CN104088227A - 后拉杆 - Google Patents

后拉杆 Download PDF

Info

Publication number
CN104088227A
CN104088227A CN201410344054.XA CN201410344054A CN104088227A CN 104088227 A CN104088227 A CN 104088227A CN 201410344054 A CN201410344054 A CN 201410344054A CN 104088227 A CN104088227 A CN 104088227A
Authority
CN
China
Prior art keywords
plate
steel plate
hole
stiffener
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410344054.XA
Other languages
English (en)
Inventor
华巧波
Original Assignee
华巧波
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华巧波 filed Critical 华巧波
Priority to CN201410344054.XA priority Critical patent/CN104088227A/zh
Publication of CN104088227A publication Critical patent/CN104088227A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种后拉杆,包括本体,所述的本体包括钢板、加强板、固定板和连接板,所述的钢板包括第一钢板和第二钢板,所述的加强板包括第一加强板和第二加强板,所述的连接板包括第一连接板和第二连接板,所述的固定板包括第一固定板和第二固定板,所述的第一钢板和第二钢板上部和下部分别通过第一固定板和第二固定板固定,所述的第一钢板和第二钢板右侧边和左侧边边分别通过第一连接板和第二连接板连接,所述的第一钢板和第二钢板结构相同,所述的第一钢板和第二钢板上分别设有第一通孔和第二通孔,所述的第一通孔和第二通孔内侧边分别设有第一加强板和第二加强板。本发明结构设计合理,特别适合用于桥梁挂篮主桁各部件的连接。

Description

后拉杆
技术领域
[0001] 本发明涉及一种后拉杆,具体地说是一种用于桥梁建设的挂篮主桁用后拉杆。 技术背景
[0002] 桥梁建设的挂篮主桁是通过后拉杆、连接杆和连接箱体连接而成,但是目前现有 市场上的一些后拉杆,设计不合理,用于连接挂篮主桁各部件后,如果拆装下来要重新利用 的话,其固定孔会破坏,而且后拉杆多为一根钢体结构,重量重,成本高,固定时候,要多个 工人抬起来,组装不方便,而且在安装挂篮主桁时候,都是在高空,重量重的部件,造成安装 的工人非常危险,不小心掉下去,就会造成重大安全事。
发明内容
[0003] 本发明提供了 一种后拉杆。
[0004] 本发明的目的是解决现有市场上的一些后拉杆,设计不合理,用于连接挂篮主桁 各部件后,如果拆装下来要从新利用的话,其固定孔会破坏,而且后拉杆多为一根钢体结 构,重量重,成本高,固定时候,要多个工人抬起来,组装不方便,而且在安装挂篮主桁时候, 都是在高空,重量重的部件,造成安装的工人非常危险,不小心掉下去,就会造成重大安全 事故的问题。
[0005] 本发明解决其技术问题所采用的技术方案是:本发明包括本体,其特征在于所述 的本体包括钢板、加强板、固定板和连接板,所述的钢板包括第一钢板和第二钢板,所述的 加强板包括第一加强板和第二加强板,所述的连接板包括第一连接板和第二连接板,所述 的固定板包括第一固定板和第二固定板,所述的第一钢板和第二钢板上部和下部分别通过 第一固定板和第二固定板固定,所述的第一钢板和第二钢板右侧边和左侧边边分别通过第 一连接板和第二连接板连接,所述的第一钢板和第二钢板结构相同,所述的第一钢板和第 二钢板上分别设有第一通孔和第二通孔,所述的第一通孔和第二通孔内侧边分别设有第一 加强板和第二加强板,所述的第一加强板和第二加强板中心设有第一加强板通孔和第二加 强板通孔,所述的第一加强板通孔和第二加强板通孔分别与第一通孔和第二通孔连通。
[0006] 本发明的有益效果是:本发明结构设计合理,特别适合用于桥梁挂篮主桁各部件 的连接,重复利用率高。
附图说明
[0007] 图1为本发明结构示意图。
[0008] 图2为图1的俯视结构示意图。
[0009] 图3是图1中A-A的剖面结构图。
[0010] 图4是图1中B-B的剖面结构图。
具体实施方式 toon] 下面结合附图和实施例对本发明进一步说明: 如图1所示,本发明包括本体,其特征在于所述的本体包括钢板、加强板、固定板和连 接板,所述的钢板包括第一钢板8和第二钢板11,所述的加强板包括第一加强板7和第二 加强板1,所述的连接板包括第一连接板4和第二连接板3,所述的固定板包括第一固定板 2和第二固定板12,所述的第一钢板8和第二钢板11上部和下部分别通过第一固定板2和 第二固定板12固定,所述的第一钢板8和第二钢板11右侧边和左侧边边分别通过第一连 接板4和第二连接板3连接,所述的第一钢板8和第二钢板11结构相同,所述的第一钢板8 和第二钢板11上分别设有第一通孔5和第二通孔9,所述的第一通孔5和第二通孔9内侧 边分别设有第一加强板7和第二加强板1,所述的第一加强板7和第二加强板1中心设有第 一加强板通孔6和第二加强板10通孔,所述的第一加强板通孔6和第二加强板通孔10分 别与第一通孔5和第二通孔9连通。
[0012] 所述的第一钢板8和第二钢板11上部和下部分别设有三块第一固定板8和三块 第二固定板12。
[0013] 所述的第一通孔5和第二通孔9分别设有二个。
[0014] 所述的第一加强板7和第二加强板1分别有二块。
[0015] 所述的第一连接板4和第二连接板3结构相同为弧形结构。
[〇〇16] 所述的第一钢板8和第二钢板11为"C"型结。

Claims (6)

1. 后拉杆,包括本体,其特征在于所述的本体包括钢板、加强板、固定板和连接板,所述 的钢板包括第一钢板和第二钢板,所述的加强板包括第一加强板和第二加强板,所述的连 接板包括第一连接板和第二连接板,所述的固定板包括第一固定板和第二固定板,所述的 第一钢板和第二钢板上部和下部分别通过第一固定板和第二固定板固定,所述的第一钢板 和第二钢板右侧边和左侧边边分别通过第一连接板和第二连接板连接,所述的第一钢板和 第二钢板结构相同,所述的第一钢板和第二钢板上分别设有第一通孔和第二通孔,所述的 第一通孔和第二通孔内侧边分别设有第一加强板和第二加强板,所述的第一加强板和第二 加强板中心设有第一加强板通孔和第二加强板通孔,所述的第一加强板通孔和第二加强板 通孔分别与第一通孔和第二通孔连通。
2. 根据权利要求1所述的后拉杆,其特征在于所述的第一钢板和第二钢板上部和下部 分别设有三块第一固定板和三块第二固定板。
3. 根据权利要求1所述的后拉杆,其特征在于所述的第一通孔和第二通孔分别设有二 个。
4. 根据权利要求1所述的后拉杆,其特征在于所述的第一加强板和第二加强板分别有 二块。
5. 根据权利要求1所述的后拉杆,其特征在于所述的第一连接板和第二连接板结构相 同为弧形结构。
6. 根据权利要求1所述的后拉杆,其特征在于所述的第一钢板和第二钢板为"C"型结 构。
CN201410344054.XA 2014-07-20 2014-07-20 后拉杆 Pending CN104088227A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410344054.XA CN104088227A (zh) 2014-07-20 2014-07-20 后拉杆

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410344054.XA CN104088227A (zh) 2014-07-20 2014-07-20 后拉杆

Publications (1)

Publication Number Publication Date
CN104088227A true CN104088227A (zh) 2014-10-08

Family

ID=51635977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410344054.XA Pending CN104088227A (zh) 2014-07-20 2014-07-20 后拉杆

Country Status (1)

Country Link
CN (1) CN104088227A (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404880A (zh) * 2014-11-10 2015-03-11 黄叶芳 吊架
CN104404881A (zh) * 2014-11-10 2015-03-11 黄叶芳 吊架箱
CN104404889A (zh) * 2014-11-10 2015-03-11 黄叶芳 吊架装置
CN104404875A (zh) * 2014-11-10 2015-03-11 黄叶芳 一种连接杆
CN104404877A (zh) * 2014-11-10 2015-03-11 黄叶芳 一种连接吊架
CN104404876A (zh) * 2014-11-10 2015-03-11 黄叶芳 一种连接杆用侧板
CN104404874A (zh) * 2014-11-10 2015-03-11 黄叶芳 一种吊架
CN104404878A (zh) * 2014-11-10 2015-03-11 黄叶芳 连接杆
CN104404890A (zh) * 2014-11-10 2015-03-11 黄叶芳 一种吊架装置
CN104404879A (zh) * 2014-11-10 2015-03-11 黄叶芳 连接吊架

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201560400U (zh) * 2009-09-17 2010-08-25 南昌市创新钢结构有限公司 一种斜拉式挂篮
CN202031219U (zh) * 2011-03-24 2011-11-09 大连伟霖膜结构工程有限公司 用于膜结构的天幕架的连接杆
CN202595625U (zh) * 2012-03-30 2012-12-12 浙江兴土桥梁建设有限公司 桥梁用挂篮主桁
CN202830783U (zh) * 2011-11-30 2013-03-27 浙江省交通工程建设集团有限公司第二分公司 三角挂篮行走装置
JP2014009461A (ja) * 2012-06-28 2014-01-20 Kurosawa Construction Co Ltd Spc橋梁架設方法
CN203583403U (zh) * 2013-11-18 2014-05-07 黎钜滦 管材连接构件
CN203938974U (zh) * 2014-07-20 2014-11-12 华巧波 后拉杆

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201560400U (zh) * 2009-09-17 2010-08-25 南昌市创新钢结构有限公司 一种斜拉式挂篮
CN202031219U (zh) * 2011-03-24 2011-11-09 大连伟霖膜结构工程有限公司 用于膜结构的天幕架的连接杆
CN202830783U (zh) * 2011-11-30 2013-03-27 浙江省交通工程建设集团有限公司第二分公司 三角挂篮行走装置
CN202595625U (zh) * 2012-03-30 2012-12-12 浙江兴土桥梁建设有限公司 桥梁用挂篮主桁
JP2014009461A (ja) * 2012-06-28 2014-01-20 Kurosawa Construction Co Ltd Spc橋梁架設方法
CN203583403U (zh) * 2013-11-18 2014-05-07 黎钜滦 管材连接构件
CN203938974U (zh) * 2014-07-20 2014-11-12 华巧波 后拉杆

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404880A (zh) * 2014-11-10 2015-03-11 黄叶芳 吊架
CN104404881A (zh) * 2014-11-10 2015-03-11 黄叶芳 吊架箱
CN104404889A (zh) * 2014-11-10 2015-03-11 黄叶芳 吊架装置
CN104404875A (zh) * 2014-11-10 2015-03-11 黄叶芳 一种连接杆
CN104404877A (zh) * 2014-11-10 2015-03-11 黄叶芳 一种连接吊架
CN104404876A (zh) * 2014-11-10 2015-03-11 黄叶芳 一种连接杆用侧板
CN104404874A (zh) * 2014-11-10 2015-03-11 黄叶芳 一种吊架
CN104404878A (zh) * 2014-11-10 2015-03-11 黄叶芳 连接杆
CN104404890A (zh) * 2014-11-10 2015-03-11 黄叶芳 一种吊架装置
CN104404879A (zh) * 2014-11-10 2015-03-11 黄叶芳 连接吊架

Similar Documents

Publication Publication Date Title
CN104088227A (zh) 后拉杆
CN104099877A (zh) 一种连接杆
CN104088226A (zh) 立柱
CN203938974U (zh) 后拉杆
CN203938973U (zh) 立柱
CN202529676U (zh) 门机轿顶安装架
CN206606918U (zh) 一种船舶分段离胎及总组吊装用的t型吊环及其安装结构
CN203938975U (zh) 一种连接杆
CN204311353U (zh) 一种连接杆
CN204311357U (zh) 一种连接杆用侧板
CN204311361U (zh) 一种吊架装置
CN204311356U (zh) 连接杆
CN204753401U (zh) 菱形建筑架用连接盒
CN204780621U (zh) 菱形建筑架
CN204311352U (zh) 一种连接吊架
CN204875557U (zh) 一种菱形建筑架
CN204780619U (zh) 桥梁用菱形建筑架用连接盒
CN204311362U (zh) 吊架装置
CN204780620U (zh) 一种菱形建筑架用连接盒
CN204325925U (zh) 一种吊架
CN204311354U (zh) 吊架箱
CN204311355U (zh) 连接吊架
CN204780637U (zh) 新型菱形建筑架
CN204311358U (zh) 吊架
CN204780636U (zh) 一种新型菱形建筑架

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141008

RJ01 Rejection of invention patent application after publication