CN104158118B - A kind of conductors on quad bundled protects line hook - Google Patents

A kind of conductors on quad bundled protects line hook Download PDF

Info

Publication number
CN104158118B
CN104158118B CN201410387518.5A CN201410387518A CN104158118B CN 104158118 B CN104158118 B CN 104158118B CN 201410387518 A CN201410387518 A CN 201410387518A CN 104158118 B CN104158118 B CN 104158118B
Authority
CN
China
Prior art keywords
hook
conductors
support frame
movable
rivet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410387518.5A
Other languages
Chinese (zh)
Other versions
CN104158118A (en
Inventor
杜印官
汤晓青
杨力
范宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410387518.5A priority Critical patent/CN104158118B/en
Publication of CN104158118A publication Critical patent/CN104158118A/en
Application granted granted Critical
Publication of CN104158118B publication Critical patent/CN104158118B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

本发明涉及输电线路带电作业工具,具体涉及一种四分裂导线保线钩,包括支撑架(1)、挂钩(2)、保线钩(4)和止位弹簧(10),其中所述支撑架(1)为条状;所述挂钩(2)有两个,分别通过相互配合的螺栓(3)与螺母(6)活动连接在支撑架(1)的两端;所述保线钩(4)有两个,分别由固定钩和活动钩组成,所述固定钩和支撑架(1)一体成型,所述活动钩通过铆钉(5)活动连接在支撑架(1)上,所述固定钩的尖端处通过螺钉(9)连接有止位弹簧销座(7)等特征。本发明的作用是:易于操作、安全可靠性强,有效地提高了工作效率,降低了作业人员的劳动强度,充分保障作业人员与设备的安全,防止出现设备及作业人员事故。

The present invention relates to live working tools for power transmission lines, in particular to a four-split wire retaining hook, comprising a support frame (1), a hook (2), a wire retaining hook (4) and a stop spring (10), wherein the support The frame (1) is strip-shaped; there are two hooks (2), which are movably connected to both ends of the support frame (1) through bolts (3) and nuts (6) that cooperate with each other; 4) There are two, respectively composed of a fixed hook and a movable hook, the fixed hook and the support frame (1) are integrally formed, the movable hook is movably connected to the support frame (1) through a rivet (5), the fixed hook The tip of the hook is connected with features such as a stop spring pin seat (7) by a screw (9). The function of the present invention is: easy to operate, strong in safety and reliability, effectively improves work efficiency, reduces the labor intensity of operators, fully guarantees the safety of operators and equipment, and prevents accidents of equipment and operators.

Description

一种四分裂导线保线钩 A four-split wire retaining hook

技术领域 technical field

本发明涉及输电线路带电作业工具,具体涉及一种四分裂导线保线钩。 The invention relates to a live working tool for a power transmission line, in particular to a four-split wire retaining hook.

背景技术 Background technique

随着社会经济的持续发展和人民群众生活水平的不断提高,对能源特别是电力能源的需求程度也越来越高, 建设坚强、智能电网已逐渐成为全社会的共识,亟需建设数量足够的500kV及以上超特高压输电线路。目前,500kV架空电力线路(以下简称500kV线路)已成为我国输电网络的主要干线,提高其运行维护水平以保证电网供电可靠性,对实现供电质量的提高和电力企业服务水平的提升有着十分重要的意义。 With the continuous development of social economy and the continuous improvement of people's living standards, the demand for energy, especially electric energy, is also increasing. The construction of a strong and smart grid has gradually become the consensus of the whole society. It is urgent to build a sufficient number of 500kV and above ultra-high voltage transmission lines. At present, the 500kV overhead power line (hereinafter referred to as 500kV line) has become the main trunk line of my country's power transmission network. Improving its operation and maintenance level to ensure the reliability of power grid power supply is very important for improving the quality of power supply and the service level of power companies. significance.

500kV线路长期处于强电磁环境中,运行中的绝缘子长期处于机械荷载和电磁场综合作用下,由于环境污染或者绝缘子本身可能存在的质量缺陷,绝缘子的绝缘电阻值会逐渐降低,甚至劣化为零值绝缘子,失去绝缘能力,这将进一步增加绝缘子串中其它完好绝缘子的电磁场强度,使其老化加速,使线路泄漏电流增大,绝缘水平降低;因500kV线路杆塔悬挂高度较高,正常运行的绝缘子极易遭受雷击损坏,危及线路正常运行,因此,必须即时更换零值或破损绝缘子,以确保线路安全稳定运行。 The 500kV line is in a strong electromagnetic environment for a long time, and the insulator in operation is under the combined action of mechanical load and electromagnetic field for a long time. Due to environmental pollution or possible quality defects of the insulator itself, the insulation resistance value of the insulator will gradually decrease, and even deteriorate to a zero-value insulator , lose the insulation ability, which will further increase the electromagnetic field strength of other intact insulators in the insulator string, accelerate its aging, increase the leakage current of the line, and reduce the insulation level; due to the high suspension height of the 500kV line tower, the normal operation of the insulator is very easy Damaged by lightning strikes will endanger the normal operation of the line. Therefore, zero value or damaged insulators must be replaced immediately to ensure safe and stable operation of the line.

带电更换直线单片(或整串)绝缘子,在500kV线路检修作业中属于较为常见的作业项目,因采用带电作业而无需停电,有利于提高供电可靠率。但其现场作业人员较多、作业难度较大、风险程度较高。为防止更换绝缘子过程中,可能由于工器具失效等因素导致导线失控掉下,危及作业人员安全、损坏设备和工器具,除安装必要的导线提升工具外,还必须对四分裂导线采取保线措施。传统的保线措施是采用绝缘保险绳结合U型环或扣环,缠绕固定四分裂导线,保线时,作业人员须下至导线做保线固定后回到横担上,拆除保线措施时还需作业人员重新下至导线手动操作,操作不便、安全风险高,操作中易出现子导线扭转、子导线之间间距不足等现象,不能充分起到保线的作用。 Replacing a single piece (or a whole string) of insulators while live is a relatively common operation item in the maintenance work of 500kV lines. Because live work is adopted, there is no need for power failure, which is conducive to improving the reliability of power supply. However, there are many on-site operators, the operation is difficult, and the risk is high. In order to prevent wires from falling out of control due to factors such as tool failure during the replacement of insulators, endangering the safety of operators and damaging equipment and tools, in addition to installing necessary wire lifting tools, wire protection measures must also be taken for the four-split wires . The traditional line protection measure is to use an insulated safety rope combined with a U-shaped ring or a buckle to wrap and fix the four-split conductor. It is also necessary for the operator to go down to the wire again for manual operation, which is inconvenient to operate and has a high safety risk. During the operation, sub-conductors are prone to twisting and insufficient spacing between sub-conductors, which cannot fully play the role of wire protection.

发明内容 Contents of the invention

本发明的目的在于提供一种四分裂导线保线钩,解决了现有的导线提升工具在安装和拆卸时极为不便,并且容易出现子导线扭转、子导线之间间距不足,安全性低的问题。 The purpose of the present invention is to provide a four-split wire retaining hook, which solves the problems that the existing wire lifting tools are extremely inconvenient when installing and dismounting, and are prone to twisting of sub-conductors, insufficient spacing between sub-conductors, and low safety. .

为解决上述的技术问题,本发明采用以下技术方案:一种四分裂导线保线钩,包括支撑架、挂钩、保线钩和止位弹簧,其中所述支撑架为条状;所述挂钩有两个,分别通过相互配合的螺栓与螺母活动连接在支撑架的两端;所述保线钩有两个,分别由固定钩和活动钩组成,所述固定钩和支撑架一体成型,所述活动钩通过铆钉活动连接在支撑架上,所述固定钩的尖端处通过螺钉连接有止位弹簧销座,所述止位弹簧销座上通过止位弹簧安装有弹簧销,所述弹簧销的尖端伸入活动钩上的钩槽内可对扣入的导线进行压紧。 In order to solve the above-mentioned technical problems, the present invention adopts the following technical solutions: a four-split wire retaining hook, including a support frame, a hook, a wire retaining hook and a stop spring, wherein the support frame is strip-shaped; the hook has Two, respectively, are movably connected to both ends of the support frame through bolts and nuts that cooperate with each other; there are two wire retaining hooks, which are respectively composed of a fixed hook and a movable hook, and the fixed hook and the support frame are integrally formed. The movable hook is movably connected on the support frame through a rivet, and the tip of the fixed hook is connected with a stop spring pin seat by a screw, and a spring pin is installed on the stop spring pin seat through a stop spring, and the spring pin The tip extends into the hook groove on the movable hook to compress the buckled lead wire.

更进一步的技术方案是,所述挂钩为字母“J”形。 A further technical solution is that the hook is in the shape of a letter "J".

更进一步的技术方案是,所述铆钉的固定位置在活动钩的中部,位于铆钉下方的活动钩部分可完全没入固定钩的沟槽内。 A further technical solution is that the fixed position of the rivet is in the middle of the movable hook, and the part of the movable hook below the rivet can be completely submerged in the groove of the fixed hook.

与现有技术相比,本发明的有益效果是:易于操作、安全可靠性强,有效地提高了工作效率,降低了作业人员的劳动强度,充分保障作业人员与设备的安全,防止出现设备及作业人员事故。 Compared with the prior art, the beneficial effects of the present invention are: easy operation, strong safety and reliability, effectively improving work efficiency, reducing the labor intensity of operators, fully ensuring the safety of operators and equipment, and preventing equipment and worker accident.

附图说明 Description of drawings

图1为本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.

图2为图1的俯视图。 FIG. 2 is a top view of FIG. 1 .

图3为图1中A处结构放大以及活动钩状态示意图。 Fig. 3 is a schematic diagram showing the enlarged structure at A in Fig. 1 and the state of the movable hook.

图4为图1的结构分解图。 FIG. 4 is an exploded view of the structure of FIG. 1 .

图中:1为支撑架,2为挂钩,3为螺栓,4为保线钩,5为铆钉,6为螺母,7为止位弹簧销座,8为弹簧销,9为螺钉,10为止位弹簧,11为钩槽。 In the figure: 1 is a support frame, 2 is a hook, 3 is a bolt, 4 is a wire retaining hook, 5 is a rivet, 6 is a nut, 7 is a stop spring pin seat, 8 is a spring pin, 9 is a screw, and 10 is a stop spring , 11 is the hook groove.

具体实施方式 detailed description

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。 In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

图1-图4示出了本发明一种四分裂导线保线钩的一个实施例:一种四分裂导线保线钩,包括支撑架1、挂钩2、保线钩4和止位弹簧10,其中所述支撑架1为条状;所述挂钩2有两个,分别通过相互配合的螺栓3与螺母6活动连接在支撑架1的两端;所述保线钩4有两个,分别由固定钩和活动钩组成,所述固定钩和支撑架1一体成型,所述活动钩通过铆钉5活动连接在支撑架1上,所述固定钩的尖端处通过螺钉9连接有止位弹簧销座7,所述止位弹簧销座7上通过止位弹簧10安装有弹簧销8,所述弹簧销8的尖端伸入活动钩上的钩槽11内可对扣入的导线进行压紧。 Figures 1-4 show an embodiment of a four-split wire retaining hook of the present invention: a four-split wire retaining hook, including a support frame 1, a hook 2, a retaining hook 4 and a stop spring 10, Wherein said bracing frame 1 is strip shape; There are two described hooks 2, which are movably connected to the two ends of the bracing frame 1 by mutually cooperating bolts 3 and nuts 6; Composed of a fixed hook and a movable hook, the fixed hook and the support frame 1 are integrally formed, the movable hook is movably connected to the support frame 1 through a rivet 5, and the tip of the fixed hook is connected with a stop spring pin seat through a screw 9 7. A spring pin 8 is installed on the stop spring pin seat 7 through a stop spring 10, and the tip of the spring pin 8 extends into the hook groove 11 on the movable hook to compress the buckled wire.

值得指出的是,位于支撑架1两端的保线钩4中心距离最佳在450mm,而同侧的保线钩4和挂钩2的钩部中心距离最佳也是在450mm,当然,这些间距可以根据实际的使用环境进行调整。 It is worth pointing out that the distance between the centers of the wire retaining hooks 4 at both ends of the support frame 1 is preferably 450 mm, and the distance between the centers of the wire retaining hooks 4 and the hook 2 on the same side is also optimally 450 mm. Of course, these distances can be determined according to Adjust the actual usage environment.

根据本发明一种四分裂导线保线钩的一个优选实施例,所述挂钩2为字母“J”形。 According to a preferred embodiment of the four-split wire retaining hook of the present invention, the hook 2 is in the shape of a letter "J".

根据本发明一种四分裂导线保线钩的另一个优选实施例,所述铆钉5的固定位置在活动钩的中部,位于铆钉5下方的活动钩部分可完全没入固定钩的沟槽11内。该形状的活动钩如同一个环形开一个可供导线进出的缺口,当导线卡入活动钩后,活动钩转动没入到固定钩的沟槽11内,此时弹簧销8在止位弹簧10的弹性作用下对导线进行挤压,起到卡位固定点作用。 According to another preferred embodiment of the four-split wire retaining hook of the present invention, the fixed position of the rivet 5 is in the middle of the movable hook, and the movable hook part below the rivet 5 can be completely submerged in the groove 11 of the fixed hook. The movable hook of this shape is like a ring with a gap for the wire to enter and exit. When the wire is stuck into the movable hook, the movable hook rotates and sinks into the groove 11 of the fixed hook. Under the action, the wire is squeezed to play the role of a clamping and fixing point.

本发明的使用时,作业人员在横担上使用绝缘操作杆即可进行保线操作,不用下至导线;四分裂子导线挂入保线钩后,在弹簧作用下,保线钩能自行闭锁,确保子导线不会扭转,其间距也在设计规定的范围内;拆除保线措施时,作业人员也可在横担上借助绝缘操作杆完成,从而实现安全、高效的作业目的。 When using the present invention, the operator can use the insulating operating rod on the crossarm to carry out the wire protection operation without going down to the wire; after the four-split wire is hung into the wire protection hook, under the action of the spring, the wire protection hook can lock itself , to ensure that the sub-conductors will not be twisted, and their spacing is also within the range specified by the design; when removing the wire protection measures, the operator can also complete the operation with the help of an insulating operating rod on the cross arm, so as to achieve safe and efficient operation.

在本发明中,所述支撑架和子导线挂钩本体可以采用钛合金制成,螺栓、保线钩、铆钉、螺母可以采用低碳钢制成,止位弹簧销座可以采用钛合金制成,止位弹簧、螺钉等可以采用高强度钢制成。 In the present invention, the supporting frame and the sub-wire hook body can be made of titanium alloy, the bolts, wire retaining hooks, rivets, and nuts can be made of low-carbon steel, and the stop spring pin seat can be made of titanium alloy. Bit springs, screws, etc. can be made of high-strength steel.

尽管这里参照本发明的多个解释性实施例对本发明进行了描述,但是,应该理解,本领域技术人员可以设计出很多其他的修改和实施方式,这些修改和实施方式将落在本申请公开的原则范围和精神之内。更具体地说,在本申请公开、附图和权利要求的范围内,可以对主题组合布局的组成部件和/或布局进行多种变型和改进。除了对组成部件和/或布局进行的变形和改进外,对于本领域技术人员来说,其他的用途也将是明显的。 Although the invention has been described herein with reference to a number of illustrative embodiments thereof, it is to be understood that numerous other modifications and implementations can be devised by those skilled in the art which will fall within the scope of the disclosure disclosed in this application. within the scope and spirit of the principles. More specifically, within the scope of the disclosure, drawings and claims of the present application, various modifications and improvements can be made to the components and/or layout of the subject combination layout. In addition to variations and modifications to the component parts and/or layout, other uses will be apparent to those skilled in the art.

Claims (3)

1. conductors on quad bundled protects a line hook, including bracing frame (1), links up with (2) and protects line hook (4), wherein said Support (1) is strip;Described hook (2) has two, and the bolt (3) by cooperating is lived with nut (6) respectively It is automatically connected in the two ends of bracing frame (1);Described guarantor's line hook (4) has two, is made up of stay hook and movable hook respectively, institute State stay hook and bracing frame (1) is one-body molded;It is characterized in that: described movable hook is movably connected in by rivet (5) and props up On support (1), the most advanced and sophisticated place of described stay hook is connected by screw (9) stop bit spring key seat (7);Described stop bit bullet Being provided with spring catch (8) by stop bit spring (10) on spring key seat (7), activity is stretched at the tip of described spring catch (8) The wire buckled into can be compressed in hook and slot (11) on hook.
A kind of conductors on quad bundled the most according to claim 1 protects line hook, it is characterised in that: described hook (2) is word Female " J " shape.
A kind of conductors on quad bundled the most according to claim 1 protects line hook, it is characterised in that: consolidating of described rivet (5) The middle part at movable hook is put in location, is positioned at the movable hook part of rivet (5) lower section and can submerge completely the groove (11) of stay hook In.
CN201410387518.5A 2014-08-08 2014-08-08 A kind of conductors on quad bundled protects line hook Active CN104158118B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410387518.5A CN104158118B (en) 2014-08-08 2014-08-08 A kind of conductors on quad bundled protects line hook

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410387518.5A CN104158118B (en) 2014-08-08 2014-08-08 A kind of conductors on quad bundled protects line hook

Publications (2)

Publication Number Publication Date
CN104158118A CN104158118A (en) 2014-11-19
CN104158118B true CN104158118B (en) 2016-09-07

Family

ID=51883562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410387518.5A Active CN104158118B (en) 2014-08-08 2014-08-08 A kind of conductors on quad bundled protects line hook

Country Status (1)

Country Link
CN (1) CN104158118B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111934267A (en) * 2020-07-06 2020-11-13 国家电网有限公司 Split type multi-bundle conductor spacing fixing device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85204196U (en) * 1985-09-28 1986-06-11 鞍山电业局 Clamps for change straight-line whole serial insulators on live wire work
SU1350725A1 (en) * 1985-09-02 1987-11-07 Предприятие Кишиневских Электрических Сетей "Молдглавэнерго" Arrangement for replacing twin insulator strings and supporting hardware in power transmission lines with split insulated wires in a phase under voltage
CN201153198Y (en) * 2007-11-30 2008-11-19 泰安供电公司 Backup protection rope for combined double- and four-splitting wire
CN201438617U (en) * 2009-02-19 2010-04-14 金华电业局 Electric lifting tool for linear insulator string on ZM tower
CN202094541U (en) * 2011-06-15 2011-12-28 辽宁省电力有限公司营口供电公司 Adjustable four-bundle conductor lifting device
CN102629745A (en) * 2012-04-26 2012-08-08 辽宁省电力有限公司辽阳供电公司 Clamp buckle type secondary protector
CN202586162U (en) * 2012-04-26 2012-12-05 辽宁省电力有限公司辽阳供电公司 Adjustable wire hanging hook
CN204030430U (en) * 2014-08-08 2014-12-17 国家电网公司 A kind of conductors on quad bundled protects line hook

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1350725A1 (en) * 1985-09-02 1987-11-07 Предприятие Кишиневских Электрических Сетей "Молдглавэнерго" Arrangement for replacing twin insulator strings and supporting hardware in power transmission lines with split insulated wires in a phase under voltage
CN85204196U (en) * 1985-09-28 1986-06-11 鞍山电业局 Clamps for change straight-line whole serial insulators on live wire work
CN201153198Y (en) * 2007-11-30 2008-11-19 泰安供电公司 Backup protection rope for combined double- and four-splitting wire
CN201438617U (en) * 2009-02-19 2010-04-14 金华电业局 Electric lifting tool for linear insulator string on ZM tower
CN202094541U (en) * 2011-06-15 2011-12-28 辽宁省电力有限公司营口供电公司 Adjustable four-bundle conductor lifting device
CN102629745A (en) * 2012-04-26 2012-08-08 辽宁省电力有限公司辽阳供电公司 Clamp buckle type secondary protector
CN202586162U (en) * 2012-04-26 2012-12-05 辽宁省电力有限公司辽阳供电公司 Adjustable wire hanging hook
CN204030430U (en) * 2014-08-08 2014-12-17 国家电网公司 A kind of conductors on quad bundled protects line hook

Also Published As

Publication number Publication date
CN104158118A (en) 2014-11-19

Similar Documents

Publication Publication Date Title
CN103618251A (en) Technology for electrified overhaul of +-800kV ultrahigh voltage direct-current transmission line
CN202026034U (en) Overhead wire insulation wire lifter for 10-kilovolt circuit
CN101820144B (en) Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire
CN207336402U (en) Strain clamp DR detection operation platforms
CN103326304B (en) 10kV charged drainage wire supporting device
CN201374521Y (en) Equipotential ladder
CN104158118B (en) A kind of conductors on quad bundled protects line hook
CN204030430U (en) A kind of conductors on quad bundled protects line hook
CN209277668U (en) A kind of reinforced electric wire cross-arm
CN209948529U (en) Live lifting mechanism for three-phase lead of straight-line section of 10kV distribution network line
CN202930825U (en) Tool for replacing the side fittings on the double split wire side of the strain tower
CN204144800U (en) The special cross-arm card of a kind of ZML type tower
CN210693413U (en) A high-strength mandrel-type arrester with visible fracture
CN203039273U (en) Transformer station tubular busbar double-clamp grounding device
CN105977860A (en) Composite cross-arm insulator device and method for replacing overhead transmission line
CN203166445U (en) Device using coupling ground line to reduce lightning trip-out rate of transmission line
CN208401405U (en) 220kV conductors on quad bundled V-type replacing insulator string tool
CN207150030U (en) Fixture for the only cross-arm shaft tower replacing insulator under electrified of 110kV straight lines
CN206878417U (en) Secondary protection device for ground wire connection fittings
CN206903345U (en) A kind of prestressed electric wire pole with lightning conducter
CN204517287U (en) A kind of crimping tubular type insulation tractor
CN104078878A (en) Wire lifting device for replacing insulator in live mode
CN205484430U (en) Transformer high -voltage testing support
CN206432681U (en) A kind of Novel lightning arrester mounting seat
CN104897931A (en) Telescopic wiring device for high-altitude test

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant