographic map that the vertical automatic pressure test device of employing heat collector runner of the present invention carries out the vertical automatic pressure test device of double heat collector of the method employing of pressure testing.
The method of the vertical automatic pressure test device of employing heat collector runner of the present invention being carried out to pressure testing below in conjunction with drawings and Examples is described further.
Embodiment
Be below the preferred example that the vertical automatic pressure test device of employing heat collector runner of the present invention carries out the method for pressure testing, therefore do not limit protection scope of the present invention.
A kind of method that adopts the vertical automatic pressure test device of heat collector runner to carry out pressure testing, the vertical automatic pressure test device of heat collector runner being somebody's turn to do comprises support 1, be installed in the control box 20 of support one side, described support 1 includes at least one test station 21, also comprise be installed in control box 20 and with inlet pipeline waterflood system 7 and the pressure charging system 8 being communicated with in parallel of test station 21 and be installed in test on station 21 outlet pipelines for eliminate water hammer can slowly closing valve 9, also comprise a controller 13, be installed in the pressure transducer 10 on described inlet pipeline, pressure transducer 10 is connected with the signal input part communication of controller 13, can the valve 9 of slowly closing and the signal output part communication of controller 13 be connected, the three-dimensional automatic pressure test device pressure-measuring method of this heat collector runner comprises the following steps:
One, water filling, the heat collector runner of required test is arranged on test station 21, starting outfit, controller 13 is controlled waterflood system 7 and pressure charging system 8 simultaneously to water filling in heat collector runner, valve 9 that now can slowly closing is in opening, in the time that outlet pipeline full-section pipe-flow goes out current,, waterflood system 7 is closed simultaneously;
Two, supercharging, after valve 9 that can slowly closing and waterflood system 7 are closed, pressure charging system 8 continues to water filling in heat collector runner, heat collector runner internal pressure progressively rises, system enters pressurized state, set needed pressure test pressure by controller 13, when the pressure in pressure transducer 10 detects heat collector runner reaches the pressure test pressure of setting, controller 13 output signals quit work pressure charging system 8;
Three, pressurize, sets the needed dwell time, enters packing state, check and whether leak everywhere simultaneously, and observe heat collector runner internal pressure and whether reduce, if heat collector runner is without leaking, skip to the 5th step, if heat collector runner leaks, then carry out the 4th step;
Four, interrupt, directly open can slowly closing valve 9 carry out pressure release, unload this heat collector runner, this heat collector runner is underproof heat collector runner;
Five, pressure release, in the time reaching the dwell time of setting, valve 9 that can slowly closing is opened and is carried out pressure release, and the pressure drop in heat collector runner, unloads this heat collector runner, and this heat collector runner is qualified heat collector runner.
Fig. 1 and Fig. 2 show respectively the vertical automatic pressure test device of a kind of heat collector runner of the present invention, the vertical automatic pressure test device of this heat collector runner is the vertical automatic pressure test device of single station heat collector runner, comprise support 1, be installed in the control box 20 of support 1 one sides, on support 1, be provided with a test station 21, described test station 21 comprises the first drive unit 2 being installed on support 1, the second drive unit 3, water supply connector 4, water out adapter 5, the first sealing adaptor 22 and the second sealing adaptor 23, the first drive unit 2 in this enforcement, the second drive unit 3 adopts cylinder, certain also available hydraulic cylinder or the device that adopts servomotor and screw mandrel etc. can realize straight line back and forth movement substitute, described the first sealing adaptor 22 and the first drive unit 2 are in transmission connection, described water out adapter 5 and the second drive unit 3 are in transmission connection, also comprise and be installed in the waterflood system 7 and the pressure charging system 8 that in control box 20 and with the inlet pipeline parallel connection of this water supply connector 4, are communicated with, and be installed on the outlet pipeline of water out adapter 5 can slowly closing valve 9, the valve 9 that in the present embodiment, this can slowly closing is electrical ball valve, also can use fluid automatic controlling valve, multifunctional water pump control valve etc. can slowly closing device, system pipeline can be carried out stably in the time closing supercharging, eliminate water hammer, improve the reliability of system, guarantee that equipment can stablize use for a long time.
