CN104153382A - 一种混凝土垫层平整度控制方法 - Google Patents

一种混凝土垫层平整度控制方法 Download PDF

Info

Publication number
CN104153382A
CN104153382A CN201410391024.4A CN201410391024A CN104153382A CN 104153382 A CN104153382 A CN 104153382A CN 201410391024 A CN201410391024 A CN 201410391024A CN 104153382 A CN104153382 A CN 104153382A
Authority
CN
China
Prior art keywords
concrete
adopted
substrate
reserved
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410391024.4A
Other languages
English (en)
Inventor
刘勃
王焕刚
陈久恒
谢辕轩
张庆
刘金山
游祖群
隋秀龙
李成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA REILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP NO6 ENGINEERING Co Ltd
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
CHINA REILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP NO6 ENGINEERING Co Ltd
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA REILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP NO6 ENGINEERING Co Ltd, China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical CHINA REILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP NO6 ENGINEERING Co Ltd
Priority to CN201410391024.4A priority Critical patent/CN104153382A/zh
Publication of CN104153382A publication Critical patent/CN104153382A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Road Repair (AREA)

Abstract

一种混凝土垫层平整度控制方法,属于轨道交通技术领域,其方法是:①基底预留30cm土方,采用人工辅助挖掘机找平并清底;②测量放样,采用电锤或水钻在基底放样点位打孔,预埋钢筋并灌入高强灌浆料固定牢固;采用精密水平仪控制高程,调整高程并在抹带和后浇带间焊接角钢;③设置5条精平条带,带宽1.8m,角钢下侧采用木模板封堵;④浇筑完混凝土,采用铝合金刮尺初平,初凝前采用滚轴压实后再用电抹子精平;⑤精平条带混凝土达到设计强度的70%后浇筑剩余混凝土,剩余混凝土面比两侧低10mm,预留基底注浆管凹槽。有益效果是:对预制装配式地铁车站施工过程中,利用简易工具实现了垫层平整度的高精度控制,而且操作起来简单、易行,达到了高质量、高效果的施工。

Description

一种混凝土垫层平整度控制方法
技术领域
本发明属于轨道交通技术领域。
背景技术
目前,在我国建设地铁车站,一般采用暗挖法施工,成本高、工期长,如果在我国北方寒冷地区地铁车站有时也采用常规明挖法施工,一般情况下须跨越两个冬季,质量难于保证、安全风险大,跨冬占路更容易造成城市拥堵,有时在冬季只能停工。
本发明人发明了预制装配式地铁车站施工方法,但预制装配式地铁车站对基底垫层精度要求非常高,垫层施工精度须达到±2㎜,因此垫层精平施工是拼装工艺是否成功的关键。现在国内外还没有这种高精密的施工控制方法。
发明内容
本发明的目的是:提供一种混凝土垫层平整度控制方法,它可对预制装配式地铁车站的基底垫层进行高精密平整施工。
本发明的方法是:
①基底预留30cm土方,采用人工辅助挖掘机找平并清底;
②测量放样,采用电锤或水钻在基底放样点位打孔,预埋钢筋并灌入高强灌浆料固定牢固;采用精密水平仪控制高程,调整高程并在抹带和后浇带间焊接角钢;
③设置5条精平条带,带宽1.8m,角钢下侧采用木模板封堵;
④浇筑完混凝土,采用铝合金刮尺初平,初凝前采用滚轴压实后再用电抹子精平;
⑤精平条带混凝土达到设计强度的70%后浇筑剩余混凝土,剩余混凝土面比两侧低10mm,预留基底注浆管凹槽。
本发明的有益效果是:对预制装配式地铁车站施工过程中,利用简易工具实现了垫层平整度的高精度控制,而且操作起来简单、易行,达到了高质量、高效果的施工。
附图说明
图1是本发明所述的垫层横断面图;
图2是本发明所述的垫层平面图;
图3是本发明预埋角钢图。
具体实施方式
实施例1
下面结合附图对本发明做进一步描述:
如图所示,1是抹带;2是预埋角钢;3是后浇带;4是围护桩;5是预埋钢筋。
1、基底预留30cm土方,采用人工辅助挖掘机找平并清底;
2、测量放样,采用电锤或水钻在基底放样点位打孔,预埋钢筋并灌入高强灌浆料固定牢固;采用精密水平仪控制高程,调整高程并焊接角钢;
3、设置5条精平条带,带宽1.8m,角钢下侧采用木模板封堵;
4、浇筑完混凝土,采用铝合金刮尺初平,初凝前采用滚轴压实后再用电抹子精平;
5、精平条带混凝土达到设计强度的70%后浇筑剩余混凝土,剩余混凝土面比两侧低10mm,预留基底注浆管凹槽。
通过上述方法可实现垫层平整度的高精度控制。

Claims (1)

1.一种混凝土垫层平整度控制方法,其方法是:
①基底预留30cm土方,采用人工辅助挖掘机找平并清底;
②测量放样,采用电锤或水钻在基底放样点位打孔,预埋钢筋并灌入高强灌浆料固定牢固;采用精密水平仪控制高程,调整高程并在抹带和后浇带间焊接角钢;
③设置5条精平条带,带宽1.8m,角钢下侧采用木模板封堵;
④浇筑完混凝土,采用铝合金刮尺初平,初凝前采用滚轴压实后再用电抹子精平;
⑤精平条带混凝土达到设计强度的70%后浇筑剩余混凝土,剩余混凝土面比两侧低10mm,预留基底注浆管凹槽。
CN201410391024.4A 2014-08-11 2014-08-11 一种混凝土垫层平整度控制方法 Pending CN104153382A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410391024.4A CN104153382A (zh) 2014-08-11 2014-08-11 一种混凝土垫层平整度控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410391024.4A CN104153382A (zh) 2014-08-11 2014-08-11 一种混凝土垫层平整度控制方法

Publications (1)

Publication Number Publication Date
CN104153382A true CN104153382A (zh) 2014-11-19

Family

ID=51878996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410391024.4A Pending CN104153382A (zh) 2014-08-11 2014-08-11 一种混凝土垫层平整度控制方法

Country Status (1)

Country Link
CN (1) CN104153382A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201004A (zh) * 2015-10-14 2015-12-30 金陵科技学院 一种建筑用混凝土垫层的铺设方法
CN105350568A (zh) * 2015-11-10 2016-02-24 中信重工机械股份有限公司 一种大型球磨机主底板的安装方法
CN110004967A (zh) * 2019-03-22 2019-07-12 中铁一局集团厦门建设工程有限公司 一种装配式综合管廊基础调平层及其施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008002114A (ja) * 2006-06-21 2008-01-10 Watanabe Pipe 独立基礎及びその構築方法
CN101440664A (zh) * 2008-11-19 2009-05-27 江苏江都建设工程有限公司 一种大面积的耐磨地坪平整度及标高控制方法
CN202266038U (zh) * 2011-09-20 2012-06-06 福建工程学院 一种混凝土板平整度控制装置
CN102677661A (zh) * 2012-05-07 2012-09-19 中铁上海工程局有限公司 一种淤泥质软基现浇箱梁支架基础加固方法
CN203441066U (zh) * 2013-07-25 2014-02-19 中冶天工集团有限公司 平整度可控的地坪超平装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008002114A (ja) * 2006-06-21 2008-01-10 Watanabe Pipe 独立基礎及びその構築方法
CN101440664A (zh) * 2008-11-19 2009-05-27 江苏江都建设工程有限公司 一种大面积的耐磨地坪平整度及标高控制方法
CN202266038U (zh) * 2011-09-20 2012-06-06 福建工程学院 一种混凝土板平整度控制装置
CN102677661A (zh) * 2012-05-07 2012-09-19 中铁上海工程局有限公司 一种淤泥质软基现浇箱梁支架基础加固方法
CN203441066U (zh) * 2013-07-25 2014-02-19 中冶天工集团有限公司 平整度可控的地坪超平装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
雷源铁: "《建筑施工实例应用手册》", 31 January 1998, 中国建筑工业出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201004A (zh) * 2015-10-14 2015-12-30 金陵科技学院 一种建筑用混凝土垫层的铺设方法
CN105201004B (zh) * 2015-10-14 2017-02-01 金陵科技学院 一种建筑用混凝土垫层的铺设方法
CN105350568A (zh) * 2015-11-10 2016-02-24 中信重工机械股份有限公司 一种大型球磨机主底板的安装方法
CN105350568B (zh) * 2015-11-10 2017-05-31 中信重工机械股份有限公司 一种大型球磨机主底板的安装方法
CN110004967A (zh) * 2019-03-22 2019-07-12 中铁一局集团厦门建设工程有限公司 一种装配式综合管廊基础调平层及其施工方法

Similar Documents

Publication Publication Date Title
CN207538350U (zh) 一种装配式剪刀楼梯
CN106245529B (zh) 铁路t形梁安全快速落梁方法
CN107905114B (zh) 一种特大跨径连续刚构拱桥的施工方法
CN105781099A (zh) 可移动组合式单侧大模板结构及施工方法
CN104060781A (zh) 一种梯段无缝的现浇板式楼梯及施工方法
CN104264984A (zh) 混凝土构筑物浇注用模板以及浇注施工方法
CN204125814U (zh) 一种园林道路结构
CN104153382A (zh) 一种混凝土垫层平整度控制方法
CN103967332B (zh) 一种建筑工地围挡的施工方法
CN110359595A (zh) 预制件拼接砌块填充墙及施工方法
CN106906747A (zh) 一种立柱与盖梁拼装结构
CN202359511U (zh) 一种地铁隧道水沟与道床一次性浇筑模板结构
CN102852343B (zh) Sp板装配式古城墙加固结构及施工方法
CN204677212U (zh) 一种减小隧道衬砌结构内力的结构
CN203905331U (zh) 一种梯段无缝的现浇板式楼梯
CN204456695U (zh) 一种用于拱坝的预制混凝土楼梯
CN106401276A (zh) 一种框架式砌块围墙墙柱拉结筋施工方法
CN207277718U (zh) 全悬空旋转钢结构楼梯结构
CN205804365U (zh) 一种盖挖法顶板节点结构
CN110080299A (zh) 一种浅埋山岭隧道明挖施工工法
CN205476528U (zh) 预制桩快速就位装置
CN102888809B (zh) 一种高效的大面积混凝土地坪施工找平方法
CN209163450U (zh) 一种工具式预制钢筋混凝土叠合梁支撑装置
CN204418666U (zh) 一种建筑工地用有侧墙楼梯模板
CN204552097U (zh) 一种用于控制墙柱模板阴阳角漏浆结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141119