CN103956691B - Method for manufacturing cross-linked polyethylene insulated cable head - Google Patents

Method for manufacturing cross-linked polyethylene insulated cable head Download PDF

Info

Publication number
CN103956691B
CN103956691B CN201410184125.4A CN201410184125A CN103956691B CN 103956691 B CN103956691 B CN 103956691B CN 201410184125 A CN201410184125 A CN 201410184125A CN 103956691 B CN103956691 B CN 103956691B
Authority
CN
China
Prior art keywords
cable
cable head
linked polyethylene
cross
polyethylene insulated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410184125.4A
Other languages
Chinese (zh)
Other versions
CN103956691A (en
Inventor
黄金龙
田野
王熠君
张波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAIBIN COUNTY ELECTRIC POWER BUREAU
State Grid Corp of China SGCC
Original Assignee
HUAIBIN COUNTY ELECTRIC POWER BUREAU
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAIBIN COUNTY ELECTRIC POWER BUREAU, State Grid Corp of China SGCC filed Critical HUAIBIN COUNTY ELECTRIC POWER BUREAU
Priority to CN201410184125.4A priority Critical patent/CN103956691B/en
Publication of CN103956691A publication Critical patent/CN103956691A/en
Application granted granted Critical
Publication of CN103956691B publication Critical patent/CN103956691B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Terminals (AREA)

Abstract

本发明公开了一种交联聚乙烯绝缘电缆头制作方法,交联聚乙烯绝缘电缆头制作工艺包含:制作环境选择、电缆防潮处理、电缆防局部闪络处理、电缆接地处理、安装电缆头及电缆头热缩绝缘。本发明所采用的电缆头制作工艺具有针对性强、操作条理清晰、可操作性强、操作规范及易学易懂的特点,可有效的规范交联聚乙烯绝缘电缆头的制作行为,方便了交联聚乙烯绝缘电缆头制作质量的管控,从而提高了电缆头质量的稳定性,同时,还可对广大施工人员提供统一规范的学习材料,有助于施工人员自身水平的提高,从而也有助于提高电缆头制作效率,降低无聊损耗。

The invention discloses a method for manufacturing a cross-linked polyethylene insulated cable head. The manufacturing process of the cross-linked polyethylene insulated cable head includes: manufacturing environment selection, cable moisture-proof treatment, cable local flashover prevention treatment, cable grounding treatment, cable head installation and Cable ends are heat-shrinkable insulated. The cable head manufacturing process adopted in the present invention has the characteristics of strong pertinence, clear operation, strong operability, standardized operation, and easy to learn and understand. It can effectively standardize the manufacturing behavior of XLPE insulated cable heads, and facilitates the communication The control of the production quality of polyethylene insulated cable heads improves the stability of the quality of the cable heads. Improve the efficiency of cable head production and reduce boring loss.

Description

一种交联聚乙烯绝缘电缆头制作方法A kind of manufacturing method of cross-linked polyethylene insulated cable head

技术领域technical field

本发明涉及一种交联聚乙烯绝缘电缆头制作方法,属输电力联结技术领域。The invention relates to a method for making a cross-linked polyethylene insulated cable head, which belongs to the technical field of power transmission connection.

背景技术Background technique

随着电力系统规模的日益扩大,从而导致电力电缆的铺设工作量增加,在电力线缆铺设中,交联聚乙烯因其容许温升高、载流量大、良好的介电性能及适合高落差甚至垂直铺设的特性而得到了广泛的使用,但随着供电需求的不断增加以及用户用电负荷不断增高,交联聚乙烯电缆的线径越来越大且电力线缆绝缘要求也越来越高,极大增加了电缆线缆铺设施工的难度及劳动强度,同时,在电力电缆的铺设中,往往需要依靠通过制作大量的电缆头来进行电力电缆的连接工作,由于在当前的电缆头制作工艺中,没有专门针对交联聚乙烯电缆电缆头统一的制作方法,因此所制作的电缆头质量受施工人员水平影响极大,且施工人员又缺少专业系统的学习培训,从而导致制作的电缆头效率底下,材料浪费严重且质量不稳定,因电缆头质量问题而造成的供电故障时有发生,严重威胁了供电及用电安全。With the increasing scale of the power system, the workload of laying power cables increases. In the laying of power cables, cross-linked polyethylene is used because of its allowable temperature rise, large carrying capacity, good dielectric properties and suitable for high drop Even the characteristics of vertical laying have been widely used, but with the increasing demand for power supply and the increasing power load of users, the diameter of XLPE cables is getting larger and the insulation requirements of power cables are also increasing. High, which greatly increases the difficulty and labor intensity of cable laying construction. At the same time, in the laying of power cables, it is often necessary to rely on making a large number of cable heads to connect the power cables. Due to the current cable head production In the process, there is no uniform production method for XLPE cable head, so the quality of the produced cable head is greatly affected by the level of construction personnel, and the construction personnel lack professional and systematic learning and training, resulting in the failure of the produced cable head The efficiency is low, the material waste is serious and the quality is unstable, and the power supply failure caused by the quality of the cable head occurs from time to time, which seriously threatens the safety of power supply and electricity use.

发明内容Contents of the invention

本发明目的就在于克服上述不足,提供一种交联聚乙烯绝缘电缆头制作方法。The object of the present invention is to overcome the above disadvantages and provide a method for making a cross-linked polyethylene insulated cable head.

为实现上述目的,本发明是通过以下技术方案来实现:To achieve the above object, the present invention is achieved through the following technical solutions:

一种交联聚乙烯绝缘电缆头制作方法,所述交联聚乙烯绝缘电缆头制作工艺包含如下步骤:A method for manufacturing a cross-linked polyethylene insulated cable head, the manufacturing process of the cross-linked polyethylene insulated cable head includes the following steps:

第一步:制作环境选择,确保施工现场温度为0℃以上、相对湿度70%以下;Step 1: Select the production environment to ensure that the temperature at the construction site is above 0°C and the relative humidity is below 70%;

第二步:电缆防潮处理,将电缆绝缘端部削成锥形,清理加工面残留物后并涂抹绝缘电力脂,然后包缠自粘密封带,其中包缠自粘密封带之间紧密无缝隙;Step 2: cable moisture-proof treatment, cut the cable insulation end into a tapered shape, clean the residue on the processed surface and apply insulating power grease, and then wrap the self-adhesive sealing tape, and the self-adhesive sealing tape is tightly wrapped without gaps ;

第三步:电缆防局部闪络处理,剥除电缆头处至少12厘米长的半导体屏蔽层,并在剥除半导体屏蔽层处清理加工面残留物后涂抹绝缘电力脂,然后安装铜应力管,其中安装铜应力管与铜屏蔽层的接触长度至少为3厘米;Step 3: Anti-local flashover treatment of the cable, strip off the semiconductor shielding layer at least 12 cm long at the cable head, and apply insulating power grease after cleaning the residue on the processing surface at the stripped semiconductor shielding layer, and then install the copper stress tube, Among them, the contact length between the installed copper stress tube and the copper shielding layer is at least 3 cm;

第四步:电缆接地处理,将电缆铜屏蔽层与铠装层分别与接地线焊接,其中接地线为线径不低于16mm²的铜线,焊接前后均需测量电缆绝缘值,绝缘值低于规定值时需重新焊接,焊接时使用冷水进行降温;Step 4: Cable grounding treatment, welding the copper shielding layer and armored layer of the cable to the grounding wire respectively. Re-welding is required when the specified value is reached, and cold water is used to cool down when welding;

第五步:安装电缆头,电缆与电缆头导体连接时采用压接,且压接孔深为5毫米;Step 5: Install the cable head. When the cable is connected to the conductor of the cable head, crimping is used, and the depth of the crimping hole is 5 mm;

第六步:电缆头热缩绝缘,用电缆头热缩绝缘管将连接好的电缆头包覆,并加热,加热温度为110℃—140℃,加热范围为100毫米—200毫米之间,加热时间为5秒—30秒,自然冷却即完成电缆头制作。Step 6: heat-shrink insulation of the cable head, cover the connected cable head with the heat-shrinkable insulation tube of the cable head, and heat it. The time is 5 seconds to 30 seconds, and the production of the cable head is completed after natural cooling.