Certainly, also can adopt water supply connector 4 and the first drive unit 2 to be in transmission connection, the second sealing adaptor 23 and two drive units 3 are in transmission connection.
In the present embodiment, waterflood system 7 comprises the water injecting pipeline 71 being connected with inlet pipeline, be installed in the first solenoid valve 72 and the first retaining valve 73 on water injecting pipeline 71, in order to control waterflood system 7 and anti-backflow, waterflood system 7 is connected with the inlet pipeline of water supply connector 4; Pressure charging system 8 comprises reserve tank 81, and the pressure piping 82 being connected with reserve tank 81 is installed in booster water pump 83 and the second retaining valve 84 on pressure piping 82, and pressure piping 82 is connected with the inlet pipeline of water supply connector 4.
In this enforcement, in described control box 20, be also provided with a controller 13, control box 20 is provided with the control panel 201 being connected with controller 13 communications, control panel 201 is provided with " power switch ", " power lights ", " blowdown ", " interruption ", " pressurize lamp ", function button and display lamps such as " startups ", on the inlet pipeline of described water supply connector 4, be equiped with pressure transducer 10, the signal input part of controller 13 is connected with pressure transducer 10 communications, the signal output part of controller 13 and described booster water pump 83, the first solenoid valve 72 is connected with valve 9 communications that can slowly closing.
Preferably, be also provided with the first threeway 15 on the inlet pipeline of described water supply connector 4, waterflood system 7, pressure charging system 8 and water supply connector 4 are connected with corresponding interface respectively.
Preferably, the water injecting pipeline 71 of described waterflood system 7 is provided with the second threeway 14, the inlet pipeline of reserve tank 81 is connected with this second threeway 14, be positioned on the inlet pipeline of reserve tank 81 of reserve tank 81 and be equiped with ball-cock assembly 85, in the time that the water level in reserve tank 81 reaches setting value, ball-cock assembly 85 is closed, and stops adding water in reserve tank 81.
Preferably, on the outlet pipeline of described water out adapter 5, be also equiped with the tensimeter 18 for showing heat collector runner internal pressure, can be observed the pressure in heat collector runner by tensimeter 18, can also on control box 20, display be set, by controller 13, pressure transducer 10 is detected to signal outputs on display and show, also can observe the pressure in heat collector runner.
Whether on the outlet pipeline of water out adapter 5, be also equiped with for judging water lines is the supervising device 51 that full-section pipe-flow goes out current, this supervising device 51 is connected with the signal input end communication of controller 13, what in the present embodiment, this supervising device 51 used is flow detector, in the time that flow detector detects that outlet pipeline reaches maximum flow, signal is passed to controller 13, then controller 13 export control signal make can slowly closing valve 9 slowly closings, certainly this supervising device 51 also can be judged the water lines device whether full-section pipe-flow goes out current with other and substitutes, as the time relay, this time relay is connected with valve 9 communications that can slowly closing, the minimum time needing need to measure by experiment outlet pipeline and reach full packages flowing water time, service time is when relay, time parameter that should the time relay is set to be more than or equal to this minimum time, certainly, also can with time condenser arrange simultaneously can slowly closing valve 9 time and the needed dwell time of closing, when water injection time reaches the time that the time relay is set, now outlet pipeline flows out with full packages water, the time relay sends signal, valve 9 that can slowly closing is closed, enter pressurization stages, packing stage reached after the dwell time that the time relay sets, and the valve 9 that time relay control can slowly closing is opened and carried out pressure release.
The bottom of reserve tank 81 is also equiped with blowdown apparatus 19, and this blowdown apparatus 19 is by the blow-off pipe 191 being connected with reserve tank 81, and the second solenoid valve 192 being installed on blow-off pipe 191 forms, and the second solenoid valve 192 is connected with controller 13 communications.
Furthermore, on described support, be also provided with the control hand valve 6 of controlling the first drive unit 2 and the second drive unit 3, by controlling hand valve 6, the first drive unit 2 and the second drive unit are controlled, the first drive unit 2 and the second drive unit 3 also can be controlled automatically by controller 13.
While adopting the vertical automatic pressure test device of above-mentioned heat collector runner to carry out pressure testing to heat collector runner, comprise water filling, supercharging, pressurize, interrupt, pressure release double teacher, while starting working, manually make two cylinders drive the first sealing adaptor 22 by controlling hand valve 6, the second sealing adaptor 23 lifts, manually heat collector runner is put in pressure testing district, heat collector collector end opening is aimed at respectively water supply connector 4, the second sealing adaptor 23, first sealing adaptor 22 of aiming at respectively suitable for reading, water out adapter 5, control two cylinders the first sealing adaptor 22 by controlling hand valve 6 again, water out adapter 5 is fallen compression collector, confirm without after deflection, access power supply, press " power switch ", now " power lights " on control panel 201 can light.
One, water filling, press " startup " button on control panel 201, controller 13 start signal output booster water pumps 83 are also opened the first solenoid valve 72, pressure charging system 8 and waterflood system 7 is simultaneously to water filling in heat collector runner, enter the water filling stage, in the time that flow detector detects outlet pipeline and goes out current with full-section pipe-flow, controller 13 output signal control electrical ball valves 9 are closed, and electrical ball valve 9 closes to eliminate water hammer with slow speed;
Two, supercharging, the first output signal of controller 13 is closed the first solenoid valve 72, waterflood system 7 stops water filling, pressure charging system 8 continues to water filling in heat collector runner, enter pressurization stages, set needed pressure test pressure by controller 13, when the pressure in pressure transducer 10 detects heat collector runner reaches the pressure test pressure of setting, controller 13 output signals quit work booster water pump 83, and pressure charging system 8 stops to water filling in heat collector runner;
Three, pressurize, set the needed dwell time, enter packing state, whether now " the pressurize lamp " on control panel can light, can check everywhere whether leak, and observe heat collector runner internal pressure by tensimeter 18 and reduce simultaneously, if heat collector runner is without leaking, skip to the 5th step, if heat collector runner leaks, then carry out the 4th step;
Four, interrupt, press " interruption " button on control panel 201, valve 9 that directly can slowly closing by controller 13 output signal controls is opened and is carried out pressure release, and heat collector runner internal pressure declines, unload this heat collector runner, this heat collector runner is underproof heat collector runner;
Five, pressure release, reached after the dwell time setting, and " pressurize lamp " closes automatically, controller 13 output signal controls can slowly closing valve 9 open and carry out pressure release, heat collector runner internal pressure declines, and unloads this heat collector runner, and this heat collector runner is qualified heat collector runner.
After long-term use, in reserve tank 81, have dirt, impurity, can be by pressing " blowdown " button on control panel 201, the second solenoid valve 192 of opening on blow-off pipe 191 by controller 13 carries out blowdown, after removing contamination, press again this key, the resilience of " blowdown " button, controller 13 controls the second solenoid valve 192 and cuts out.
Embodiment bis-
The vertical automatic pressure test device of another kind of heat collector runner of the present invention has been shown in Fig. 3, the vertical automatic pressure test device of this heat collector runner is the vertical automatic pressure test device of double heat collector runner, only need on support 1, install test battery stations 21 more, a set of and newly-increased test station 21 inlet pipelines waterflood system 7 and the pressure charging system 8 being communicated with in parallel is set in control box more, described waterflood system 7, pressure charging system 8 shares a reserve tank 81 to save space, two cover test stations 21 are provided with separately the independently tensimeter 18 of detected pressures, pressure transducer 10, and whether judged water lines on outlet pipeline is that full-section pipe-flow goes out the supervising device 51 of current and valve 9 that can slowly closing, can be by the separate work of key control two cover system of pressing on control panel 201, other structures are identical with embodiment mono-, repeat no more.
Above-described embodiment is preferably embodiment of the present invention; but embodiments of the present invention are not restricted to the described embodiments; other any do not deviate from change, the modification done under Spirit Essence of the present invention and principle, substitutes, combination, simplify; all should be equivalent substitute mode, within being included in protection scope of the present invention.
Claims (10)
1. a method that adopts the vertical automatic pressure test device of heat collector runner to carry out pressure testing, the vertical automatic pressure test device of this heat collector runner comprises support (1), be installed in the control box (20) of support one side, described support (1) includes at least one test station (21), also comprise be installed in control box (20) and with inlet pipeline waterflood system (7) and the pressure charging system (8) being communicated with in parallel of test station (21) and be installed in test on station (21) outlet pipeline for eliminate water hammer can slowly closing valve (9), also comprise a controller (13), be installed in the pressure transducer (10) on described inlet pipeline, pressure transducer (10) is connected with the signal input part communication of controller (13), valve (9) that can slowly closing is connected with the signal output part communication of controller (13), it is characterized in that: comprise the following steps:
One, water filling, the heat collector runner of required test is arranged on test station (21), starting outfit, controller (13) is controlled waterflood system (7) and pressure charging system (8) while to water filling in heat collector runner, valve (9) that now can slowly closing is in opening, in the time that outlet pipeline full-section pipe-flow goes out current, valve (9) slowly closing that can slowly closing, waterflood system (7) is closed simultaneously;
Two, supercharging, after valve (9) that can slowly closing and waterflood system (7) are closed, pressure charging system (8) continues to water filling in heat collector runner, heat collector runner internal pressure progressively rises, system enters pressurization stages, set needed pressure test pressure by controller (13), in the time that pressure transducer (10) detects that pressure in heat collector runner reaches the pressure test pressure of setting, controller (13) output signal quits work pressure charging system (8);
Three, pressurize, sets the needed dwell time, enters packing stage, check and whether leak everywhere simultaneously, and observe heat collector runner internal pressure and whether reduce, if heat collector runner is without leaking, skip to the 5th step, if heat collector runner leaks, then carry out the 4th step;
Four, interrupt, directly open can slowly closing valve (9) carry out pressure release, unload this heat collector runner, this heat collector runner is underproof heat collector runner;
Five, pressure release, in the time reaching the dwell time of setting, valve (9) that can slowly closing is opened and is carried out pressure release, and the pressure drop in heat collector runner, unloads this heat collector runner, and this heat collector runner is qualified heat collector runner.
2. the method that the vertical automatic pressure test device of employing heat collector runner according to claim 1 carries out pressure testing, it is characterized in that: described test station (21) comprises the first drive unit (2) being installed on support (1), the second drive unit (3), water supply connector (4), water out adapter (5), the first sealing adaptor (22) and the second sealing adaptor (23), described water supply connector (4) or the first sealing adaptor (22) are in transmission connection with the first drive unit (2), described water out adapter (5) or the second sealing adaptor (23) are in transmission connection with the second drive unit (3), described water supply connector (4) is communicated with inlet pipeline, water out adapter (5) is communicated with outlet pipeline.
3. the method that the vertical automatic pressure test device of employing heat collector runner according to claim 1 carries out pressure testing, it is characterized in that: described waterflood system (7) comprises a water injecting pipeline (71), be installed in the first solenoid valve (72) and the first retaining valve (73) on water injecting pipeline (71), water injecting pipeline (71) is connected with the inlet pipeline of described water supply connector (4), and the first solenoid valve (72) is connected with the signal output part communication of controller (13).
4. the method that the vertical automatic pressure test device of employing heat collector runner according to claim 1 carries out pressure testing, it is characterized in that: described pressure charging system (8) comprises reserve tank (81), the pressure piping (82) being connected with reserve tank (81), be installed in booster water pump (83), the second retaining valve (84) on pressure piping (82), pressure piping (82) is connected with the inlet pipeline of described water supply connector (4), and the second solenoid valve (84) is connected with the signal output part communication of controller (13).
5. the method that the vertical automatic pressure test device of employing heat collector runner according to claim 1 carries out pressure testing, is characterized in that: on the outlet pipeline of described water out adapter (5), be equiped with the tensimeter (18) for showing the pressure in heat collector runner.
6. the method that the vertical automatic pressure test device of employing heat collector runner according to claim 1 carries out pressure testing, it is characterized in that: on the outlet pipeline of described water out adapter (5), be equiped with for monitoring the outlet pipeline supervising device (51) whether full packages flows out, this supervising device (51) is connected with the signal input part communication of controller (13).
7. the method that the vertical automatic pressure test device of employing heat collector runner according to claim 1 carries out pressure testing, it is characterized in that: on the inlet pipeline of described water supply connector (4), be equiped with the first threeway (15), water supply connector (4), waterflood system (7) and pressure charging system (8) are connected with the upper corresponding interface of the first threeway (15) respectively.
8. the method that the vertical automatic pressure test device of employing heat collector runner according to claim 1 carries out pressure testing, it is characterized in that: on described water injecting pipeline (71), be equiped with the second threeway (14), the inlet pipeline of reserve tank (81) is connected with this second threeway (14), is positioned on the inlet pipeline of reserve tank (81) of reserve tank (81) and is equiped with ball-cock assembly (85).
9. the method that the vertical automatic pressure test device of employing heat collector runner according to claim 1 carries out pressure testing, is characterized in that: the described dwell time is set as 10~300s.
10. the method that the vertical automatic pressure test device of employing heat collector runner according to claim 1 carries out pressure testing, it is characterized in that: the bottom of described reserve tank (81) is equiped with blowdown apparatus (19), this blowdown apparatus (19) is by the blow-off pipe (191) being connected with reserve tank (81), the second solenoid valve (192) being installed on blow-off pipe (191) forms, and the second solenoid valve (192) is connected with controller (13) communication.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410386205.8A CN104165739B (en) | 2014-08-07 | 2014-08-07 | Method for testing pressure by adoption of vertical and automatic heat collector flow channel pressure test machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410386205.8A CN104165739B (en) | 2014-08-07 | 2014-08-07 | Method for testing pressure by adoption of vertical and automatic heat collector flow channel pressure test machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104165739A true CN104165739A (en) | 2014-11-26 |
CN104165739B CN104165739B (en) | 2017-02-08 |
Family
ID=51909654
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410386205.8A Active CN104165739B (en) | 2014-08-07 | 2014-08-07 | Method for testing pressure by adoption of vertical and automatic heat collector flow channel pressure test machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104165739B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106153272A (en) * | 2016-08-25 | 2016-11-23 | 中国十七冶集团有限公司 | A kind of multifunctional pipe valve pressure testing device |
CN108572052A (en) * | 2017-03-14 | 2018-09-25 | 中国石油天然气股份有限公司 | Multitube fast pressure testing device |
CN109556967A (en) * | 2018-12-30 | 2019-04-02 | 广东省工业设备安装有限公司 | A kind of environment-friendly type monolithic conduit pressure device and hammering method |
CN110208103A (en) * | 2019-06-21 | 2019-09-06 | 哈电集团(秦皇岛)重型装备有限公司 | A kind of hydraulic test of pressure vessel connection control device and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008175515A (en) * | 2007-01-22 | 2008-07-31 | Takeshi Oshima | Vessel used in solar water heater |
CN201653657U (en) * | 2010-02-04 | 2010-11-24 | 深圳市鹏桑普太阳能股份有限公司 | Multifunctional heat collector board core air tightness pressure testing device |
CN202748199U (en) * | 2012-07-25 | 2013-02-20 | 玉溪市兴红太阳能设备有限公司 | Pressure test device of pressure-bearing solar thermal collector |
CN203688177U (en) * | 2014-01-17 | 2014-07-02 | 合肥荣事达太阳能科技有限公司 | Solar flat plate collector flow channel leakage detection device |
-
2014
