CN104153615B - Ramp side frame idle pattern formula garage parking - Google Patents
Ramp side frame idle pattern formula garage parking Download PDFInfo
- Publication number
- CN104153615B CN104153615B CN201310417629.1A CN201310417629A CN104153615B CN 104153615 B CN104153615 B CN 104153615B CN 201310417629 A CN201310417629 A CN 201310417629A CN 104153615 B CN104153615 B CN 104153615B
- Authority
- CN
- China
- Prior art keywords
- steel
- pin
- translation
- cores
- cross beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The present invention is ramp side frame idle pattern formula garage parking, fix steel column using being fixedly mounted on the dypass face of ramp and heighten the steel fixed cross beam that is set between steel column, steel front beam, the overhead framework that steel rear cross beam is combined, steel fixed cross beam is embedded in setting steel and translates crossbeam and translation steel frame, turbine is passed through by translation motor, drive shaft, shiftable gear, translation steel frame is promoted before and after rack, the lifting motor set on translation steel frame, lift drive shaft, inward turning nut worm wheel, lifting screw Synchronous Transmission lifts steel landing, driver is selected by wireless charging IC-card, main electric cabinet receive after driver's selection instruction by be arranged in steel fixed cross beam and protection pipe on before, it is spacing afterwards and on, under, heighten the rotating forward that spacing magnetoresistive sensor enters the time-sharing automatic control translation motor of line program and lifting motor, reversion, shut down to realize self-service parking and self-service pick-up, its environmental protection saves land, it is easy to install, convenient operation is practical, safeguard simple.
Description
Technical field
The present invention relates to vehicle stores field, specifically ramp side frame idle pattern formula garage parking.
Background technology
At present, the bicycle lane of known current ramp side generally is the non-motor vehicle that individual layer is independently operated, ramp side
Road overhead be generally it is outdoor do not made full use of, with sharply increasing for China Today automobile quantity, solve parking stall in short supply
Problem is into the task of top priority, due to the rare non-maneuver for causing more driver that automobile is directly parked in ramp side on parking stall
On track, motor vehicle is caused mutually to fight for the contradiction and problem in space with non-motor vehicle, motor vehicle stops on bicycle lane
It can disturb the public order, non-motor vehicle scrapes the car for being parked in non-motor vehicle road surface when non-motor vehicle road surface is walked accidentally
The situation of lacquer painting happens occasionally;Common Parking Meter ramp dypass face parking, common Parking Meter ramp dypass face parking stall is generally list
Floor is parked, it is necessary to take the limited road width in ramp dypass face and cause the reduction of vehicle pass-through efficiency;Ramp side vapour is solved at this stage
The method that car parks problem, it implements to have the characteristics that 1. non-motor vehicle road surface in ramp side can only realize individually traveling non-maneuver
Automobile is parked on the non-motor vehicle road surface of ramp side by car function or more driver in violation of rules and regulations;2. limited road width is taken on slope
Parked on the common Parking Meter parking stall in road side;The parking function having with present ramp side parking stall, ramp side to be resolved is non-
The problem of car lane overhead utilization rate is relatively low, common Parking Meter parking stall need to take the limited road width in ramp side.
The content of the invention
In order to solve, existing ramp side bicycle lane overhead utilization rate is relatively low, common Parking Meter parking stall need to take ramp
The problem of limited road width in side, organically combined it is an object of the invention to provide one kind by machine driven system and automatically controlled automated system
What is be integrated more preferable solves the problems, such as that ramp side overhead utilization rate is relatively low, common Parking Meter parking stall need to take the limited road width in ramp side
Ramp side frame idle pattern formula garage parking.
The technical solution adopted for the present invention to solve the technical problems is:The direction of arrow is to be preceding to the fixed steel in terms of front
The lower end of column 1 is fixedly mounted on the ramp dypass face 7 by high side, and the lower end for heightening steel column 2 is fixedly mounted on by downside
Ramp dypass face 7 on, the pipe for heightening the top end of steel column 2 is embedded in the flexible steel column 3 of setting, heightens the top end of steel column 2
The front and back sides for being combined section on lower side with flexible steel column 3 penetrate setting and heighten screw 4 and bolt 5, preceding fixed steel column 1
Leaning between centre position for top end position and front stretching steel column 3 sets steel front beam 6, heightens steel column 2 and flexible steel is vertical
Post 3 carries out height adjustment by bolt 5 with corresponding screw 4 of heightening, and is horizontally oriented steel front beam 6, front and rear fixed steel is stood
Level is fixedly installed in fore-and-aft direction respectively for relative inner side, the top end position of vertical direction between post 1 and elastic steel column 3
And symmetrical C-shaped steel fixed cross beam 8, relatively, the setting height of steel front beam 6 is solid less than steel for the C-shaped mouthful of left and right steel fixed cross beam 8
Determine the front end downside of crossbeam 8, fixation is set the upper surface fore-and-aft direction of the following inner side of C-shaped mouthful of left and right steel fixed cross beam 8 respectively
Put the lower surface fore-and-aft direction on the inside of I-steel 13, the C-shaped mouthful top of left and right steel fixed cross beam 8 and translating rack is fixedly installed respectively
17, load-bearing bearing 15, the inner side point of the C-shaped mouthful of left and right steel fixed cross beam 8 is fixedly installed in the upper surface of the front end of I-steel 13 respectively
Other fore-and-aft direction insertion sets C-shaped steel translation crossbeam 14, and downwards, steel translates the C-shaped of crossbeam 14 to the c-shaped opening of steel translation crossbeam 14
Intraoral face layer is pressed on the outer layer surface of load-bearing bearing 15, the end rearward of steel translation crossbeam 14, c-shaped opening inner side, horizontal direction
Sliding bearing 16 is set respectively, and sliding bearing 16 is symmetrical arranged in the groove of I-steel 13, steel translation crossbeam 14 in left and right is held rearward
Upper surface rolling bearing units 19 are fixedly installed respectively, between rear fixed steel column 1 and afterwards flexible steel column 3, vertical direction it is top
Steel rear cross beam 12 is fixedly installed in end position, and the rear branch of U-bracket seat 54 is fixedly installed in the upper surface in the centre position of steel rear cross beam 12
Cable is set to fold the postbrachium of arm 48 in frame, the after-poppet of U-bracket seat 54, the postbrachium that cable folds arm 48 is embedded in U on lower side
The after-poppet of shape carrier base 54 is simultaneously flexibly connected by pivot pin 43, and the top of rear fixed steel column 1 sets the main electric cabinet of water proof type
11, the upper end of main electric cabinet 11 penetrates setting luminance sensor 24, a cores, b cores one end and the luminance sensor 24 of signal cable 25
Positive pole, negative pole electrical connection, No. 13 of a cores of signal cable 25, the b cores other end and main electric cabinet 11, No. 14 terminals are electrically connected
Connect, the position insertion of the preceding fixed liftoff 1.5 meters of height in the front end of steel column 1 is set on waterproof type control panel 27, control panel 27
LCD panel 29, red LED lamp 31, RF induction coils 30, green LED lamp 32 are set respectively, and red LED lamp 31 is to have accounted for
Use parking stall indicator lamp, green LED lamp 32 is empty parking space indicator lamp, the one end of signal cable 28 respectively with the JT2 on control panel 27
Group of terminals is electrically connected, upper surface of the other end of signal cable 27 along right steel fixed cross beam 4 access main electric cabinet 11 and respectively with
The JT1 group of terminals electrical connection of main electric cabinet 11, the front end insertion in the centre position of steel front beam 6 sets LED illumination lamp 9, control
The a cores of cable 10, b cores one end are electrically connected with positive pole, the negative pole of LED illumination lamp 9, control a cores, the b core other ends edge of cable 10
The inner side of steel front beam 6, the upper surface of right side steel fixed cross beam 8 access main electric cabinet 11 and respectively with main electric cabinet 11 No. 15,
The electrical connection of No. 16 terminals, a cores of circumscripted power line 26, b cores, c cores, d cores one end respectively with 380 volts of AC powers of three-phase and four-line
LN1, LN2, LN3, LN0 electrical connection, a cores of circumscripted power line 26, b cores, c cores, the d cores other end are fixed after steel column 1 after
The inner side of lower end access main electric cabinet 11 and respectively with electromagnetic relay in main electric cabinet 11(J1)57 1 pin, 3 pin, 5 pin and public affairs
