CN103953331B - A kind of self-drilling type coal-bed gas pressure in-site detecting device - Google Patents

A kind of self-drilling type coal-bed gas pressure in-site detecting device Download PDF

Info

Publication number
CN103953331B
CN103953331B CN201410175472.0A CN201410175472A CN103953331B CN 103953331 B CN103953331 B CN 103953331B CN 201410175472 A CN201410175472 A CN 201410175472A CN 103953331 B CN103953331 B CN 103953331B
Authority
CN
China
Prior art keywords
capsule
gas pressure
packing
drilling
liquid feeding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410175472.0A
Other languages
Chinese (zh)
Other versions
CN103953331A (en
Inventor
郭保华
郝从猛
马擎
支光辉
陈岩
席可峰
王辰霖
王龙
郭文兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201410175472.0A priority Critical patent/CN103953331B/en
Publication of CN103953331A publication Critical patent/CN103953331A/en
Application granted granted Critical
Publication of CN103953331B publication Critical patent/CN103953331B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of self-drilling type coal-bed gas pressure in-site detecting device of the present invention.Determination of coal seam gas pressure can be realized under the premise of not extracting drilling rod out, especially suitable for measuring easy collapse hole coal-bed gas pressure.Including drilling system, sealing of hole system, pressure measuring system.After drilling reaches design drilling depth, exiting drilling machine and stepping back drilling rod is more than a distance for insulating capsule groove width, is connected to feed flow and drain line, connects gas pressure measurement conducting wire and instrument, gap between sealed cooling water passageway and packing drilling rod periphery and the wall of a borehole forms enclosure space.Gas pressure measurement instrument is opened, measures gas pressure variation in enclosure space, steady pressure is the drilling original position gas pressure.Finally, restoring the connection of cooling-water duct by the operation to capsule piston, packing capsule, casing capsule, close gas pressure probe cavity, restore sliding threaded sleeve screw position, removes the outer feed flow of drilling rod and drain line and gas pressure measurement device, extract drilling rod or continue to creep into.

Description

A kind of self-drilling type coal-bed gas pressure in-site detecting device
Technical field
The present invention relates to a kind of self-drilling type coal-bed gas pressure in-site detecting device, can in-site detecting coal-bed gas pressure, Especially suitable for measuring easy collapse hole weak seam gas pressure.
Background technique
Coal-bed gas pressure is the power of gas ejection and coal and gas prominent, there is positive close with coal seam gas-bearing capacity System.Determination of coal seam gas pressure is an element task for preventing and treating coal mine gas disaster, and is examined projecting coal bed after extraction Whether the important means of extinction.Test coal-bed gas pressure at present, mostly uses coal industry standard AQ10478-2007 " coal mine The regulation of the Direct Determination of down-hole coal bed gas pressure " defined grouting pump sealing of hole passive type method.Test philosophy To reach the gas pressure of balance at drilling exposure using the naturally osmotic principle measurement of gas in coal seam, which utilizes Gas-guide tube is placed in coal seam by layer-through drilling, and gas-guide tube connects with orifice pressure gage, and the pressure change of coal-bed gas fluid is logical It crosses pressure-measuring pipe to be reflected on external pressure gauge, observes the variation of pressure value daily, reach to stablize to pressure value and complete to be somebody's turn to do after a week The coal-bed gas pressure in hole is tested, and the period for testing a hole is generally 30d or so.
Currently, carrying out gas pressure measurement to coal seam mainly uses first drilling, it is deep that pressure measuring unit is then sent into drilling Portion finally carries out sealing of hole and surveys pressure.The process that drilling rod is withdrawn from after pore-forming will lead to the intracorporal gas of a certain range coal around drilling It discharges rapidly, and sealing of hole process extends the release time of gas in drilling surrounding medium again, so as to cause needing with longer Minute can just measure true gas pressure value;In addition, usually drilling when carrying out drilling survey pressure to weak seam It collapses, clogging, so having led to next survey pressure work can not carry out.
Due to the progress of present extraction technique and equipment, coal roadway tunneling speed is getting faster, and the pressure of protrusion-dispelling is also more next It is bigger, only the loss of protrusion-dispelling bring production efficiency is made up by constantly shortening the testing time of every prevention prominent index. According to existing protrusion-dispelling regulation, the protrusion-dispelling index test other than coal-bed gas pressure can be accomplished substantially with boring with survey, when It can be obtained by various test index data.
To alleviate the time inconsistency between determination of coal seam gas pressure and driving, and it is easy to collapse hole cherry coal gas convenient for measurement Pressure proposes a kind of self-drilling type determination of coal seam gas pressure device, can accomplish to greatly shorten coal-bed gas pressure with boring with survey The time of power measurement.
Summary of the invention
In view of the above-mentioned problems, the present invention provides a kind of self-drilling type coal-bed gas pressure in-site detecting device, which can be fitted For the measurement of most of coal-bed gas pressures, easily collapses especially for drilling, easily stifled weak seam, survey can be increased substantially Determine efficiency, and due to being encapsulated the reliability that hole greatly improves measurement pressure value using double hole sealing glue.
The present invention provides a kind of self-drilling type coal-bed gas pressure in-site detecting device.The device includes drilling system, sealing of hole System and pressure measuring system.
The drilling system includes the body of rod, screw thread, the first liquid feeding channel, the second liquid feeding channel, third liquid feeding channel, conducting wire Channel, movable whorl casing, packing capsule slot, cannula slide mechanism, drill bit, the first cooling-water duct and the second cooling water are logical Road, the first capsule piston and the second capsule piston, gas pressure measurement probe cavity.Drilling system destroys coal body by drill bit, By drill rod body and drill rod thread deslagging, cooling and auxiliary deslagging function are provided by supplying water to cooling-water duct.
The sealing of hole system include solution feed pump, vacuum pump, pressure duct, four-way valve, switch, triple valve, high pressure aluminium-plastic pipe, The outer feed flow of the drilling rod of pressure gauge composition or drainage system, liquid feeding channel, capsule piston, cannula slide mechanism, packing capsule.Feed flow Pump and vacuum pump control the supply and discharge of 3 liquid feeding channel liquid by 2 four-way valves and 3 triple valves, share 3 feed flows Pipe and 3 drain pipes, whether having its connection of 6 switch controls respectively, 3 pressure gauges are for observing 3 liquid feeding channel liquid Real-time pressure.First liquid feeding channel, third liquid feeding channel, cannula slide mechanism, the first packing capsule and the second packing capsule control The packing of air between drilling rod and hole wall processed;The first packing capsule and the second packing capsule are cyclic annular capsule;Described sleeve pipe is sliding Motivation structure includes casing floor, cannula slide ring flat-plate, first sleeve capsule, the second casing capsule, movable whorl casing.When first Liquid feeding channel pressurization, the decompression of third liquid feeding channel, then first sleeve capsule pressurization elongation, the decompression of the second casing capsule are shortened, set Pipe slides ring flat-plate and drives movable whorl casing to slide to bottom hole direction along casing capsule slide axis by casing floor, until complete Packing capsule slot is opened, the first packing capsule and the second packing capsule is made to be exposed to hole wall.Finally it is pressurized the second liquid feeding channel, So that the first packing capsule and second is insulated capsule pressurization elongation, compresses hole wall, completely cut off the gas fluid communication inside and outside hole.Second supplies Liquid channel, the first capsule piston control packing cooling-water duct, when the pressurization of the second liquid feeding channel, then the first capsule plunger booster is stretched It is long, so that the first capsule piston is insulated cooling-water duct;Complete sealing of hole work.In the case of normal drilling, the first packing capsule and the Two packing capsule decompressions are shunk, and sliding sleeve and drill rod thread and drill rod body are in close contact, the pressurization elongation of the second casing capsule, The decompression of first sleeve capsule is shunk, and the second capsule plunger booster elongation, the first capsule piston decompression is shunk.It surveys under pressure condition, the The pressurization elongation of sleeve capsule, the decompression of the second casing capsule are shunk, and the decompression of the second capsule piston is shunk, the first capsule plunger booster Elongation, the first packing capsule and the second packing capsule pressurization elongation.
The pressure measuring system includes the second capsule piston, third liquid feeding channel, gas pressure measurement probe, gas pressure survey Determine conducting wire, gas pressure measurement instrument.The gas pressure measurement probe is installed in gas pressure measurement probe cavity, by conducting wire Channel inside conductor, gas pressure measurement conducting wire are connected to gas pressure measurement instrument.When third liquid feeding channel pressure reduction, the second glue Capsule piston retraction, gas pressure measurement probe cavity outlet are opened, and methane gas enters gas pressure measurement by cooling-water duct Probe cavity is popped one's head in by gas pressure measurement and measures gas pressure, and data pass to gas pressure through gas pressure measurement conducting wire and survey Determine instrument.
Detailed description of the invention
Fig. 1 is a kind of self-drilling type coal-bed gas pressure in-site detecting device diagrammatic cross-section of the present invention.
In figure: 1 is gas pressure measurement instrument;2 be gas pressure measurement conducting wire;3 be vacuum pump;4 be the first high pressure plastic-aluminum Pipe;5 be the first four-way valve;6 be the second high pressure aluminium-plastic pipe;7 be first switch;8 be the first triple valve;9 be the high jewelling of third Modeling pipe;10 be first pressure gauge;11 be the 4th high pressure aluminium-plastic pipe;12 be second switch;13 be the second triple valve;14 be second Pressure gauge;15 be the 5th high pressure aluminium-plastic pipe;16 switch for third;17 be the 6th high pressure aluminium-plastic pipe;18 be third threeway Valve;19 be the 7th high pressure aluminium-plastic pipe;20 be third pressure gauge;21 be solution feed pump;22 be the 8th high pressure aluminium-plastic pipe;23 be second Four-way valve;24 be the 4th switch;25 be the 9th high pressure aluminium-plastic pipe;26 be the 5th switch;27 be the tenth high pressure aluminium-plastic pipe;28 are 6th switch;29 be the 11st high pressure aluminium-plastic pipe;30 be drill rod thread;31 be drill rod body;32 be coal body;33 be drilling;34 For the first liquid feeding channel;35 be the second liquid feeding channel;36 be the first cooling-water duct;37 be gas pressure measurement wire channel; 38 be third liquid feeding channel;39 be the second cooling-water duct;40 be the first capsule piston;41 pop one's head in for gas pressure measurement;42 For gas pressure measurement probe cavity;43 be the second capsule piston;44 be the first packing capsule;45 be packing capsule slot;46 are Second packing capsule;47 be movable whorl casing;48 be first sleeve capsule;49 be casing capsule axis;50 be cannula slide ring Plate;51 be the second casing capsule;52 be collection headroom;53 be drill bit;54 be casing floor.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
The present invention provides a kind of self-drilling type coal-bed gas pressure in-site detecting device.
As shown in Figure 1, the specific steps of the present invention are as follows.
(1) after drilling to set depth, drilling rod is mobile to hell direction, moving distance is greater than packing capsule groove width Degree, less than 2 times of packing capsule groove width.Drilling machine steps back a distance, and drilling rod is exited from drilling machine.
(2) it connects the 7th high pressure aluminium-plastic pipe 19 and the first liquid feeding channel 34, the 5th high pressure aluminium-plastic pipe 15 and the second feed flow is logical Road 35, third high pressure aluminium-plastic pipe 9 and third liquid feeding channel 38, gas pressure measurement conducting wire 2 and gas pressure measurement wire channel Conducting wire in 37.