- 2014-08-07 CN CN201410386205.8A patent/CN104165739B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008175515A (en) * | 2007-01-22 | 2008-07-31 | Takeshi Oshima | Vessel used in solar water heater |
CN201653657U (en) * | 2010-02-04 | 2010-11-24 | 深圳市鹏桑普太阳能股份有限公司 | Multifunctional heat collector board core air tightness pressure testing device |
CN202748199U (en) * | 2012-07-25 | 2013-02-20 | 玉溪市兴红太阳能设备有限公司 | Pressure test device of pressure-bearing solar thermal collector |
CN203688177U (en) * | 2014-01-17 | 2014-07-02 | 合肥荣事达太阳能科技有限公司 | Solar flat plate collector flow channel leakage detection device |
Non-Patent Citations (1)
Title |
---|
郑瑞澄 等: "《中华人民共和国国家标准GB/T6424-2007》", 8 November 2007 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106153272A (en) * | 2016-08-25 | 2016-11-23 | 中国十七冶集团有限公司 | A kind of multifunctional pipe valve pressure testing device |
CN108572052A (en) * | 2017-03-14 | 2018-09-25 | 中国石油天然气股份有限公司 | Multitube fast pressure testing device |
CN109556967A (en) * | 2018-12-30 | 2019-04-02 | 广东省工业设备安装有限公司 | A kind of environment-friendly type monolithic conduit pressure device and hammering method |
CN110208103A (en) * | 2019-06-21 | 2019-09-06 | 哈电集团(秦皇岛)重型装备有限公司 | A kind of hydraulic test of pressure vessel connection control device and method |
CN110208103B (en) * | 2019-06-21 | 2021-10-15 | 哈电集团(秦皇岛)重型装备有限公司 | Pressure vessel hydrostatic test connection control device and method |
Also Published As
Publication number | Publication date |
---|---|
CN104165739B (en) | 2017-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101598624B (en) | High-efficiency high pressure gas leak detection method | |
CN202939022U (en) | Service life testing device for energy-saving air water valves | |
CN101672748B (en) | 400MPa super-high pressure fatigue test device and test method | |
CN104165739A (en) | Method for testing pressure by adoption of vertical and automatic heat collector flow channel pressure test machine | |
CN101598623A (en) | A kind of leak detection tool that is used for the gases at high pressure leak hunting method | |
CN206627252U (en) | A kind of oil-gas pipeline water filling, pressure testing, drainage system | |
CN102352957A (en) | Electronic grade ultra pure ammonia automatic filling device and method | |
CN101672721A (en) | Intelligent comprehensive test bed for hydraulic oil pipes | |
CN204064591U (en) | The vertical automatic pressure test device of heat collector runner | |
CN113137409A (en) | Electromagnetic reversing valve test method in ultrahigh pressure environment | |
CN104165731A (en) | Automatic pressure test machine for horizontal type collector flow channel | |
CN101509605B (en) | Method for recovering relief gas in process for examining and repairing gas pipe network and device thereof | |
CN209394615U (en) | Band gas is changed the shuttle valve tooling | |
CN205898392U (en) | High pressure watertight nature testing arrangement | |
CN104180955A (en) | Heat collector channel vertical type automatic pressure testing machine | |
CN102563201B (en) | Device for eliminating leakage risk of gas gate valve online | |
CN105890845B (en) | Pipeline high strength and tightness test tool and method | |
CN104180954B (en) | Method for testing pressure of horizontal automatic pressure testing machine by use of heat collector channel | |
CN101598625B (en) | Tracer gas accumulator applied in high pressure gas leak detection method | |
CN201548832U (en) | Intelligent hydraulic oil pipe integrated test-bed warning system | |
CN211829060U (en) | Flow battery pipeline system convenient to detect leakproofness | |
CN204142432U (en) | The horizontal automatic pressure test device of heat collector runner | |
CN210833985U (en) | Automatic pressure stabilizer for water discharge after low-temperature strain strengthening storage tank water pressure | |
CN219796913U (en) | PMC air source rack | |
CN204851448U (en) | Engine fuel valves system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: The method of using a vertical automatic testing machine with a collector channel for pressure testing Effective date of registration: 20230721 Granted publication date: 20170208 Pledgee: China Co. truction Bank Corp Dongguan branch Pledgor: GUANGDONG FIVESTAR SOLAR ENERGY Co.,Ltd. Registration number: Y2023980049390 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |