CN104085502B - In in ship building, segment section construction method - Google Patents

In in ship building, segment section construction method Download PDF

Info

Publication number
CN104085502B
CN104085502B CN201410280564.5A CN201410280564A CN104085502B CN 104085502 B CN104085502 B CN 104085502B CN 201410280564 A CN201410280564 A CN 201410280564A CN 104085502 B CN104085502 B CN 104085502B
Authority
CN
China
Prior art keywords
segmentation
dimensional unit
berth
construction method
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410280564.5A
Other languages
Chinese (zh)
Other versions
CN104085502A (en
Inventor
孟杰飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Gangzha Shipbuilding Co Ltd
Original Assignee
Nantong Gangzha Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Gangzha Shipbuilding Co Ltd filed Critical Nantong Gangzha Shipbuilding Co Ltd
Priority to CN201410280564.5A priority Critical patent/CN104085502B/en
Publication of CN104085502A publication Critical patent/CN104085502A/en
Application granted granted Critical
Publication of CN104085502B publication Critical patent/CN104085502B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses in a kind of ship building, segment section construction method, the manufacture of three dimensional unit divides figure according to segmentation, in conjunction with workyard, load-carrying ability, two segmentations or two or more segmentation can merge monolithic construction, but large seam is only made tack welding and is not welded, and then takes apart and hangs berth combination, to control the coverboard fairing of line of segmentation interface; Strive for precision shipbuilding target, improve the build guality of non-allowance healing segmentation; Conscientiously must carry out the survey record of segmentation principal dimensions after the completion of flat section, three dimensional unit, and take off data is submitted to building berth close up greatly; Before segment folding, pre-advanced cabin such as bin, large-scale pedestal and mechanical equipment, pipeline etc., the welding equipment of answering that can put in place is located, and what be difficult to put in place should make interim firm position.The inventive method is easy, easy to operate, good working effect.

Description

In in ship building, segment section construction method
Technical field
The present invention relates to a kind of shipbuilding method.
Background technology
In in existing ship building, segment section construction method is complicated, and working effect is undesirable.
Summary of the invention
The object of the present invention is to provide in a kind of easy, effective ship building, segment section construction method.
Technical solution of the present invention is:
In in a kind of ship building, segment section construction method, it is characterized in that: comprise the following steps: that the manufacture of three dimensional unit is according to segmentation division figure, in conjunction with workyard, load-carrying ability, two segmentations or two or more segmentation can merge monolithic construction, but large seam is only made tack welding and is not welded, and then takes apart and hangs berth combination, to control the coverboard fairing of line of segmentation interface; Strive for precision shipbuilding target, improve the build guality of non-allowance healing segmentation.Complete, accreditation of applying for checking and examination must be corrected in three dimensional unit welding equipment without surplus berth combination segmentation, then carry out segmentation surplus secondary line beveling and cutting and just do, for berth combination provides high-quality segmentation; Take charge of the sectional construction cycle severely, the existing place of the company that makes full use of, reasonable arrangement, transfer all welding equipment strength, the construction working hard to complete each segmentation completes on schedule.Expand segmentation storage capacity, for ensureing the qualified segmentation that the berth combination cycle provides sufficient as far as possible; Segmentation final lengths should require to mark large seam excision remainder punching according to accuracy standard; After segmentation welding equipment terminates, should weld in time, apply for checking and examination; Its integraty must be checked according to drawing after the completion of flat section, three dimensional unit; Conscientiously must carry out the survey record of segmentation principal dimensions after the completion of flat section, three dimensional unit, and take off data is submitted to building berth close up greatly; Before segment folding, pre-advanced cabin such as bin, large-scale pedestal and mechanical equipment, pipeline etc., the welding equipment of answering that can put in place is located, and what be difficult to put in place should make interim firm position.
Three segmentations merge monolithic construction.
Four segmentations merge monolithic construction.
The inventive method is easy, easy to operate, good working effect.
Below in conjunction with embodiment, the invention will be further described.
Detailed description of the invention
In in a kind of ship building, segment section construction method, comprise the following steps: that the manufacture of three dimensional unit is according to segmentation division figure, in conjunction with workyard, load-carrying ability, two segmentations or two or more segmentation can merge monolithic construction, but large seam is only made tack welding and is not welded, and then takes apart and hangs berth combination, to control the coverboard fairing of line of segmentation interface; Strive for precision shipbuilding target, improve the build guality of non-allowance healing segmentation.Complete, accreditation of applying for checking and examination must be corrected in three dimensional unit welding equipment without surplus berth combination segmentation, then carry out segmentation surplus secondary line beveling and cutting and just do, for berth combination provides high-quality segmentation; Take charge of the sectional construction cycle severely, the existing place of the company that makes full use of, reasonable arrangement, transfer all welding equipment strength, the construction working hard to complete each segmentation completes on schedule.Expand segmentation storage capacity, for ensureing the qualified segmentation that the berth combination cycle provides sufficient as far as possible; Segmentation final lengths should require to mark large seam excision remainder punching according to accuracy standard; After segmentation welding equipment terminates, should weld in time, apply for checking and examination; Its integraty must be checked according to drawing after the completion of flat section, three dimensional unit; Conscientiously must carry out the survey record of segmentation principal dimensions after the completion of flat section, three dimensional unit, and take off data is submitted to building berth close up greatly; Before segment folding, pre-advanced cabin such as bin, large-scale pedestal and mechanical equipment, pipeline etc., the welding equipment of answering that can put in place is located, and what be difficult to put in place should make interim firm position.
Three segmentations merge monolithic construction.
Four segmentations merge monolithic construction.

Claims (3)

1. in a ship building, segment section construction method, it is characterized in that: comprise the following steps: that the manufacture of three dimensional unit is according to segmentation division figure, two segmentations or two or more segmentation merge monolithic construction, but large seam is only made tack welding and is not welded, then take apart and hang berth combination, to control the coverboard fairing of line of segmentation interface; Strive for precision shipbuilding target, improve the build guality of non-allowance healing segmentation; Complete, accreditation of applying for checking and examination must be corrected in three dimensional unit welding equipment without surplus berth combination segmentation, then carry out segmentation surplus secondary line beveling and cutting and just do, for berth combination provides high-quality segmentation; Take charge of the sectional construction cycle severely, the existing place of the company that makes full use of, reasonable arrangement, transfer all welding equipment strength, the construction working hard to complete each segmentation completes on schedule; Expand segmentation storage capacity, for ensureing the qualified segmentation that the berth combination cycle provides sufficient as far as possible; Segmentation final lengths should require to mark large seam excision remainder punching according to accuracy standard; After segmentation welding equipment terminates, should weld in time, apply for checking and examination; Its integraty must be checked according to drawing after the completion of flat section, three dimensional unit; Conscientiously must carry out the survey record of segmentation principal dimensions after the completion of flat section, three dimensional unit, and take off data is submitted to building berth close up greatly; Before segment folding, bin, large-scale pedestal and mechanical equipment, the pre-advanced cabin of pipeline, the welding equipment of answering that can put in place is located, and what be difficult to put in place should make interim firm position.
2. in ship building according to claim 1, segment section construction method, it is characterized in that: three segmentations merge monolithic constructions.
3. in ship building according to claim 1, segment section construction method, it is characterized in that: four segmentations merge monolithic constructions.
CN201410280564.5A 2014-06-23 2014-06-23 In in ship building, segment section construction method Expired - Fee Related CN104085502B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410280564.5A CN104085502B (en) 2014-06-23 2014-06-23 In in ship building, segment section construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410280564.5A CN104085502B (en) 2014-06-23 2014-06-23 In in ship building, segment section construction method

Publications (2)

Publication Number Publication Date
CN104085502A CN104085502A (en) 2014-10-08
CN104085502B true CN104085502B (en) 2016-04-27

Family

ID=51633304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410280564.5A Expired - Fee Related CN104085502B (en) 2014-06-23 2014-06-23 In in ship building, segment section construction method

