CN104060688A - Section steel lifting and supporting system for super high-rise steel structure, and construction method thereof - Google Patents

Section steel lifting and supporting system for super high-rise steel structure, and construction method thereof Download PDF

Info

Publication number
CN104060688A
CN104060688A CN201410179790.4A CN201410179790A CN104060688A CN 104060688 A CN104060688 A CN 104060688A CN 201410179790 A CN201410179790 A CN 201410179790A CN 104060688 A CN104060688 A CN 104060688A
Authority
CN
China
Prior art keywords
steel
support
girder
lifting
girder steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410179790.4A
Other languages
Chinese (zh)
Other versions
CN104060688B (en
Inventor
周观根
何云飞
程志敏
郭园园
游桂模
袁健
施海洋
沈梦英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Southeast Space Frame Co Ltd
Original Assignee
Zhejiang Southeast Space Frame Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Southeast Space Frame Co Ltd filed Critical Zhejiang Southeast Space Frame Co Ltd
Priority to CN201410179790.4A priority Critical patent/CN104060688B/en
Publication of CN104060688A publication Critical patent/CN104060688A/en
Application granted granted Critical
Publication of CN104060688B publication Critical patent/CN104060688B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a section steel lifting and supporting system, in particular to a section steel lifting and supporting system for a super high-rise steel structure, and a construction method thereof, which is applied to the technical field of construction steel structure construction. The section steel lifting and supporting system comprises a pair of steel columns distributed at an interval and a pair of section steel supports; an upper steel beam is arranged between the upper ends of the steel columns; a lower steel beam is arranged between the lower ends of the steel columns; the upper parts of the section steel supports are fixed to the upper steel beam; the lower parts of the section steel supports are fixed to the lower steel beam; the two section steel supports are distributed symmetrically; the section steel support are fixed to the upper steel beam, the lower steel beam and the steel columns in a supporting manner through connecting corbels; a pulley guy cable is arranged at each of the two ends of the bottom of the upper steel beam. The section steel lifting and supporting system for the super high-rise steel structure, and the construction method thereof are compact in structures, have relatively lower requirements on equipment, improve the construction efficiency, reduce construction costs, and improve the construction safety.

Description

The shaped steel of super high steel structure promotes support system and construction method thereof
Technical field
The present invention relates to a kind of shaped steel and promote support system, the shaped steel that relates in particular to a kind of super high steel structure promotes support system and construction method thereof, is applied to construction steel structure technical field of construction.
Background technology
In super high steel structure system, type steel support structure plays a part shear wall, bears most of lateral force, for reduce the horizontal movement of structure and improve structure internal force distribute very effective.
The general work progress of existing resistance of super high-rise steel structures is: steel column is first installed, is refilled girder steel, then support is installed and becomes a complete frame system, carry out on this basis the construction of steel floor, so circulation is until top layer.
The installation of type steel support is all to carry out after steel column steel girder erection completes, and this has just brought a series of problem:
1. within type steel support is generally diagonal to the framework of girder steel and steel column composition, when lifting, be difficult to once in placely, need to have assisted by other instruments, thereby expend more man power and material.
2. while supporting installation location, difficulty is higher, and danger is larger.
3. each root supports while installation all needs independent lifting, and for super high steel structure, lifting once often needs for a long time, even if hang in batch on middle mounting platform, also needs secondary hoisting, thereby construction period is extended greatly when installation.
Summary of the invention
The present invention solves the deficiencies in the prior art, a kind of compact conformation is provided, effectively solve that type steel support construction is difficult, a difficult problem for long construction period, make shaped steel lifting support system and the construction method thereof of the super high steel structure that the fireballing advantage of Construction of Steel Structure really embodied.
Above-mentioned technical problem of the present invention is mainly solved by following technical proposals:
A kind of shaped steel of super high steel structure promotes support system, comprise steel column and a pair of type steel support that pair of spaced distributes, between the upper end of described steel column, be provided with girder steel, between the lower end of described steel column, be provided with lower girder steel, the top of type steel support and upper girder steel fix, the bottom of type steel support and steel column and lower girder steel fix, two type steel supports are symmetry shape and distribute, between described type steel support and upper girder steel, the two ends of supporting mutually respectively fixing, described upper steel beam bottom between type steel support and lower girder steel and steel column by being connected bracket are respectively equipped with pulley drag-line.
As preferably, between described upper girder steel and steel column, between lower girder steel and steel column, type steel support is fastened by high-strength bolt respectively with being connected between bracket, splice mutually by connecting bracket on the top of two type steel supports, and described type steel support is skewed distribution.
As preferably, in described steel column, be provided with stiffener.
Super high steel structure shaped steel promotes the construction method of support system, carries out according to the following steps:
(1), reinforce temporarily:
On working platform, type steel support is fixed with temporary fixed bolt with the girder steel being connected with Deepen Design figure according to working drawing, temporary fixed bolt conventionally adopts common large hex bolts, and then with bracing means by an integral unit of type steel support and girder steel formation;
Bracing means can adopt double flute steel and be connected securing member composition, and bracing means must have enough rigidity can meet support and girder steel assembling every technical requirements of integral lifting afterwards;
Working platform refers to ground or middle operation platform, for easy to assembly, moulding bed need to be set temporarily;
(2), girder steel lifting:
After steel column installs, the integral unit after reinforcing is lifted by crane and according to the requirement of construction drawing, girder steel is installed in the position of regulation, lifting should have professional to operate, and before lifting, must try to hang, and confirms errorlessly can carry out operation;
(3), location is installed:
After steel girder erection is complete, bracing means is removed and is carried out the fixing and lifting of next unit, during this, just can utilize pulley drag-line instrument by type steel support be connected bracket and align, substitute temporary fixed bolt with high-strength bolt also fixing, now high-strength bolt only needs just to twist, applied force square To=0.065*Pc*d;
Pc is high-strength bolt pretension; D is the diameter of bolt;
After treating that the girder steel being connected with steel column all installs, high-strength bolt is twisted eventually, twist eventually and need complete first twisting in latter 24 hours, the moment Tc=k*Pc*d now applying, k is torque coefficient, then by the edge of a wing of type steel support and bracket welding.
Girder steel is the general designation of upper girder steel and lower girder steel.
Advantage of the present invention is:
1. type steel support and girder steel are assembled into an integral unit in advance, have reduced lifting number of times, improved construction machinery efficiency.
2. type steel support simple installation, the vacant time after installing girder steel just can tentatively align support, install, and greatly shortens construction period.
3. fastening devices can repeatedly be utilized, and has significantly reduced the danger of type steel support installation exercise.
Therefore, the shaped steel of super high steel structure of the present invention promotes support system and construction method thereof, and compact conformation is relatively low to equipment requirement, improves efficiency of construction, reduces construction cost, lifting construction safety.
Brief description of the drawings
Fig. 1 is the structural representation of integral unit in the present invention;
Fig. 2 is structural representation of the present invention.
Description of reference numerals: 1, steel column; 2, type steel support; 3, upper girder steel; 4, lower girder steel; 5, connect bracket; 6, pulley drag-line; 7, high-strength bolt; 8, stiffener; 9, bracing means; 10, temporary fixed bolt.
Detailed description of the invention
Below by embodiment, and by reference to the accompanying drawings, technical scheme of the present invention is described in further detail.
Embodiment 1: as depicted in figs. 1 and 2, a kind of shaped steel of super high steel structure promotes support system, comprise steel column 1 and a pair of type steel support 2 that pair of spaced distributes, between the upper end of described steel column 1, be provided with girder steel 3, between the lower end of described steel column 1, be provided with lower girder steel 4, the top of type steel support 2 and upper girder steel 3 fix, the bottom of type steel support 2 and steel column 1 and lower girder steel 4 fix, two type steel supports 2 are symmetry shape and distribute, between described type steel support 2 and upper girder steel 3, between type steel support 2 and lower girder steel 4 and steel column 1, support mutually fixing by being connected bracket 5 respectively, the two ends of described upper girder steel 3 bottoms are respectively equipped with pulley drag-line 6.
Between described upper girder steel 3 and steel column 1, between lower girder steel 4 and steel column 1, type steel support 2 is fastened by high-strength bolt 7 respectively with being connected between bracket 5, splice mutually by connecting bracket 5 on the top of two type steel supports 2, and described type steel support 2 is skewed distribution.In described steel column 1, be provided with stiffener 8.
Super high steel structure shaped steel promotes the construction method of support system, carries out according to the following steps:
(1), reinforce temporarily:
On working platform, type steel support is fixed with temporary fixed bolt with the girder steel being connected with Deepen Design figure according to working drawing, temporary fixed bolt conventionally adopts common large hex bolts, and then with bracing means by an integral unit of type steel support and girder steel formation;
Bracing means can adopt double flute steel and be connected securing member composition, and bracing means must have enough rigidity can meet support and girder steel assembling every technical requirements of integral lifting afterwards;
Working platform refers to ground or middle operation platform, for easy to assembly, moulding bed need to be set temporarily;
(2), girder steel lifting:
After steel column installs, the integral unit after reinforcing is lifted by crane and according to the requirement of construction drawing, girder steel is installed in the position of regulation, lifting should have professional to operate, and before lifting, must try to hang, and confirms errorlessly can carry out operation;
(3), location is installed:
After steel girder erection is complete, bracing means is removed and is carried out the fixing and lifting of next unit, during this, just can utilize pulley drag-line instrument by type steel support be connected bracket and align, substitute temporary fixed bolt with high-strength bolt also fixing, now high-strength bolt only needs just to twist, applied force square To=0.065*Pc*d;
Pc is high-strength bolt pretension; D is the diameter of bolt;
After treating that the girder steel being connected with steel column all installs, high-strength bolt is twisted eventually, twist eventually and need complete first twisting in latter 24 hours, the moment Tc=k*Pc*d now applying, k is torque coefficient, then by the edge of a wing of type steel support and bracket welding.

Claims (4)

1. the shaped steel of a super high steel structure promotes support system, it is characterized in that: comprise steel column (1) and a pair of type steel support (2) that pair of spaced distributes, between the upper end of described steel column (1), be provided with girder steel (3), between the lower end of described steel column (1), be provided with lower girder steel (4), the top of type steel support (2) and upper girder steel (3) fix, the bottom of type steel support (2) and steel column (1) and lower girder steel (4) fix, two type steel supports (2) are symmetry shape and distribute, between described type steel support (2) and upper girder steel (3), between type steel support (2) and lower girder steel (4) and steel column (1), support mutually fixing by being connected bracket (5) respectively, the two ends of described upper girder steel (3) bottom are respectively equipped with pulley drag-line (6).
2. the shaped steel of super high steel structure according to claim 1 promotes support system, it is characterized in that: between described upper girder steel (3) and steel column (1), between lower girder steel (4) and steel column (1), type steel support (2) is fastened by high-strength bolt (7) respectively with being connected between bracket (5), splice mutually by connecting bracket (5) on the top of two type steel supports (2), and described type steel support (2) is skewed distribution.
3. the shaped steel of super high steel structure according to claim 1 and 2 promotes support system, it is characterized in that: in described steel column (1), be provided with stiffener (8).
4. super high steel structure shaped steel according to claim 1 and 2 promotes the construction method of support system, it is characterized in that carrying out according to the following steps:
(1), reinforce temporarily:
On working platform, type steel support is fixed with temporary fixed bolt with the girder steel being connected with Deepen Design figure according to working drawing, temporary fixed bolt conventionally adopts common large hex bolts, and then with bracing means by an integral unit of type steel support and girder steel formation;
Bracing means can adopt double flute steel and be connected securing member composition, and bracing means must have enough rigidity can meet support and girder steel assembling every technical requirements of integral lifting afterwards;
Working platform refers to ground or middle operation platform, for easy to assembly, moulding bed need to be set temporarily;
(2), girder steel lifting:
After steel column installs, the integral unit after reinforcing is lifted by crane and according to the requirement of construction drawing, girder steel is installed in the position of regulation, lifting should have professional to operate, and before lifting, must try to hang, and confirms errorlessly can carry out operation;
(3), location is installed:
After steel girder erection is complete, bracing means is removed and is carried out the fixing and lifting of next unit, during this, just can utilize pulley drag-line instrument by type steel support be connected bracket and align, substitute temporary fixed bolt with high-strength bolt also fixing, now high-strength bolt only needs just to twist, applied force square To=0.065*Pc*d;
Pc is high-strength bolt pretension; D is the diameter of bolt;
After treating that the girder steel being connected with steel column all installs, high-strength bolt is twisted eventually, twist eventually and need complete first twisting in latter 24 hours, the moment Tc=k*Pc*d now applying, k is torque coefficient, then by the edge of a wing of type steel support and bracket welding.
CN201410179790.4A 2014-04-30 2014-04-30 Super high steel structure shaped steel promotes the construction method of a support system Active CN104060688B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410179790.4A CN104060688B (en) 2014-04-30 2014-04-30 Super high steel structure shaped steel promotes the construction method of a support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410179790.4A CN104060688B (en) 2014-04-30 2014-04-30 Super high steel structure shaped steel promotes the construction method of a support system

Publications (2)

Publication Number Publication Date
CN104060688A true CN104060688A (en) 2014-09-24
CN104060688B CN104060688B (en) 2016-06-08

Family

ID=51548602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410179790.4A Active CN104060688B (en) 2014-04-30 2014-04-30 Super high steel structure shaped steel promotes the construction method of a support system

Country Status (1)

Country Link
CN (1) CN104060688B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625732A (en) * 2015-12-30 2016-06-01 常州第一建筑集团有限公司 Supporting-free construction method of ultrahigh overhung steel-structure truss

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282691A (en) * 1999-03-30 2000-10-10 Sumitomo Heavy Ind Ltd Construction method for mounting member on inner wall of high-rise, tower structure, and scaffold device
CN101260692A (en) * 2008-04-11 2008-09-10 广厦建设集团有限责任公司 Earthquake-free steel support system
CN101864846A (en) * 2010-06-18 2010-10-20 北京工业大学 Embedded shock-absorbing steel frame for seismic reinforcement
CN103696498A (en) * 2013-12-19 2014-04-02 北京工业大学 Novel post-earthquake easy-to-repair steel irregular column- center support
CN203866962U (en) * 2014-04-30 2014-10-08 浙江东南网架股份有限公司 Profile steel lifting and supporting system of super high-rise steel structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282691A (en) * 1999-03-30 2000-10-10 Sumitomo Heavy Ind Ltd Construction method for mounting member on inner wall of high-rise, tower structure, and scaffold device
CN101260692A (en) * 2008-04-11 2008-09-10 广厦建设集团有限责任公司 Earthquake-free steel support system
CN101864846A (en) * 2010-06-18 2010-10-20 北京工业大学 Embedded shock-absorbing steel frame for seismic reinforcement
CN103696498A (en) * 2013-12-19 2014-04-02 北京工业大学 Novel post-earthquake easy-to-repair steel irregular column- center support
CN203866962U (en) * 2014-04-30 2014-10-08 浙江东南网架股份有限公司 Profile steel lifting and supporting system of super high-rise steel structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625732A (en) * 2015-12-30 2016-06-01 常州第一建筑集团有限公司 Supporting-free construction method of ultrahigh overhung steel-structure truss

Also Published As

Publication number Publication date
CN104060688B (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN105780925B (en) Truss-hanging combined system installation construction method
CN102561669B (en) Cantilever scaffold and construction method thereof
CN106812328B (en) The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer
CN104005569A (en) Construction method for supporting beam and removing columns
CN107476561A (en) A kind of attachment type raise scaffold and its construction
CN105780922A (en) Construction method for segmental formwork hoisting system of large-span steel reinforced concrete transfer truss
CN105804400A (en) Curved surface net frame lifting construction method
CN204385883U (en) A kind of Fabricated balcony
CN103266799B (en) Mast and installation technology thereof
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN113387281A (en) Alternate conversion attachment system of externally attached tower crane and construction method
CN106567542A (en) Super high-rise double tower building steel structure corridor assembling method
CN104060688A (en) Section steel lifting and supporting system for super high-rise steel structure, and construction method thereof
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN107013044A (en) The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof
CN201825672U (en) Lifting device for generator stator
CN203866962U (en) Profile steel lifting and supporting system of super high-rise steel structure
CN207109843U (en) A kind of goaf transmission line foundation bracing means
CN202519621U (en) Steel hoop used for suspending support system
CN104499565A (en) Assembled balcony
CN109083408A (en) A kind of shear wall pours device for fixing module and construction method
CN103266777A (en) Large-span prestress double-arch frame hoisting process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant