CN103969097B - A kind of sample producing device tested with Soil Interface friction performance for anchor or stake and method - Google Patents

A kind of sample producing device tested with Soil Interface friction performance for anchor or stake and method Download PDF

Info

Publication number
CN103969097B
CN103969097B CN201410176977.9A CN201410176977A CN103969097B CN 103969097 B CN103969097 B CN 103969097B CN 201410176977 A CN201410176977 A CN 201410176977A CN 103969097 B CN103969097 B CN 103969097B
Authority
CN
China
Prior art keywords
sample
anchor
stake
sun
core bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410176977.9A
Other languages
Chinese (zh)
Other versions
CN103969097A (en
Inventor
梁冠亭
陈昌富
罗宏
徐优林
张根宝
赵洪波
米汪
赵湘龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CN201410176977.9A priority Critical patent/CN103969097B/en
Publication of CN103969097A publication Critical patent/CN103969097A/en
Application granted granted Critical
Publication of CN103969097B publication Critical patent/CN103969097B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of sample producing device for anchor or stake and the test of Soil Interface friction performance and method, the extension bar (702) being connected including core bar (701), upper centralizer, lower centralizer with described core bar (701) upper end.Use sample producing device of the present invention and method, can make in batches, simply, in high quality with Soil Interface friction performance pilot system for anchor or stake and meet the sample that EXPERIMENTAL DESIGN arbitrarily requires, thus substantially increase test efficiency, save experimentation cost, and can thereby obtain substantial amounts of test data, research different affecting factors and various complex working condition to anchor soil or the impact of stake Soil Interface friction performance.

Description

A kind of sample producing device tested with Soil Interface friction performance for anchor or stake and method
Technical field
The present invention relates to room build, highway, railway, municipal administration, commonly used anchor pole or pile foundation test technology in the engineering such as mine, Particularly relate to a kind of sample producing device tested for anchor or stake and method with Soil Interface friction performance.
Background technology
Anchor pole and pile foundation technology be widely used in room build, highway, railway, municipal administration, the engineering field such as mine, its bearing capacity tries Test and generally carry out in situ in outdoor.In recent years, have Some Universities and scientific research institutions by indoor model test test anchor or stake with Soil Interface friction performance, but be all to test in geosyncline or model casing, its research technique and method and outdoor in-situ test phase Similar, they are as in-situ test, all there is difference time-consuming, laborious, repeatable and result of the test comparability difference etc. and lack Fall into.Anchor or stake and Soil Interface friction performance is estimated by the direct shear test of soil with works to this end, also have both at home and abroad, but because being somebody's turn to do Method is not inconsistent with the actual condition of anchor or stake, it is impossible to simulation anchor-soil or the true loading process at Pile Soil interface, acquired results can not be true The real actual interface friction performance reflecting anchor or stake and soil.
Research and develop a set of simplicity, easy be consistent with actual condition, pilot system and the separable anchor-soil of test sample or Pile Soil interface Friction performance laboratory test instrument and test method are imperative, and the sample being for experiment makes, especially anchoring body or stake The molding of body, just becomes the key preparing high-quality sample.
Summary of the invention
Present invention aim to overcome the deficiencies in the prior art, it is provided that a kind of simple, convenient, can being used in indoor making The sample producing device of anchor or stake and the test of Soil Interface friction performance and manufacture method.
For solving above technical problem, the technical solution adopted in the present invention is: one is used for anchor or stake and Soil Interface friction performance The sample producing device of test, the extension bar being connected with described core bar upper end including core bar, upper centralizer, lower centralizer,
Described upper centralizer includes that upper cover, a plurality of lower ends are fixed on the support covered on described;By described pedestal upper end and ring Shape centering folder torr is affixed, makes described centering folder torr placed in the middle, and utilizes the centering folder being placed in described centering folder torr to limit described core bar The extension bar of upper end, thus realize described core bar upper end centering;
Described lower centralizer includes chassis, a lower half be partially disposed in described center chassis pit to Intermediate gasket, described centering pad Sheet is connected with described core bar lower end, makes described core bar lower end centering;
Further, described upper cover is buckled in the sample cylinder top of sample by upper cover outer rim, and the internal diameter of described upper cover outer rim is with described The external diameter close fit of sample cylinder;An elastic Upper gasket it is provided with between described upper cover bottom surface and the sun-dried mud brick end face of sample, Upper gasket The space that when effect is to prevent gel from irrigating, serosity penetrates between upper cover and sun-dried mud brick;Described upper cover and the center of described Upper gasket Bore dia is consistent with the center-hole diameter of described sun-dried mud brick.
Further, described chassis is clasped bottom cylinder pad by chassis outer rim, and the cylinder pad of the internal diameter of described chassis outer rim and sample External diameter close fit;An elastic lower gasket, the effect of lower gasket it is provided with between the sun-dried mud brick bottom surface of described chassis surface and sample The space that when being to prevent gel from irrigating, serosity penetrates between chassis and sun-dried mud brick.
Further, the described sun-dried mud brick center-hole diameter close fit to Intermediate gasket external diameter Yu sample;Described to Intermediate gasket with described Core bar lower end connects with thread forms.
Further, described centering folder is opposite opened, and after merging, intermediate formation centering folder centre bore is used for limiting described core bar upper end Extension bar, and every centering folder is respectively arranged with prominent outer rim, in order to be hung in described centering folder torr.
Further, described core bar is reinforcing bar, is connected with thread forms with extension bar.
A kind of said apparatus is utilized to make the manufacture method for anchor or stake with Soil Interface friction performance test sample, including following step Rapid:
(1) the described upper surface to Intermediate gasket being coated releasing agent, the lower end of described core bar is screwed into described to Intermediate gasket Centre bore, then from described cylinder pad side, the described half to Intermediate gasket is tucked into the bottom of described sun-dried mud brick centre bore, another Partly expose;
(2) pad is set on upper berth, described chassis, by the sample blanks being made up of described sample cylinder, screw, cylinder pad and sun-dried mud brick and centering Pad and core bar entirety buckle in the outer rim on described chassis, and make the described half exposing Intermediate gasket drop into the recessed of described chassis In hole;
(3) lay Upper gasket at described sun-dried mud brick upper surface, the outer rim of described upper cover is buckled in described sample cylinder top, by described centering The outer rim of folder hangs in described centering folder torr;
(4) described core bar and extension bar being threaded connection, described extension bar is by described centering folder clamping;
(5) Binder Materials configured is circulated in the central cavity of sun-dried mud brick, with spillikin vibrations closely knit after, maintenance to be gelled material Material reaches design strength, forms gel.
(6) leave described sample cylinder and the sun-dried mud brick of parcel, gel and core bar, remove other parts, and with pocket knife scraping institute State sun-dried mud brick (110) so that it is upper and lower surface flushes with described sample cylinder (101) top, bottom surface respectively, and sample makes molding.
Further, described Binder Materials is mortar, concrete or resin.
The technical solution adopted in the present invention has the beneficial effect that
Use sample producing device of the present invention and method, can be anchor or stake with soil with Soil Interface friction performance pilot system in batches, Make simply, in high quality and meet the sample that EXPERIMENTAL DESIGN arbitrarily requires, thus substantially increase test efficiency, save Experimentation cost, and can thereby obtain substantial amounts of test data, research different affecting factors and various complex working condition are to anchor-soil or stake The impact of-Soil Interface friction performance.
The present invention advantage and effect will further describe in a specific embodiment.
Accompanying drawing explanation
Fig. 1 is the composition structural representation of sample producing device of the present invention;
Fig. 2 is the assembling structural representation of sample producing device of the present invention;
Fig. 3 is the internal structure schematic diagram of sample producing device of the present invention;
Fig. 4 is the sample schematic diagram after utilizing the present invention to make.
In figure entitled shown in label: 101-sample cylinder;102-cylinder pad;109-fixes screw;110-sun-dried mud brick;501-upper cover;501a- Outer rim;502-support;503-centering folder torr;504-centering is pressed from both sides;504a-outer rim;504b-centre bore;505-Upper gasket;601- Chassis;601a-outer rim;601b-pit;602-is to Intermediate gasket;602a-centre bore;603-lower gasket;701-core bar;702-connects Stock;703-gel.
Detailed description of the invention
Below in conjunction with the accompanying drawings embodiments of the present invention are further described.
As shown in figures 1-4, a kind of sample blanks producing device tested with Soil Interface friction performance for anchor or stake and the following institute of method State:
Intermediate gasket 602 upper surface coated releasing agent by external diameter and sun-dried mud brick 110 center-hole diameter close fit, will be by reinforcing bar system Core bar 701 lower end become is screwed into the centre bore 602a to Intermediate gasket 602, then from cylinder pad 102 side by described right The half of Intermediate gasket 602 is tucked into the bottom of sun-dried mud brick 110 centre bore, and second half exposes.
Setting pad 603 on upper berth, chassis 601, lower gasket 603 can be made up of elastomeric material, it is therefore intended that make chassis 601 with Sun-dried mud brick 110 lower surface is fitted, and when preventing potting compound gel material, serosity overflows and infiltrates into sun-dried mud brick 110 lower surface.
Utilize outer rim 601a on chassis 601 by whole for the sample blanks being made up of sample cylinder 101, screw 109, cylinder pad 102 and sun-dried mud brick 110 Body buckles into, and makes the half exposing Intermediate gasket 602 drop in the pit 601b on chassis 601, chassis outer rim 601a interior Footpath and the external diameter close fit of cylinder pad 102, chassis 601 pit 601b diameter is slightly larger than to Intermediate gasket 602 external diameter.
Laying Upper gasket 505 at sun-dried mud brick 110 upper surface, its material is identical with lower gasket, it is therefore intended that make upper cover 501 and sun-dried mud brick 110 upper surfaces laminatings, when preventing potting compound gel material, serosity overflows and infiltrates into sun-dried mud brick 110 upper surface.Outer rim by upper cover 501 501a is buckled in sample cylinder 101 top, the external diameter close fit of the internal diameter of upper cover outer rim 501a and sample cylinder 101, upper cover 501 and upper The center-hole diameter of pad 505 is consistent with the center-hole diameter of sun-dried mud brick 110.
3 supports 502 are affixed with the side of upper cover 501, the most affixed ring-type centering in the top folder torr 503 of support 502, Its outer rim 504a is utilized to hang in centering folder torr 503 on split centering folder 504.By extension bar 702 by screw thread and core bar 701 connect, and extension bar 702 upper end is clamped by the centre bore 504b of centering folder 504, is achieved in core bar 701 upper end centering. By in the mortar injection that configured to the centre bore of sun-dried mud brick 110, upper tops has a funnel-form domatic, beneficially Binder Materials to Lower flowing.With spillikin Binder Materials is shaken closely knit after, need maintenance reach Binder Materials play design strength time.Maintenance is complete Bi Hou, dismantles upper centralizer and lower centralizer, extension bar 702 of back-outing, owing to having smeared releasing agent before, and cylinder pad 102 He Intermediate gasket 602 can be easily removed, then with pocket knife scraping sun-dried mud brick 110 so that it is upper and lower surface respectively with described sample cylinder 101 Top, bottom surface flush, specimen molding.
The specific embodiment of the invention in sum is only the preferred embodiment of the present invention, is not intended to limit present invention protection The restriction of scope.Therefore, any made within the technical characteristic of the present invention change, modify, substitute, combine or simplify, All should be the substitute mode of equivalence, within being included in protection scope of the present invention.

Claims (8)

1. the sample producing device tested with Soil Interface friction performance for anchor or stake, including core bar (701) and described core The extension bar (702) that bar (701) upper end connects, upper centralizer, lower centralizer, it is characterised in that:
Described upper centralizer includes upper cover (501), and the support (502) on described upper cover (501) is fixed in a plurality of lower ends;Logical Cross described support (502) upper end affixed with ring-type centering folder torr (503), make described centering folder torr (503) placed in the middle, and utilize It is placed in the folder of the centering in described centering folder torr (503) (504) and limits the extension bar (702) of described core bar (701) upper end, from And realize described core bar (701) upper end centering;
Described lower centralizer includes chassis (601), and a lower half is partially disposed in described chassis (601) center pit (601b) To Intermediate gasket (602), described Intermediate gasket (602) is connected with described core bar (701) lower end, makes under described core bar (701) End centering;
Described upper cover (501) is buckled in sample cylinder (101) top of sample, and upper cover outer rim (501a) by upper cover outer rim (501a) The external diameter close fit of internal diameter and sample cylinder (101);
Described chassis (601) is clasped bottom cylinder pad (102) by chassis outer rim (601a), and chassis outer rim (601a) The external diameter close fit of the cylinder pad (102) of internal diameter and sample;
Described sun-dried mud brick (110) the center-hole diameter close fit to Intermediate gasket (602) external diameter Yu sample.
A kind of sample producing device tested with Soil Interface friction performance for anchor or stake the most according to claim 1, it is special Levy and be: between sun-dried mud brick (110) end face of described upper cover (501) bottom surface and sample, be provided with an elastic Upper gasket (505); Described upper cover (501) is consistent with the center-hole diameter of described sun-dried mud brick (110) with the center-hole diameter of described Upper gasket (505).
A kind of sample producing device tested with Soil Interface friction performance for anchor or stake the most according to claim 1, it is special Levy and be: between sun-dried mud brick (110) bottom surface of (601) surface, described chassis and sample, be provided with an elastic lower gasket (603).
A kind of sample producing device tested with Soil Interface friction performance for anchor or stake the most according to claim 1, it is special Levy and be: described Intermediate gasket (602) is connected with thread forms with described core bar (701) lower end.
A kind of sample producing device tested with Soil Interface friction performance for anchor or stake the most according to claim 1, it is special Levying and be, described centering folder (504) is opposite opened, and after merging, intermediate formation centering folder centre bore (504b) is used for limiting described The extension bar (702) of core bar (701) upper end, and every centering folder (504) is respectively arranged with prominent outer rim (504a), in order to It is hung in described centering folder torr (503).
A kind of sample producing device tested with Soil Interface friction performance for anchor or stake the most according to claim 1, it is special Levying and be, described core bar (701) is reinforcing bar, is connected with thread forms with extension bar (702).
7. one kind utilizes in the claims sample producing device described in any one to make for anchor or stake and Soil Interface frictional resistance The manufacture method of energy test sample, it is characterised in that comprise the following steps:
(1) the described upper surface to Intermediate gasket (602) being coated releasing agent, screw thread is passed through in the lower end of described core bar (701) Be screwed into the described centre bore to Intermediate gasket (602) (602a), then from cylinder pad (102) side by described to Intermediate gasket (602) Half be tucked into the bottom of sun-dried mud brick (110) centre bore, second half exposes;
(2) pad (603) is set on described chassis (601) upper berth, will be by sample cylinder (101), screw (109), cylinder pad (102) The sample blanks that forms with sun-dried mud brick (110) and Intermediate gasket (602) and core bar (701) entirety are buckled into described chassis (601) In outer rim (601a), and the described half that Intermediate gasket (602) is exposed is made to drop into the pit (601b) of described chassis (601) In;
(3) Upper gasket (505) is laid at described sun-dried mud brick (110) upper surface, by the outer rim (501a) of described upper cover (501) It is buckled in described sample cylinder (101) top, the outer rim (504a) of described centering folder (504) is hung over described centering folder torr (503) On;
(4) described core bar (701) and extension bar (702) being threaded connection, described extension bar (702) is by described Centering folder (504) clamping;
(5) Binder Materials configured is circulated in the central cavity of sun-dried mud brick (110), shake closely knit after, maintenance to gelling Material reaches design strength, forms gel (703);
(6) leave described sample cylinder (101) and sun-dried mud brick (110), gel (703) and the core bar (701) of parcel, move Except other parts, and with sun-dried mud brick (110) described in pocket knife scraping so that it is upper and lower surface respectively with described sample cylinder (101) top, Bottom surface flushes, and sample makes molding.
A kind of manufacture method for anchor or stake with Soil Interface friction performance test sample the most according to claim 7, it is special Levying and be, described Binder Materials is mortar, concrete or resin.
CN201410176977.9A 2014-04-29 2014-04-29 A kind of sample producing device tested with Soil Interface friction performance for anchor or stake and method Active CN103969097B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410176977.9A CN103969097B (en) 2014-04-29 2014-04-29 A kind of sample producing device tested with Soil Interface friction performance for anchor or stake and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410176977.9A CN103969097B (en) 2014-04-29 2014-04-29 A kind of sample producing device tested with Soil Interface friction performance for anchor or stake and method

Publications (2)

Publication Number Publication Date
CN103969097A CN103969097A (en) 2014-08-06
CN103969097B true CN103969097B (en) 2016-09-28

Family

ID=51238865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410176977.9A Active CN103969097B (en) 2014-04-29 2014-04-29 A kind of sample producing device tested with Soil Interface friction performance for anchor or stake and method

Country Status (1)

Country Link
CN (1) CN103969097B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105784590B (en) * 2016-04-22 2018-08-14 华北水利水电大学 Test the method and device of anchor system anchoring interface binding intensity

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5938539B2 (en) * 1979-11-07 1984-09-18 川崎地質株式会社 Adhesion test method between anchor body and installation ground
JP4297234B2 (en) * 1999-11-08 2009-07-15 岡部株式会社 Anchor material fixing force measurement method
JP2002267593A (en) * 2001-03-08 2002-09-18 Okabe Co Ltd Method for testing anchor body, method for adjusting, and supporting table and load cell used in these methods
CN102628767B (en) * 2012-03-23 2014-01-22 河海大学 Device and method for testing mechanical properties of pile-soil contact surface
CN103528949B (en) * 2013-10-31 2015-07-01 闫楠 Device for testing bonding strength between anchor rod anchoring body and weathered rock mass
CN103558088B (en) * 2013-11-05 2016-02-17 兰州大学 Earthen ruins anchoring shop experiment system
CN203795487U (en) * 2014-04-29 2014-08-27 湖南大学 Sample manufacturing device used for anchor or pile interface friction tests

Also Published As

Publication number Publication date
CN103969097A (en) 2014-08-06

Similar Documents

Publication Publication Date Title
CN109342166B (en) Sample preparation die for shear test of rock mass structural surface
CN110018291B (en) Filling mining fluid-solid coupling physical analog simulation experiment test system
CN107477259B (en) A kind of water conservancy construction pipeline fixing device
CN106769758B (en) A kind of prismatical joint Seepage of Rock Masses experimental rig and production method
CN103969097B (en) A kind of sample producing device tested with Soil Interface friction performance for anchor or stake and method
CN204882029U (en) Large scale and high turbulent wind field arrangement structure
CN203337656U (en) Novel working performance tester of high-slump concrete
CN204389254U (en) A kind of deformation coal raw coal sample preparation device
CN102749439A (en) Test and evaluation device for segregation of fresh concrete
CN109342138A (en) The artificial shale core production method of densification and its molding die for having stratification
CN102589946B (en) Anchor-contained test piece preparation method and device
CN203795487U (en) Sample manufacturing device used for anchor or pile interface friction tests
CN109115106B (en) Anchoring body producing device and anchoring interface strain piece method of attaching in model test
CN208650253U (en) A kind of assembled architecture component based on BIM
CN102749278A (en) Method for testing depth of influence of acid rain on red clay on the basis of pH value test
CN204085972U (en) A kind of direct shear test associating sampling instrument
CN205280483U (en) Experimental mould of bitumen ductility
CN202227272U (en) Novel corbel overhanging support
CN204023791U (en) Embedding anchor bolts device
CN202706295U (en) Cast-in-place concrete hollow floor system pore-forming core model
CN107271343B (en) Multi-scale rock fracture permeability size effect test method
CN205786620U (en) Fill out sand tube anti-channeling processing means
CN205228777U (en) Experimental device for it is experimental to flow resistance to simulate flexible plant
CN205665147U (en) Non -sand large aperture concrete permeation coefficient test device
CN204855486U (en) Fertilizer test device that agglomerates fast

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant