CN103991787B - Power plant electric precipitation anode plate installs lifting appliance - Google Patents

Power plant electric precipitation anode plate installs lifting appliance Download PDF

Info

Publication number
CN103991787B
CN103991787B CN201410246059.9A CN201410246059A CN103991787B CN 103991787 B CN103991787 B CN 103991787B CN 201410246059 A CN201410246059 A CN 201410246059A CN 103991787 B CN103991787 B CN 103991787B
Authority
CN
China
Prior art keywords
anode plate
main body
body frame
fixed
holding device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410246059.9A
Other languages
Chinese (zh)
Other versions
CN103991787A (en
Inventor
戚加元
林海
吕延波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201410246059.9A priority Critical patent/CN103991787B/en
Publication of CN103991787A publication Critical patent/CN103991787A/en
Application granted granted Critical
Publication of CN103991787B publication Critical patent/CN103991787B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The present invention relates to a kind of power plant electric precipitation anode plate and lifting appliance be installed, comprise be arranged on ground slide rail, rolled by the road wheel being fixed on lower end be installed on the main body frame on slide rail, the some anode plate holding devices be installed on main body frame, be movably set in the movable holding device of anode plate above main body frame, be arranged at main body frame side and height higher than the winch of main body frame and crane.Due to this power plant electric precipitation anode plate, lifting appliance is installed and can carries out combination lifting to one group of anode plate, therefore improve installation effectiveness.Can play spacing effect at lifting anodic plate holding device and the movable holding device of anode plate, the situation therefore effectively preventing anode plate to be out of shape occurs, and enhances the bending strength of anode plate, decreases the use of lifting machine.

Description

Power plant electric precipitation anode plate installs lifting appliance
Technical field
The present invention relates to lifting appliance technical field, be specifically related to a kind of power plant electric precipitation anode plate and lifting appliance is installed.
Background technology
Power plant electric precipitation anode plate install by equipment itself and environmental concerns larger, in combination and lifting, easily cause that equipment is out of shape, lifting speed is slow, wind-force causes equipment swinging time larger, require in hoisting process that wind-force is less than 2 grades, install to equipment and bring difficulty, general run of thins needs two cranes to coordinate lifting, therefore very inconvenient.
Summary of the invention
The present invention, in order to overcome the deficiency of above technology, provides one and prevents anode plate to be out of shape, and the power plant electric precipitation anode plate that efficiency is high installs lifting appliance.
The present invention overcomes the technical scheme that its technical matters adopts:
This power plant electric precipitation anode plate installs lifting appliance, comprise and be arranged on ground slide rail, to be rolled the main body frame be installed on slide rail by the road wheel being fixed on lower end, be installed on the some anode plate holding devices on main body frame, be movably set in the movable holding device of anode plate above main body frame, be arranged at main body frame side and height higher than the winch of main body frame and crane, hanger I is fixed with outside described main body frame, be fixed on after steel rope I on described winch walks around pulley on hanger I, one lifting cross beam upper end is fixed with hanger II, steel rope III one end is fixed on the suspension hook of crane, its other end is fixed on hanger II, described lifting cross beam lower end is fixed with some steel ropes II respectively, some anode plate active card are placed in anode plate holding device, and be slidably mounted in the movable holding device of anode plate, the movable holding device of described anode plate is lifted on lifting cross beam by the rope made of hemp, the other end of described some steel ropes II is individually fixed on each anode plate.
Above-mentioned anode plate holding device comprises the some clamping bar groups I being vertically fixed on rear and front end on main body frame respectively, described each clamping bar group I is made up of two clamping bars be parallel to each other I, spacing between two clamping bars I of described each clamping bar group I and the thickness of anode plate match, and each anode plate described respectively vertical activity is plugged in each clamping bar group I.
The movable holding device of above-mentioned anode plate comprises portable plate and is vertically fixed on the some clamping bar groups II on portable plate, described each clamping bar group II is made up of two clamping bars be parallel to each other II, spacing between two clamping bars II of described each clamping bar group II and the thickness of anode plate match, each anode plate described respectively vertical activity is plugged in each clamping bar group II, and the upper end of described each clamping bar group II is provided with lock pin.
In order to prevent anode plate from moving in lifting process, the tail end of aforementioned body framework is provided with some baffle plates, and the tail end of each anode plate is resisted against on baffle plate respectively.
The invention has the beneficial effects as follows: installing lifting appliance due to this power plant electric precipitation anode plate can carry out combination lifting to one group of anode plate, therefore improves installation effectiveness.Can play spacing effect at lifting anodic plate holding device and the movable holding device of anode plate, the situation therefore effectively preventing anode plate to be out of shape occurs, and enhances the bending strength of anode plate, decreases the use of lifting machine.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the plan structure schematic diagram of main body frame;
Fig. 3 is the side-looking structural representation of main body frame;
Fig. 4 is that A-A in Fig. 1 is to cross-sectional view;
Fig. 5 is lifting cross beam structural representation;
Fig. 6 is anode plate lifting view;
Fig. 7 is after anode plate lifting and main body frame disengaged position schematic diagram;
Fig. 8 is anode plate stationary state structural representation;
In figure, 1. main body frame 2. slide rail 3. winch 4. pulley 5. steel rope I 6. hanger I 7. road wheel 8. portable plate 9. clamping bar I 10. lifting cross beam 11. clamping bar II 12. lock pin 13. steel rope II 14. steel rope III 15. crane 16. baffle plate 17. rope made of hemp 18. hanger II.
Detailed description of the invention
Below in conjunction with accompanying drawing 1 to accompanying drawing 8, the present invention will be further described.
This power plant electric precipitation anode plate installs lifting appliance as shown in Figures 1 and 2, comprise and be arranged on ground slide rail 2, to be rolled the main body frame 1 be installed on slide rail 2 by the road wheel 7 being fixed on lower end, be installed on the some anode plate holding devices on main body frame 1, be movably set in the movable holding device of anode plate above main body frame 1, be arranged at main body frame 1 side and height higher than the winch 3 of main body frame 1 and crane 15, hanger I 6 is fixed with outside main body frame 1, be fixed on hanger I 6 after steel rope I 5 on winch 3 walks around pulley 4.Lifting cross beam 10 upper end is fixed with hanger II 18 as shown in Figure 5, steel rope III 14 one end is fixed on the suspension hook of crane 15, its other end is fixed on hanger II 18, lifting cross beam 10 lower end is fixed with some steel ropes II 13 respectively, some anode plate active card are placed in anode plate holding device, and are slidably mounted in the movable holding device of anode plate.As shown in Figure 8, the movable holding device of anode plate is lifted on lifting cross beam 10 by the rope made of hemp 17, and the other end of some steel ropes II 13 is individually fixed on each anode plate.Anode plate activity clamping device lateral is placed on the middle part of main body frame 1.Anode plate one piece of block lies in a horizontal plane in anode plate holding device on theme framework 1 and the movable holding device of anode plate by workmen, makes anode plate be edge-on state.After anode plate has been put, start winch 3 and slowly sling main body frame 1 upper end, main body frame 1 freely will be moved forward by road wheel 7 in hoisting process on slide rail 2, as shown in Figure 7, make main frame 1 be vertical state with anode plate.Crane 15 and winch synchronously hook up, the lifting cross beam 10 that plays is followed on main body frame 1 upper end and is risen, in uphill process, steel rope II 13 does not stress, when anode plate is in vertical state, winch 3 stops action, crane 15 continues to hook up, each anode plate is hung out and its disengaging from the anode plate holding device main body frame 1, finally hang electric precipitation top, directly over installation site slowly by anode plate to whereabouts, dropping to a half by movable for anode plate holding device disengagement, then continue to fall anode plate installation in position, throw off the connection of steel rope II 13 and anode plate, lifting cross beam 10 and the movable holding device of anode plate are lifted on ground.After anode plate and main body frame 1 are thrown off, start winch 3 main body frame 1 is slowly fallen revert to horizontality, complete this time lifting, and realize resetting.Due to this power plant electric precipitation anode plate, lifting appliance is installed and can carries out combination lifting to one group of anode plate, therefore improve installation effectiveness.Can play spacing effect at lifting anodic plate holding device and the movable holding device of anode plate, the situation therefore effectively preventing anode plate to be out of shape occurs, and enhances the bending strength of anode plate, decreases the use of lifting machine.
As shown in Figure 3, anode plate holding device can it comprises the some clamping bar groups I being vertically fixed on rear and front end on main body frame 1 respectively for following structure, each clamping bar group I is made up of two clamping bars be parallel to each other I 9, spacing between two clamping bars I 9 of each clamping bar group I and the thickness of anode plate match, and each anode plate respectively vertical activity is plugged in each clamping bar group I.Due to clamping bar group I upper end open that two clamping bars I 9 are formed, therefore when anode plate rise winch to vertical state time, it conveniently can be in main body frame 1 from opening and depart from, and structure is simple, easily manufactured.Movable holding device can it comprises portable plate 8 and is vertically fixed on the some clamping bar groups II on portable plate 8 anode plate for following structure as shown in Figure 4, each clamping bar group II is made up of two clamping bars be parallel to each other II 11, spacing between two clamping bars II 11 of each clamping bar group II and the thickness of anode plate match, each anode plate respectively vertical activity is plugged in each clamping bar group II, and the upper end of each clamping bar group II is provided with lock pin 12.Before using, portable plate 8 is laterally placed into the middle part on main body frame 1, each anode plate two ends respectively slip holding with in clamping bar group I, slide and be placed in clamping bar group II in position, intermediate portion, lock pin 12 is fixed in clamping bar group II and can prevents anode plate from coming off in lifting process after placing by anode plate.When anode plate hang put in place time, removed by lock pin 12, now portable plate 8 and anode plate can be departed from, structure is simply, convenient to use.
As shown in accompanying drawing 1 and accompanying drawing 3, the tail end of main body frame 1 can be provided with some baffle plates 16, and the tail end of each anode plate is resisted against on baffle plate 16 respectively.In anode plate lifting process, because it contacts with baffle plate 16 under gravity always, therefore can prevent anode plate from lifting process, sliding phenomenon occurring, further increase the stability of lifting.

Claims (4)

1. a power plant electric precipitation anode plate installs lifting appliance, it is characterized in that: comprise and be arranged on ground slide rail (2), to be rolled the main body frame (1) be installed on slide rail (2) by the road wheel (7) being fixed on lower end, be installed on the some anode plate holding devices on main body frame (1), be movably set in the movable holding device of anode plate of main body frame (1) top, be arranged at main body frame (1) side and height higher than the winch (3) of main body frame (1) and crane (15), described main body frame (1) outside is fixed with hanger I (6), be fixed on after steel rope I (5) on described winch (3) walks around pulley (4) on hanger I (6), one lifting cross beam (10) upper end is fixed with hanger II (18), steel rope III (14) one end is fixed on the suspension hook of crane (15), its other end is fixed on hanger II (18), described lifting cross beam (10) lower end is fixed with some steel ropes II (13) respectively, some anode plate active card are placed in anode plate holding device, and be slidably mounted in the movable holding device of anode plate, the movable holding device of described anode plate is lifted on lifting cross beam (10) by the rope made of hemp (17), the other end of described some steel ropes II (13) is individually fixed on each anode plate.
2. power plant according to claim 1 electric precipitation anode plate installs lifting appliance, it is characterized in that: described anode plate holding device comprises the some clamping bar groups I being vertically fixed on the upper rear and front end of main body frame (1) respectively, described each clamping bar group I is made up of two clamping bars be parallel to each other I (9), spacing between two clamping bars I (9) of described each clamping bar group I and the thickness of anode plate match, and each anode plate described respectively vertical activity is plugged in each clamping bar group I.
3. power plant according to claim 1 electric precipitation anode plate installs lifting appliance, it is characterized in that: the movable holding device of described anode plate comprises portable plate (8) and is vertically fixed on the some clamping bar groups II on portable plate (8), described each clamping bar group II is made up of two clamping bars be parallel to each other II (11), spacing between two clamping bars II (11) of described each clamping bar group II and the thickness of anode plate match, each anode plate described respectively vertical activity is plugged in each clamping bar group II, the upper end of described each clamping bar group II is provided with lock pin (12).
4. the power plant electric precipitation anode plate according to claim 1 or 2 or 3 installs lifting appliance, and it is characterized in that: the tail end of described main body frame (1) is provided with some baffle plates (16), the tail end of each anode plate is resisted against on baffle plate (16) respectively.
CN201410246059.9A 2014-06-05 2014-06-05 Power plant electric precipitation anode plate installs lifting appliance Active CN103991787B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410246059.9A CN103991787B (en) 2014-06-05 2014-06-05 Power plant electric precipitation anode plate installs lifting appliance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410246059.9A CN103991787B (en) 2014-06-05 2014-06-05 Power plant electric precipitation anode plate installs lifting appliance

Publications (2)

Publication Number Publication Date
CN103991787A CN103991787A (en) 2014-08-20
CN103991787B true CN103991787B (en) 2015-10-07

Family

ID=51306174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410246059.9A Active CN103991787B (en) 2014-06-05 2014-06-05 Power plant electric precipitation anode plate installs lifting appliance

Country Status (1)

Country Link
CN (1) CN103991787B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3073833A1 (en) * 2017-11-21 2019-05-24 Societe D'applications Electriques Et Mecaniques - Sapem ANTI-FOX DEVICE.

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104743437A (en) * 2015-04-16 2015-07-01 山东电力建设第二工程公司 Electric precipitation anode plate hoisting device
CN105236258A (en) * 2015-11-18 2016-01-13 中国神华能源股份有限公司 Lifting method
CN106861908B (en) * 2017-03-03 2018-07-24 中冶宝钢技术服务有限公司 Sintering machine electric precipitator maintenance process
CN108622784A (en) * 2017-03-24 2018-10-09 中国二十冶集团有限公司 RS or BS discharge lines deduster electric field combined hanging methods
FR3098806A1 (en) * 2019-07-18 2021-01-22 Societe D'applications Electriques Et Mecaniques - Sapem Anti-router device, associated system and method, for tipping a heavy load.
CN112871454B (en) * 2021-01-04 2022-12-09 中国神华能源股份有限公司国华电力分公司 Cathode and anode installation method of electric dust collector

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2920418Y (en) * 2006-04-03 2007-07-11 朝阳双凌环保设备有限公司 Single point eccentric suspension structure of electric dust collector anode plate
CN202199428U (en) * 2011-08-02 2012-04-25 北票市波迪机械制造有限公司 Anode plate suspension device of electric dust collector
CN102978668A (en) * 2012-12-20 2013-03-20 株洲天桥起重机股份有限公司 Method and tool for lifting electrolysis cathode plate and electrolysis anode plate
CN203474230U (en) * 2013-10-08 2014-03-12 铜陵有色金属集团股份有限公司金昌冶炼厂 Lifting appliance for lifting cathode plate and anode plate of electrodeposition technology
CN203593524U (en) * 2013-11-12 2014-05-14 宁夏天元锰业有限公司 Traveling crane hanger for metal manganese anode plate discharging
CN203922465U (en) * 2014-06-05 2014-11-05 山东电力建设第一工程公司 Power plant electric precipitation anode plate is installed lifting appliance

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3164285B2 (en) * 1996-03-13 2001-05-08 日鉱金属株式会社 Suspension device for electrode plate transfer device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2920418Y (en) * 2006-04-03 2007-07-11 朝阳双凌环保设备有限公司 Single point eccentric suspension structure of electric dust collector anode plate
CN202199428U (en) * 2011-08-02 2012-04-25 北票市波迪机械制造有限公司 Anode plate suspension device of electric dust collector
CN102978668A (en) * 2012-12-20 2013-03-20 株洲天桥起重机股份有限公司 Method and tool for lifting electrolysis cathode plate and electrolysis anode plate
CN203474230U (en) * 2013-10-08 2014-03-12 铜陵有色金属集团股份有限公司金昌冶炼厂 Lifting appliance for lifting cathode plate and anode plate of electrodeposition technology
CN203593524U (en) * 2013-11-12 2014-05-14 宁夏天元锰业有限公司 Traveling crane hanger for metal manganese anode plate discharging
CN203922465U (en) * 2014-06-05 2014-11-05 山东电力建设第一工程公司 Power plant electric precipitation anode plate is installed lifting appliance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3073833A1 (en) * 2017-11-21 2019-05-24 Societe D'applications Electriques Et Mecaniques - Sapem ANTI-FOX DEVICE.
WO2019102095A1 (en) * 2017-11-21 2019-05-31 Societe D'applications Electriques Et Mecaniques - Sapem Anti-dog device

Also Published As

Publication number Publication date
CN103991787A (en) 2014-08-20

Similar Documents

Publication Publication Date Title
CN103991787B (en) Power plant electric precipitation anode plate installs lifting appliance
CN201220891Y (en) Bridge crane with guide elevating function
CN202785258U (en) Hoisting device for air overturn of large-sized steel column
CN202785364U (en) Movable dual-door-type mast hoisting device
CN206502579U (en) Power pole hoisting device
CN203845712U (en) Heavy-duty equipment hoisting device
CN204281061U (en) A kind of can the combined sling of automatic releasing hook
CN201626764U (en) Coke oven fire door hanger
CN203922465U (en) Power plant electric precipitation anode plate is installed lifting appliance
CN203807909U (en) Crawler crane roadbed box with invisible lifting lug
CN207597986U (en) A kind of multi-storied garage parking position falling prevention device
CN202754704U (en) Hoisting device for heating surface module of heat recovery boiler
CN203998745U (en) The tower machine suspension hook disconnected rope anti-drop device of rushing to summit
CN205061416U (en) OG fan tegillum hoist device
CN204038805U (en) The anti-loose detecting device of a kind of hoist ropes
CN202575637U (en) Lifting device for overhauling annealing furnaces
CN202164037U (en) Adjustable plate hook
CN201737611U (en) Lifting device for power capacitor tower
CN104016224B (en) A kind of closed type mill guide beam hoisting auxiliary device
CN203997408U (en) Gantry suspension hook storage rack of lifting steel scrap
CN203333145U (en) Self-separation type special lifting tool for cylinder-shaped proximate matter
CN202296763U (en) Gantry crane installation structure installed on door head
CN201102870Y (en) Movable swing device
CN203781628U (en) Hoisting tool for rectangular steel plate
CN204056931U (en) Cylinder draw gear collected by small-sized steelmaking furnace slag charge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.6 building, zone 2, Hanyu financial and business center, hi tech Zone, Jinan City, Shandong Province

Patentee after: SEPCO1 ELECTRIC POWER CONSTRUCTION CORPORATION Co.,Ltd.

Address before: 250131 No. 244 Industrial North Road, Jinan City, Shandong Province

Patentee before: SEPCO1 ELECTRIC POWER CONSTRUCTION Corp.

CP03 Change of name, title or address