Country Status (1)

Country Link
CN (1) CN104085502B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114379736A (en) * 2021-12-17 2022-04-22 沪东中华造船(集团)有限公司 Installation method of electric equipment crossing over welding line

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1020300A1 (en) * 1981-09-28 1983-05-30 Предприятие П/Я А-1944 Method of assembling ship hull structures
CN101811553A (en) * 2010-03-05 2010-08-25 南通港闸船舶制造有限公司 Preparation and on-board installation process of crane span of cutter suction dredger
CN102874379A (en) * 2012-10-30 2013-01-16 上海振华重工集团(南通)有限公司 Manufacture method of offshore riprap leveling ship
CN102910255A (en) * 2012-10-31 2013-02-06 南通港闸船舶制造有限公司 Berth combination method in ship construction

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2623049B2 (en) * 1992-05-22 1997-06-25 財団法人シップ・アンド・オーシャン財団 Automatic large assembly equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1020300A1 (en) * 1981-09-28 1983-05-30 Предприятие П/Я А-1944 Method of assembling ship hull structures
CN101811553A (en) * 2010-03-05 2010-08-25 南通港闸船舶制造有限公司 Preparation and on-board installation process of crane span of cutter suction dredger
CN102874379A (en) * 2012-10-30 2013-01-16 上海振华重工集团(南通)有限公司 Manufacture method of offshore riprap leveling ship
CN102910255A (en) * 2012-10-31 2013-02-06 南通港闸船舶制造有限公司 Berth combination method in ship construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
船体分段建造的精度质量控制和改进;王利军;《CNKI的中国优秀硕士学位论文全文数据库 工程科技II辑》;20120315(第03期);C036-33 *
船体无余量装配工艺的应用;方欣;《造船技术》;19800831(第4期);第1-8页 *

Also Published As

Publication number Publication date
CN104085502A (en) 2014-10-08

Similar Documents

Publication Publication Date Title
EP3942642A4 (en) Quasi-solid-state electrolyte composite based on three-dimensionally ordered macroporous metal-organic framework materials for lithoum secondary battery and method for manufacturing the same
CN204419190U (en) A kind of shield machine of variable diameter
CN104858542A (en) Vacuum electron beam welding method for thin-wall titanium alloy box structure with multiple cabin sections
CN103418969A (en) Special-shaped pipe fitting welding auxiliary clamp
CN104085502B (en) In in ship building, segment section construction method
EP3794270A4 (en) A hydrostatically compensated compressed gas energy storage system
CN107380343B (en) Shipbuilding method
EP4004631A4 (en) System and method for 3d pose measurement with high precision and real-time object tracking
CN204308503U (en) For the auxiliary welding tool of steel cylinder docking
CN205166279U (en) Welding frock of welding burst ball sealing head
CN105382438A (en) Novel oblique-inserted-pipe double-side welding groove and welding method
SG11202012290WA (en) Systems and method for hybrid energy storage
MX2019011409A (en) Welded joint manufacturing method, and welded joint.
CN204326327U (en) A kind of non-conventional glass curtain wall connection device
CN104439690A (en) Pressure welding method applied to valve rod
CN203751597U (en) Multi-section elbow positioning overlap welding mold
CN202901697U (en) Inner and outer coating plastic compound steel pipe with thick-walled stainless steel joints
CN204470862U (en) The accurate positioning welding frock of circular staving hush panel
WO2015004538A3 (en) Multilayer repair of thick wall vessels
CN103962737A (en) Horizontal welding joint welding technology of steel rib column with section shaped like Chinese character 'tong'
CN204917112U (en) Product transfer platform positioner
EP3942571A4 (en) Systems and methods for nuclear fusion
CN104565361A (en) End plug for mutual inductor
CN204075567U (en) A kind of inner flexible bracing or strutting arrangement for large-scale cylinder section component docking
CN204366338U (en) A kind of island robot welding system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160427

Termination date: 20180623