CN104037622A - Two-in and two-out sectionalized power distribution station - Google Patents

Two-in and two-out sectionalized power distribution station Download PDF

Info

Publication number
CN104037622A
CN104037622A CN201410124522.2A CN201410124522A CN104037622A CN 104037622 A CN104037622 A CN 104037622A CN 201410124522 A CN201410124522 A CN 201410124522A CN 104037622 A CN104037622 A CN 104037622A
Authority
CN
China
Prior art keywords
switch
busbar
section
voltage
distribution station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410124522.2A
Other languages
Chinese (zh)
Inventor
游兆阳
谢邦鹏
孙阳盛
陈雪瓅
冯蓓艳
都泓蔚
张恺伦
郑雨翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201410124522.2A priority Critical patent/CN104037622A/en
Publication of CN104037622A publication Critical patent/CN104037622A/en
Pending legal-status Critical Current

Links

Landscapes

  • Patch Boards (AREA)

Abstract

本发明提供一种两进两出带分段的PT2型配电站,两路10kV进线分别连通10kV一段、二段母线,还通过各自的SF6负荷闸刀分别连通1号、2号变压器,并为通过相应的0.4kV进线开关与相应变压器连接的0.4kV一段母线及其多条出线,和0.4kV二段母线及其多条出线供电;所述10kV一段母线与10kV二段母线之间通过10kV分段开关连接;所述0.4kV一段母线与0.4kV二段母线之间通过0.4kV分段开关连接。所述SF6负荷闸刀设置于SF6环网柜,所述0.4kV进线开关设置于GGD柜。本发明能够在不改变原有规模和主接线方式的前提下,对配电站一次设备进行更换,有利于提高设备的健康水平和安全运行水平,减少检修、维护的工作量,提高供电可靠性。

The present invention provides a PT2-type distribution station with two inlets and two outlets with segments. The two 10kV incoming lines are respectively connected to the 10kV first-stage and second-stage busbars, and are also connected to No. 1 and No. 2 transformers through their respective SF6 load switches. And supply power for the 0.4kV first-section busbar and its multiple outgoing lines connected to the corresponding transformer through the corresponding 0.4kV incoming line switch, and the 0.4kV second-section busbar and its multiple outgoing lines; between the 10kV first-section busbar and the 10kV second-section busbar It is connected through a 10kV sub-section switch; the 0.4kV first-section bus and the 0.4kV second-section bus are connected through a 0.4kV sub-section switch. The SF6 load switch is set in the SF6 ring network cabinet, and the 0.4kV incoming line switch is set in the GGD cabinet. The invention can replace the primary equipment of the distribution station without changing the original scale and main wiring mode, which is beneficial to improve the health level and safe operation level of the equipment, reduce the workload of inspection and maintenance, and improve the reliability of power supply .