(3) second switch 12, third switch 16, the 4th switch 24, the 5th switch 26, opening first switch 7 and the are closed Six switches 28 open solution feed pump 21 and vacuum pump 3.Solution feed pump 21 passes through the 8th high pressure aluminium-plastic pipe 22, the second four-way valve the 23, the 6th Switch 28, the 11st high pressure aluminium-plastic pipe 29, third triple valve 18, the 7th high pressure aluminium-plastic pipe 19, the first liquid feeding channel 34 control the Sleeve capsule 48;Vacuum pump 3 passes through the first high pressure aluminium-plastic pipe 4, the first four-way valve 5, the second high pressure aluminium-plastic pipe 6, first switch 7, the first triple valve 8, third high pressure aluminium-plastic pipe 9, third liquid feeding channel 38 control the second capsule piston 43 and the second casing capsule 51;The reading of first pressure gauge 10 reduces, and the reading of third pressure gauge 20 increases.Second capsule piston 43 is shunk, and surveys gas pressure Fixed probe is connected to the second cooling-water duct 39, the gas pressure of impression collection headroom 52.Second casing capsule 51 decompression contraction, The pressurization elongation of first sleeve capsule 48, slides along casing capsule axis 49 and shrinks, push cannula slide ring flat-plate 50,54 and of casing floor Movable whorl casing 47 is slided to bottom hole direction, and the first packing capsule 44 and the second packing capsule 46 is exposed.
(4) second switch 12, third switch 16, the 4th switch 24, the 6th switch 28, first switch 7 are closed, opens the 5th Switch 26 closes vacuum pump 3, continues starting solution feed pump 21.Solution feed pump 21 passes through the 8th high pressure aluminium-plastic pipe 22, the second four-way valve 23, the 5th switch 26, the tenth high pressure aluminium-plastic pipe 27, the second triple valve 13, the 5th high pressure aluminium-plastic pipe 15, the control of the second liquid feeding channel 35 Make the first capsule piston 40, first packing capsule 44 and the second packing capsule 46;The reading of second pressure gauge 14 increases, the first capsule The pressurization elongation of piston 40, blocks the first cooling-water duct 36, and it is logical to completely cut off the first cooling-water duct 36 and the second cooling water in drilling rod Gas fluid communication between road 39;To the first packing capsule 44 and the second packing 46 feed flow of capsule pressurization, first insulates solution feed pump Capsule 44 and the second packing pressurization elongation of capsule 46, compress hole wall, completely cut off between drilling rod and hole wall the gas stream insulated inside and outside capsule Communications and liaison system;Complete sealing of hole work.
(5) gas pressure measurement instrument 1 is opened, reads survey pressure 41 data of probe in real time, when data keep stablizing, it is believed that Pressure is surveyed to complete.
(6) it surveys after the completion of pressure work, closes first switch 7, third switch 16, the 4th switch 24, the 5th switch the 26, the 6th Switch 28 opens second switch 12, closes solution feed pump 21, opens vacuum pump 3.Vacuum pump 3 passes through the first high pressure aluminium-plastic pipe 4, the One four-way valve 5, the 4th high pressure aluminium-plastic pipe 11, the second triple valve 13, the 5th high pressure aluminium-plastic pipe 15, the second liquid feeding channel 35, control First capsule piston 40, first insulates capsule 44 and the second packing capsule 46.The reading of second pressure gauge 14 reduces, and the first capsule is living Plug 40 is shunk, and the first cooling-water duct 36 is connected to the recovery of the second cooling-water duct 39;First packing capsule 44 and the second packing Capsule 46 is shunk, and leaves hole wall, is close to the body of rod.
(7) the 5th switch 26, the 6th switch 28, first switch 7, second switch 12 are closed, third switch the 16, the 4th is opened Switch 24 opens simultaneously solution feed pump 21, and holding vacuum pump 3 is run.Vacuum pump 3 passes through the first high pressure aluminium-plastic pipe 4, the first four-way Valve 5, the 6th high pressure aluminium-plastic pipe 17, the first triple valve 18, the 7th high pressure aluminium-plastic pipe 19, the first liquid feeding channel 34 control first sleeve Capsule 48 shrinks first sleeve capsule 48;Solution feed pump 21 is high by the 8th high pressure aluminium-plastic pipe 22, the second four-way valve the 23, the 9th Aluminium-plastic pipe 25, the first triple valve 8, third high pressure aluminium-plastic pipe 9, third liquid feeding channel 38 is pressed to control the second capsule piston 43 and second Casing capsule 51.The reading of first pressure gauge 10 increases, and the reading of third pressure gauge 20 reduces.The pressurization elongation of second capsule piston 43, Gas pressure measurement probe cavity 42 is blocked, water in cooling-water duct when making gas pressure measurement probe 41 not by normal drilling Influence;The pressurization of second casing capsule 51 is extended along casing capsule axis 49, and first sleeve capsule 48 is shunk along casing capsule axis 49, It pushes cannula slide ring flat-plate 50, casing floor 54 and movable whorl casing 47 to slide to aperture direction, keeps the company of drill rod thread Continuous property, and the first packing capsule 44 and the second packing capsule 46 is isolated with hole wall.
(8) it disconnects the 7th high pressure aluminium-plastic pipe 19 and the first liquid feeding channel 34, the 5th high pressure aluminium-plastic pipe 15 and the second feed flow is logical Road 35, third high pressure aluminium-plastic pipe 9 and third liquid feeding channel 38, gas pressure measurement conducting wire 2 and gas pressure measurement wire channel Conducting wire in 37.
(9) drilling rod is exited, or connection drilling machine continues to creep into drilling rod.
(10) creep into other drilling or continue drilling reach design drilling depth after, when needing to measure gas pressure, repeat Step (1) ~ (9).

Claims (1)

1. a kind of self-drilling type coal-bed gas pressure in-site detecting device, including drilling system, sealing of hole system, pressure measuring system, special Sign is,
1) drilling system includes that the body of rod, screw thread, the first liquid feeding channel, the second liquid feeding channel, third liquid feeding channel, conducting wire are logical Road, movable whorl casing, packing capsule slot, cannula slide mechanism, drill bit, the first cooling-water duct and the second cooling-water duct, First capsule piston and the second capsule piston, gas pressure measurement probe cavity;The drilling system destroys coal body by drill bit, By drill rod body and drill rod thread deslagging, cooling and auxiliary deslagging function are provided by supplying water to cooling-water duct;
2) the sealing of hole system includes solution feed pump, vacuum pump, pressure duct, four-way valve, switch, triple valve, high pressure aluminium-plastic pipe, pressure The outer feed flow of the drilling rod of power table composition or drainage system, liquid feeding channel, capsule piston, cannula slide mechanism, the first and second packings Capsule;The solution feed pump and vacuum pump control the supply and row of 3 liquid feeding channel liquid by 2 four-way valves and 3 triple valves Out, 3 liquid supply pipes and 3 drain pipes are shared, whether having its connection of 6 switch controls respectively, 3 pressure gauges are for observing 3 The real-time pressure of liquid feeding channel liquid;First liquid feeding channel, third liquid feeding channel, cannula slide mechanism, the first packing glue The packing of air between capsule and the second packing capsule control drilling rod and hole wall;The first packing capsule and the second packing capsule are ring Shape capsule;Described sleeve pipe sliding equipment includes casing floor, cannula slide ring flat-plate, first sleeve capsule, the second casing capsule, work Dynamic threaded sleeve, when the first liquid feeding channel is pressurized, the decompression of third liquid feeding channel, then first sleeve capsule is pressurized elongation, second set The decompression of pipe capsule is shortened, and cannula slide ring flat-plate drives movable whorl casing sliding along casing capsule to bottom hole direction by casing floor Moving axis sliding makes the first packing capsule and the second packing capsule be exposed to hole wall until fully opening packing capsule slot;Finally make Second liquid feeding channel, the first packing capsule and the second packing capsule pressurization elongation, compress hole wall, completely cut off the gas circulation inside and outside hole Connection;Second liquid feeding channel, the first capsule piston control packing cooling-water duct, when the second liquid feeding channel is pressurized, then the The elongation of one capsule plunger booster, makes the first capsule piston insulate cooling-water duct, completes sealing of hole work;In the case of normal drilling, First packing capsule and the second packing capsule decompression are shunk, and sliding sleeve and drill rod thread and drill rod body are in close contact, and second The pressurization elongation of casing capsule, the decompression of first sleeve capsule are shunk, and the second capsule plunger booster elongation, the first capsule piston decompression is received Contracting;It surveys under pressure condition, first sleeve capsule pressurization elongation, the second casing capsule decompression is shunk, and the decompression of the second capsule piston is shunk, The elongation of first capsule plunger booster, the first packing capsule and the second packing capsule pressurization elongation;
3) pressure measuring system includes the second capsule piston, third liquid feeding channel, gas pressure measurement probe, gas pressure measurement Conducting wire, gas pressure measurement instrument;The gas pressure measurement probe is installed in gas pressure measurement probe cavity, is led to by conducting wire Road inside conductor, gas pressure measurement conducting wire are connected to gas pressure measurement instrument;When third liquid feeding channel pressure reduction, the second capsule Piston decompression is shunk, and gas pressure measurement probe cavity outlet is opened, and methane gas enters gas pressure by cooling-water duct and surveys Surely it pops one's head in cavity, is popped one's head in measurement gas pressure by gas pressure measurement, data pass to gas pressure through gas pressure measurement conducting wire Analyzer.
CN201410175472.0A 2014-04-29 2014-04-29 A kind of self-drilling type coal-bed gas pressure in-site detecting device Expired - Fee Related CN103953331B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410175472.0A CN103953331B (en) 2014-04-29 2014-04-29 A kind of self-drilling type coal-bed gas pressure in-site detecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410175472.0A CN103953331B (en) 2014-04-29 2014-04-29 A kind of self-drilling type coal-bed gas pressure in-site detecting device

Publications (2)

Publication Number Publication Date
CN103953331A CN103953331A (en) 2014-07-30
CN103953331B true CN103953331B (en) 2019-07-19

Family

ID=51330662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410175472.0A Expired - Fee Related CN103953331B (en) 2014-04-29 2014-04-29 A kind of self-drilling type coal-bed gas pressure in-site detecting device

Country Status (1)

Country Link
CN (1) CN103953331B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695940B (en) * 2015-02-05 2018-02-16 煤科集团沈阳研究院有限公司 Coal bed drilling gas inrush initial velocity measurement device and assay method
CN104747075B (en) * 2015-02-14 2017-01-25 河南理工大学 Anti-collapsing drilling method for grout spraying of soft coal seam
CN105927214B (en) * 2016-05-19 2022-11-11 六盘水师范学院 Method for accurately measuring gas pressure of original coal seam
CN108457643B (en) * 2018-02-05 2020-07-31 中国矿业大学 Water-invasion drilling gas pressure measuring method based on vacuum condition
CN110725661B (en) * 2019-11-06 2021-12-17 河南理工大学 Segmented spiral rubber bag hole sealing device
CN111677495B (en) * 2020-05-08 2023-08-15 中煤科工集团西安研究院有限公司 Coal mine underground directional drilling while-drilling gas measuring device, drilling tool and measuring method
CN111948645A (en) * 2020-08-07 2020-11-17 武汉长盛煤安科技有限公司 Coal mine roadway and tunnel drilling while drilling radar advanced detection device and method
CN113153274B (en) * 2021-04-30 2022-09-09 中国矿业大学 Deep coal seam in-situ gas content measuring method
CN114215507B (en) * 2021-05-21 2023-11-17 华北科技学院(中国煤矿安全技术培训中心) Gas pressure measuring device and method based on directional drilling machine
CN113237453B (en) * 2021-05-28 2023-08-22 中煤科工集团沈阳研究院有限公司 Automatic measurement device and method for expansion deformation of push-expansion type protected layer
CN114809915B (en) * 2022-04-15 2022-11-22 河南理工大学 Hole drilling, sealing and pressure measuring integrated device and pressure measuring method for coal seam deep and long hole

