CN103991826A - Hanging rod lifting device - Google Patents

Hanging rod lifting device Download PDF

Info

Publication number
CN103991826A
CN103991826A CN201410246077.7A CN201410246077A CN103991826A CN 103991826 A CN103991826 A CN 103991826A CN 201410246077 A CN201410246077 A CN 201410246077A CN 103991826 A CN103991826 A CN 103991826A
Authority
CN
China
Prior art keywords
suspension rod
lifting
support
base plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410246077.7A
Other languages
Chinese (zh)
Other versions
CN103991826B (en
Inventor
李开
孙巨伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201410246077.7A priority Critical patent/CN103991826B/en
Publication of CN103991826A publication Critical patent/CN103991826A/en
Application granted granted Critical
Publication of CN103991826B publication Critical patent/CN103991826B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a hanging rod lifting device which comprises a bottom plate, two supporting bases arranged on the two sides of the upper end of the bottom plate, an adjusting plate with the bottom installed on the supporting bases through a hinge pin II in a rotating mode, an ejecting support arranged at the upper end of the bottom plate, and two jacks arranged below the ejecting support and located on the two sides of the bottom plate. Two movable connecting devices are fixed to the lower end of the ejecting support. The sliding plate is fixed in the movable connecting devices in a sliding mode. A hole with the diameter larger than the outer diameter of a hanging rod is formed in the middle of the bottom plate. The hanging rod penetrates through the hole and is then locked through a nut. The hanging rod can drive the ejecting support to rise or fall through the jacks after being fixed to the bottom plate through a nut. The movable connecting devices drive the bottom plate through the adjusting plate to drive the hanging rod so that the ejecting support can rise and fall, and therefore the elevation of devices under the hanging rod can be conveniently adjusted. Thus, the defect that a traditional chain block can not be conveniently adjusted is overcome, and safety is improved.

Description

Suspension rod bont
Technical field
The present invention relates to hanging apparatus suspension rod elevated height device.
Background technology
The heat distribution pipeline in the field such as factory, building, the suspension bracket of equipment must be adjusted the absolute altitude of equipment under its suspension rod after installing, by adjusting the suspension rod of suspension bracket, just realizing equipment under suspension rod reaches designed elevation, adjusting at present suspension rod and equipment absolute altitude generally adopts chain and tackle block that the device height under suspension rod is promoted, then at the height of adjusting suspension rod, the method operation is more, can not disposable equipment absolute altitude be adjusted, workmen need repeatedly adjust check equipment and suspension rod absolute altitude, operation is loaded down with trivial details, and dangerous large.
Summary of the invention
The present invention is in order to overcome the deficiency of above technology, provide a kind of adjustment quick, assemble suspension rod bont flexibly.
The present invention overcomes the technical scheme that its technical matters adopts:
This suspension rod bont, two bearings, bottom that comprise base plate, are installed on both sides, base plate upper end are rotated the regulating plate that is installed on bearing, are arranged at the lifting-up support of base plate upper end and are arranged at lifting-up support below and be positioned at two jacks of base plate both sides by bearing pin II, described lifting-up support lower end is fixed with two articulating devices, described regulating plate is slidably fixed in articulating device, the middle part of described base plate is provided with the hole that diameter is greater than suspension rod external diameter, and suspension rod is through passing through nut locking behind hole.
Above-mentioned articulating device comprises two slide plate groups that are individually fixed in lifting-up support lower end, described each slide plate group is made up of two connecting panels that are vertically installed on lifting-up support lower end and be parallel to each other, spacing between two connecting panels in described each slide plate group and the gauge of regulating plate match, described connecting panel and regulating plate are respectively arranged with some pin-and-holes from top to bottom, and described regulating plate slides to be plugged in slide plate group and by bearing pin I and inserts in pin-and-hole and be connected and fixed.
For the convenient suspension rod that is suitable for different size, above-mentioned bearing is installed on base plate by bolt.
In order to shorten return trip time, above-mentioned jack is lifting screw.
In order to improve driving efficiency, above-mentioned jack is hydraulic jack.
In order to prevent that bearing pin from departing from, the tail end of above-mentioned bearing pin II is provided with spring cotter II.
In order to prevent that bearing pin from departing from, the tail end of above-mentioned bearing pin I is provided with spring cotter I.
The invention has the beneficial effects as follows: after suspension rod is fixed on base plate by nut, can drive lifting-up support to promote or landing by jack, the lifting of lifting-up support utilizes regulating plate to drive base plate to drive suspension rod to realize by articulating device and promotes or landing, realized easily the adjustment work of equipment absolute altitude under suspension rod.Due to this suspension rod bont assembling flexibly and adjust regulating plate connecting length therein by articulating device, the lifting of suspension rod that can different size easy to use.Therefore overcome the inconvenience that traditional chain block is adjusted, and improved safety.
Brief description of the drawings
Fig. 1 is main TV structure schematic diagram of the present invention;
Fig. 2 is side-looking structural representation of the present invention;
In figure, 1. lifting-up support 2. jack 3. connecting panel 4. bearing pin I 5. spring cotter I 6. regulating plate 7. base plate 8. hole 9. suspension rod 10. nut 11. bearing 12. bolt 13. bearing pin II 14. spring cotter II 15. pin-and-holes.
Detailed description of the invention
Below in conjunction with accompanying drawing 1, the present invention will be further described for accompanying drawing 2.
This suspension rod bont, two bearings 11, bottom that comprise base plate 7, are installed on base plate 7 both sides, upper end are rotated the regulating plate 6 that is installed on bearing 11, are arranged at the lifting-up support 1 of base plate 7 upper ends and are arranged at lifting-up support 1 below and be positioned at two jacks 2 of base plate 7 both sides by bearing pin II 13, lifting-up support 1 lower end is fixed with two articulating devices, regulating plate 6 is slidably fixed in articulating device, the middle part of base plate 7 is provided with the hole 8 that diameter is greater than suspension rod 9 external diameters, and suspension rod 9 is rear by nut 10 lockings through hole 8.After suspension rod 9 is fixed on base plate 7 by nut 10, can drive lifting-up support 1 promote or land by jack 2, the lifting of lifting-up support 1 utilizes regulating plate 6 to drive base plate 7 to drive suspension rod 9 to realize by articulating device and promotes or landing, realized easily the adjustment work of 9 times equipment absolute altitudes of suspension rod.Due to this suspension rod bont assembling flexibly and adjust regulating plate 6 connecting length therein by articulating device, the lifting of suspension rod 9 that can different size easy to use.Therefore overcome the inconvenience that traditional chain block is adjusted, and improved safety.
Above-mentioned articulating device comprises two slide plate groups that are individually fixed in lifting-up support 1 lower end, each slide plate group is made up of two connecting panels 3 that are vertically installed on lifting-up support 1 lower end and be parallel to each other, spacing between two connecting panels 3 in each slide plate group and the gauge of regulating plate 6 match, connecting panel 3 and regulating plate 6 are respectively arranged with some pin-and-holes 15 from top to bottom, and regulating plate 6 slides to be plugged in slide plate group and by bearing pin I 4 and inserts in pin-and-hole 15 and be connected and fixed.Slide in slide plate group by regulating plate 6, can adjust according to the jack of different tonnages 2 spacing of lifting-up support 1 and base plate 7, after adjusting to the right place, make regulating plate 6 and the pin-and-hole 15 on connecting panel 3 coincide, insert afterwards after bearing pin I 4 and can realize and being connected and fixed, adjustment work is simple and convenient.
Bearing 11 can be installed on base plate 7 by bolt 12.Therefore the suspension rod of corresponding different size, can conveniently unload bearing 11 from base plate 7, then change the base plate 7 of respective model.Further improve the Applicable scope of this suspension rod bont.
Jack 2 can be lifting screw.Lifting screw is by manpower by screw pair transmission, and screw rod or ut socket are lifted part as top.Lifting screw is supported weight by screw thread self-locking effect, simple structure, but driving efficiency is low, but it can support weight for a long time.Jack 2 can be also hydraulic jack, hydraulic jack compact conformation, and steadily jacking weight, hoisting capacity maximum reaches 1000 tons, 1 meter of stroke, driving efficiency is higher, can save operative employee's labour intensity.
The tail end of bearing pin II 13 and bearing pin I 4 can be respectively arranged with spring cotter II 14 and spring cotter I 5, can be by fixing to bearing pin II 13 and bearing pin I 4 by spring cotter II 14 and spring cotter I 5, prevent that bearing pin II 13 and bearing pin I 4 from departing from the dangerous situation causing and occurring.

Claims (7)

1. a suspension rod bont, it is characterized in that: comprise base plate (7), be installed on two bearings (11) of base plate (7) both sides, upper end, the regulating plate (6) being installed on bearing (11) is rotated in bottom by bearing pin II (13), be arranged at the lifting-up support (1) of base plate (7) upper end and be arranged at lifting-up support (1) below and be positioned at two jacks (2) of base plate (7) both sides, described lifting-up support (1) lower end is fixed with two articulating devices, described regulating plate (6) is slidably fixed in articulating device, the middle part of described base plate (7) is provided with the hole (8) that diameter is greater than suspension rod (9) external diameter, suspension rod (9) is through passing through nut (10) locking behind hole (8).
2. suspension rod bont according to claim 1, it is characterized in that: described articulating device comprises two slide plate groups that are individually fixed in lifting-up support (1) lower end, described each slide plate group is made up of two connecting panels (3) that are vertically installed on lifting-up support (1) lower end and be parallel to each other, spacing between two connecting panels (3) in described each slide plate group and the gauge of regulating plate (6) match, described connecting panel (3) and regulating plate (6) are respectively arranged with some pin-and-holes (15) from top to bottom, described regulating plate (6) slides to be plugged in slide plate group and by bearing pin I (4) and inserts in pin-and-hole (15) and be connected and fixed.
3. suspension rod bont according to claim 1 and 2, is characterized in that: described bearing (11) is installed on base plate (7) by bolt (12).
4. suspension rod bont according to claim 3, is characterized in that: described jack (2) is lifting screw.
5. suspension rod bont according to claim 3, is characterized in that: described jack (2) is hydraulic jack.
6. suspension rod bont according to claim 1, is characterized in that: the tail end of described bearing pin II (13) is provided with spring cotter II (14).
7. suspension rod bont according to claim 2, is characterized in that: the tail end of described bearing pin I (4) is provided with spring cotter I (5).
CN201410246077.7A 2014-06-05 2014-06-05 Suspension rod bont Active CN103991826B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410246077.7A CN103991826B (en) 2014-06-05 2014-06-05 Suspension rod bont

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410246077.7A CN103991826B (en) 2014-06-05 2014-06-05 Suspension rod bont

Publications (2)

Publication Number Publication Date
CN103991826A true CN103991826A (en) 2014-08-20
CN103991826B CN103991826B (en) 2016-02-03

Family

ID=51306210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410246077.7A Active CN103991826B (en) 2014-06-05 2014-06-05 Suspension rod bont

Country Status (1)

Country Link
CN (1) CN103991826B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350700A (en) * 2017-08-15 2017-11-17 山东大学 A kind of high-speed train body side wall positive and negative welding turnover fixture and method of work
CN112678746A (en) * 2019-10-18 2021-04-20 中冶宝钢技术服务有限公司 Low-position motor replacing device and replacing method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1162779A (en) * 1967-08-12 1969-08-27 Mitsui Shipbuilding Eng Jacking apparatus for Raising and Lowering a Heavy Weight
CN201462790U (en) * 2009-08-14 2010-05-12 河北省电力建设第一工程公司 Suspender adjusting device
CN102079480A (en) * 2011-01-28 2011-06-01 西安热工研究院有限公司 Force adjusting device of high-loading rigid hanger
CN103626040A (en) * 2013-11-13 2014-03-12 芜湖华强文化科技产业有限公司 Two-level elevating type hoisting bracket with adjustable hoisting width
CN203903928U (en) * 2014-06-05 2014-10-29 山东电力建设第一工程公司 Boom lifting device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1162779A (en) * 1967-08-12 1969-08-27 Mitsui Shipbuilding Eng Jacking apparatus for Raising and Lowering a Heavy Weight
CN201462790U (en) * 2009-08-14 2010-05-12 河北省电力建设第一工程公司 Suspender adjusting device
CN102079480A (en) * 2011-01-28 2011-06-01 西安热工研究院有限公司 Force adjusting device of high-loading rigid hanger
CN103626040A (en) * 2013-11-13 2014-03-12 芜湖华强文化科技产业有限公司 Two-level elevating type hoisting bracket with adjustable hoisting width
CN203903928U (en) * 2014-06-05 2014-10-29 山东电力建设第一工程公司 Boom lifting device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350700A (en) * 2017-08-15 2017-11-17 山东大学 A kind of high-speed train body side wall positive and negative welding turnover fixture and method of work
CN107350700B (en) * 2017-08-15 2023-08-22 山东大学 Turnover fixture for welding front and back sides of side wall of high-speed train body and working method
CN112678746A (en) * 2019-10-18 2021-04-20 中冶宝钢技术服务有限公司 Low-position motor replacing device and replacing method thereof

Also Published As

Publication number Publication date
CN103991826B (en) 2016-02-03

Similar Documents

Publication Publication Date Title
US9562367B2 (en) Utility tower lifting apparatus and method
CN202181179U (en) Crane balance weight self disassembling and assembling device
CN101814704A (en) Device for mounting and adjusting control box of isolating switch
CN202897920U (en) Combined type jack
CN203903928U (en) Boom lifting device
CN103991826B (en) Suspension rod bont
CN203975532U (en) The removable transformer bushing special stand of a kind of novel modular transportable
CN204094726U (en) A kind of heavy pin shaft fast assembling-disassembling frock
CN203236194U (en) Replacing device for hinged pin roll mechanism of stacker cantilever
CN211594794U (en) Small and medium-sized crane frame
CN203837903U (en) Test bench for vertical column and jack
CN203474218U (en) Lifting rod fastening device on water-cooling wall of boiler in thermal power plant
CN206850247U (en) A kind of power distribution cabinet base of lift
CN208103826U (en) Transformer body jacking system
CN203402880U (en) Detachable hoist frame
CN203212276U (en) Jack with bolts
CN203728491U (en) Jacking device for heavy type parts for machining automobiles
CN102389901A (en) Cardan shaft bracket hydraulic device of rolling mill
CN203304858U (en) Split-type horizontal cylinder assembling machine
CN207450771U (en) A kind of petroleum vapor recovery tank body support construction
CN202214199U (en) Counter weight block self-dismounting device and crane with same
CN205123512U (en) Install dedicated dismouting device of motor perpendicularly
CN205275098U (en) Condenser hoist and mount utensil
CN104085796B (en) Macrobending radius roller hoist cable protective device
CN204852809U (en) Dedicated mounting bracket of batch meter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.6 building, zone 2, Hanyu financial and business center, hi tech Zone, Jinan City, Shandong Province

Patentee after: SEPCO1 ELECTRIC POWER CONSTRUCTION CORPORATION Co.,Ltd.

Address before: 250131 No. 244 Industrial North Road, Jinan City, Shandong Province

Patentee before: SEPCO1 ELECTRIC POWER CONSTRUCTION Corp.

CP03 Change of name, title or address