Description

A kind of two enter the power distribution station of scene 2 band segmentation
Technical field
The present invention relates to power distribution field, particularly a kind of two enter the PT2 type power distribution station of scene 2 band segmentation.
Background technology
To shopping centre and residential building when power supply, user generally requires higher to power supply reliability.Some power distribution stations that put into operation in the nineties, main electrical scheme adopts two to enter the mode of scene 2 band segmentation.
As shown in Figure 1, a road 10kV inlet wire is connected to transformer No. 1 through switch S 1, switch S 11, and another road 10kV inlet wire is connected to transformer No. 2 through switch S 2, switch S 21, and mono-section, two sections buses of 10kV connect by two block switch S3 and lead-in wire.The 10kV inlet wire side of mono-, two sections of bus places of 10kV and No. 1, No. 2 transformer is respectively arranged with lightning arrester.Afterwards, No. 1 transformer is powered for the mono-section of bus of 0.4kV and six outlets thereof that are attached thereto by switch S 14, and No. 2 transformers are that bis-sections of buses of 0.4kV and six outlets thereof that are attached thereto by switch S 24 are powered; Mono-section, two sections buses of 0.4kV connect by block switch S31 and lead-in wire; No. 1, No. 2 0.4kV capacitors are connected to respectively mono-section of 0.4kV, two sections of buses by capacitor switch separately.
Fig. 2 is the floor plan of existing power distribution station, establishes two low voltage incoming line cabinets 1, six low-pressure line-outgoing cabinets 2, two capacitor box 3 and a low pressure segmentation cabinet 4 and place the relevant device of 0.4kV side in low-pressure chamber.In hyperbaric chamber, place four high-voltage boards 6, place the related device of above-mentioned 10kV side.No. 1 and No. 2 transformers connect corresponding high-voltage board 6 and low voltage incoming line cabinet 1 by some cables.
Yet, equipment outmoded (conventionally using the high-voltage board of GG1A type and the low-voltage cabinet of PGL) in above-mentioned existing power distribution station, without standby redundancy, power supply reliability is poor, is difficult to meet growing electricity consumption requirement.And power distribution station to the power supply of shopping centre and residential building is limited by often in place, be difficult to expansion scale, transformation difficulty is large.
Summary of the invention
The object of this invention is to provide a kind of two and enter the PT2 type power distribution station of scene 2 band segmentation, not changing under the prerequisite of original scale and main wiring mode, power distribution station primary equipment is changed, to improve equipment power supply reliability.
In order to achieve the above object, technical scheme of the present invention is to provide a kind of two and enters the PT2 type power distribution station of scene 2 band segmentation, and it comprises:
One road 10kV inlet wire is communicated with mono-section of bus of 10kV, also by a set of SF6 load plug-in strip, is communicated with No. 1 transformer, and the mono-section of bus of 0.4kV and many outlets thereof that convert to after 0.4kV as being connected to by a set of 0.4kV service entrance switch after No. 1 transformer are powered;
Another road 10kV inlet wire is communicated with bis-sections of buses of 10kV, also by another set of SF6 load plug-in strip, is communicated with No. 2 transformers, and the bis-sections of buses of 0.4kV and many outlets thereof that convert to after 0.4kV as being connected to by another set of 0.4kV service entrance switch after No. 2 transformers are powered;
Between bis-sections of buses of mono-section of bus of described 10kV and 10kV, by 10kV block switch, be connected; Between bis-sections of buses of mono-section of bus of described 0.4kV and 0.4kV, by 0.4kV block switch, be connected.
Preferably, described SF6 load plug-in strip is arranged at SF6 ring main unit;
Described 0.4kV service entrance switch is arranged at GGD cabinet.
Preferably, one end of described SF6 load plug-in strip is connected with 10kV inlet wire by copper bus-bar, this SF6 load plug-in strip other end is by after fuse, current transformer minute two-way, leads up to capacity earth, and another road is connected to leading-out terminal and is connected to No. 1 or No. 2 transformers by outlet cable.
Preferably, one end of described SF6 load plug-in strip is connected with 10kV inlet wire by copper bus-bar, and this SF6 load plug-in strip other end is by Fen San road after current transformer, and two-way is connected to respectively electric capacity and the lightning arrester of ground connection, and another road is connected to leading-out terminal.
Preferably, the neutral ground form of No. 1, No. 2 transformer is direct ground connection; The 10kV side of No. 1, No. 2 transformer is installed respectively one group of lightning arrester.
Preferably, in each outlet of mono-section of bus of 0.4kV and bis-sections of buses of 0.4kV, be respectively equipped with outlet switch;
Two group capacitors, by corresponding capacitor switch, are connected to respectively mono-section of bus of described 0.4kV and bis-sections of buses of 0.4kV; Each 0.4kV service entrance switch, 0.4kV block switch, outlet switch, capacitor switch are all the vacuum circuit-breakers that are arranged at GGD cabinet.
Preferably, two groups of high-voltage boards that SF6 load plug-in strip is set are respectively positioned at hyperbaric chamber;
The low voltage incoming line cabinet of two relative set 0.4kV service entrance switchs, the low-pressure line-outgoing cabinet of six relative set outlet switchs, two capacitor panels, a low pressure segmentation cabinet that 0.4kV block switch is set are positioned at low-pressure chamber;
No. 1, No. 2 transformers, by corresponding line cable, access respectively the high-voltage board in hyperbaric chamber, and by the low voltage incoming line cabinet of low pressure copper busbar access low-pressure chamber.
Compared with prior art, PT2 type power distribution station provided by the invention, do not changing under the prerequisite of original scale and electrical wiring mode, power distribution station primary equipment is changed, SF6 load plug-in strip is set and is equipped with SF6 warning device, be conducive to improve the general level of the health and the safety operation level of equipment, the workload of reduce maintenance, safeguarding, improves power supply reliability.
Accompanying drawing explanation
Fig. 1 is the electrical wiring schematic diagram of existing power distribution station;
Fig. 2 is the floor plan of existing power distribution station;
Fig. 3 is 10kV electrical wiring schematic diagram in PT2 type power distribution station of the present invention;
Fig. 4 is 0.4kV electrical wiring schematic diagram in PT2 type power distribution station of the present invention;
Fig. 5 is the floor plan of power distribution station of the present invention.
Embodiment
As shown in Figure 3,4, the invention provides a kind of PT2 type power distribution station (PT2 type, with the looped network power distribution station of 2 transformers and 10kV outlet), main electrical scheme still adopts two to enter the mode of scene 2 band segmentation, and 0.4kV wiring adopts single-trunk segmental wiring mode.That is, mono-section of bus of No. 1 transformer, 0.4kV that a road 10kV inlet wire is 10kV/0.4kV and six outlet power supplies thereof, bis-sections of buses of No. 2 transformers, 0.4kV that another road 10kV inlet wire is 10kV/0.4kV and six outlet power supplies thereof.Between mono-section, two sections buses of 10kV, by 10kV block switch and lead-in wire, connect; Between mono-section, two sections buses of 0.4kV, by 0.4kV block switch and lead-in wire, connect.
Two groups of 10kV high-voltage boards are positioned at hyperbaric chamber, adopt respectively SF6 load plug-in strip to be communicated with or disconnect corresponding 10kV inlet wire.In this example, above-mentioned 10kV high-voltage board adopts SF6 ring main unit as shown in Figure 3, wherein, there are two switch cubicles to use following device mode to arrange: wherein one end of SF6 load plug-in strip is connected with 10kV inlet wire by copper bus-bar, this SF6 load plug-in strip other end is leaded up to capacity earth after by fuse, current transformer, and another road is connected to leading-out terminal and further by outlet cable, is connected to No. 1 or No. 2 transformers; In each switch cubicle, be also provided with SF6 pressure indicator, capacitance voltage indicating device, display device for short circuit, three position switch auxiliary contact, gas pressure auxiliary contact, fuse auxiliary contact, etc.
Also having in four switch cubicles uses following another kind of device arrangements mode: SF6 to load plug-in strip by current transformer Hou Fen tri-tunnels, be connected to respectively electric capacity and the lightning arrester of leading-out terminal and ground connection, can connect corresponding transformer by leading-out terminal, or (the SF6 load plug-in strip of arranging such as above-mentioned front a kind of mode is as 10kV service entrance switch to be connected to meet different wiring needs from device in other switch cubicles, the SF6 load plug-in strip that rear a kind of mode is arranged is as connecting the switch of lightning arrester or the block switch on bus etc., cooperatively interact the connection plan shown in design of graphics 1 etc.).
Current period short circuit current level with reference to early stage equipment select, 10kV short circuit current level is pressed 20kA and is considered.Preferably the parameter of load plug-in strip is as follows: rated voltage 12 kV, rated current 630 A, nominal short-circuit capacity 346 MVA, specified drop-out current 20 kA, moving drop-out current peak value 50 kA, 4 seconds heat-stable current 20 kA of stablizing.
In addition, in conjunction with primary equipment transformation, corresponding line cable has been done to reconfiguration, all used flame retardant cable.For example, at 10kV side inlet wire, adopt ZA-YJV-8.7/10-3X70 cable, 10kV distribution transforming outlet adopts ZA-YJV-8.7/10-3X70 cable.Each position in storehouse primary equipment ground connection is used 5*40 band iron, and is connected with indoor ground connection main line.
No. 1 transformer and No. 2 transformers are two 10kV/0.4kV transformers, lay respectively at distribution transforming chamber No. 1, No. 2, and these two transformers are incited somebody to action respectively 10kV primary voltage separately and changed 0.4kV output into, and transformer neutral point ground connection form is direct ground connection.The 10kV inlet wire side of No. 1, No. 2 transformer is respectively installed one group of lightning arrester, plays lightning protection effect.
As shown in Figure 4, the switch of all 0.4kV sides all adopts the 0.4kV voltage switchgear that is positioned at 0.4kV switch gear room, and each switch all adopts vacuum circuit-breaker, can be communicated with or disconnect corresponding outlet or its power pack.In this power distribution station of the present invention, be provided with altogether 2 0.4kV service entrance switchs, 12 outlet switchs, 2 capacitor switches, 1 0.4kV block switch.
That is, the 0.4kV low-pressure side of No. 1 transformer is connected to mono-section of bus of 0.4kV by 0.4kV service entrance switch Q14, current transformer, in 6 outlets dividing into, corresponding outlet switch Q15 and current transformer is set separately; The 0.4kV low-pressure side of No. 2 transformers is connected to bis-sections of buses of 0.4kV by 0.4kV service entrance switch Q24, current transformer, divides in other 6 outlets corresponding outlet switch Q25 and current transformer are set separately; Between mono-section, two sections buses of 0.4kV, establish 0.4kV block switch Q31 and lead-in wire.
Two group capacitors (240kVar) play inactive power compensation, are arranged on respectively in two capacitor panels, by corresponding capacitor switch Q26, are connected to respectively mono-section of 0.4kV, two sections of buses.
Be the floor plan of power distribution station of the present invention as shown in Figure 5, two groups of totally six 10kV high-voltage board 6(SF6 ring main units) be positioned at hyperbaric chamber.The 0.4kV low voltage incoming line cabinet 1(of two relative set 0.4kV service entrance switchs is as GGD2-02), the 0.4kV low-pressure line-outgoing cabinet 2(of six relative set outlet switchs is as GGD2-38), two capacitor panel 3(are as GGD), a low pressure segmentation cabinet 4(that 0.4kV block switch is set is as GGD2-02) and some low pressure copper busbars 5(TMY-100 * 10) be positioned at low-pressure chamber.No. 1 transformer and No. 2 transformers are connected to the relevant device in hyperbaric chamber and low-pressure chamber by turnover cable separately.
According to the filthy rank of site, the creepage of current period engineering equipment selected by III level than distance, and 10V and following equipment are creepage than considering by 31mm/kV apart from outdoor, and the indoor 25mm/kV that presses considers.Below newly-increased each electrical room and protection screen screen cabinet, and Cable Reformation, related cable interlayer, floor through walls, wall, cabinet, dish place has cable cavern and gap to carry out fireproof blocking when newly-increased.And adopt fire prevention band to paste or painting fireproof paint the cable sheath within the scope of each 1m of shutoff place both sides.
As shown in Fig. 2, Fig. 5, in this example, can in Nei Dui hyperbaric chamber, existing site, transform with low pressure indoor equipment, without other expropriation of land.
In sum, PT2 type power distribution station provided by the invention, do not changing under the prerequisite of original scale and electrical wiring mode, power distribution station primary equipment is changed, SF6 load plug-in strip is set and is equipped with SF6 warning device, be conducive to improve the general level of the health and the safety operation level of equipment, the workload of reduce maintenance, safeguarding, improves power supply reliability.
Although content of the present invention has been done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.Those skilled in the art, read after foregoing, for multiple modification of the present invention with to substitute will be all apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (7)

1.一种两进两出带分段的PT2型配电站,其特征在于,包含: 1. A PT2 type substation with two inputs and two outputs with segments, characterized in that it includes: 一路10kV进线连通10kV一段母线,还通过一套SF6负荷闸刀连通1号变压器,转换成0.4kV后为通过一套0.4kV进线开关连接在1号变压器之后的0.4kV一段母线及其多条出线供电; One 10kV incoming line is connected to a 10kV section of busbar, and is also connected to No. 1 transformer through a set of SF6 load switch. After conversion to 0.4kV, it is connected to a 0.4kV section of busbar and its multi-section after No. 1 transformer through a set of 0.4kV incoming line switch. outlet power supply; 另一路10kV进线连通10kV二段母线,还通过另一套SF6负荷闸刀连通2号变压器,转换成0.4kV后为通过另一套0.4kV进线开关连接在2号变压器之后的0.4kV二段母线及其多条出线供电; Another 10kV incoming line is connected to the 10kV second-section busbar, and it is also connected to the No. 2 transformer through another set of SF6 load switch. Segment busbar and its multiple outgoing lines supply power; 所述10kV一段母线与10kV二段母线之间通过10kV分段开关连接;所述0.4kV一段母线与0.4kV二段母线之间通过0.4kV分段开关连接。 The first 10kV busbar is connected to the second 10kV busbar through a 10kV sectional switch; the first 0.4kV busbar is connected to the second 0.4kV busbar through a 0.4kV sectional switch. 2.如权利要求1所述的PT2型配电站,其特征在于, 2. The PT2 type distribution station as claimed in claim 1, characterized in that, 所述SF6负荷闸刀设置于SF6环网柜; The SF6 load switch is set in the SF6 ring network cabinet; 所述0.4kV进线开关设置于GGD柜。 The 0.4kV incoming line switch is set in the GGD cabinet. 3.如权利要求2所述的PT2型配电站,其特征在于, 3. The PT2 type distribution station as claimed in claim 2, characterized in that, 所述SF6负荷闸刀的一端通过铜母排与10kV进线连接,该SF6负荷闸刀另一端通过熔断器、电流互感器之后分两路,一路通过电容接地,另一路则连接至出线端并通过出线电缆连接至1号或2号变压器。 One end of the SF6 load switch is connected to the 10kV incoming line through a copper busbar. The other end of the SF6 load switch is divided into two circuits after passing through a fuse and a current transformer. One is grounded through a capacitor, and the other is connected to the outlet terminal and Connect to Transformer No. 1 or No. 2 via outgoing cable. 4.如权利要求2所述的PT2型配电站,其特征在于, 4. PT2 type distribution station as claimed in claim 2, is characterized in that, 所述SF6负荷闸刀的一端通过铜母排与10kV进线连接,该SF6负荷闸刀另一端通过电流互感器之后分三路,两路分别连接至接地的电容和避雷器,另一路连接至出线端。 One end of the SF6 load switch is connected to the 10kV incoming line through a copper busbar, and the other end of the SF6 load switch is divided into three circuits after passing through a current transformer, two of which are respectively connected to the grounded capacitor and lightning arrester, and the other is connected to the outgoing line end. 5.如权利要求1-4中任意一项所述的PT2型配电站,其特征在于, 5. The PT2 type distribution station according to any one of claims 1-4, characterized in that, 1号、2号变压器的中性点接地形式为直接接地;1号、2号变压器的10kV侧分别安装一组避雷器。 The neutral point grounding form of No. 1 and No. 2 transformers is direct grounding; a set of arresters are respectively installed on the 10kV sides of No. 1 and No. 2 transformers. 6.如权利要求5所述的PT2型配电站,其特征在于, 6. The PT2 type distribution station as claimed in claim 5, characterized in that, 0.4kV一段母线和0.4kV二段母线的每个出线上分别设有出线开关; Each outgoing line of the 0.4kV first-section bus and 0.4kV second-section bus is respectively equipped with an outlet switch; 两组电容器通过相应的电容器开关,分别连接至所述0.4kV一段母线和0.4kV二段母线;各个0.4kV进线开关、0.4kV分段开关、出线开关、电容器开关均是设置于GGD柜的真空断路器。 The two sets of capacitors are respectively connected to the 0.4kV first-stage busbar and the 0.4kV second-stage busbar through corresponding capacitor switches; each 0.4kV incoming line switch, 0.4kV sectional switch, outgoing line switch, and capacitor switch are all set in the GGD cabinet Vacuum circuit breaker. 7.如权利要求6所述的PT2型配电站,其特征在于, 7. The PT2 type distribution station as claimed in claim 6, characterized in that, 两组分别设置SF6负荷闸刀的高压柜位于高压室内; Two sets of high-voltage cabinets respectively equipped with SF6 load switch blades are located in the high-voltage chamber; 两台相应设置0.4kV进线开关的低压进线柜、六台相应设置出线开关的低压出线柜、两台电容器柜、一台设置0.4kV分段开关的低压分段柜位于低压室内; Two low-voltage incoming cabinets with 0.4kV incoming switches, six low-voltage outgoing cabinets with outgoing switches, two capacitor cabinets, and one low-voltage section cabinet with 0.4kV section switches are located in the low-voltage room; 1号、2号变压器通过相应的进出线电缆,分别接入高压室的高压柜,以及通过低压铜母线接入低压室的低压进线柜。 Transformers No. 1 and No. 2 are respectively connected to the high-voltage cabinet in the high-voltage room through corresponding incoming and outgoing cables, and connected to the low-voltage incoming cabinet in the low-voltage room through low-voltage copper bus bars.
CN201410124522.2A 2014-03-31 2014-03-31 Two-in and two-out sectionalized power distribution station Pending CN104037622A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410124522.2A CN104037622A (en) 2014-03-31 2014-03-31 Two-in and two-out sectionalized power distribution station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410124522.2A CN104037622A (en) 2014-03-31 2014-03-31 Two-in and two-out sectionalized power distribution station

Publications (1)

Publication Number Publication Date
CN104037622A true CN104037622A (en) 2014-09-10

Family

ID=51468295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410124522.2A Pending CN104037622A (en) 2014-03-31 2014-03-31 Two-in and two-out sectionalized power distribution station

Country Status (1)

Country Link
CN (1) CN104037622A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108963840A (en) * 2018-05-31 2018-12-07 海宁市金能电力实业有限公司 A method of it is designed with electrical engineering massive quantity power supply and measurement
CN110265880A (en) * 2019-05-20 2019-09-20 杭州市电力设计院有限公司 Single bus segment ring distributed structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1334627A (en) * 2001-08-17 2002-02-06 清华大学 Relay protection and failure location system for power distribution network
CN103457262A (en) * 2013-08-20 2013-12-18 国家电网公司 Energy-saving and cost-reducing power source double-loop grid knot line system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1334627A (en) * 2001-08-17 2002-02-06 清华大学 Relay protection and failure location system for power distribution network
CN103457262A (en) * 2013-08-20 2013-12-18 国家电网公司 Energy-saving and cost-reducing power source double-loop grid knot line system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘振亚: "《国家电网公司输变电工程典型设计10kV配电工程分册》", 31 March 2007, article "第30章10kV配电站典型设计(方案PB-8)" *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108963840A (en) * 2018-05-31 2018-12-07 海宁市金能电力实业有限公司 A method of it is designed with electrical engineering massive quantity power supply and measurement
CN110265880A (en) * 2019-05-20 2019-09-20 杭州市电力设计院有限公司 Single bus segment ring distributed structure

Similar Documents

Publication Publication Date Title
RU2414786C2 (en) Power distribution system with individually isolated functional zones
CN106159787A (en) A kind of closed gas insulated switch cabinet
CN101577400A (en) Chamber type liaison transforming plant reduced by 0.4kV from 20kV/10KV
CN101150246B (en) 110kV and higher modular transformer substation and its construction method
CN103840380A (en) PT2 type power distribution station
CN203813223U (en) A comprehensive automatic substation
CN104037622A (en) Two-in and two-out sectionalized power distribution station
CN103840378A (en) Improved PT1 type power distribution station
WO2009138461A3 (en) A transformation substation
CN203826781U (en) PT2 power distribution station
CN203813217U (en) An Improved PT1 Distribution Substation
CN207896531U (en) Extra-high voltage alternating current transformer substation
CN203813222U (en) A PT2 type substation with two inputs and two outputs with segments
CN203813221U (en) A PT1 type distribution station
CN110380340A (en) A kind of transformer substation power distribution unit
CN104868391A (en) Outdoor transformer substation
CN205029223U (en) Movable type transformer station
CN106451435A (en) Distribution control system
CN105356306A (en) Mounting structure for grouping automatic switching compensation cabinet
Hu Electrical distribution equipment in data center environments
CN205429545U (en) Indoor metal armored movable -type flat top type cubical switchboard
EP2408075A1 (en) Air-insulated switchgear
CN205407086U (en) Indoor metal armored movable -type height type cubical switchboard
CN110165563A (en) A kind of 220kV HGIS power distribution equipment applied to substation's single-trunk segmental wiring
CN203039274U (en) Compact-space substation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140910