CN104110527A - 输油管道支撑装置 - Google Patents

输油管道支撑装置 Download PDF

Info

Publication number
CN104110527A
CN104110527A CN201410358822.7A CN201410358822A CN104110527A CN 104110527 A CN104110527 A CN 104110527A CN 201410358822 A CN201410358822 A CN 201410358822A CN 104110527 A CN104110527 A CN 104110527A
Authority
CN
China
Prior art keywords
groove
piece
supportive body
support device
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410358822.7A
Other languages
English (en)
Other versions
CN104110527B (zh
Inventor
周斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jiangyuan Machinery Co.,Ltd.
Original Assignee
Chengdu Gaopu Petroleum Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Gaopu Petroleum Engineering Technology Co Ltd filed Critical Chengdu Gaopu Petroleum Engineering Technology Co Ltd
Priority to CN201410358822.7A priority Critical patent/CN104110527B/zh
Publication of CN104110527A publication Critical patent/CN104110527A/zh
Application granted granted Critical
Publication of CN104110527B publication Critical patent/CN104110527B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing

Abstract

本发明公开了输油管道支撑装置,包括顶面开设有管体凹槽的支撑主体块,从管体凹槽的槽面向支撑主体块内部开设有升降凹槽,升降凹槽内部放置有弧形升降板,弧形升降板的凹面向上,弧形升降板的凸面设置有导向套筒,升降凹槽的底部连通有向支撑主体块下端面方向延伸的伸缩杆空腔,伸缩杆空腔贯通到支撑主体块下端面,导向套筒延伸到伸缩杆空腔,从支撑主体块的下方插入有螺纹杆,螺纹杆穿过伸缩杆空腔后延伸到导向套筒内,螺纹杆与弧形升降板的凸面进行顶压接触,支撑主体块的下端面连接有底部封块,螺纹杆贯穿底部封块并与底部封块进行螺纹配合。本发明的优点在于:解决地质沉降后,支撑结构可以对输油管道起到支撑的作用。

Description

输油管道支撑装置
技术领域
    本发明涉及输油管道支撑装置。 
背景技术
输油管道支撑装置是一种用来支撑大型石油管路系统中石油输油管道的装置,主要用于超大管道的支持。 
现有的输油管道支撑装置主要是由两个支架柱、以及焊接在支架柱之间的板架结构组成,其中板架结构上安装有多个支柱,每个支柱上套设有螺旋弹簧。将石油管道放置在板架结构的支柱上即可。这种结构不能克服地质沉降发生后的变形,由于该结构直接与地面相连,在地质沉降发生后,整个的结构均会下沉,例如三个支撑装置中,架设在一根输油管道,此时,当中间的支持装置发生下沉后,此时主要承重的支撑结构为2端,中间的支撑结构不能起到支撑的作用,此时,需要重新安装中间的支撑结构,而在维修过程,有可能两端的支撑结构受力过大,造成损坏。这种设计,在地质沉降区域极不安全。 
发明内容
本发明的目的在于提供一种输油管道支撑装置,解决地质沉降后,支撑结构可以对输油管道起到支撑的作用。 
本发明的目的主要通过以下技术方案实现:输油管道支撑装置,包括顶面开设有管体凹槽的支撑主体块,从管体凹槽的槽面向支撑主体块内部开设有升降凹槽,升降凹槽内部放置有弧形升降板,弧形升降板的凹面向上,弧形升降板的凸面设置有导向套筒,升降凹槽的底部连通有向支撑主体块下端面方向延伸的伸缩杆空腔,伸缩杆空腔贯通到支撑主体块下端面,导向套筒延伸到伸缩杆空腔,从支撑主体块的下方插入有螺纹杆,螺纹杆穿过伸缩杆空腔后延伸到导向套筒内,螺纹杆与弧形升降板的凸面进行顶压接触,支撑主体块的下端面连接有底部封块,螺纹杆贯穿底部封块并与底部封块进行螺纹配合。 
本发明中,上述结构的设计原理为:利用支撑主体块构成地质沉降前对输油管道起到支撑作用,利用弧形升降板、螺纹杆、支撑主体块组成在地质沉降后对输油管道支撑的作用。上述结构中,输油管道1放置到支撑主体块顶面的管体凹槽内,此时支撑主体块直接支持输油管道,当地质沉降发生后,支撑主体块下沉,此时的管体凹槽的槽面与输油管道发生分离,二者不接触,这时,我们只需要旋转螺纹杆,使得螺纹杆向上移动,而这时,螺纹杆的上端在导向套筒的导向下,挤压接触到弧形升降板的凸面,继续旋转螺纹杆,螺纹杆挤压弧形升降板向上移动,直到弧形升降板挤压接触到输油管道1。这样整个结构可以再次起到支撑输油管道的目的。 
优选的,支撑主体块下端面安装有底部支架脚。 
优选的,地质未沉降时,弧形升降板的最高点低于管体凹槽的最低点。 
优选的,升降凹槽内填充有封蜡块。设置封蜡块,可以将弧形升降板封在升降凹槽,优选的支撑主体块为混凝土结构件,而弧形升降板为金属铸件,为了升降凹槽不存在积水,使得金属铸件不氧化,此处才加设封蜡块,而在沉降发生后,需要对金属铸件加热,使得封蜡块软化后,才能驱动螺纹杆上移。 
本发明的优点在于:结构简单,成本低,操作方便,解决地质沉降后,支撑结构可以对输油管道起到支撑的作用。 
附图说明
图1为本装置在地质沉降前的侧刨结构图。 
图2为本装置在地质沉降后的侧刨结构图。 
图3为支撑主体块的立体图。 
图中的附图标记分别表示为:1、输油管道;2、支撑主体块;21、升降凹槽;22、伸缩杆空腔;23、弧形升降板;24、螺纹杆;25、底部封块;26、导向套筒;27、管体凹槽;28、底部支架脚。 
具体实施方式
下面结合实施例及附图对本发明作进一步的详细说明,但本发明的实施方式不限于此。 
实施例1: 
如图1-图3所示
输油管道支撑装置,其特征在于:包括顶面开设有管体凹槽27的支撑主体块2,从管体凹槽27的槽面向支撑主体块2内部开设有升降凹槽21,升降凹槽21内部放置有弧形升降板23,弧形升降板23的凹面向上,弧形升降板23的凸面设置有导向套筒26,升降凹槽21的底部连通有向支撑主体块2下端面方向延伸的伸缩杆空腔22,伸缩杆空腔22贯通到支撑主体块2下端面,导向套筒26延伸到伸缩杆空腔,从支撑主体块2的下方插入有螺纹杆24,螺纹杆24穿过伸缩杆空腔22后延伸到导向套筒26内,螺纹杆24与弧形升降板23的凸面进行顶压接触,支撑主体块2的下端面连接有底部封块25,螺纹杆24贯穿底部封块25并与底部封块25进行螺纹配合。
本发明中,上述结构的设计原理为:利用支撑主体块2构成地质沉降前对输油管道起到支撑作用,利用弧形升降板23、螺纹杆24、支撑主体块2组成在地质沉降后对输油管道支撑的作用。上述结构中,输油管道1放置到支撑主体块2顶面的管体凹槽27内,此时支撑主体块2直接支持输油管道1,当地质沉降发生后,支撑主体块2下沉,此时的管体凹槽27的槽面与输油管道1发生分离,二者不接触,这时,我们只需要旋转螺纹杆24,使得螺纹杆24向上移动,而这时,螺纹杆的上端在导向套筒26的导向下,挤压接触到弧形升降板23的凸面,继续旋转螺纹杆24,螺纹杆24挤压弧形升降板23向上移动,直到弧形升降板23挤压接触到输油管道1。这样整个结构可以再次起到支撑输油管道的目的。上述操作完成后,还可以在输油管道与管体凹槽27之间塞入三角形的垫块。 
优选的,支撑主体块2下端面安装有底部支架脚28。 
优选的,地质未沉降时,弧形升降板23的最高点低于管体凹槽的最低点。 
优选的,升降凹槽内填充有封蜡块。设置封蜡块,可以将弧形升降板23封在升降凹槽,优选的支撑主体块2为混凝土结构件,而弧形升降板23为金属铸件,为了升降凹槽不存在积水,使得金属铸件不氧化,此处才加设封蜡块,而在沉降发生后,需要对金属铸件加热,使得封蜡块软化后,才能驱动螺纹杆24上移。 
如上所述,则能很好的实现本发明。 

Claims (4)

1.输油管道支撑装置,其特征在于:包括顶面开设有管体凹槽(27)的支撑主体块(2),从管体凹槽(27)的槽面向支撑主体块(2)内部开设有升降凹槽(21),升降凹槽(21)内部放置有弧形升降板(23),弧形升降板(23)的凹面向上,弧形升降板(23)的凸面设置有导向套筒(26),升降凹槽(21)的底部连通有向支撑主体块(2)下端面方向延伸的伸缩杆空腔(22),伸缩杆空腔(22)贯通到支撑主体块(2)下端面,导向套筒(26)延伸到伸缩杆空腔,从支撑主体块(2)的下方插入有螺纹杆(24),螺纹杆(24)穿过伸缩杆空腔(22)后延伸到导向套筒(26)内,螺纹杆(24)与弧形升降板(23)的凸面进行顶压接触,支撑主体块(2)的下端面连接有底部封块(25),螺纹杆(24)贯穿底部封块(25)并与底部封块(25)进行螺纹配合。
2.根据权利要求1所述的输油管道支撑装置,其特征在于:支撑主体块(2)下端面安装有底部支架脚(28)。
3.根据权利要求1所述的输油管道支撑装置,其特征在于:地质未沉降时,弧形升降板(23)的最高点低于管体凹槽的最低点。
4.根据权利要求1所述的输油管道支撑装置,其特征在于:升降凹槽内填充有封蜡块。
CN201410358822.7A 2014-07-27 2014-07-27 输油管道支撑装置 Active CN104110527B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410358822.7A CN104110527B (zh) 2014-07-27 2014-07-27 输油管道支撑装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410358822.7A CN104110527B (zh) 2014-07-27 2014-07-27 输油管道支撑装置

Publications (2)

Publication Number Publication Date
CN104110527A true CN104110527A (zh) 2014-10-22
CN104110527B CN104110527B (zh) 2017-01-25

Family

ID=51707447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410358822.7A Active CN104110527B (zh) 2014-07-27 2014-07-27 输油管道支撑装置

Country Status (1)

Country Link
CN (1) CN104110527B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105697924A (zh) * 2016-03-23 2016-06-22 朱德仲 一种输油管路维修架
CN106216330A (zh) * 2016-07-28 2016-12-14 成都高普石油工程技术有限公司 石油输送装置的自清洁工艺
CN106516805A (zh) * 2016-11-27 2017-03-22 无锡金顶石油管材配件制造有限公司 一种石油管路专用卸载装置
US9890876B2 (en) 2014-03-28 2018-02-13 Joint Stock Company “Transneft Siberia” Method for installing a stationary support in a planned position
US10077541B2 (en) 2014-03-28 2018-09-18 Public Joint Stock Company “Transneft” Movable pipeline-support and support assembly thereof
US10240690B2 (en) 2014-03-28 2019-03-26 Public Joint Stock Company “Transneft” Stationary pipeline support

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070187556A1 (en) * 2005-12-20 2007-08-16 Naoyuki Yoshitake Vertically adjustable pipe support apparatus
DE102009022175A1 (de) * 2009-05-20 2010-12-09 Airbus Operations Gmbh Haltersystem zur Anbindung von Leitungen in Luftfahrzeugen und Verfahren zur Befestigung des Haltersystems
CN201739731U (zh) * 2010-08-20 2011-02-09 张小军 一种便携可调式支架
CN202901535U (zh) * 2012-09-28 2013-04-24 中国石油天然气股份有限公司 管线支撑高度调节架
CN203202409U (zh) * 2013-04-17 2013-09-18 于浩 一种炼油厂泵油管固定装置
CN203948785U (zh) * 2014-07-27 2014-11-19 成都高普石油工程技术有限公司 输油管道支撑装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070187556A1 (en) * 2005-12-20 2007-08-16 Naoyuki Yoshitake Vertically adjustable pipe support apparatus
DE102009022175A1 (de) * 2009-05-20 2010-12-09 Airbus Operations Gmbh Haltersystem zur Anbindung von Leitungen in Luftfahrzeugen und Verfahren zur Befestigung des Haltersystems
CN201739731U (zh) * 2010-08-20 2011-02-09 张小军 一种便携可调式支架
CN202901535U (zh) * 2012-09-28 2013-04-24 中国石油天然气股份有限公司 管线支撑高度调节架
CN203202409U (zh) * 2013-04-17 2013-09-18 于浩 一种炼油厂泵油管固定装置
CN203948785U (zh) * 2014-07-27 2014-11-19 成都高普石油工程技术有限公司 输油管道支撑装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9890876B2 (en) 2014-03-28 2018-02-13 Joint Stock Company “Transneft Siberia” Method for installing a stationary support in a planned position
US10077541B2 (en) 2014-03-28 2018-09-18 Public Joint Stock Company “Transneft” Movable pipeline-support and support assembly thereof
US10240690B2 (en) 2014-03-28 2019-03-26 Public Joint Stock Company “Transneft” Stationary pipeline support
CN105697924A (zh) * 2016-03-23 2016-06-22 朱德仲 一种输油管路维修架
CN106216330A (zh) * 2016-07-28 2016-12-14 成都高普石油工程技术有限公司 石油输送装置的自清洁工艺
CN106516805A (zh) * 2016-11-27 2017-03-22 无锡金顶石油管材配件制造有限公司 一种石油管路专用卸载装置

Also Published As

Publication number Publication date
CN104110527B (zh) 2017-01-25

Similar Documents

Publication Publication Date Title
CN104110527A (zh) 输油管道支撑装置
CN203940128U (zh) 一种可调石油运输管道支架
CN203948785U (zh) 输油管道支撑装置
CN203413239U (zh) 石油管道支架座
CN205114934U (zh) 一种土木工程用顶升装置
CN203037472U (zh) 石油钻机静载荷测试装置
CN203963253U (zh) 输油管道支撑系统
CN102367895A (zh) 石油管道支架座
CN104110528A (zh) 输油管道支撑系统
CN204225459U (zh) 一种建筑工地用支撑架
CN105730866A (zh) 一种管材放置架
CN204554274U (zh) 一种支撑架装置
CN203900808U (zh) 小口径管道焊接对口装置
CN203477174U (zh) 风力发电设备用减震件
CN203309354U (zh) 一种双层石油管道支座
CN203034829U (zh) 液压随动支撑装置
CN204457505U (zh) 卸管机的支撑脚结构
CN204368692U (zh) 一种管材放置架
CN204609790U (zh) 一种煤矿井下大范围自动升降钻机
CN203309369U (zh) 一种石油管道底托结构
CN204310244U (zh) 螺杆钻具摆放架
CN203756211U (zh) 双液压支架互锁控制装置
CN204024672U (zh) 一种让压式连接套管结构及钢管混凝土支架
CN203320530U (zh) 建筑支撑杆拔出装置
CN105697880A (zh) 适应下沉地质的输油管支撑结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Han Zhenghai

Inventor after: Han Wenhao

Inventor after: Kuang Qianqian

Inventor before: Zhou Bin

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161207

Address after: 224500 Century Avenue, North Industrial Park, Binhai County, Jiangsu

Applicant after: Jiangsu Hai Hai Petroleum Machinery Co., Ltd.

Address before: 610000 Chenghua District, Sichuan, Jianshe Road, No. 56,

Applicant before: The Chengdu general petroleum works technology of height Co., Ltd

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 224500 No.22 Industrial Branch Road, Binhai Economic and Technological Development Zone, Yancheng City, Jiangsu Province

Patentee after: Jiangsu Jiangyuan Machinery Co.,Ltd.

Address before: 224500 Century Avenue, North Industrial Park, Binhai County, Jiangsu Province

Patentee before: JIANGSU QINGHAI PETROLEUM MACHINERY CO.,LTD.