Holding altogether is electrically connected, and the c cores of circumscripted power line 26, the d cores other end also respectively with main electric cabinet 11 No. 1, No. 2 terminals are electrically connected
Connect, electromagnetic relay(J1)57 1 pin and 2 pin, 3 pin and 6 pin, 4 pin and 5 pin, 7 pin and 8 pin, 9 pin and 10 pin, 11 pin and 12 pin
It is electrically connected, electromagnetic relay(J1)57 7 pin and electromagnetic relay(J2)58 5 pin, electromagnetic relay(J3)59 5 pin
And electromagnetic relay(J4)60 5 pin electrical connection, electromagnetic relay(J1)57 9 pin and electromagnetic relay(J2)58 3 pin, electricity
Magnetic relay(J3)59 3 pin and electromagnetic relay(J4)60 3 pin electrical connection, electromagnetic relay(J1)57 11 pin and electromagnetism
Relay(J2)58 1 pin, electromagnetic relay(J3)59 1 pin and electromagnetic relay(J4)60 1 pin electrical connection, electromagnetism relay
Device(J1)57 13 pin, 14 pin respectively with main electric cabinet 11 No. 23, No. 24 terminals are electrically connected, electromagnetic relay(J2)58
7 pin, 8 pin respectively with main electric cabinet 11 No. 21, No. 22 terminals are electrically connected, electromagnetic relay(J3)59 7 pin, 8 pin difference
No. 19 with main electric cabinet 11, No. 20 terminals electrically connect, electromagnetic relay(J4)60 7 pin, 8 pin respectively with main electric cabinet 11
No. 17, the electrical connection of No. 18 terminals, penetrating the C-shaped mouthful upper surface of right steel fixed cross beam 8, end position divides at forward end and rearward
Qian Ru not set the A of spacing magnetron 22 to manage and B pipes, a cores of signal cable 23, b cores, c cores, d cores one end respectively with spacing magnetic
1 pin of keyholed back plate 22A pipes, 2 pin, 1 pin of spacing magnetron 22B pipes, the electrical connection of 2 pin, a cores, b cores, c cores, the d cores of signal cable 23
Upper surface of the other end along right steel fixed cross beam 4 access main electric cabinet 11 and respectively with main electric cabinet 11 No. 9, No. 10, No. 11,
No. 12 terminals electrical connections, right steel translation crossbeam 14 holds the position of the spacing magnetron 22 of upper surface correspondence on the outside of c-shaped opening rearward
Put and translation positioning magnetic steel 21 is fixedly installed, vertical view, which is fixedly installed, by centre position horizontal direction between left and right steel translation crossbeam 14 is in
The translation steel frame 33 of openning shape, the after-poppet position of correspondence U-bracket seat 54 is upper in the middle of the back rest of translation steel frame 33
Surface rearward position be fixedly installed U-bracket seat 54 fore-stock, U-bracket seat 54 fore-stock in set cable fold arm 48
Forearm, cable fold arm 48 forearm on lower side be embedded in U-bracket seat 54 fore-stock and be flexibly connected by pivot pin 43, line
The forearm upper end that cable folds arm 48 is flexibly connected with the postbrachium upper end that cable folds arm 48 by pivot pin 43 in the shape of falling V, is translated
The closed water proof type protection pipe 35 in upper end is fixedly installed by being respectively perpendicular above end positions in the left and right curb girder of steel frame 33, protects
The lifting screw 34 that sets and can move up and down is respectively perpendicular in pillar 35, the top of left back lifting screw 34 sets lifting positioning magnetic
The A pipes and B of the fixedly embedded spacing magnetron 50 of setting are distinguished by top and by bottom position in steel 51, the right side of left back protection pipe 35
Pipe, hole 55 is heightened in end position setting on the lower on the right side of left back protection pipe 35, is heightened hole 55 and is embedded in the C for setting spacing magnetron 50
Pipe, a cores of signal cable 49, b cores, c cores, d cores, e cores, f cores one end are managed with spacing magnetron 50A respectively, the 1 of B pipes and C pipes
Pin, the electrical connection of 2 pin, a cores of signal cable 49, b cores, c cores, d cores, e cores, the f cores other end edge translation rear end upper table of steel frame 33
Main electric cabinet 11 and respectively 3 with main electric cabinet 11 are accessed in C-shaped inner side, the upper surface of steel rear cross beam 12 that face, cable fold arm 48
Number, No. 4, No. 7, No. 8, No. 5, the electrical connection of No. 6 terminals, translate and worm gear 46, worm screw 45, translation be set in the back rest of steel frame 33
Translation motor is fixedly installed in drive shaft 20, the keep left upper surface of position of translation steel frame 33 rear end(M1)44, translation motor(M1)
44 rotating shaft vertically penetrate in the back rest of insertion translation steel frame 33 with worm screw 45 is concentric is fixedly connected, worm gear 46 and worm screw 45
Engagement, worm gear 46 with translation drive shaft 20 is concentric is fixedly connected, the left and right of translation drive shaft 20 is concentric solid by top difference
Shiftable gear 18 is set surely, and the left and right top of translation drive shaft 20 is respectively embedded into concentric flexible connection in rolling bearing units 19, put down
Gear 18 is moved to engage with translating rack 17 respectively, control a cores of cable 47, b cores, c cores one end respectively with translation motor (M1) 44
The electrical connection of a, b, c winding terminal, control a cores of cable 47, b cores, the c cores other end along translation steel frame 33 rear end upper surface, line
Cable is folded on the inside of the C-shaped of arm 48, main electric cabinet 11 is accessed in the upper surface of steel rear cross beam 12 and respectively with electromagnetism in main electric cabinet 11 after
Electrical equipment(J2)58 2 pin, 4 pin, the electrical connection of 6 pin, the lower end of lifting screw 34 vertically penetrate translation steel frame 33, translate steel frame
With the concentric nut worm wheel of setting inward turning respectively 36 of lifting screw 34 and cone bearing 39 in 33 left and right curb girder, steel frame is translated
Lifting motor (M3) 56 is fixedly installed in 33 left side beam rear end, and lifting motor is fixedly installed in the right side beam rear end of translation steel frame 33
(M2) 38, the rotating shaft of lifting motor (M2) 38 and lifting motor (M3) 56 respectively with lift drive shaft 37 is concentric is fixedly connected,
Lift drive shaft 37 is worm screw by two ends, and the worm screw on lift drive shaft 37 engages with inward turning nut worm wheel 36, control cable
A, b, c winding terminal of the 52 a cores, b cores, c cores one end respectively with lifting motor (M2) 38 is electrically connected, and controls a cores, the b of cable 52
Core, the c cores other end are along translation steel frame 33 rear end upper surface, cable are folded on the inside of the C-shaped of arm 48, the upper surface of steel rear cross beam 12 connects
Become owner of electric cabinet 11 and respectively with electromagnetic relay in main electric cabinet 11(J3)59 2 pin, 4 pin, the electrical connection of 6 pin, control cable
A, b, c winding terminal of the 53 a cores, b cores, c cores one end respectively with lifting motor (M3) 56 is electrically connected, and controls a cores, the b of cable 53
Core, the c cores other end are along translation steel frame 33 rear end upper surface, cable are folded on the inside of the C-shaped of arm 48, the upper surface of steel rear cross beam 12 connects
Become owner of electric cabinet 11 and respectively with electromagnetic relay in main electric cabinet 11(J4)60 2 pin, 4 pin, the electrical connection of 6 pin, lifting screw
34 lower end fore-and-aft direction sets correspondence lifting screw 34 at axis hole 42, four angles of the horizontal direction of steel landing 40 respectively
Position is respectively perpendicular setting hollow groove 41, the end position on the lower of lifting screw 34 and the top end position front and back of groove 41
To axis hole 42 is correspondingly arranged respectively, the lower end of lifting screw 34 is embedded in groove 41, in terms of front, the insertion groove 41 of lifting screw 34
Lower end be arc-shaped, the axis hole 42 of lifting screw 34 on lower side and the axis hole 42 at the top end of groove 41 set pivot pin 43 to live respectively
Dynamic connection;When ramp side frame idle pattern formula garage parking is in whne parking rounding state, No. 1, No. 2 terminals of main electric cabinet 11
LN3, LN0 phase line for connecting 380 volts of power supplys of external exchange by the c cores of circumscripted power line 26, d cores are standby, in main electric cabinet 11
Electromagnetic relay(J1)The a cores, b cores, c cores that 57 1 pin, 3 pin, 5 pin pass through circumscripted power line 26 respectively connect external three-phase four
LN1, LN2, LN3 phase line of 380 volts of AC powers of line are standby, and steel landing 40 rises to the bottom of translation steel frame 33, lifting
Screw rod 34 is risen in protection pipe 35, and the end on the lower of lifting screw 34 is risen in inward turning nut worm wheel 36 and cone bearing 39, is risen
The S poles of drop positioning magnetic steel 51 are leaned against on the A pipes of spacing magnetron 50, and now 1 pin, 2 pin of the spacing A pipes of magnetron 50 are normally opened touches
Point is in on-state, makes 1 pin, 2 pin of spacing magnetron 50B pipes and C pipes normally opened due to being moved away from lifting positioning magnetic steel 51
Contact is in off-state, and steel translation crossbeam 14 is moved rearwards by drawing on the I-steel 13 in steel fixed cross beam 8, steel landing
40 are parked in the centre position of the fore-and-aft direction of steel fixed cross beam 8 with translation steel frame 33, and the S poles of translation positioning magnetic steel 21 lean against spacing
On the B pipes of magnetron 22, now 1 pin, the 2 pin normally opened contacts of spacing magnetron switch 22B pipes are in on-state, because translation is fixed
1 pin for making spacing magnetron 22A pipes, 2 pin normally opened contacts are moved away from after the magnet steel 21 of position in off-state, main electric cabinet 11 passes through
Empty parking space green LED lamp 32 on the drive control panel 27 of signal cable 28 of electrical connection is lighted, and when that need to stop, driver sees
When the empty parking space green LED lamp 32 of the built on stilts Combined parking garage in ramp is bright, vehicle is temporarily parked in control by the driver that need to stop
Panel 27 is above at right side, and then driver, which gets off, supplements valid wireless with money IC-card and lean against the RF lines of induction on control panel 27
Enclose at 30, the RF induction coils 30 on control panel 27 read effective wireless charging IC card information and information is passed through into signal cable
28 send main electric cabinet 11 to, and main 11 pairs of valid wireless of electric cabinet supplement IC-card with money and start charging and start landing release
Flow, the luminance sensor 24 that electric cabinet 11 main first is connected by No. 13, No. 14 terminals with a cores, the b cores of signal cable 25
Ambient light intensity is detected, if the light intensity signal that luminance sensor 24 is detected is less than the setting of main electric cabinet 11
Value, main electric cabinet 11 connects control cable 10 by the pin of terminals 15,16 pin and illuminating LED lamp 9 is powered, 9 points of illuminating LED lamp
Bright, then, main electric cabinet 11 is by No. 23, No. 24 terminals to electromagnetic relay(J1)57 13 pin, 14 pin are not powered, electromagnetism
Relay(J1)57 do not work, electromagnetic relay(J1)57 normally-closed contact makes 1 pin and 12 pin, 3 pin and 10 pin, 5 pin and 8 pin point
Do not connect, then, main electric cabinet 11 gives electromagnetic relay respectively by No. 21, No. 22 terminals(J2)58 7 pin, 8 pin are powered,
Electromagnetic relay(J2)58 work, electromagnetic relay(J2)58 1 pin is respectively turned on 2 pin, 3 pin and 4 pin, 5 pin and 6 pin, is put down
Move motor(M1)44 a, b, c winding passes through the electromagnetic relay with controlling a cores, b cores, the c cores of cable 47 to connect respectively(J2)
58 2 pin, 4 pin, 6 pin connect external 380 volts of AC powers of three-phase, translation motor(M1)44 rotate forward, with translation motor(M1)44
The worm screw 45 that rotating shaft is fixedly connected drives worm gear 46, translation drive shaft 20, shiftable gear 18 to be rotated in rolling bearing units 19, translation
The translating rack 17 that gear 18 is fixedly connected on the inner side of steel fixed cross beam 8 by engagement will translate gooseneck 14, translation steel frame
33 and steel landing 40 promote forward, when translate positioning magnetic steel 21 S poles come to the A pipes of spacing magnetron 22 when, spacing magnetic
1 pin of keyholed back plate 22A pipes, 2 pin normally opened contacts are in on-state, and 1 pin of spacing magnetron 22A pipes, 2 pin pass through the letter that is attached thereto
9 pin, 10 pin of the main electric cabinet 11 of a cores, b wick feeds of number cable 23, which are provided, connects signal, and main electric cabinet 11 cuts off electromagnetism relay
Device(J2)58 power supply, translation motor(M1)44 stallings, then, main electric cabinet 11 passes through No. 17, No. 18, No. 19, No. 20 wiring
Electromagnetic relay is given at end respectively(J4)60 7 pin, 8 pin and electromagnetic relay(J3)59 7 pin, 8 pin are powered, electromagnetic relay
(J3)59 and electromagnetic relay(J4)60 work, electromagnetic relay(J3)59 and electromagnetic relay(J4)60 1 pin and 2 pin, 3 pin
It is respectively turned on 4 pin, 5 pin and 6 pin, lifting motor(M2)38 a, b, c winding passes through a cores, the b with controlling cable 52 respectively
Core, the electromagnetic relay of c cores connection(J3)59 2 pin, 4 pin, 6 pin connect external 380 volts of AC powers of three-phase, lifting motor
(M2)38 rotate forward, meanwhile, lifting motor(M3)56 a, b, c winding is respectively by with controlling a cores, b cores, c cores of cable 53 to connect
Logical electromagnetic relay(J4)60 2 pin, 4 pin, 6 pin connect external 380 volts of AC powers of three-phase, lifting motor(M3)56 just
Turn, lifting motor(M2)38 synchronously drive the inward turning spiral shell of front and back end in the translation right beam of steel frame 33 by lift drive shaft 37 respectively
Female worm gear 36 is rotated forward, lifting motor(M3)56 by front and rear in the lift drive shaft 37 respectively left beam of synchronous driving steel translational frame 33
The inward turning nut worm wheel 36 at end is rotated forward, and the driving lifting screw 34 of inward turning nut worm wheel 36 makes the horizontal synchronization of steel landing 40
Decline, when the bottom right base of steel landing 40 is down to above ramp dypass face 7, that is, the S poles for lifting positioning magnetic steel 51 are leaned on
To spacing magnetron 50 C pipes when, 1 pin of spacing magnetron 50C pipes, 2 pin normally opened contacts be in on-state, spacing magnetron
No. 5 of the main electric cabinet 11 of e cores, f wick feeds that 1 pin, 2 pin of 50C pipes pass through the signal cable 49 being attached thereto, No. 6 terminals carry
For trigger signal, main electric cabinet 11 cuts off electromagnetic relay(J3)59 power supply, lifting motor(M2)38 stallings, when steel parking
When the lower-left base of platform 40 is down to above ramp dypass face 7, that is, the S poles for lifting positioning magnetic steel 51 come to spacing magnetron 50
B pipes when, 1 pin of spacing magnetron 50B pipes, 2 pin normally opened contacts are in on-state, and 1 pin of spacing magnetron 50B pipes, 2 pin lead to
No. 7, No. 8 terminals offer connection signals of the main electric cabinet 11 of c cores, d wick feeds for the signal cable 50 being attached thereto are crossed, master is automatically controlled
Case 11 cuts off electromagnetic relay(J4)60 power supply, lifting motor(M3)56 stallings, landing release flow is completed, and need to be stopped
Car driver is by storing cycle in parking area on steel landing 40, and then driver gets off valid wireless again
Supplement IC-card with money and lean against RF induction coils on confirmation of being stopped at the RF induction coils 30 on control panel 27, control panel 27
30 again read off effective wireless charging IC card information and send information to main electric cabinet 11 by signal cable 28, and master is automatically controlled
The i.e. control of accepting confirmation after parking information of case 11 enters landing and draws flow, first electromagnetic relay in(J1)57 work, electricity
Magnetic relay(J1)57 pin of normally opened contact 2 and 11 pin, 4 pin and 9 pin, 6 pin and 7 pin are respectively turned on LN2 and the LN3 friendship to access
Flow power supply and carry out commutation, then, main electric cabinet 11 is by No. 17, No. 18 terminals to electromagnetic relay(J4)60 7 pin, 8 pin
Power supply, electromagnetic relay(J4)60 work, electromagnetic relay(J4)60 1 pin and 2 pin, 3 pin and 4 pin, 5 pin and 6 pin are connected, and are risen
Motor drops(M3)56 a, b, c winding passes through the electromagnetic relay with controlling a cores, b cores, the c cores of cable 53 to connect respectively(J4)
380 volts of AC powers of external three-phase that 60 2 pin, 4 pin, 6 pin are connected after commutation, lifting motor(M3)56 reversions, lifting motor
(M3)56 is anti-by the inward turning nut worm wheel 36 of front and back end in the lift drive shaft 37 respectively left beam of synchronous driving steel translational frame 33
Turn, the inward turning nut worm wheel 36 of the Zuo Liang front and back ends of steel translational frame 33 drives left side front and back end lifting screw 34 by steel landing
40 left side is first synchronous to be raised up to steel landing 40 in left and right horizontal state, that is, lift positioning magnetic steel 51 S poles come to it is spacing
During the C pipes of magnetron 50,1 pin of spacing magnetron 50C pipes, 2 pin normally opened contacts are in on-state, the 1 of spacing magnetron 50C pipes
Pin, 2 pin pass through No. 5 of the main electric cabinet 11 of e cores, f wick feeds for the signal cable 49 being attached thereto, No. 6 terminals offer triggering letters
Number, main electric cabinet 11 is i.e. to electromagnetic relay(J3)59 power supply, main electric cabinet 11 by No. 19, No. 20 terminals to electromagnetism after
Electrical equipment(J3)59 7 pin, 8 pin are powered, electromagnetic relay(J3)59 work, electromagnetic relay(J3)59 1 pin and 2 pin, 3 pin with
4 pin, 5 pin and 6 pin are connected, lifting motor(M2)38 a, b, c winding is respectively by with controlling a cores, b cores, c cores of cable 52 to connect
Logical electromagnetic relay(J3)380 volts of AC powers of external three-phase that 59 2 pin, 4 pin, 6 pin are connected after commutation, lifting motor
(M2)38 reversions, lifting motor(M2)38 pass through front and back end in the lift drive shaft 37 respectively right beam of synchronous driving steel translational frame 33
Inward turning nut worm wheel 36 invert, the front and back end lifting of the inward turning nut worm wheels 36 of the You Liang front and back ends of steel translational frame 33 driving right side
Screw rod 34 rises on the right side of steel landing 40 and the left side of steel landing 40 in left and right horizontal state, steel landing 40
