CN104122185B - The compression of a kind of refuse soil and infiltration relation analyzer - Google Patents

The compression of a kind of refuse soil and infiltration relation analyzer Download PDF

Info

Publication number
CN104122185B
CN104122185B CN201410350911.7A CN201410350911A CN104122185B CN 104122185 B CN104122185 B CN 104122185B CN 201410350911 A CN201410350911 A CN 201410350911A CN 104122185 B CN104122185 B CN 104122185B
Authority
CN
China
Prior art keywords
infiltration
water
compression
bearing
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410350911.7A
Other languages
Chinese (zh)
Other versions
CN104122185A (en
Inventor
张振营
章凌峰
严立俊
吴大志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Original Assignee
Zhejiang University of Technology ZJUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT filed Critical Zhejiang University of Technology ZJUT
Priority to CN201410350911.7A priority Critical patent/CN104122185B/en
Publication of CN104122185A publication Critical patent/CN104122185A/en
Application granted granted Critical
Publication of CN104122185B publication Critical patent/CN104122185B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses compression and the infiltration relation analyzer of a kind of refuse soil.At present, the instrument studied with infiltration relation for the compression of refuse soil in landfill body not yet occurs.The side permeating post in the present invention is connected to multiple water out adapter, and opposite side is connected to many pressure-measuring pipes of equidistant placement;Adjustable base plate is connected by pin with water level adjusting rod;Water storage box is connected with infiltration post by water inlet pipe;Water storage box is connected to multiple water out adapter;Gland is connected by hanger bar with entablature;Sill, the first balancing weight, the second balancing weight are all hinged with lever;The wheel hub of turbine and worm screw are all bearing in bearing by bearing, turbine and worm engaging;One end of worm screw is stretched out and is fixed with handwheel outside bearing;Turbine is connected with screw mandrel;The bottom of screw mandrel is hinged with lever.The present invention can realize the mechanization experimental determination of refuse soil penetration property, compression property, fills up existing instrument to refuse soil compression and penetration study vacancy.

Description

The compression of a kind of refuse soil and infiltration relation analyzer
Technical field
The invention belongs to laboratory apparatus technical field, relate to geotechnique's compression test device and geotechnique's permeability experimental facility, tool Body relates to compression and the infiltration relation analyzer of a kind of refuse soil.
Background technology
With the development of Chinese Urbanization, the load of urban population is increasing, causes domestic waste continuous Increasing, instant stage has been arrived in the process of rubbish.For the process of domestic waste, mainly have following both at home and abroad Several ways: landfill, burn, biodegradable etc..Wherein, Landfill has advantageous excellent in the development of current city Gesture.Landfill method processes urban solid garbage, and landfill capacity consumption big, economic is few, therefore uses landfill method to process urban life Rubbish extensive application at home and abroad.Landfill method is used to process domestic waste, it is necessary to tackle various engineering properties problem, Such as garbage loading embeading capacity, the landfill problem such as body slope stability, percolate migration rate.Only thorough studies well urban life The engineering properties of rubbish, just can use landfill method to solve the problems such as existing garbage-surrounded city effectively.In garbage loading embeading process In, there is diversity material in rubbish body, degradable material includes: rubbish from cooking, paper, wood-fibred;Difficult degradation material includes: mould Material, bone, rubber etc., non-degradable material includes: soil stone, metal, glass etc..Above-mentioned material constituent is various just Property, determining the particularity of refuse soil soil mechanical properties, decrement is big, and infiltration coefficient is higher than other conventional soil samples.Degradable Material must produce biological chemistry action under the complex environments such as refuse landfill solid, liquid, gas, temperature, biological chemistry action Being the main cause that percolate produces, the heavy metal element containing in landfill body makes percolate by biological chemistry action Containing severe toxicity composition, therefore the extent of injury of percolate increases the weight of, and seepage flow buries and causes heavy metal pollution of soil, and seepage flow enters water to be caused Pollution of waterhead, causes serious harm to human ecological environment.Therefore, it is necessary to the penetration property of landfill body is thoroughly studied. Penetration property refers to the size of medium water permeable ability, and urban solid garbage penetration property namely refers to that water passes through the ability of rubbish body Size.Landfill body penetration property closely related with compression property, landfill body landfill height bigger, bottom rubbish be subject to oneself Weight stress is bigger, and its underpart rubbish is just compressed more closely knit, and infiltration coefficient is also gradually decreased, and migration rate reduces.Mesh Before, the instrument studied with infiltration relation for the compression of refuse soil in landfill body not yet occurs.
Content of the invention
It is an object of the invention to, for the deficiencies in the prior art, provide the compression of a kind of refuse soil and infiltration relation to measure Instrument, it is achieved refuse soil penetration property, the mechanization experimental determination of compression property, fills up existing instrument and compresses refuse soil and ooze Research vacancy thoroughly.
The present invention includes infiltration post, lever labor-saving device and water-storing device;Described infiltration post is arranged on test platform; The side of infiltration post is connected to multiple water out adapter, and opposite side is connected to many pressure-measuring pipes of equidistant placement;The head of described water out adapter Portion seals and arranges.
Described water-storing device includes water storage box, adjustable base plate and water level adjusting rod;Described water level adjusting rod offers Symmetrically arranged two water level adjustment hole groups, two water level adjustment hole groups all include multiple water levels of vertically equidistant arrangement Adjustment hole, adjustable base plate is connected by pin at two symmetrical water level adjustment holes of two water level adjustment hole groups with water level adjusting rod Connect;Water storage box is arranged on adjustable base plate, and is connected by the bottom of water inlet pipe and infiltration post;The side of described water storage box is connected to Multiple water out adapters, the head seal of water out adapter is arranged.
Described lever labor-saving device includes gland, supporting frame, lever and elevation and subsidence regulating device.Described supporting frame Including entablature, sill and support column, entablature and sill are fixed with one end of support column respectively;Described gland with outstanding Peg is fixed, and the top of hanger bar and entablature are threaded connection;Described lever offers sill hinge hole, fixes and prop up Point articulated hole, the first balancing weight hinge hole and the second balancing weight hinge hole, and it is provided with horizontal detector;Described lever under At crossbeam hinge hole hinged with sill;First balancing weight and lever are hinged at the first balancing weight hinge hole, the second balancing weight With lever at the second balancing weight hinge hole hinged.Described elevation and subsidence regulating device includes worm screw, turbine, screw mandrel, handwheel and props up Seat;Described bearing is fixed on bottom test platform;The wheel hub of described turbine and worm screw are all bearing in bearing by bearing, whirlpool Wheel and worm engaging;One end of described worm screw is stretched out and is fixed with handwheel outside bearing;Turbine is connected with screw mandrel;The bottom of described screw mandrel With lever at fixed pivot hinge hole hinged.
Described infiltration post is the cylindrical shape of bottom lock.
The head of each water out adapter of described infiltration post is threaded connection with a pipe cap respectively;One of them water outlet Joint is arranged on the bottommost of infiltration post.
The head of each water out adapter of described water storage box is threaded connection with a pipe cap respectively.
Beneficial effects of the present invention:
1st, the present invention can realize sedimentation test and the penetration testing of refuse soil;Sedimentation test is to be filled by lever force-saving Put, be compressed measurement to the refuse soil under bigger stress load, below practical simulation landfill yard level ground to 100 meters of degree of depth Refuse soil stress state;Penetration testing can test the change of refuse soil infiltration coefficient in the presence of stress state Value.
2nd, the present invention compensate for landfill yard and studies vacancy with regard to the infiltration coefficient below 100 meters of degree of depth of urban solid garbage, For urban solid garbage in compression process the test of infiltration coefficient provide accurate, reliably test device.
3rd, present invention can apply to engineering practice, it is possible to be applied to other special soils laboratory experiments, applied range.
Brief description
Fig. 1 is the overall structure stereogram of the present invention;
Fig. 2 is the side view of the present invention;
Fig. 3 is the structural perspective permeating post in the present invention;
Fig. 4 is the schematic diagram of middle water level adjusting rod of the present invention;
Fig. 5 is the structural perspective of gland and hanger bar in the present invention;
Fig. 6 is the schematic diagram of lever in the present invention;
Fig. 7 is the sectional view of elevation and subsidence regulating device in the present invention;
Fig. 8 is the stereogram of elevation and subsidence regulating device in the present invention.
Detailed description of the invention:
Below in conjunction with the accompanying drawings and embodiment the invention will be further described.
As shown in Figure 1,2 and 3, the compression of a kind of refuse soil and infiltration relation analyzer, including infiltration post the 1st, lever force-saving Device 2 and water-storing device 3;Infiltration post 1 is arranged on test platform 5;The cylindrical shape that infiltration post 1 is bottom lock, end face is the end of to The distance of portion's inwall is 300mm, and inner sidewall diameter is 202mm;The side of infiltration post 1 is connected to four water out adapters 4, another side joint Have three pressure-measuring pipe 1-1 of equidistant placement;The distance between center line of adjacent two water out adapters 4 is 100mm, a water out adapter 4 bottommosts being arranged on infiltration post 1;The head of each water out adapter 4 is threaded connection with a pipe cap respectively.
As shown in figs. 1 and 4, water-storing device 3 includes water storage box 3-1, adjustable base plate 3-2 and water level adjusting rod 3-3;Water level is adjusted Pole 3-3 offers symmetrically arranged two water level adjustment hole groups, and two water level adjustment hole groups all include vertically equidistant Nine water level adjustment hole 3-4, adjustable base plate 3-2 and water level adjusting rod 3-3 of arrangement are the two of two water level adjustment hole groups symmetries Connected by pin at individual water level adjustment hole 3-4;Water storage box 3 is arranged on adjustable base plate 3-2, and by water inlet pipe 6 and infiltration The bottom connection of post 1;The side of water storage box 3-1 is connected to four water out adapters 4, the head of each water out adapter 4 respectively with one Pipe cap is threaded connection.By regulation water storage box 3-1 lifting, refuse soil sample oozing under different hydraulic gradients can be tested Saturating coefficient.
Such as Fig. 1, shown in the 2nd, the 5th, the 6th, 7 and 8, lever labor-saving device 2 includes gland 2-1, supporting frame 2-2, lever 2-3 and liter Falling tone regulating device 2-4.Supporting frame 2-2 includes entablature 2-5, sill 2-6 and support column 2-7, entablature 2-5 and sill 2-6 fixes with one end of support column 2-7 respectively;Gland 2-1 and hanger bar 2-8 are fixed, the top of hanger bar 2-8 and entablature 2- 5 are threaded connection;It is hinged that lever 2-3 offers sill hinge hole 2-9, fixed pivot hinge hole 2-10, the first balancing weight Hole 2-11 and the second balancing weight hinge hole 2-12, and it is provided with horizontal detector 2-13;Horizontal detector 2-13 is used for testing The poised state of lever 2-3;Lever 2-3 is hinged with sill 2-6 at sill hinge hole 2-9;First balancing weight 7 and lever 2-3 is hinged at the first balancing weight hinge hole 2-11, and the second balancing weight 8 and lever 2-3 is at the second balancing weight hinge hole 2-12 Hinged.Elevation and subsidence regulating device 2-4 includes worm screw 2-14, turbine 2-15, screw mandrel 2-16, handwheel 2-17 and bearing 2-18;Bearing 2- 18 are fixed on bottom test platform 5;The wheel hub of turbine 2-15 and worm screw 2-14 are all bearing in bearing 2-18 by bearing, turbine 2-15 engages with worm screw 2-14;One end of worm screw 2-14 is stretched out and is fixed with handwheel 2-17 outside bearing 2-18;Turbine 2-15 and screw mandrel 2-16 connects;The bottom of screw mandrel 2-16 and lever 2-3 are hinged at fixed pivot hinge hole 2-10.
The compression of this refuse soil and the operation principle of infiltration relation analyzer:
Fill up refuse soil sample in infiltration post 1;The weight of the first balancing weight 7 and the second balancing weight 8 is set so that gland 2-1 to infiltration post 1 in refuse soil sample reach 25kPa, 50kPa, 75kPa, 100kPa, 200kPa, 300kPa, 400kPa, The load pressure gradient of 500kPa, 600kPa, 700kPa, 800kPa, 900kPa, 1000kPa compresses the rubbish in infiltration post 1 respectively Rubbish soil sample, thus test the permeability of refuse soil sample;Refuse soil sample (settles thick stick during compressing through 24h stable settlement Bar 2-3 can produce inclination, otherwise the open close handwheel 2-17 of mistake regulates worm screw 2-14, and the rotation of worm screw 2-14 drives turbine 2-15 to turn Dynamic, thus drive screw mandrel 2-16 to decline, make lever 2-3 restore balance state), after compression is stable, use high accuracy meter ruler to measure The compressed value of gland 2-1, if now compressed value is 0~100mm, height of materialsingHigh as the test of infiltration coefficient for 200mm Degree, opens the water out adapter 4 that bottom distance infiltration post 1,200mm highly locates as infiltration coefficient test experiments water side;If compression Value is 0~200mm, height of materialsingFor 100mm as the test height of infiltration coefficient, open bottom distance infiltration post 1 The water out adapter 4 that 100mm highly locates is as infiltration coefficient test experiments water side.Open the corresponding water out adapter of water storage box 3-1 4, thus regulate and keep the height of water level of water storage box 3-1, start test;Water level in three pressure-measuring pipe 1-1 measurement infiltration posts Highly, average;When the water out adapter 4 permeating post starts stable water outlet, open Chronograph and start timing, every three points The water yield of clock record one sub-percolation post, test five times, average.According to darcy seepage law formula:
The infiltration coefficient of refuse soil sample under different hydraulic gradients can be calculated;In formula,For permeating the madial wall of post 1 Cross-sectional area.

Claims (4)

1. the compression of refuse soil and an infiltration relation analyzer, including infiltration post, lever labor-saving device and water-storing device, it is special Levy and be:
Described infiltration post is arranged on test platform;The side of infiltration post is connected to multiple water out adapter, and opposite side is connected to equidistantly The many pressure-measuring pipes arranged;The head seal of described water out adapter is arranged;
Described water-storing device includes water storage box, adjustable base plate and water level adjusting rod;Described water level adjusting rod offers symmetry Two the water level adjustment hole groups arranging, two water level adjustment hole groups all include multiple water level regulation of vertically equidistant arrangement Hole, adjustable base plate is connected by pin at two symmetrical water level adjustment holes of two water level adjustment hole groups with water level adjusting rod; Water storage box is arranged on adjustable base plate, and is connected by the bottom of water inlet pipe and infiltration post;The side of described water storage box is connected to many Individual water out adapter, the head seal of water out adapter is arranged;
Described lever labor-saving device includes gland, supporting frame, lever and elevation and subsidence regulating device;Described supporting frame includes Entablature, sill and support column, entablature and sill are fixed with one end of support column respectively;Described gland and hanger bar Fixing, the top of hanger bar and entablature are threaded connection;Described lever offers sill hinge hole, fixed pivot hinge Connect hole, the first balancing weight hinge hole and the second balancing weight hinge hole, and be provided with horizontal detector;Described lever is at sill At hinge hole hinged with sill;First balancing weight and lever are hinged at the first balancing weight hinge hole, the second balancing weight and thick stick Bar is hinged at the second balancing weight hinge hole;Described elevation and subsidence regulating device includes worm screw, worm gear, screw mandrel, handwheel and bearing;Institute The bearing stated is fixed on bottom test platform;The wheel hub of described worm gear and worm screw are all bearing in bearing by bearing, worm gear with Worm engaging;One end of described worm screw is stretched out and is fixed with handwheel outside bearing;Worm gear is connected with screw mandrel;The bottom of described screw mandrel and thick stick Bar is hinged at fixed pivot hinge hole.
2. the compression of a kind of refuse soil according to claim 1 and infiltration relation analyzer, it is characterised in that: described oozes Saturating post is the cylindrical shape of bottom lock.
3. the compression of a kind of refuse soil according to claim 1 and infiltration relation analyzer, it is characterised in that: described infiltration The head of each water out adapter of post is threaded connection with a pipe cap respectively;One of them water out adapter is arranged on infiltration post Bottommost.
4. the compression of a kind of refuse soil according to claim 1 and infiltration relation analyzer, it is characterised in that: described retaining The head of each water out adapter of case is threaded connection with a pipe cap respectively.
CN201410350911.7A 2014-07-22 2014-07-22 The compression of a kind of refuse soil and infiltration relation analyzer Active CN104122185B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410350911.7A CN104122185B (en) 2014-07-22 2014-07-22 The compression of a kind of refuse soil and infiltration relation analyzer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410350911.7A CN104122185B (en) 2014-07-22 2014-07-22 The compression of a kind of refuse soil and infiltration relation analyzer