第一步中缆绝缘端部削成锥形其锥面长度至少为电缆绝缘端部直角边长度的2倍;In the first step, the insulating end of the cable is cut into a tapered shape, and the length of the tapered surface is at least twice the length of the right-angled side of the insulating end of the cable;

第四步中电缆铜屏蔽层与铠装层分别与接地线焊接,焊接点为椭圆形,长10—25毫米,宽20毫米。In the fourth step, the copper shielding layer and armor layer of the cable are welded to the grounding wire respectively. The welding point is oval, 10-25mm long and 20mm wide.

第一步、第二步及第三步中清理加工面残留物后工作面光滑平整,且清理方向为从绝缘段想半导体层方向单向清理。After cleaning the residues on the processing surface in the first step, the second step and the third step, the working surface is smooth and flat, and the cleaning direction is one-way cleaning from the insulating section to the semiconductor layer.

本发明所采用的电缆头制作工艺具有针对性强、操作条理清晰、可操作性强、操作规范及易学易懂的特点,可有效的规范交联聚乙烯绝缘电缆头的制作行为,方便了交联聚乙烯绝缘电缆头制作质量的管控,从而提高了电缆头质量的稳定性,同时,还可对广大施工人员提供统一规范的学习材料,有助于施工人员自身水平的提高,从而也有助于提高电缆头制作效率,降低无聊损耗。The cable head manufacturing process adopted in the present invention has the characteristics of strong pertinence, clear operation, strong operability, standardized operation, and easy to learn and understand. The control of the production quality of polyethylene insulated cable heads improves the stability of the quality of the cable heads. Improve the efficiency of cable head production and reduce boring loss.

附图说明Description of drawings

图1为本发明工艺流程图。Fig. 1 is process flow chart of the present invention.

具体实施方式detailed description

如图1所示,一种交联聚乙烯绝缘电缆头制作方法,所述交联聚乙烯绝缘电缆头制作工艺包含以下步骤:As shown in Figure 1, a method for manufacturing a cross-linked polyethylene insulated cable head, the manufacturing process of the cross-linked polyethylene insulated cable head includes the following steps:

第一步:制作环境选择,确保电缆头制作施工环境温度为20℃、相对湿度50%;Step 1: Select the production environment to ensure that the construction environment temperature of the cable head is 20°C and the relative humidity is 50%;

第二步:电缆防潮处理,将电缆绝缘端部削成锥形,并使用纱布、不掉毛毛巾对锥面清理并涂抹绝缘电力脂,然后包缠自粘密封带,其中包缠自粘密封带之间紧密无缝隙,其中缆绝缘端部削成锥形其锥面长度至少为电缆绝缘端部直角边长度的3倍;Step 2: cable moisture-proof treatment, cut the cable insulation end into a tapered shape, clean the tapered surface with gauze and a lint-free towel, apply insulating power grease, and then wrap a self-adhesive sealing tape, which is wrapped with a self-adhesive seal There is no gap between the strips, and the end of the cable insulation is cut into a tapered shape, and the length of the tapered surface is at least 3 times the length of the right-angled side of the cable insulation end;

第三步:电缆防局部闪络处理,剥除电缆头处15厘米长的半导体屏蔽层,并对剥除半导体屏蔽层表面清理,去除加工面残留物并涂抹绝缘电力脂,然后安装铜应力管,其中安装铜应力管与铜屏蔽层的接触长度为5厘米;Step 3: Anti-local flashover treatment of the cable, strip off the 15 cm long semiconductor shielding layer at the cable head, clean the surface of the stripped semiconductor shielding layer, remove the residue on the processed surface and apply insulating power grease, and then install the copper stress tube , where the contact length between the installed copper stress tube and the copper shielding layer is 5 cm;

第四步:电缆接地处理,将电缆铜屏蔽层与铠装层分别与接地线焊接,其中接地线为线径为16mm²的铜线,其中焊接点为椭圆形,长15毫米,宽20毫米,焊接前后均需测量电缆绝缘值,绝缘值低于规定值时需重新焊接,焊接时使用冷水进行降温;Step 4: Cable grounding treatment, solder the copper shielding layer and armored layer of the cable to the grounding wire respectively, where the grounding wire is a copper wire with a diameter of 16mm², and the welding point is oval, 15mm long and 20mm wide. The insulation value of the cable needs to be measured before and after welding. When the insulation value is lower than the specified value, re-welding is required, and cold water is used to cool down during welding;

第五步:安装电缆头,电缆与电缆头导体连接时采用压接,且压接孔深为5毫米;Step 5: Install the cable head. When the cable is connected to the conductor of the cable head, crimping is used, and the depth of the crimping hole is 5 mm;

第六步:电缆头热缩绝缘,用电缆头热缩绝缘管将连接好的电缆头包覆并加热,加热温度为100℃,加热范围为100毫米—200毫米之间,加热时间为15秒,自然冷却即完成电缆头制作。Step 6: heat-shrinkable insulation of the cable head, wrap and heat the connected cable head with the heat-shrinkable insulation tube of the cable head, the heating temperature is 100°C, the heating range is between 100 mm and 200 mm, and the heating time is 15 seconds , Natural cooling completes the production of the cable head.

Claims (4)

1. a kind of cross-linked polyethylene insulated cable head preparation method, it is characterised in that:The cross-linked polyethylene insulated cable head system Comprise the steps of as method:
The first step:Production environment is selected, it is ensured that job site temperature is more than 0 DEG C, relative humidity is below 70%;
Second step:Cable damp-proof treatment, by cable insulation end taper is whittled into, and after the residue of clearing up and processing face and smears insulated electro Power fat, then looping self-adhesion band, closed seamless gap wherein between looping self-adhesion band;
3rd step:The anti-local flashover of cable is processed, and divests at end at least semi-conductive shield of 12 centimeter lengths, and is being divested Insulating power fat is smeared after the residue of clearing up and processing face at semi-conductive shield, then copper stress tube is installed, wherein install copper should Solenoid is at least 3 centimetres with the contact length of copper shield;
4th step:Cable grounding process, by cable of copper shield layer and armor respectively with ground connection wire bonding, wherein ground wire is line Footpath is not less than 16mm2Copper cash, be both needed to before and after welding measure cable insulation value, insulation values be less than setting when need to weld again, Lowered the temperature using cold water during welding;
5th step:End is installed, using crimping when cable is connected with end conductor, and it is 5 millimeters to crimp hole depth;
6th step:End pyrocondensation is insulated, and is coated the end for connecting with end pyrocondensation insulation tube, and is heated, and is heated Temperature is 110 DEG C -140 DEG C, and heated perimeter is that between 100 millimeters -200 millimeters, the heat time is -30 seconds 5 seconds, naturally cold But manufacturing cable head is completed.
2. a kind of cross-linked polyethylene insulated cable head preparation method according to claim 1, it is characterised in that:Described Cable insulation end is whittled into 2 times that taper its conical surface length is at least cable insulation end right angle edge lengths by two steps.
3. a kind of cross-linked polyethylene insulated cable head preparation method according to claim 1, it is characterised in that:Described Cable of copper shield layer and armor are respectively ellipse with ground wire welded contact in four steps, long 10-25 millimeters, wide 20 millimeters.
4. a kind of cross-linked polyethylene insulated cable head preparation method according to claim 1, it is characterised in that:Described Working face is smooth after the residue of clearing up and processing face in one step, second step and the 3rd step, and clear up direction be from insulating end to Semiconductor layer direction is unidirectionally cleared up.
CN201410184125.4A 2014-05-05 2014-05-05 Method for manufacturing cross-linked polyethylene insulated cable head Expired - Fee Related CN103956691B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410184125.4A CN103956691B (en) 2014-05-05 2014-05-05 Method for manufacturing cross-linked polyethylene insulated cable head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410184125.4A CN103956691B (en) 2014-05-05 2014-05-05 Method for manufacturing cross-linked polyethylene insulated cable head

Publications (2)

Publication Number Publication Date
CN103956691A CN103956691A (en) 2014-07-30
CN103956691B true CN103956691B (en) 2017-04-12

Family

ID=51333939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410184125.4A Expired - Fee Related CN103956691B (en) 2014-05-05 2014-05-05 Method for manufacturing cross-linked polyethylene insulated cable head

Country Status (1)

Country Link
CN (1) CN103956691B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104466616A (en) * 2014-12-11 2015-03-25 张家港金海港电线电缆有限公司 Process for manufacturing plug-in type cable head
CN105207134B (en) * 2015-09-21 2018-03-16 国家电网公司 The high-voltgae pothead preparation method coated using semiconductor
CN116191310A (en) * 2022-12-15 2023-05-30 上海船舶电子设备研究所(中国船舶集团有限公司第七二六研究所) A kind of preparation method of cable head of well logging transducer

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102104240A (en) * 2009-12-17 2011-06-22 贵州黎阳航空动力有限公司 Special vacuum water-cooled cable joint and manufacturing method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5137524B2 (en) * 2007-10-18 2013-02-06 株式会社ビスキャス Power cable connection

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102104240A (en) * 2009-12-17 2011-06-22 贵州黎阳航空动力有限公司 Special vacuum water-cooled cable joint and manufacturing method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
10kV电缆热缩接头制作中出现的问题解析;潘会武;《建筑电气》;20090531;第28卷(第5期);42-43 *
冶金企业热缩型电缆头制作工艺标准;刘爱群等;《冶金机电设备标准汇编》;20031130;627-647 *

Also Published As

Publication number Publication date
CN103956691A (en) 2014-07-30

Similar Documents

Publication Publication Date Title
CN104967065B (en) A kind of high pressure cold-shrinking intermediate joint preparation method based on interior electrode copper bell-type
CN102709866B (en) The crosslinked polyetylene insulated stress cone cable terminal of middle pressure and restorative procedure
CN207368584U (en) Crosslinking polyethylene-insulated cable insulation shields isolating joint
CN103956691B (en) Method for manufacturing cross-linked polyethylene insulated cable head
CN101640358B (en) Coaxial cable jumper and welding manufacturing method thereof
RU2014118477A (en) One-piece joint for insulated conductors
CN207426656U (en) A kind of high-voltage cable middle joint
CN111768922A (en) A kind of coating method of busbar insulation layer, busbar and power equipment
CN103855652A (en) Special manufacturing process for heat-shrinkable cable terminal head
CN105207134B (en) The high-voltgae pothead preparation method coated using semiconductor
CN207705751U (en) A kind of cable intermediate joint
CN107767996B (en) A kind of wind electricity blade lightning protection cable and preparation method thereof
CN105337224A (en) Quick restoration method for middle and low voltage XLPE power cable terminal fault
CN113937589A (en) A cable connection construction technology
CN208093772U (en) A waterproof cable fusion joint
CN209200188U (en) A kind of recovery cable body structure jointing
CN201336535Y (en) Pressing sheet for repairing cable insulation jacket
CN105226582A (en) 35kV pyrocondensation power cable terminal process for making
CN103904592A (en) Method for manufacturing 10 kV cross linked polyethylene insulated thermal shrinkage terminal
CN105390978B (en) The anti-lightning strike broken string method of insulated over-head line
CN205178464U (en) Cable joint
CN209516490U (en) A kind of cross-inked polyethylene power cable breakdown reparation structure
CN209401347U (en) A special medium-voltage branch cable for urban power transmission
CN208041425U (en) A kind of utilidor joint structure
TW201707321A (en) A method for producing cables with water resistant core wire structures

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: HUAIBIN ELECTRIC POWER BUREAU

Effective date: 20140808

Owner name: HUAIBIN ELECTRIC POWER BUREAU

Effective date: 20140808

C10 Entry into substantive examination
C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 464400 XINYANG, HENAN PROVINCE TO: 100031 XICHENG, BEIJING

SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20140808

Address after: 100031 West Street, Beijing, Xicheng District, No. 86, No.

Applicant after: State Grid Corporation of China

Applicant after: HUAIBIN COUNTY ELECTRIC POWER BUREAU

Address before: 464400, Henan County, Xinyang City, Huaibin Province, South Central Street, Huaibin County Power Bureau

Applicant before: HUAIBIN COUNTY ELECTRIC POWER BUREAU

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20180505