CN104109998B - Suspension cable whole bundle intelligent tensioning equipment - Google Patents

Suspension cable whole bundle intelligent tensioning equipment Download PDF

Info

Publication number
CN104109998B
CN104109998B CN201310161898.6A CN201310161898A CN104109998B CN 104109998 B CN104109998 B CN 104109998B CN 201310161898 A CN201310161898 A CN 201310161898A CN 104109998 B CN104109998 B CN 104109998B
Authority
CN
China
Prior art keywords
stretch
backing plate
suspension cable
tensioning
whole bundle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310161898.6A
Other languages
Chinese (zh)
Other versions
CN104109998A (en
Inventor
陈春林
陈科良
陈炜锋
赵轶才
李闯
罗杰
王南川
杨家玉
田稀林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING WANQIAO TRAFFIC TECHNOLOGY DEVELOPMENT CO LTD
CHONGQING CHANGJIANG PRESTRESS Co Ltd
Original Assignee
CHONGQING WANQIAO TRAFFIC TECHNOLOGY DEVELOPMENT CO LTD
CHONGQING CHANGJIANG PRESTRESS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING WANQIAO TRAFFIC TECHNOLOGY DEVELOPMENT CO LTD, CHONGQING CHANGJIANG PRESTRESS Co Ltd filed Critical CHONGQING WANQIAO TRAFFIC TECHNOLOGY DEVELOPMENT CO LTD
Priority to CN201310161898.6A priority Critical patent/CN104109998B/en
Publication of CN104109998A publication Critical patent/CN104109998A/en
Application granted granted Critical
Publication of CN104109998B publication Critical patent/CN104109998B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of suspension cable whole bundle intelligent tensioning equipment, including: stretch-draw backing plate, anchor plate, jacking apparatus, support tube and tensioning nut;Described jacking apparatus is connected between described stretch-draw backing plate and described anchor plate, and described tensioning nut is positioned at the outside of described stretch-draw backing plate, and described tensioning nut is threadeded with described support tube.The suspension cable whole bundle intelligent tensioning equipment that the present invention provides, everything performs to realize automatically controlling by electric, hydraulic principle, realizes, by mechanical action, the work that manpower cannot complete, alleviate the labor intensity of people, enhance the safety guarantee of workmen.

Description

Suspension cable whole bundle intelligent tensioning equipment
Technical field
The present invention relates to a kind of suspension cable whole bundle intelligent tensioning equipment.
Background technology
At present, in Design of Cable-Stayed Bridge field, suspension cable is partial to use parallel steel stranded wire drag-line more.Cable body Being made up of multiply soap-free emulsion polymeization high intensity parallel galvanized steel strand wires, outer layer is synchronized hot extrusion by bilayer and shapes Double helix Line HDPE protecting pipe protects.Steel strand wires use single reeve, single tendon stretch, single test-based examination, and Single steel strand can be carried out and adjust rope and replacing.But in Practical Project is constructed, according to designing unit and executing The requirement of work monitoring unit, generally requires secondary or repeatedly adjusts Suo Li to reach the bridge line style of design. If secondary adjusts the mode of Suo Caiyong single tendon stretch, then the intermediate plate that can commonly there is first stretch-draw can not be appointed Meaning is taken out, and new intermediate plate can not be installed;Adjust every steel strand wires discontinuity during rope;The most single steel Twisted wire can not carry out the problems such as little tonnage cable force adjustment less than an intermediate plate stroke.Therefore in construction During steel strand stay cable should have the condition of whole cable stretching, and reserved regulating measures.
In view of this requirement, adjusted rope scheme according to former CONSTRUCTION OF CABLE-STAYED BRIDGE, be by tensioning nut, anchor The anchor system that backing plate, jack, stretch-draw backing plate etc. are constituted realizes by controlling the elongation of jack The adjustment of whole cable force.But this construction method is only applicable to, and cable body diameter is less, anchorage light weight and Pull end suspension cable bridge construction on tower, the cable-stayed bridge for parallel steel stranded wire drag-line is the most practical. Reason is that parallel steel stranded wire drag-line cable body is relatively large in diameter under normal circumstances, and stretching end anchorage overall dimensions is very Greatly, matched tensioning nut and stretch-draw backing plate weigh several tons, and most stretching end is to be located at beam On, it is impossible to as stretch-draw on tower, stretch-draw backing plate, jack, tensioning nut are folded the most successively Add, but need opposite direction by downward for drag-line stretch-draw.Therefore it is impossible to rely on manpower in work progress Anchorage and jack have been held up stretching construction, it is necessary to rely on plant equipment complete stretching construction with Ensure the correct adjustment of cord force of cable-stayed bridge.
Summary of the invention
Construction action cannot be completed in order to complete to depend merely on manpower, alleviate the labor intensity of people and improve labourer Inherently safe coefficient, the present invention provides a kind of suspension cable whole bundle intelligent tensioning equipment, can not only complete Draw the basic actss such as the fuel feeding in work progress, oil return can also be automatically performed the work such as stretch-draw segmentation, pressurize, Operate the easiest, reliable simultaneously, there is good human-computer interaction, digitized and personalization level relatively Height, the concrete scheme of the present invention is as follows for achieving the above object:
A kind of suspension cable whole bundle intelligent tensioning equipment, including:
Stretch-draw backing plate, anchor plate, jacking apparatus, support tube and tensioning nut;
Described jacking apparatus is connected between described stretch-draw backing plate and described anchor plate, described tensioning nut position In the outside of described stretch-draw backing plate, described tensioning nut is threadeded with described support tube.
Preferably, also include gear ring and with described gear ring meshed gears, described gear ring is fixed in described Nut outer wall, described gear and the first driving means is drawn to be in transmission connection.
Preferably, fixed gear and the work nut engaged with described fixed gear, described work nut are also included It is fixed in anchor plate, described fixed gear and the second driving means to be in transmission connection.
Preferably, described stretch-draw backing plate is provided with retainer, and described retainer is connected with fairlead, described Fairlead mates with described tensioning nut external diameter and is positioned on the shift motion of described tensioning nut.
Preferably, also include that ultra-thin jack, described ultra-thin jack are connected to described tensioning nut and institute State between retainer.
Preferably, also including articulated stand, described stretch-draw backing plate is hinged with described articulated stand, described Draw and be provided with hydraulic cylinder between backing plate and described articulated stand.
Preferably, also include that lifting-up support, described lifting-up support are slidably connected with described articulated stand, institute State and be provided with hydraulic cylinder between lifting-up support and described articulated stand.
Preferably, also including that platform, described platform are provided with driving rack and track, described lifting-up support sets There are travelling gear, described travelling gear to engage with described driving rack, and described lifting-up support is flat with described Platform is slidably connected.
The suspension cable whole bundle intelligent tensioning equipment that the present invention provides, everything performs can be by electricity air-liquid Pressure principle realizes automatically controlling, and realizes, by mechanical action, the work that manpower cannot complete, alleviates people's Labor intensity, enhances the safety guarantee of workmen.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes of the application Point, it is not intended that inappropriate limitation of the present invention, in the accompanying drawings:
Fig. 1 is embodiment of the present invention stretch-draw mechanism explosive view;
Fig. 2 is another angle explosive view of embodiment of the present invention stretch-draw mechanism;
Fig. 3 is embodiment of the present invention articulated stand structural representation;
Fig. 4 is embodiment of the present invention lifting-up support and platform structure schematic diagram;
Fig. 5 is embodiment of the present invention structural representation.
Detailed description of the invention
The present invention is described in detail, in the signal of this present invention below in conjunction with accompanying drawing and specific embodiment Property embodiment and explanation be used for explaining the present invention, but not as a limitation of the invention.
Embodiment
As shown in Figures 1 and 2, suspension cable whole bundle intelligent tensioning equipment includes stretch-draw mechanism: by four Draw and be fixed on same stretch-draw backing plate 32 formation one " jack pad " combination, with thousand with jack 31 Jin top is 31 as jacking apparatus, and four jack 31 stress simultaneously are adjusted required for rope to reach stretching construction Super large stretching force.In the middle of stretch-draw backing plate 32, a macropore is set, passes and stretch-draw in order to anchor cable, anchor head Screwing of nut 33.Anchor head is bolted on support tube 34, and support tube 34 is internal in order to parallel Steel strand wires pass through, and outside car has external screw thread to spin together with tensioning nut 33.Tensioning nut 33 interior Screw thread and anchor head external thread rotary are combined the stretching force born between jack 31 and anchor cable.Tensioning nut 33, stretch-draw backing plate 32, jack 31, anchor head, parallel steel stranded wire anchor cable, anchor plate 35 form one Tensioned anchorage system, regulates the elongation of anchor cable by the elongation and stretching force size controlling jack 31 Amount and stretching force size.
Before equipment works, tensioning nut 33 and anchor head are separate, will after anchor cable stretching single steel strand Anchor head is fixed on beam.This is accomplished by equipment and has ability tensioning nut 33 and anchor head screwed.Therefore Fix a gear ring 1 at tensioning nut 33 cylindrical to engage with the gear 2 being fixed on stretch-draw backing plate 32, tooth Wheel 2 coordinates transmission tensioning nut 33 to rotate required moment of torsion with the spline 4 on bearing block 3.Exist simultaneously Tensioning nut 33 is internal arranges a guide cylinder 5, and guide cylinder 5 overall diameter is equal with anchor head major diameter of thread, Internal reservation can accommodate the space of steel strand wires.Guide cylinder 5 by with the holding being fixed on stretch-draw backing plate 32 Fairlead 7 on frame 6 has coordinated the guide function to tensioning nut 33.Retainer 6 is installed one Individual ultrathin hydraulic jack 8, the piston rod of ultra-thin jack 8 acts on guide cylinder 5, by ultra-thin thousand The back and forth movement of jin top 8 pistons provides the axial force that nut is required during screwing.
After stretch-draw terminates, the decelerator 9 being scheduled in week on stretch-draw backing plate 32 is rotated by chain-driving splined shaft, Transfer torque to that fixed gear 12 band on splined shaft is automatically connected on work nut 13 determines ring gear against rotation, Work nut be fixed in anchor plate 35, with reductor 9 be the second driving means by locked for work nut at anchor On backing plate 35, the Suo Li with holding drag-line is constant.
As shown in Fig. 3, Fig. 5, under beam during stretching construction, owing to anchor cable and horizontal plane have certain Angle 25 °~70 °, and the angle of every anchor cable differs.This is accomplished by constantly adjusting tensioning tooling From the angle between horizontal plane to adapt to the stretching construction action of different anchor cable different angles.Therefore design by Stretch-draw backing plate 32 one end is hingeably secured to the lower end of an articulated stand 15 by the first bearing pin 14, another Hold and be articulated with epimere on articulated stand by swing type engineering hydraulic cylinder 16 by the second bearing pin 17, logical Cross and control the extension elongation of oscillating motor 16 to adjust the angle between stretch-draw backing plate 32 and horizontal plane.
As shown in Figure 4, Figure 5, tensioning tooling include welding support, stretch-draw backing plate 32, tensioning nut 33, Fairlead, guide cylinder and jack 31 weight are bigger, it is impossible to rely on manpower and common facility to be carried to Anchor head place height also ensures that the central axis of anchor head and anchor cable coincides with the axis of tensioning nut 33.Cause This design realizes the raising and lowering of tensioning tooling in the vertical direction with the lifting of four hydraulic jacks 18 Action.Design a lifting-up support 19 in order to fixing articulated stand 15, make articulated stand 15 at lifting-up support 19 internal dependence hydraulic cylinders 18 move up and down.
As shown in Figure 4, Figure 5, because anchor head has certain length with work nut and anchor cable self, project to The component of a displacement is had on horizontal plane.Therefore one " gear-tooth bar " drive system of design, by gear Rotate and control tensioning tooling motion in the horizontal direction.For one platform 20 of this bottom design in order to pacify Dress driving rack 21 and the track 22 for the walking of lifting-up support 19 horizontal direction.By on lifting-up support 19 The travelling gear 23 installed engages transmission moment of torsion and props up to complete jacking with the tooth bar 21 being arranged on platform 20 Frame 19 and tensioning tooling, relative to platform 20 action that moves forward and backward in the horizontal direction, are arranged on jacking 6 slide blocks 24 bottom support 19 complete in horizontal direction with the track 22 being arranged on platform 20 Guide effect.
The technical scheme provided the embodiment of the present invention above is described in detail, used herein Principle and the embodiment of the embodiment of the present invention are set forth by specific case, saying of above example The bright principle being only applicable to help to understand the embodiment of the present invention;General technology people simultaneously for this area Member, according to the embodiment of the present invention, all will change in detailed description of the invention and range of application, In sum, this specification content should not be construed as limitation of the present invention.

Claims (6)

1. a suspension cable whole bundle intelligent tensioning equipment, it is characterised in that including: stretch-draw backing plate, anchor plate, jacking Device, support tube and tensioning nut;Described jacking apparatus is connected to described stretch-draw backing plate and described anchor plate Between, described tensioning nut is positioned at the outside of described stretch-draw backing plate, described tensioning nut and described support tube spiral shell Stricture of vagina connects;Also include gear ring and with described gear ring meshed gears, described gear ring is fixed in described tensioning nut Outer wall, described gear and the first driving means are in transmission connection.
2. suspension cable whole bundle intelligent tensioning equipment as claimed in claim 1, it is characterised in that: described stretch-draw backing plate Being provided with retainer, described retainer is connected with fairlead, described fairlead and described tensioning nut external diameter Join and be positioned on the shift motion of described tensioning nut.
3. suspension cable whole bundle intelligent tensioning equipment as claimed in claim 2, it is characterised in that: also include ultra-thin thousand Jin top, described ultra-thin jack is connected between described tensioning nut and described retainer.
4. suspension cable whole bundle intelligent tensioning equipment as claimed in claim 1, it is characterised in that: also include hinged Frame, described stretch-draw backing plate is hinged with described articulated stand, sets between described stretch-draw backing plate and described articulated stand There is hydraulic cylinder.
5. suspension cable whole bundle intelligent tensioning equipment as claimed in claim 4, it is characterised in that:
Also include that lifting-up support, described lifting-up support are slidably connected with described articulated stand, described lifting-up support and institute State and between articulated stand, be provided with hydraulic cylinder.
6. suspension cable whole bundle intelligent tensioning equipment as claimed in claim 5, it is characterised in that: also include platform, Described platform is provided with driving rack and track, and described lifting-up support is provided with travelling gear, described travelling gear with Described driving rack engages, and described lifting-up support is slidably connected with described platform.
CN201310161898.6A 2013-04-19 2013-04-19 Suspension cable whole bundle intelligent tensioning equipment Active CN104109998B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310161898.6A CN104109998B (en) 2013-04-19 2013-04-19 Suspension cable whole bundle intelligent tensioning equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310161898.6A CN104109998B (en) 2013-04-19 2013-04-19 Suspension cable whole bundle intelligent tensioning equipment

Publications (2)

Publication Number Publication Date
CN104109998A CN104109998A (en) 2014-10-22
CN104109998B true CN104109998B (en) 2016-12-28

Family

ID=51706976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310161898.6A Active CN104109998B (en) 2013-04-19 2013-04-19 Suspension cable whole bundle intelligent tensioning equipment

Country Status (1)