Publications (2)

Publication Number Publication Date
CN104122185A CN104122185A (en) 2014-10-29
CN104122185B true CN104122185B (en) 2016-10-05

Family

ID=51767684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410350911.7A Active CN104122185B (en) 2014-07-22 2014-07-22 The compression of a kind of refuse soil and infiltration relation analyzer

Country Status (1)

Country Link
CN (1) CN104122185B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104297132B (en) * 2014-11-07 2017-06-27 李铮 A kind of experimental rig for testing multilayer geotextiles vertical permeability coefficient
CN104914029B (en) * 2015-05-29 2017-05-31 浙江工业大学 Large scale city solid waste skeleton and pore water Volume Changes coefficient measuring device
CN104880404A (en) * 2015-06-08 2015-09-02 中国科学院武汉岩土力学研究所 Settlement testing device for garbage soil
CN107255490A (en) * 2017-06-14 2017-10-17 哈尔滨工业大学深圳研究生院 Multifunctional garbage soil degraded compression device
CN107389474A (en) * 2017-08-02 2017-11-24 华北科技学院 A kind of soil test direct shear apparatus
CN109030315B (en) * 2018-08-22 2020-11-27 福州大学 Low-stress initial one-dimensional compression-penetration test system and working method thereof
CN110274842B (en) * 2019-07-12 2024-03-22 浙江理工大学 MBT garbage field water-holding capacity measuring method
CN113624659B (en) * 2021-08-20 2023-08-15 内蒙古自治区林业科学研究院 Indoor soil infiltration rate measuring equipment

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4319976A1 (en) * 1993-06-11 1995-02-02 Blz Geotechnik Gmbh Method and arrangement for determining the permeability of a ground (soil) formation
CN101504354A (en) * 2009-03-18 2009-08-12 中国科学院武汉岩土力学研究所 Impervious material permeation deformation test apparatus for refuse landfill pad
CN201425575Y (en) * 2009-04-28 2010-03-17 清华大学 Equipment for directly measuring hydraulic parameters of solid waste
CN101846613A (en) * 2010-05-25 2010-09-29 浙江大学 Clogging simulation test device for drainage layer of refuse landfill under different-temperature conditions
CN101915718A (en) * 2010-08-20 2010-12-15 中国科学院武汉岩土力学研究所 Multifunctional soil consolidation and penetration test device and test method thereof
CN102053054A (en) * 2010-11-12 2011-05-11 清华大学 Method for on-site measuring permeability coefficient of landfill gas
CN202141667U (en) * 2011-06-29 2012-02-08 黄河水利职业技术学院 Improved solid waste leakage model test device
CN103398933A (en) * 2013-07-31 2013-11-20 东南大学 Constant-pressure concrete permeability testing device
CN203965292U (en) * 2014-07-22 2014-11-26 浙江理工大学 The compression of refuse soil is related to analyzer with infiltration

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4319976A1 (en) * 1993-06-11 1995-02-02 Blz Geotechnik Gmbh Method and arrangement for determining the permeability of a ground (soil) formation
CN101504354A (en) * 2009-03-18 2009-08-12 中国科学院武汉岩土力学研究所 Impervious material permeation deformation test apparatus for refuse landfill pad
CN201425575Y (en) * 2009-04-28 2010-03-17 清华大学 Equipment for directly measuring hydraulic parameters of solid waste
CN101846613A (en) * 2010-05-25 2010-09-29 浙江大学 Clogging simulation test device for drainage layer of refuse landfill under different-temperature conditions
CN101915718A (en) * 2010-08-20 2010-12-15 中国科学院武汉岩土力学研究所 Multifunctional soil consolidation and penetration test device and test method thereof
CN102053054A (en) * 2010-11-12 2011-05-11 清华大学 Method for on-site measuring permeability coefficient of landfill gas
CN202141667U (en) * 2011-06-29 2012-02-08 黄河水利职业技术学院 Improved solid waste leakage model test device
CN103398933A (en) * 2013-07-31 2013-11-20 东南大学 Constant-pressure concrete permeability testing device
CN203965292U (en) * 2014-07-22 2014-11-26 浙江理工大学 The compression of refuse soil is related to analyzer with infiltration

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
城市固体垃圾应力压缩计算方法;张振营 等;《浙江大学学报(工学版)》;20090228;第43卷(第2期);第370-375页 *
杭州市固体垃圾的直接剪切试验研究;张振营 等;《浙江理工大学学报》;20100930;第27卷(第5期);第760-765页 *

Also Published As

Publication number Publication date
CN104122185A (en) 2014-10-29

Similar Documents

Publication Publication Date Title
CN104122185B (en) The compression of a kind of refuse soil and infiltration relation analyzer
CN103076230B (en) Test method and test device of mechanical properties of soil-structure contact surface
CN202793990U (en) Constant head multihole concrete penetrometer
CN106290006B (en) A kind of experimental rig measuring shear strength parameter variation in soft clay consolidation process
CN111208042B (en) Device and method for inverting hydraulic parameters of unsaturated waste soil
CN103940718B (en) A kind of on-the-spot permeability experimental facility of discrete material
CN104677807B (en) A kind of large scale soil sample true triaxial seepage characteristic and strength test device
CN104155427A (en) Low back pressure saturation method for loess liquidation experiment
CN104020092B (en) One kind consolidation pore water pressure combined test device and method
CN103926182A (en) Permeability coefficient test method and test device under normal pressure
CN111796074A (en) Device capable of testing multidirectional deformation and expansive force of expansive soil
CN109030315A (en) Low stress originates one-dimensional compression-infiltration experiment system and its working method
CN204630786U (en) A kind of sludge consolidating sample making apparatus
CN206818523U (en) A kind of coefficient of collapsibility of loess is layered in-situ testing device
CN103033460B (en) The determinator of soil body horizontal osmotic coefficient and method thereof
CN106091905A (en) A kind of soil sample multidirectional humidification deformation measuring device and measuring method
CN203965292U (en) The compression of refuse soil is related to analyzer with infiltration
Anderson et al. A clay calibration chamber for testing field devices
CN204694600U (en) A kind of large scale city solid waste skeleton and pore water volume change coefficient measuring device
US11808684B2 (en) French press permeameter
Li et al. Preliminary study on soil water characteristics of Maryland clay
CN113552037B (en) Device and method for testing dual-porosity seepage parameters of garbage
CN212082773U (en) Soil body disintegration test equipment under simulated dynamic water condition
Ajdari et al. Experimental evaluation of the influence of the level of the ground water table on the bearing capacity of circular footings
CN110082182B (en) Preparation device of saturated clay samples at different depths and determination method of pore water types and content of saturated clay samples

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20141029

Assignee: Zhejiang Tugong Instrument Co., Ltd.

Assignor: Zhejiang Sci-Tech University

Contract record no.: 2018330000112

Denomination of invention: Tester for researching compression-permeation relationship of garbage soil

Granted publication date: 20161005

License type: Common License

Record date: 20181019