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3690375A (en) * 1971-04-05 1972-09-12 Harold E Shillander Inflatable packer
US4411315A (en) * 1981-06-29 1983-10-25 Hughes Tool Company Drag spring unit
RU2078924C1 (en) * 1993-05-12 1997-05-10 Внедренческая научно-производственная фирма "НефтеТестСервис" Formation tester
CN2558757Y (en) * 2002-06-18 2003-07-02 大庆石油管理局 Pressure compensator of pressure maintaining seal coring tool
CN101581219A (en) * 2008-05-16 2009-11-18 中国科学院力学研究所 Device and method for measurement while drilling of ground stress

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3690375A (en) * 1971-04-05 1972-09-12 Harold E Shillander Inflatable packer
US4411315A (en) * 1981-06-29 1983-10-25 Hughes Tool Company Drag spring unit
RU2078924C1 (en) * 1993-05-12 1997-05-10 Внедренческая научно-производственная фирма "НефтеТестСервис" Formation tester
CN2558757Y (en) * 2002-06-18 2003-07-02 大庆石油管理局 Pressure compensator of pressure maintaining seal coring tool
CN101581219A (en) * 2008-05-16 2009-11-18 中国科学院力学研究所 Device and method for measurement while drilling of ground stress

Also Published As

Publication number Publication date
CN103953331A (en) 2014-07-30

Similar Documents

Publication Publication Date Title
CN103953331B (en) A kind of self-drilling type coal-bed gas pressure in-site detecting device
CN105716747A (en) Crustal stress rapid measuring device and method of rock stratum under coal mine
US2198821A (en) Sample-taking apparatus
CN207647494U (en) A kind of twin packer layering water plug
CN107191165A (en) Both-end blocks water filling device in hole
US11905829B2 (en) Integrated logging instrument for coring and sampling
CN107701155B (en) Underground intelligent control type packing injection allocation device
CN106595986A (en) Bottom plate mining failure zone segmental observation method
CN110308052B (en) Hollow rock sample radial seepage test device and test method based on acoustic emission technology
CN103016007B (en) Electronically controlled single-loop water-plugging overburden strata fracture detection method and probing machine
CN103670306A (en) Complex working condition monitoring device for well drilling
CN103912262B (en) A kind of concordant boring radially device for measuring volume variation
CN113266347B (en) Near-bit coal seam gas parameter while-drilling comprehensive measurement device and method
CN104632195B (en) A kind of gaslift helps flowing water horizontal well searching pipe column and method
CN203626726U (en) Integrated device for oil extraction wellhead
CN112855134B (en) Midway test device and test method for stationary drilling tool
CN204082135U (en) Extraction borehole sealing quality detector
CA2074962A1 (en) Apparatus and method for draining high pressure fluid samples without mercury
CN104420836A (en) Water finding tubular column of horizontal well section seat sealing wellhead flow method and water finding method thereof
CN202937264U (en) Electronically controlled single-loop water plugging and overburden rock fracture detector
CN207863945U (en) A kind of underground coal mine long drilled holes gas flow test device
CN107288571B (en) Integrated layered gas distribution and pressure measurement process for gas well
CN202250054U (en) Long probe system
CN204691750U (en) Supercritical CO 2 laminated distributor under well gas injection tube column
CN201193520Y (en) Double-measure press-guiding device under well of electric pump

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190719

Termination date: 20200429