With the past rising simultaneously that parks cars, the bottom position of translation steel frame 33, steel are risen to when steel landing 40 carries to park cars
The bottom surface of landing 40 is higher than the upper surface of steel front beam 6, that is, the S poles for lifting positioning magnetic steel 51 come to restriction position magnetron
During 50 A pipes, 1 pin of spacing magnetron 50A pipes, 2 pin normally opened contacts are in on-state, 1 pin, 2 pin of spacing magnetron 50A pipes
There is provided by No. 3 of the main electric cabinet 11 of a cores, b wick feeds for the signal cable 49 being attached thereto, No. 4 terminals and connect signal, main electricity
Control case 11 and cut off electromagnetic relay(J3)59 and electromagnetic relay(J4)60 power supply, lifting motor(M2)38 and lifting motor
(M3)56 stallings, then, main electric cabinet 11 is by No. 21, No. 22 terminals to electromagnetic relay(J2)58 7 pin, 8 pin are powered,
Electromagnetic relay(J2)58 work, electromagnetic relay(J2)58 1 pin is respectively turned on 2 pin, 3 pin and 4 pin, 5 pin and 6 pin, is put down
Move motor(M1)44 a, b, c winding passes through the electromagnetic relay with controlling a cores, b cores, the c cores of cable 47 to connect respectively(J2)
380 volts of AC powers of external three-phase that 58 2 pin, 4 pin, 6 pin are connected after commutation, translation motor(M1)44 reversions, with translation electricity
Machine(M1)The worm screw 45 that 44 rotating shafts are fixedly connected drives worm gear 46, translation drive shaft 20, shiftable gear 18 in rolling bearing units 19
Rotation, the translating rack 17 that shiftable gear 18 is fixedly connected on the inner side of steel fixed cross beam 8 by engagement will translate gooseneck 14, put down
Move steel frame 33 and steel landing 40 is pulled back, when the S poles of translation positioning magnetic steel 21 come to the B pipes of spacing magnetron 22
When, 1 pin of spacing magnetron 22B pipes, 2 pin normally opened contacts are in on-state, 1 pin of spacing magnetron 22B pipes, 2 pin by with
11 pin of the main electric cabinet 11 of c cores, d wick feeds, 12 pin of signal cable 23 of connection provide and connect signal, main electric cabinet 11 is cut
Power off magnetic relay(J2)58 power supply, translation motor(M1)44 stallings, landing draws flow in and completed, waits to park cars
Discharge complete, the red LED lamp of parking stall has been taken on the drive control panel 27 of signal cable 28 that main electric cabinet 11 passes through electrical connection
31 light;When the driver that this parks cars comes to pick up the car, the driver supplements the valid wireless with money IC-card and leans against chain of command
At RF induction coils 30 on plate 27, effective wireless charging IC card information that the RF induction coils 30 on control panel 27 are read is led to
Cross signal cable 28 and send main electric cabinet 11 to, main 11 pairs of valid wireless of electric cabinet supplement IC-card with money and checked and deducted fees simultaneously
The presentation of information that will deduct fees starts landing release flow simultaneously on the LCD panel 29 of control panel 27, and parking is flat
After the completion of platform release flow, vehicle is sailed out of steel landing 40 by the driver, and main electric cabinet 11 starts landing receipts immediately
Rope flow journey, landing is drawn in after the completion of flow, the drive control panel 27 of signal cable 28 that main electric cabinet 11 passes through electrical connection
On empty parking space green LED lamp 32 light, ramp side frame idle pattern formula garage parking is again introduced into rounding state to be stopped.
The beneficial effects of the invention are as follows machine driven system and automatically controlled automated system organic assembling is integral, its ring
Guarantor saves land, easy to install, convenient operation is practical, safeguard simple, more preferably solves ramp side bicycle lane overhead utilization rate relatively low, general
The problem of logical Parking Meter parking stall need to take the limited road width in ramp side, and expense and material are saved, meet Modern Green and efficiently give birth to
Development trend living and requirement, to ground is wanted in the air, while caused by residential quarter, the shortage of urban road parking stall can be solved
Human lives and the problems such as traffic order.
Brief description of the drawings
The whole state of receipts completely that Fig. 1 is the present invention faces overall structure diagram.
Fig. 2 is the whole state A partial enlarged drawings of receipts completely of the present invention.
The whole state of receipts completely that Fig. 3 is the present invention overlooks overall structure diagram.
Fig. 4 is the whole state B partial enlarged drawings of receipts completely of the present invention.
Fig. 5 is the whole state right side structural representation of receipts completely of the present invention.
Fig. 6 is the electric control principle block diagram of the present invention.
In figure:1. fixing steel column, 2. heighten steel column, 3. flexible steel columns, and 4. heighten before screw, 5. bolts, 6. steel
It is horizontal after crossbeam, 7. ramp dypass faces, 8. steel fixed cross beams, 9.LED illuminating lamps, 10. control cables, 11. main electric cabinets, 12. steel
Beam, 13. I-steel, 14. translation crossbeams, 15. load-bearing bearings, 16. sliding bearings, 17. translating racks, 18. shiftable gears, 19.
Rolling bearing units, 20. translation drive shafts, 21. translation positioning magnetic steels, 22. spacing magnetrons, 23. control cables, 24. brightness sensing
Device, 25. signal cables, 26. circumscripted power lines, 27. control panels, 28. signal cables, 29. LCD panels, 30.RF sensings
Coil, 31. LEDs, 32. LEDs, 33. translation steel frames, 34. lifting screws, 35. protection pipes, 36. inward turning nut worm wheels,
37. lift drive shaft, 38. lifting motors(M2), 39. cone bearings, 40. steel landings, 41. grooves, 42. axis holes, 43.
Pivot pin, 44. translation motors (M1), 45. worm screws, 46. worm gears, 47. control cables, 48. cables folding arm, 49. signal cables,
50. spacing magnetron, 51. lifting positioning magnetic steels, 52. control cables, 53. control cables, 54.U shape carrier bases, 55. heighten hole,
56. lifting motor (M3), 57. electromagnetic relays(J1), 58. electromagnetic relays(J2), 59. electromagnetic relays(J3), 60. electromagnetism
Relay(J4).
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
Refering to accompanying drawing 1, accompanying drawing 2, see that the lower end of fixed steel column 1 is fixedly mounted on the ramp dypass face by high side from front
On 7, the lower end for heightening steel column 2 is fixedly mounted on the ramp dypass face 7 by downside, in the pipe for heightening the top end of steel column 2
It is embedded that flexible steel column 3 is set, heighten the top end of steel column 2 and flexible steel column 3 is combined the front and back sides of section and worn on lower side
Set thoroughly and heighten screw 4 and bolt 5, the top end position of preceding fixed steel column 1 and front stretching steel column 3 by centre position it
Between steel front beam 6 is set, heighten steel column 2 and flexible steel column 3 and the progress height adjustment of screw 4 heightened with corresponding by bolt 5,
It is horizontally oriented steel front beam 6, relative inner side, Vertical Square between front and rear fixed steel column 1 and elastic steel column 3
To top end position, level and symmetrical C-shaped steel fixed cross beam 8, the C of left and right steel fixed cross beam 8 is fixedly installed in fore-and-aft direction respectively
Shape mouthful is relative, and the setting height of steel front beam 6 is less than the front end downside of steel fixed cross beam 8, the C-shaped of left and right steel fixed cross beam 8
The upper surface fore-and-aft direction of the following inner side of mouth is fixedly installed on the inside of I-steel 13, the C-shaped mouthful top of left and right steel fixed cross beam 8 respectively
Lower surface fore-and-aft direction translating rack 17 is fixedly installed respectively, load-bearing axle is fixedly installed in the upper surface of the front end of I-steel 13 respectively
15 are held, the inner side difference fore-and-aft direction insertion of the C-shaped mouthful of left and right steel fixed cross beam 8 sets C-shaped steel translation crossbeam 14, and steel translation is horizontal
Downwards, the intraoral face layer of C-shaped of steel translation crossbeam 14 is pressed on the outer layer surface of load-bearing bearing 15 c-shaped opening of beam 14, steel translation
The end rearward of crossbeam 14, c-shaped opening inner side, horizontal direction set sliding bearing 16 respectively, and sliding bearing 16 is recessed in I-steel 13
It is symmetrical arranged in groove, rolling bearing units 19 are fixedly installed in the upper surface that steel translation crossbeam 14 in left and right is held rearward respectively, and preceding fixed steel is stood
The position insertion for 1.5 meters of height that the front end of post 1 is liftoff is set sets liquid crystal respectively on waterproof type control panel 27, control panel 27
Show plate 29, red LED lamp 31, RF induction coils 30, green LED lamp 32, red LED lamp 31 is green to have taken parking stall indicator lamp
Color LED 32 is empty parking space indicator lamp, and the one end of signal cable 28 is electrically connected with the JT2 group of terminals on control panel 27 respectively,
Main electric cabinet 11 is accessed in upper surface of the other end of signal cable 27 along right steel fixed cross beam 4.
Refering to accompanying drawing 3, accompanying drawing 4, the direction of arrow is to be preceding between preceding fixed steel column 1 and front stretching steel column 3, vertical
Steel front beam 6 is fixedly installed in the top end position in direction, between rear fixed steel column 1 and afterwards flexible steel column 3, vertical direction it is top
Steel rear cross beam 12 is fixedly installed in end position, and the rear branch of U-bracket seat 54 is fixedly installed in the upper surface in the centre position of steel rear cross beam 12
Cable is set to fold the postbrachium of arm 48 in frame, the after-poppet of U-bracket seat 54, the postbrachium that cable folds arm 48 is embedded in U on lower side
The after-poppet of shape carrier base 54 is simultaneously flexibly connected by pivot pin 43, and the top of rear fixed steel column 1 sets the main electric cabinet of water proof type
11, the upper end of main electric cabinet 11 penetrates setting luminance sensor 24, and the front end insertion in the centre position of steel front beam 6 sets LED to shine
Bright lamp 9, controls a cores of cable 10, b cores one end to be electrically connected with positive pole, the negative pole of LED illumination lamp 9, controls a cores, the b of cable 10
Upper surface of the core other end along the inner side of steel front beam 6, right side steel fixed cross beam 8 access main electric cabinet 11 and respectively with main electric cabinet
No. 15 of 11, No. 16 terminals electrical connections, a cores of circumscripted power line 26, b cores, c cores, d cores one end respectively with three-phase and four-line 380
LN1, LN2, LN3, LN0 electrical connection of AC power are lied prostrate, a cores, b cores, c cores, the d cores other end of circumscripted power line 26 are fixed after
Main electric cabinet 11 is accessed in the inner side of the posterior end of steel column 1, penetrates the C-shaped mouthful upper surface of right steel fixed cross beam 8 at forward end and leans on
Back-end location, which is respectively embedded into, sets the A of spacing magnetron 22 to manage and B pipes, a cores of signal cable 23, b cores, c cores, d cores one end point
Do not electrically connected with 1 pin of spacing magnetron 22A pipes, 2 pin, 1 pin of spacing magnetron 22B pipes, 2 pin, a cores, the b of signal cable 23
Main electric cabinet 11 is accessed in the upper surface of core, c cores, the d cores other end along right steel fixed cross beam 4, and right steel translation crossbeam 14 holds C-shaped rearward
Translation positioning magnetic steel 21, left and right steel translation crossbeam 14 is fixedly installed in the position of the spacing magnetron 22 of upper surface correspondence of open outer side
Between by centre position horizontal direction be fixedly installed overlook in openning shape translation steel frame 33, correspondence U-bracket seat 54 after
Backing positions, translation steel frame 33 the back rest in the middle of upper surface rearward position be fixedly installed U-bracket seat 54 fore-stock,
Cable is set to fold the forearm of arm 48 in the fore-stock of U-bracket seat 54, the forearm that cable folds arm 48 is embedded in U-shaped branch on lower side
The fore-stock of stand 54 is simultaneously flexibly connected by pivot pin 43, and the left and right curb girder of translation steel frame 33 is distinguished by the top of end positions
It is vertical that the lifting spiral shell for being respectively perpendicular in the closed water proof type protection pipe 35 in upper end, protection pipe 35 and setting and can moving up and down is fixedly installed
Bar 34, the top of left back lifting screw 34 sets lifting positioning magnetic steel 51, and the right side of left back protection pipe 35 is by top and by bottom
The A pipes and B pipes of the fixedly embedded spacing magnetron 50 of setting of position difference, end position sets tune on the lower on the right side of left back protection pipe 35
High hole 55, heightens hole 55 and is embedded in and set the C of spacing magnetron 50 to manage, a cores, b cores, c cores, d cores, e cores, the f of signal cable 49
Core one end is managed with spacing magnetron 50A respectively, B pipes and 1 pin, 2 pin of C pipes are electrically connected, a cores of signal cable 49, b cores, c cores,
D cores, e cores, the f cores other end are along along translation steel frame 33 rear end upper surface, the C-shaped inner side of cable folding arm 48, steel rear cross beam 12
Main electric cabinet 11 is accessed on surface, translates and worm gear 46, worm screw 45, translation drive shaft 20 are set in the back rest of steel frame 33, translates steel
Translation motor is fixedly installed in the keep left upper surface of position of the rear end of framework 33(M1)44, translation motor(M1)44 rotating shaft is vertically penetrated
In the back rest of insertion translation steel frame 33 with worm screw 45 is concentric is fixedly connected, worm gear 46 is engaged with worm screw 45, worm gear 46 and is put down
Move that drive shaft 20 is concentric is fixedly connected, shiftable gear is fixedly installed by top is concentric respectively in the left and right of translation drive shaft 20
18, the left and right top of translation drive shaft 20 is respectively embedded into concentric flexible connection in rolling bearing units 19, shiftable gear 18 respectively with
Translating rack 17 is engaged, and controls a, b, c winding terminal electricity of a cores, b cores, c cores one end of cable 47 respectively with translation motor (M1) 44
Connection, controls a cores, b cores, the c cores other end of cable 47 to fold the C-shaped of arm 48 along translation steel frame 33 rear end upper surface, cable
Main electric cabinet 11 is accessed in inner side, the upper surface of steel rear cross beam 12, and the lower end of lifting screw 34 vertically penetrates translation steel frame 33, translation
With the concentric nut worm wheel of setting inward turning respectively 36 of lifting screw 34 and cone bearing 39, translation in the left and right curb girder of steel frame 33
Lifting motor (M3) 56 is fixedly installed in the left side beam rear end of steel frame 33, and liter is fixedly installed in the right side beam rear end of translation steel frame 33
Motor (M2) 38 drops, the rotating shaft of lifting motor (M2) 38 and lifting motor (M3) 56 respectively with the concentric fixation of lift drive shaft 37
Connection, lift drive shaft 37 is worm screw by two ends, and the worm screw on lift drive shaft 37 engages with inward turning nut worm wheel 36, control
A, b, c winding terminal of a cores, b cores, c cores one end of cable 52 processed respectively with lifting motor (M2) 38 is electrically connected, control cable 52
A cores, b cores, the c cores other end are along along translation steel frame 33 rear end upper surface, the C-shaped inner side of cable folding arm 48, steel rear cross beam 12
Main electric cabinet 11 is accessed on surface, controls a cores, b cores, a, b, c winding of c cores one end respectively with lifting motor (M3) 56 of cable 53
End electrical connection, controls a cores, b cores, the c cores other end of cable 53 to fold arm 48 along translation steel frame 33 rear end upper surface, cable
Main electric cabinet 11 is accessed in C-shaped inner side, the upper surface of steel rear cross beam 12, and the lower end fore-and-aft direction of lifting screw 34 sets axis hole respectively
42, the position of correspondence lifting screw 34 is respectively perpendicular setting hollow groove at four angles of the horizontal direction of steel landing 40
41, the end position on the lower of lifting screw 34 is correspondingly arranged axis hole 42 respectively with the top end position fore-and-aft direction of groove 41, lifts
The lower end insertion groove 41 of screw rod 34, in terms of front, the lower end of the insertion groove 41 of lifting screw 34 is arc-shaped, lifting screw 34
Axis hole 42 on lower side sets pivot pin 43 to be flexibly connected respectively with the axis hole 42 at the top end of groove 41.
Refering to accompanying drawing 5, the direction of arrow is to be preceding to the intraoral face layer of C-shaped of steel translation crossbeam 14 is pressed in load-bearing bearing 15
On outer layer surface, the end rearward of steel translation crossbeam 14, horizontal direction set sliding bearing 16 respectively, and cable is folded on the forearm of arm 48
The postbrachium upper end for folding arm 48 with cable is held to be flexibly connected by pivot pin 43 in the shape of falling V, the right side of left back protection pipe 35 is on the lower
End position sets and heightens hole 55, heightens hole 55 and is embedded in and sets the C of spacing magnetron 50 to manage.