Country Link
CN (1) CN104109998B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762884B (en) * 2015-04-30 2017-04-05 湖南联智桥隧技术有限公司 The control method of Multipoint synchronous intelligent tensioning system
CN105862608B (en) * 2016-05-20 2017-09-19 东南大学 The automation tensioning system and method for a kind of pre-stress fibre plate reinforcing slab plate
CN106812070B (en) * 2017-03-22 2019-01-25 贵州大学 A kind of arch bridge cable-hoisting construction stayed knotting method knotted rope tensioning equipment
CN108908693B (en) * 2018-06-29 2024-03-15 周兆弟 Steel bar prestress tensioning machine
CN110725210B (en) * 2019-05-01 2021-09-17 河南交院工程技术集团有限公司 Inhaul cable stepping tensioning construction method and tensioning equipment
CN112176881A (en) * 2020-10-16 2021-01-05 盐城市双强管桩有限公司 Whole intelligent stretch-draw equipment of restrainting of suspension cable
CN113481890B (en) * 2021-07-20 2022-12-23 重庆万桥交通科技发展有限公司 Stay cable anchor ring dismounting device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0626012A (en) * 1992-07-09 1994-02-01 Kyokuto Kogen Concrete Shinko Kk Cable tension grip for cable stayed bridge and loading carriage thereof
CN101761035A (en) * 2010-01-14 2010-06-30 中交第二公路工程局有限公司 Soft and hard combined traction method for long-cable installation of cable-stayed bridge
CN201923818U (en) * 2010-11-23 2011-08-10 江苏法尔胜新日制铁缆索有限公司 Combined puncturing-type big-tonnage jack
CN102776830A (en) * 2012-08-10 2012-11-14 浙江省交通规划设计研究院 Large-tonnage low-retraction pres-stress anchor and tightening device thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120004908A (en) * 2010-12-13 2012-01-13 케이블텍 주식회사 Apparatus for applying tension force to cable

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0626012A (en) * 1992-07-09 1994-02-01 Kyokuto Kogen Concrete Shinko Kk Cable tension grip for cable stayed bridge and loading carriage thereof
CN101761035A (en) * 2010-01-14 2010-06-30 中交第二公路工程局有限公司 Soft and hard combined traction method for long-cable installation of cable-stayed bridge
CN201923818U (en) * 2010-11-23 2011-08-10 江苏法尔胜新日制铁缆索有限公司 Combined puncturing-type big-tonnage jack
CN102776830A (en) * 2012-08-10 2012-11-14 浙江省交通规划设计研究院 Large-tonnage low-retraction pres-stress anchor and tightening device thereof

Also Published As

Publication number Publication date
CN104109998A (en) 2014-10-22

Similar Documents

Publication Publication Date Title
CN104109998B (en) Suspension cable whole bundle intelligent tensioning equipment
CN203143980U (en) Winch free of disordering of ropes
CN101618837B (en) Installation method and device of caterpillar crane mast
CN103193172A (en) Winding machine without rope tangling
CN105329412B (en) Articulated type extension ladder peculiar to vessel
CN1266929A (en) Guy system for bridge
CN103630416A (en) Test platform of hoisting mechanism
CN105821773A (en) Electric penetration device for hogging moment steel strands of prefabricated T-shaped beams
CN108002255A (en) Movable arm tower crane climbing beam support system and its application method
CN207739136U (en) A kind of multi-functional bridge beam bottom inspection vehicle
CN101264855B (en) Inclined guy cable stretching torsion-proof jack
CN107253651B (en) Steel wire rope lifting clamp holder for checking elevator speed limiter
CN108643058A (en) Anchor after cable crane main rope cross sliding type
CN106087729A (en) A kind of bridge detecting device and detection method thereof
CN105297631B (en) Traction-type tool derrick rig for replacing derricks of steel tube truss-concrete arch bridge
CN105926438B (en) Bridge machinery structure and its detection method
CN204940111U (en) A kind of bridge detecting device
CN2172761Y (en) Asynchronous traction device
CN207890921U (en) A kind of boom hoisting for overhead traveling crane
CN110541599A (en) Device for lifting inverted chimney steel inner cylinder by using steel twisted rope hydraulic pressure
CN203653080U (en) Mooring rope hanging mechanism capable of meeting motion of portal crane
CN2430473Y (en) Multifunction pile frame
CN208996484U (en) It is a kind of to pitch servo-actuated wiring armed lever mechanism and crossing frame
CN108248526A (en) A kind of intelligence mapping vehicle for Tactics of Urban Surveying based on Internet of Things
CN107364793A (en) A kind of double towed Lift-on/Lift-off Systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant