CN103982049A - 剪力墙墙体组装调直装置 - Google Patents

剪力墙墙体组装调直装置 Download PDF

Info

Publication number
CN103982049A
CN103982049A CN201410191279.6A CN201410191279A CN103982049A CN 103982049 A CN103982049 A CN 103982049A CN 201410191279 A CN201410191279 A CN 201410191279A CN 103982049 A CN103982049 A CN 103982049A
Authority
CN
China
Prior art keywords
wall body
straightening
assembly
precast
precast wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410191279.6A
Other languages
English (en)
Other versions
CN103982049B (zh
Inventor
陈建伟
闫文赏
廖永
苏幼坡
龚丽艳
冯暄铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PENGDA CONSTRUCTION GROUP
Hebei United University
Original Assignee
PENGDA CONSTRUCTION GROUP
Hebei United University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PENGDA CONSTRUCTION GROUP, Hebei United University filed Critical PENGDA CONSTRUCTION GROUP
Priority to CN201410191279.6A priority Critical patent/CN103982049B/zh
Publication of CN103982049A publication Critical patent/CN103982049A/zh
Application granted granted Critical
Publication of CN103982049B publication Critical patent/CN103982049B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及装配式剪力墙的装配调整装置,具体剪力墙墙体组装调直装置,包括两对调直组件、两套夹具组件和两套调高板;调直组件包括长度调整装置;调高板安装在预制墙体与底座之间;两套夹具组件平行的固定在底座或预制板上,并与预制墙体垂直,两对调直组件对称的分布在预制墙体的两面,调直组件一端通过连接机构连接在预制墙体上,另一端分别连接在同一套夹具组件的两个端部。本发明提供的剪力墙墙体组装调直装置,通过调整调直组件的长度来调整预制墙体的垂直度,通过调节调高板的高度来调整墙体水平缝的高度,安装便捷,而且能够快速准确的调直和调高。

Description

剪力墙墙体组装调直装置
技术领域
本发明涉及装配式剪力墙的装配调整装置,具体是一种剪力墙墙体组装调直装置。
背景技术
剪力墙作为一种抵抗侧向力的结构单元,由于它刚度大,承载力高,因此非常普遍的应用在大多数的高层建筑中。我国所发展的用于高层住宅建筑的结构体系为预制装配式混凝土剪力墙结构。预制装配式混凝土剪力墙结构部分或全部构件在工厂预先制作完成,然后运输到施工现场,通过可靠的连接方式将构件组装成一体。墙体的调直是墙体组装中最重要的一个环节,目前在现场施工中,剪力墙一般直接通过吊车吊装,依靠预留钢筋和预留孔进行定位,然后用可调节的临时支撑将墙板和楼地板上的支撑嵌片拉牢,施工比较复杂、费时和粗糙,而且安装误差较大,没有具体的墙体水平缝高度调节装置和墙体调直装置,为了更好的开展对装配式剪力墙结构的试验研究,发明一种简单方便有效的调制装置和调直方法是很有必要的。
发明内容
本发明旨在解决现有装配式钢筋混凝土剪力墙结构墙体组装过程中的问题,提出了一种既能调节墙体垂直,又能调节墙体水平缝高度的简易装置,从而保证墙体组装的质量,不会影响整个结构的抗震性能,在试验中还能保证试验的可靠性;而且整个装置构造简单,操作方便。
本发明解决所述问题采用的技术方案是:
一种剪力墙墙体组装调直装置,包括两对调直组件、两套夹具组件和两套调高板;所述的调直组件包括长度调整装置;调高板安装在预制墙体与底座之间,用于调节墙体水平缝的高度;
两套夹具组件平行的固定在底座或预制板上,并与预制墙体垂直,两对调直组件对称的分布在预制墙体的两面,调直组件一端通过连接机构连接在预制墙体上,每对调直组件的另一端分别连接在同一套夹具组件的两个端部;调直组件与预制墙体形成夹角,通过长度调整装置调整调直组件长度,从而调整预制墙体的垂直度。
其中,所述的连接机构,包括定位通丝和定位角铁,定位角铁铰接在调直组件上,定位通丝穿过预制墙体上的预埋管,将定位角铁固定在预制墙体上。
所述的夹具组件的端部包括T型的加强筋,加强筋上有连接螺栓,连接螺栓与调直组件连接。
所述的夹具组件的端部还包括卡位角铁和调节螺栓,两端的卡位角铁卡在底座或者楼板的边缘,通过调节螺栓将卡位角铁固定在底座或者楼板上。
与现有技术相比,本发明的优点是:利用两对长度可调的调直组件与预制墙体形成夹角,通过调整调直组件的长度来调整预制墙体的垂直度,通过调节调高板的高度来调整墙体水平缝的高度,安装便捷,而且能够快速准确的调直和调高。
附图说明
图1是本发明实施例侧视结构示意图; 
图2是本发明实施例主视结构示意图;
图3是本实施例中调直组件的结构示意图;
图4是本实施例中夹具组件的俯视结构示意图;
图5是本实施例中夹具组件的侧视结构示意图。
具体实施方式
下面结合实施例对本发明作进一步说明,目的仅在于更好的理解本发明内容。因此,所举之例并非限制本发明的保护范围。
如图1、和图2所示,本实施例所述的剪力墙墙体组装调直装置,包括两对调直组件1、两套夹具组件2和两套调高板4;所述的调直组件1包括长度调整装置11;长度调整装置11为花篮螺丝。
调高板4安装在预制墙体5与底座6之间,调高板4通过调节调高螺栓41来调节墙体水平缝51的高度。
两套夹具组件2平行的固定在底座6或预制板7上,并与预制墙体5垂直,两对调直组件1对称的分布在预制墙体5的两面,调直组件1一端通过连接机构3连接在预制墙体5上,每对调直组件1的另一端分别连接在同一套夹具组件2的两个端部;调直组件1与预制墙体5形成夹角,通过长度调整装置11调整调直组件1长度来调整预制墙体5的垂直度。
如图1和图3所示,连接机构3,包括定位通丝32和定位角铁31,定位角铁31铰接在调直组件1上,定位通丝32与预制墙体5上的预埋管52连接,将定位角铁31固定在预制墙体5上。
如图4和图5所示,为进一步提高夹具组件2在整个调直过程中的稳定性,夹具组件2的端部包括T型的加强筋21,加强筋21上有连接螺栓22,连接螺栓22与调直组件1连接。设置T型的加强筋21,防止在调节过程中由于拉力太大将夹具组件2端部变形翘起。
如图1和图5所示,夹具组件2的端部还包括卡位角铁23和调节螺栓24,两端的卡位角铁23卡在底座6或者预制板7的边缘,通过调节螺栓24将卡位角铁23固定在底座6或者楼板7上。
剪力墙墙体组装调直装置使用方法为:
(1)按预制墙体5和底座6或者预制板7的尺寸,设计并加工制作尺寸适配的调直组件1、夹具组件2和调高板4。
(2)将夹具组件2放置于底座16 或者预制板7上,与预制墙体5垂直,通过调节螺栓24将卡位角铁23固定在底座6或者楼板7上。
(3)定位通丝32穿过预制墙体5上的预埋管52,将一对调直组件1的定位角铁31固定在预制墙体5的两侧。
(4)将每对调直组件1分别与每套夹具组件2的两个端部连接。
(5)通过四个长度调整装置11分别调整调直组件1的长度,从而进行调整预制墙体5的垂直度。通过调节调高螺栓41来调节墙体水平缝51的高度。

Claims (4)

1.一种剪力墙墙体组装调直装置,其特征在于:包括两对调直组件、两套夹具组件和两套调高板;所述的调直组件包括长度调整装置;调高板安装在预制墙体与底座之间,用于调节墙体水平缝的高度;
两套夹具组件平行的固定在底座或预制板上,并与预制墙体垂直,两对调直组件对称的分布在预制墙体的两面,调直组件一端通过连接机构连接在预制墙体上,每对调直组件的另一端分别连接在同一套夹具组件的两个端部;调直组件与预制墙体形成夹角,通过长度调整装置调整调直组件长度,从而调整预制墙体的垂直度。
2.根据权利要求1所述的剪力墙墙体组装调直装置,其特征在于:所述的连接机构,包括定位通丝和定位角铁,定位角铁铰接在调直组件上,定位通丝穿过预制墙体上的预埋管,将定位角铁固定在预制墙体上。
3.根据权利要求1所述的剪力墙墙体组装调直装置,其特征在于:所述的夹具组件的端部包括T型的加强筋,加强筋上有连接螺栓,连接螺栓与调直组件连接。
4.根据权利要求1或3所述的剪力墙墙体组装调直装置,其特征在于:所述的夹具组件的端部还包括卡位角铁和调节螺栓,两端的卡位角铁卡在底座或者楼板的边缘,通过调节螺栓将卡位角铁固定在底座或者楼板上。
CN201410191279.6A 2014-05-08 2014-05-08 剪力墙墙体组装调直装置 Expired - Fee Related CN103982049B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410191279.6A CN103982049B (zh) 2014-05-08 2014-05-08 剪力墙墙体组装调直装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410191279.6A CN103982049B (zh) 2014-05-08 2014-05-08 剪力墙墙体组装调直装置

Publications (2)

Publication Number Publication Date
CN103982049A true CN103982049A (zh) 2014-08-13
CN103982049B CN103982049B (zh) 2016-03-09

Family

ID=51274196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410191279.6A Expired - Fee Related CN103982049B (zh) 2014-05-08 2014-05-08 剪力墙墙体组装调直装置

Country Status (1)

Country Link
CN (1) CN103982049B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587128A (zh) * 2016-02-22 2016-05-18 北京六建集团有限责任公司 保温结构墙板安装专用卡具及首层保温结构墙板安装方法
CN108505751A (zh) * 2018-04-11 2018-09-07 佛山科学技术学院 一种预应力楼板安装用辅助装置
CN110318548A (zh) * 2019-06-24 2019-10-11 天元建设集团有限公司 一种装配式墙体安装支架及其施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050252123A1 (en) * 2004-05-14 2005-11-17 Karen Colonias Construction connector anchor cage system
CN203097306U (zh) * 2013-01-31 2013-07-31 中国建筑第七工程局有限公司 一种装配式建筑墙板安装工具
CN203821867U (zh) * 2014-05-08 2014-09-10 河北联合大学 剪力墙墙体组装调直装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201264825Y (zh) * 2008-09-11 2009-07-01 陈塬燚 多刮臂式刮料机

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050252123A1 (en) * 2004-05-14 2005-11-17 Karen Colonias Construction connector anchor cage system
CN203097306U (zh) * 2013-01-31 2013-07-31 中国建筑第七工程局有限公司 一种装配式建筑墙板安装工具
CN203821867U (zh) * 2014-05-08 2014-09-10 河北联合大学 剪力墙墙体组装调直装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587128A (zh) * 2016-02-22 2016-05-18 北京六建集团有限责任公司 保温结构墙板安装专用卡具及首层保温结构墙板安装方法
CN108505751A (zh) * 2018-04-11 2018-09-07 佛山科学技术学院 一种预应力楼板安装用辅助装置
CN110318548A (zh) * 2019-06-24 2019-10-11 天元建设集团有限公司 一种装配式墙体安装支架及其施工方法
CN110318548B (zh) * 2019-06-24 2023-08-22 天元建设集团有限公司 一种装配式墙体安装支架及其施工方法

Also Published As

Publication number Publication date
CN103982049B (zh) 2016-03-09

Similar Documents

Publication Publication Date Title
CN203821867U (zh) 剪力墙墙体组装调直装置
CN203594213U (zh) 灵活拆装式承重桁架
CN203783165U (zh) 预埋件多方位精确调节装置
CN103982049B (zh) 剪力墙墙体组装调直装置
CN204940126U (zh) 桥梁垫石锚栓孔位置控制器
CN106193591A (zh) 一种铝合金模板楼板支撑快速拆装机构
CN203891462U (zh) 清水混凝土独立柱支模装置
CN103848361B (zh) 塔吊附墙装置的支撑梁
CN105113536A (zh) 一种移动式地下结构侧墙支模系统及其施工方法
CN205712133U (zh) 围檩梁与钢支撑的对中连接结构
KR101253679B1 (ko) Pc 세그먼트보 구조 및 이의 시공방법
CN103953201A (zh) 空间网架反吊装装置
CN204038921U (zh) 超高层塔吊附墙装置
CN107013034B (zh) 一种基于钢骨梁的模板支撑体系及施工方法
CN105442868A (zh) 一种可调式钢结构网壳拼装胎架
CN104563515A (zh) 超高剪力墙的模板支设结构及施工方法
CN204126077U (zh) 一种用于预制墙板与钢柱连接安装的临时固定装置
CN205445100U (zh) 可装卸式人字抱杆底座
CN210369955U (zh) 一种预制外墙板安装结构
CN203795854U (zh) 清水混凝土楼板预留孔模板固定装置
CN202899643U (zh) 满堂钢管可调顶杆支撑
KR20120049687A (ko) 건축용 기능성 파이프 서포트
CN108286316B (zh) 一种u型预制混凝土外挂墙板及施工方法
CN202754719U (zh) 一种用于起重机上的大车导电架
CN206607706U (zh) 一种用于剪力墙施工的拉顶撑杆

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160309

Termination date: 20190508

CF01 Termination of patent right due to non-payment of annual fee