Refering to accompanying drawing 6, a cores of signal cable 25, b cores one end are electrically connected with positive pole, the negative pole of luminance sensor 24, signal
No. 13 of a cores of cable 25, the b cores other end and main electric cabinet 11, No. 14 terminals electrically connect, control a cores, the b cores of cable 10
One end is electrically connected with positive pole, the negative pole of LED illumination lamp 9, control a cores of cable 10, the b cores other end respectively with main electric cabinet 11
No. 15, the electrical connection of No. 16 terminals, a cores of circumscripted power line 26, b cores, c cores, d cores one end respectively with 380 volts of friendships of three-phase and four-line
LN1, LN2, LN3, LN0 electrical connection of power supply are flowed, a cores, b cores, c cores, the d cores other end of circumscripted power line 26 are automatically controlled with master respectively
Electromagnetic relay in case 11(J1)57 1 pin, 3 pin, 5 pin and common electrical connection, c cores, the d cores of circumscripted power line 26 is another
End also respectively with main electric cabinet 11 No. 1, No. 2 terminals are electrically connected, electromagnetic relay(J1)57 1 pin and 2 pin, 3 pin and 6
Pin, 4 pin are electrically connected with 5 pin, 7 pin and 8 pin, 9 pin and 10 pin, 11 pin and 12 pin, electromagnetic relay(J1)57 7 pin and electricity
Magnetic relay(J2)58 5 pin, electromagnetic relay(J3)59 5 pin and electromagnetic relay(J4)60 5 pin electrical connection, electromagnetism after
Electrical equipment(J1)57 9 pin and electromagnetic relay(J2)58 3 pin, electromagnetic relay(J3)59 3 pin and electromagnetic relay(J4)
60 3 pin electrical connection, electromagnetic relay(J1)57 11 pin and electromagnetic relay(J2)58 1 pin, electromagnetic relay(J3)59
1 pin and electromagnetic relay(J4)60 1 pin electrical connection, electromagnetic relay(J1)57 13 pin, 14 pin respectively with main electric cabinet
11 No. 23, No. 24 terminals electrical connections, electromagnetic relay(J2)58 7 pin, 8 pin respectively with main electric cabinet 11 No. 21,22
The electrical connection of number terminals, electromagnetic relay(J3)59 7 pin, 8 pin respectively with main electric cabinet 11 No. 19, No. 20 terminals are electrically connected
Connect, electromagnetic relay(J4)60 7 pin, 8 pin respectively with main electric cabinet 11 No. 17, No. 18 terminals are electrically connected, and control cable
A, b, c winding terminal of the 47 a cores, b cores, c cores one end respectively with translation motor (M1) 44 is electrically connected, and controls a cores, the b of cable 47
Core, the c cores other end respectively with electromagnetic relay in main electric cabinet 11(J2)58 2 pin, 4 pin, the electrical connection of 6 pin, signal cable 23
A cores, b cores, c cores, the pin of B pipes 1,2 pin of d cores one end respectively with the pin of A pipes 1,2 pin, spacing magnetron 22 of spacing magnetron 22
Electrical connection, a cores of signal cable 23, b cores, c cores, the d cores other end respectively with main electric cabinet 11 No. 9, No. 10, No. 11, No. 12
Terminals are electrically connected, and control a, b, c winding terminal of a cores, b cores, c cores one end of cable 52 respectively with lifting motor (M2) 38 to be electrically connected
Connect, control a cores of cable 52, b cores, the c cores other end respectively with electromagnetic relay in main electric cabinet 11(J3)59 2 pin, 4 pin, 6
Pin is electrically connected, and controls a, b, c winding terminal of a cores, b cores, c cores one end of cable 53 respectively with lifting motor (M3) 56 to electrically connect,
Control a cores of cable 52, b cores, the c cores other end respectively with electromagnetic relay in main electric cabinet 11(J4)60 2 pin, 4 pin, 6 pin
Electrical connection, a cores of signal cable 49, b cores, c cores, d cores, e cores, f cores one end respectively with the pin of A pipes 1 of spacing magnetron 50,2 pin,
The pin of B pipes 1 of spacing magnetron 50, the pin of C pipes 1 of 2 pin and spacing magnetron 50, the electrical connection of 2 pin, a cores of signal cable 49, b cores,
C cores, d cores, e cores, the f cores other end respectively with main electric cabinet 11 No. 3, No. 4, No. 7, No. 8, No. 5, No. 6 terminals electrically connect, believe
Number one end of cable 28 is electrically connected with the JT2 group of terminals on control panel 27 respectively, the other end of signal cable 28 respectively with main electricity
Control the JT1 group of terminals electrical connection of case 11;When ramp side frame idle pattern formula garage parking is in whne parking rounding state, master is automatically controlled
No. 1 of case 11, No. 2 terminals pass through LN3, LN0 phase that the c cores of circumscripted power line 26, d cores connect 380 volts of power supplys of external exchange
Line is standby, electromagnetic relay in main electric cabinet 11(J1)57 1 pin, 3 pin, 5 pin pass through a cores, the b of circumscripted power line 26 respectively
LN1, LN2, LN3 phase line that core, c cores connect external 380 volts of AC powers of three-phase and four-line are standby, and steel landing 40 rises to translation
The bottom of steel frame 33, lifting screw 34 is risen in protection pipe 35, and the end on the lower of lifting screw 34 rises to inward turning nut worm wheel
36 and cone bearing 39 in, the S poles of lifting positioning magnetic steel 51 are leaned against on the A pipes of spacing magnetron 50, now spacing magnetron 50
1 pin of A pipes, 2 pin normally opened contacts are in on-state, and spacing magnetron 50B is managed due to being moved away from lifting positioning magnetic steel 51
1 pin, 2 pin normally opened contacts with C pipes are in off-state, and steel translation crossbeam 14 is moved rearwards by drawing the work in steel fixed cross beam 8 in
On word steel 13, steel landing 40 is parked in the centre position of the fore-and-aft direction of steel fixed cross beam 8, translation positioning with translation steel frame 33
The S poles of magnet steel 21 are leaned against on the B pipes of spacing magnetron 22, and now 1 pin, the 2 pin normally opened contacts of spacing magnetron switch 22B pipes are in
On-state, due to being moved away from 1 pin for making spacing magnetron 22A pipes, 2 pin normally opened contacts in disconnection after translation positioning magnetic steel 21
State, the empty parking space green LED lamp 32 on the drive control panel 27 of signal cable 28 that main electric cabinet 11 passes through electrical connection is lighted,
When the driver that need to stop sees that the empty parking space green LED lamp 32 of the built on stilts Combined parking garage in ramp is bright, the driver that need to stop will
Vehicle is temporarily parked in control panel 27 above at right side, and then driver, which gets off, supplements valid wireless with money IC-card and lean against control
At RF induction coils 30 on panel 27, the RF induction coils 30 on control panel 27 read effective wireless charging IC card information simultaneously
Information is sent to main electric cabinet 11 by signal cable 28, main 11 pairs of valid wireless of electric cabinet supplement IC-card with money and start charging
And starting landing release flow, electric cabinet 11 main first passes through No. 13, a cores, the b cores of No. 14 terminals and signal cable 25
The luminance sensor 24 of connection is detected to ambient light intensity, if the light intensity signal that luminance sensor 24 is detected is less than
The setting value of main electric cabinet 11, main electric cabinet 11 connects control cable 10 to illuminating LED lamp 9 by the pin of terminals 15,16 pin
Power supply, illuminating LED lamp 9 is lighted, and then, main electric cabinet 11 is by No. 23, No. 24 terminals to electromagnetic relay(J1)The 13 of 57
Pin, 14 pin are not powered, electromagnetic relay(J1)57 do not work, electromagnetic relay(J1)57 normally-closed contact makes 1 pin and 12 pin, 3
Pin is respectively turned on 10 pin, 5 pin and 8 pin, then, and main electric cabinet 11 gives electromagnetic relay respectively by No. 21, No. 22 terminals
(J2)58 7 pin, 8 pin are powered, electromagnetic relay(J2)58 work, electromagnetic relay(J2)58 1 pin and 2 pin, 3 pin and 4 pin,
5 pin are respectively turned on 6 pin, translation motor(M1)44 a, b, c winding is respectively by with controlling a cores, b cores, c cores of cable 47 to connect
Logical electromagnetic relay(J2)58 2 pin, 4 pin, 6 pin connect external 380 volts of AC powers of three-phase, translation motor(M1)44 just
Turn, with translation motor(M1)The worm screw 45 that 44 rotating shafts are fixedly connected drives worm gear 46, translation drive shaft 20, shiftable gear 18 in band
Rotated in seat bearing 19, the translating rack 17 that shiftable gear 18 is fixedly connected on the inner side of steel fixed cross beam 8 by engagement will be translated
Gooseneck 14, translation steel frame 33 and steel landing 40 are promoted forward, when the S poles of translation positioning magnetic steel 21 come to spacing magnetic control
During the A pipes of pipe 22,1 pin of spacing magnetron 22A pipes, 2 pin normally opened contacts are in on-state, 1 pin of spacing magnetron 22A pipes, 2
Pin is provided by 9 pin, 10 pin of the main electric cabinet 11 of a cores, b wick feeds for the signal cable 23 being attached thereto and connects signal, and master is automatically controlled
Case 11 cuts off electromagnetic relay(J2)58 power supply, translation motor(M1)44 stalling, then, main electric cabinet 11 by No. 17,
No. 18, No. 19, No. 20 terminals respectively give electromagnetic relay(J4)60 7 pin, 8 pin and electromagnetic relay(J3)59 7 pin, 8
Pin is powered, electromagnetic relay(J3)59 and electromagnetic relay(J4)60 work, electromagnetic relay(J3)59 and electromagnetic relay
(J4)60 1 pin is respectively turned on 2 pin, 3 pin and 4 pin, 5 pin and 6 pin, lifting motor(M2)38 a, b, c winding passes through respectively
The electromagnetic relay connected with a cores, b cores, the c cores for controlling cable 52(J3)59 2 pin, 4 pin, 6 pin connect external 380 volts of three-phase
AC power, lifting motor(M2)38 rotate forward, meanwhile, lifting motor(M3)56 a, b, c winding is respectively by with controlling cable
53 a cores, b cores, the electromagnetic relay of c cores connection(J4)60 2 pin, 4 pin, 6 pin connect external 380 volts of AC powers of three-phase,
Lifting motor(M3)56 rotate forward, lifting motor(M2)38 drive the translation right beam of steel frame 33 by the way that lift drive shaft 37 is synchronous respectively
The inward turning nut worm wheel 36 of interior front and back end is rotated forward, lifting motor(M3)56 pass through the synchronous driving steel translation respectively of lift drive shaft 37
The inward turning nut worm wheel 36 of front and back end is rotated forward in the left beam of framework 33, and the driving lifting screw 34 of inward turning nut worm wheel 36 makes steel parking flat
The horizontal synchronous decline of platform 40, when the bottom right base of steel landing 40 is down to above ramp dypass face 7, that is, it is fixed to lift
When the S poles of position magnet steel 51 come to the C pipes of spacing magnetron 50,1 pin of spacing magnetron 50C pipes, 2 pin normally opened contacts are in connection shape
State, 1 pin of spacing magnetron 50C pipes, 2 pin by be attached thereto the 5 of the main electric cabinet 11 of e cores, f wick feeds of signal cable 49
Number, No. 6 terminals trigger signals are provided, main electric cabinet 11 cuts off electromagnetic relay(J3)59 power supply, lifting motor(M2)
38 stallings, when the lower-left base of steel landing 40 is down to above ramp dypass face 7, that is, lift the S poles of positioning magnetic steel 51
When coming to the B pipes of spacing magnetron 50,1 pin of spacing magnetron 50B pipes, 2 pin normally opened contacts are in on-state, spacing magnetron
No. 7 of the main electric cabinet 11 of c cores, d wick feeds that 1 pin, 2 pin of 50B pipes pass through the signal cable 50 being attached thereto, No. 8 terminals carry
For connecting signal, main electric cabinet 11 cuts off electromagnetic relay(J4)60 power supply, lifting motor(M3)56 stallings, landing
Discharge flow to complete, the driver that need to stop is by storing cycle in parking area on steel landing 40, then under driver
Car supplements valid wireless with money IC-card again and leans against stopped at the RF induction coils 30 on control panel 27 confirmation, chain of command
RF induction coils 30 on plate 27 again read off effective wireless charging IC card information and transmit information by signal cable 28
To main electric cabinet 11, the i.e. control of accepting confirmation after parking information of main electric cabinet 11 enters landing and draws flow, first electromagnetism in
Relay(J1)57 work, electromagnetic relay(J1)57 pin of normally opened contact 2 connects respectively with 11 pin, 4 pin and 9 pin, 6 pin and 7 pin
The logical LN2 and LN3 AC powers to access carry out commutation, then, main electric cabinet 11 by No. 17, No. 18 terminals to electromagnetism after
Electrical equipment(J4)60 7 pin, 8 pin are powered, electromagnetic relay(J4)60 work, electromagnetic relay(J4)60 1 pin and 2 pin, 3 pin with
4 pin, 5 pin and 6 pin are connected, lifting motor(M3)56 a, b, c winding is respectively by with controlling a cores, b cores, c cores of cable 53 to connect
Logical electromagnetic relay(J4)380 volts of AC powers of external three-phase that 60 2 pin, 4 pin, 6 pin are connected after commutation, lifting motor
(M3)56 reversions, lifting motor(M3)56 pass through front and back end in the lift drive shaft 37 respectively left beam of synchronous driving steel translational frame 33
Inward turning nut worm wheel 36 invert, the front and back end lifting of the inward turning nut worm wheels 36 of the Zuo Liang front and back ends of steel translational frame 33 driving left side
Screw rod 34 is by the first synchronous steel landing 40 that is raised up in the left side of steel landing 40 in left and right horizontal state, i.e. lifting positioning magnetic
When the S poles of steel 51 come to the C pipes of spacing magnetron 50,1 pin of spacing magnetron 50C pipes, 2 pin normally opened contacts are in on-state,
1 pin of spacing magnetron 50C pipes, 2 pin by No. 5 of the main electric cabinet 11 of e cores, f wick feeds of signal cable 49 that is attached thereto, 6
Number terminals provide trigger signal, and main electric cabinet 11 is i.e. to electromagnetic relay(J3)59 power supply, main electric cabinet 11 by No. 19,
No. 20 terminals are to electromagnetic relay(J3)59 7 pin, 8 pin are powered, electromagnetic relay(J3)59 work, electromagnetic relay(J3)
59 1 pin and 2 pin, 3 pin and 4 pin, 5 pin and 6 pin are connected, lifting motor(M2)38 a, b, c winding is respectively by electric with control
A cores, b cores, the electromagnetic relay of c cores connection of cable 52(J3)380 volts of the external three-phase that 59 2 pin, 4 pin, 6 pin are connected after commutation
AC power, lifting motor(M2)38 reversions, lifting motor(M2)38 pass through the synchronous driving steel translation respectively of lift drive shaft 37
The inward turning nut worm wheel 36 of front and back end is inverted in the right beam of framework 33, the inward turning nut worm wheel 36 of the You Liang front and back ends of steel translational frame 33
The right side of steel landing 40 and the left side of steel landing 40 are in left and right horizontal shape by driving right side front and back end lifting screw 34
State rises, steel landing 40 and the past rising simultaneously that parks cars, and translation steel is risen to when steel landing 40 carries to park cars
The bottom position of framework 33, the bottom surface of steel landing 40 is higher than the upper surface of steel front beam 6, that is, lifts positioning magnetic steel 51
When S poles come to the A pipes for limiting position magnetron 50,1 pin of spacing magnetron 50A pipes, 2 pin normally opened contacts are in on-state, spacing
No. 3, No. 4 of the main electric cabinet 11 of a cores, b wick feeds that 1 pin, 2 pin of magnetron 50A pipes pass through the signal cable 49 being attached thereto connect
Line end, which is provided, connects signal, and main electric cabinet 11 cuts off electromagnetic relay(J3)59 and electromagnetic relay(J4)60 power supply, rises
Motor drops(M2)38 and lifting motor(M3)56 stallings, then, main electric cabinet 11 gives electromagnetism relay by No. 21, No. 22 terminals
Device(J2)58 7 pin, 8 pin are powered, electromagnetic relay(J2)58 work, electromagnetic relay(J2)58 1 pin and 2 pin, 3 pin and 4
Pin, 5 pin are respectively turned on 6 pin, translation motor(M1)44 a, b, c winding passes through a cores, b cores, the c with controlling cable 47 respectively
The electromagnetic relay of core connection(J2)380 volts of AC powers of external three-phase that 58 2 pin, 4 pin, 6 pin are connected after commutation, translation electricity
Machine(M1)44 reversions, with translation motor(M1)The worm screw 45 that 44 rotating shafts are fixedly connected drives worm gear 46, translation drive shaft 20, translation
Gear 18 is rotated in rolling bearing units 19, and shiftable gear 18 is fixedly connected on the translation tooth of the inner side of steel fixed cross beam 8 by engagement
Bar 17 will translate gooseneck 14, translation steel frame 33 and steel landing 40 and pull back, when the S poles of translation positioning magnetic steel 21 are leaned on
To spacing magnetron 22 B pipes when, 1 pin of spacing magnetron 22B pipes, 2 pin normally opened contacts be in on-state, spacing magnetron
11 pin, 12 pin for the main electric cabinet 11 of c cores, d wick feeds that 1 pin, 2 pin of 22B pipes pass through the signal cable 23 being attached thereto are provided and connect
Messenger, main electric cabinet 11 cuts off electromagnetic relay(J2)58 power supply, translation motor(M1)44 stallings, landing is drawn in
Flow is completed, and waiting to park cars to park finishes, on the drive control panel 27 of signal cable 28 that main electric cabinet 11 passes through electrical connection
The red LED lamp 31 for having taken parking stall is lighted;The driver parked cars when this comes to pick up the car, and the driver is by the effective nothing
Line is supplemented with money at the RF induction coils 30 that IC-card is leaned against on control panel 27, and what the RF induction coils 30 on control panel 27 were read has
Effect wireless charging IC card information sends main electric cabinet 11 to by signal cable 28, and main 11 pairs of valid wireless of electric cabinet are supplemented with money
IC-card is checked and deducted fees and will deduct fees presentation of information on the LCD panel 29 of control panel 27, and starts parking simultaneously
Platform is discharged after the completion of flow, landing release flow, and vehicle is sailed out of steel landing 40, main electric cabinet 11 by the driver
Start landing immediately and draw flow in, landing is drawn in after the completion of flow, the signal electricity that main electric cabinet 11 passes through electrical connection
Empty parking space green LED lamp 32 on the drive control panel 27 of cable 28 is lighted, and ramp side frame idle pattern formula garage parking, which is again introduced into, to be treated
Stop rounding state.
Claims (1)
1. ramp side frame idle pattern formula garage parking, it is characterized in that:The lower end of fixed steel column (1) is fixedly mounted on the slope by high side
On road dypass face (7), the lower end for heightening steel column (2) is fixedly mounted on the ramp dypass face (7) by downside, heightens steel column
(2) pipe at top end is embedded in the flexible steel column (3) of setting, heightens steel column (2) top end and flexible steel column (3) on lower side
The front and back sides for being combined section penetrate setting and heighten screw (4) and bolt (5), the top end position of preceding fixed steel column (1) with
Leaning between centre position for front stretching steel column (3) sets steel front beam (6), heightens steel column (2) and flexible steel column (3) and leads to
Cross bolt (5) and carry out height adjustment with corresponding screw (4) of heightening, be horizontally oriented steel front beam (6), front and rear fixed steel is stood
Fore-and-aft direction is fixedly installed respectively for relative inner side, the top end position of vertical direction between post (1) and elastic steel column (3)
Level and symmetrical C-shaped steel fixed cross beam (8), the C-shaped mouthful of left and right steel fixed cross beam (8) are relative, and the setting of steel front beam (6) is high
Degree is less than before and after the front end downside of steel fixed cross beam (8), the upper surface of the following inner side of C-shaped mouthful of left and right steel fixed cross beam (8)
The lower surface fore-and-aft direction point on the inside of I-steel (13), the C-shaped mouthful top of left and right steel fixed cross beam (8) is fixedly installed in direction respectively
Translating rack (17) is not fixedly installed, load-bearing bearing (15), left and right steel is fixedly installed in the upper surface of I-steel (13) front end respectively
The inner side difference fore-and-aft direction insertion of the C-shaped mouthful of fixed cross beam (8) sets C-shaped steel translation crossbeam (14), steel translation crossbeam (14)
C-shaped opening downwards, steel translation crossbeam (14) the intraoral face layer of C-shaped be pressed on the outer layer surface of load-bearing bearing (15), steel translation
The end rearward of crossbeam (14), c-shaped opening inner side, horizontal direction set sliding bearing (16) respectively, and sliding bearing (16) is in I-shaped
It is symmetrical arranged in steel (13) groove, rolling bearing units are fixedly installed in the upper surface that left and right steel translation crossbeam (14) is held rearward respectively
(19), fix afterwards between steel column (1) and rear flexible steel column (3), steel rear cross beam is fixedly installed in the top end position of vertical direction
(12), the after-poppet of U-bracket seat (54), U-bracket seat (54) is fixedly installed in the upper surface in steel rear cross beam (12) centre position
After-poppet in set cable fold arm (48) postbrachium, cable fold arm (48) postbrachium on lower side be embedded in U-bracket seat
(54) after-poppet simultaneously passes through pivot pin (43) and is flexibly connected, and the top that steel column (1) is fixed afterwards sets the main electric cabinet of water proof type
(11), the upper end of main electric cabinet (11) penetrates setting luminance sensor (24), and preceding fixed steel column (1) front end is liftoff 1.5 meters high
The position insertion of degree is set sets LCD panel (29), red respectively on waterproof type control panel (27), control panel (27)
LED (31), RF induction coils (30), green LED lamp (32), the front end insertion in steel front beam (6) centre position set LED to shine
Bright lamp (9), the other end of circumscripted power line (26) fixes the main electric cabinet (11) of inner side access of steel column (1) posterior end after,
The C-shaped mouthful upper surface for penetrating right steel fixed cross beam (8) is respectively embedded into the spacing magnetron of setting at forward end and rearward end position
(22) A pipes and B pipes, right steel translation crossbeam (14) hold the spacing magnetron (22) of upper surface correspondence on the outside of c-shaped opening rearward
Position is fixedly installed between translation positioning magnetic steel (21), left and right steel translation crossbeam (14) and is fixedly installed by centre position horizontal direction
Overlook the translation steel frame (33) in openning shape, the after-poppet position of correspondence U-bracket seat (54), in translation steel frame (33)
Position is fixedly installed in the fore-stock of U-bracket seat (54), the fore-stock of U-bracket seat (54) rearward for upper surface in the middle of the back rest
Cable is set to fold the forearm of arm (48), the forearm of cable folding arm (48) is embedded in the fore-stock of U-bracket seat (54) on lower side
And be flexibly connected by pivot pin (43), the postbrachium upper end that the forearm upper end that cable folds arm (48) folds arm (48) with cable passes through
Pivot pin (43) is flexibly connected in the shape of falling V, and the left and right curb girder of translation steel frame (33) is solid by being respectively perpendicular above end positions
Surely set in the closed water proof type protection pipe (35) in upper end, protection pipe (35) and be respectively perpendicular the lifting screw that sets and can move up and down
(34), the top of left back lifting screw (34) sets lifting positioning magnetic steel (51), the right side of left back protection pipe (35) by top and
Distinguish the fixedly embedded A pipes and B for setting spacing magnetron (50) by bottom position to manage, the right side of left back protection pipe (35) is on lower side
Position sets and heightens hole (55), heightens hole (55) and is embedded in and sets the C of spacing magnetron (50) to manage, and translates after steel frame (33)
Worm gear (46), worm screw (45), translation drive shaft (20) be set in beam, and the keep left upper surface of position of translation steel frame (33) rear end is consolidated
Translation motor M1 (44) is set surely, translation motor M1 (44) rotating shaft vertically penetrate in the back rest of insertion translation steel frame (33) with
Worm screw (45) is concentric to be fixedly connected, and worm gear (46) is engaged with worm screw (45), and worm gear (46) and translation drive shaft (20) are concentric
It is fixedly connected, shiftable gear (18), translation drive shaft is fixedly installed by top is concentric respectively in the left and right of translation drive shaft (20)
(20) left and right top be respectively embedded into rolling bearing units (19) it is concentric flexible connection, shiftable gear (18) respectively with translating rack
(17) engage, the lower end of lifting screw (34) is vertically penetrated in translation steel frame (33), the left and right curb girder of translation steel frame (33)
With the concentric left side for setting inward turning nut worm wheel (36) and cone bearing (39) respectively, translating steel frame (33) of lifting screw (34)
Lifting motor M3 (56) is fixedly installed in curb girder rear end, and lifting motor M2 is fixedly installed in the right side beam rear end of translation steel frame (33)
(38), lifting motor M2 (38) and lifting motor M3 (56) rotating shaft respectively with lift drive shaft (37) is concentric is fixedly connected,
Lift drive shaft (37) is worm screw by two ends, and the worm screw on lift drive shaft (37) engages with inward turning nut worm wheel (36), liter
The lower end fore-and-aft direction of drop screw rod (34) sets correspondence at axis hole (42), four angles of steel landing (40) horizontal direction respectively
The position of lifting screw (34) is respectively perpendicular setting hollow groove (41), the end position on the lower and groove of lifting screw (34)
(41) top end position fore-and-aft direction is correspondingly arranged axis hole (42) respectively, and the lower end of lifting screw (34) is embedded in groove (41),
In terms of front, the lower end of the embedded groove (41) of lifting screw (34) is arc-shaped, the axis hole (42) of lifting screw (34) on lower side
Pivot pin (43) is set to be flexibly connected respectively with the axis hole (42) at groove (41) top end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310417629.1A CN104153615B (en) | 2013-09-14 | 2013-09-14 | Ramp side frame idle pattern formula garage parking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310417629.1A CN104153615B (en) | 2013-09-14 | 2013-09-14 | Ramp side frame idle pattern formula garage parking |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104153615A CN104153615A (en) | 2014-11-19 |
CN104153615B true CN104153615B (en) | 2017-08-25 |
Family
ID=51879229
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310417629.1A Active CN104153615B (en) | 2013-09-14 | 2013-09-14 | Ramp side frame idle pattern formula garage parking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104153615B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114178075B (en) * | 2021-11-09 | 2022-08-05 | 浙江安胜科技股份有限公司 | Surface coating treatment process and treatment device for stainless steel heat-insulating container |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9181722B2 (en) * | 2011-03-31 | 2015-11-10 | Criterion Manufacturing Solutions, Inc. | Automatic storage system for vehicles |
CN102146739A (en) * | 2011-04-25 | 2011-08-10 | 宋泽贵 | Full-terrain three-dimensional parking garage |
CN202954592U (en) * | 2012-10-30 | 2013-05-29 | 朱旭红 | Screw-driven overhead combinable automatic parking garage |
CN203145534U (en) * | 2013-03-31 | 2013-08-21 | 朱旭红 | Combined type sidewalk aerial type parking long corridor |
CN203430116U (en) * | 2013-09-14 | 2014-02-12 | 朱旭红 | Ramp side overhead combined parking garage |
-
2013
- 2013-09-14 CN CN201310417629.1A patent/CN104153615B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104153615A (en) | 2014-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102496304B (en) | Parking lot management system | |
CN202352101U (en) | Parking lot management system | |
CN107587747A (en) | A kind of double-layer parking parking system and its control method for roadside | |
CN107757760A (en) | One kind can assembled bicycle parking rack | |
CN108442780A (en) | A kind of car parking device | |
CN201857786U (en) | Novel stereoscopic storage garage of sedan | |
CN102277987A (en) | Three-dimensional unobstructed parking device | |
CN104153615B (en) | Ramp side frame idle pattern formula garage parking | |
CN202117369U (en) | Double-layer parking space lifting machine | |
CN207360463U (en) | One kind can assembled bicycle parking rack | |
CN203430116U (en) | Ramp side overhead combined parking garage | |
CN104831966B (en) | Intelligent suspension type stereo garage and work method thereof | |
CN202055585U (en) | Air parking frame | |
CN202945838U (en) | Oveground and underground multi-storey parking automatic lifting garage | |
CN203145534U (en) | Combined type sidewalk aerial type parking long corridor | |
CN206667859U (en) | Rotary type three-dimensional parking garage | |
CN206829733U (en) | A kind of bay type multi-storied garage based on trackside | |
CN108612374A (en) | A kind of mechanical stereo garage above residential quarters runway and its application method | |
CN205901335U (en) | Electric vehicle charging station | |
CN208328758U (en) | A kind of buried jam plate | |
CN208267464U (en) | One kind detachably reusing prefabricated parking stall | |
CN208981863U (en) | A kind of stereo garage | |
CN104074379B (en) | Combined type pedestrian road overhead type parking gallery | |
CN208380202U (en) | A kind of car parking device | |
CN208310335U (en) | A kind of parallel lift overhead parking space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |