CN103949501A - 用于修复桥式起重机主梁下挠的装置 - Google Patents
用于修复桥式起重机主梁下挠的装置 Download PDFInfo
- Publication number
- CN103949501A CN103949501A CN201410175624.7A CN201410175624A CN103949501A CN 103949501 A CN103949501 A CN 103949501A CN 201410175624 A CN201410175624 A CN 201410175624A CN 103949501 A CN103949501 A CN 103949501A
- Authority
- CN
- China
- Prior art keywords
- bearing support
- main beam
- pull bar
- repairing
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种用于修复桥式起重机主梁下挠的装置,包括支承架、拉杆、工作螺母和构造螺母;所述支承架设有两组,分别固定于起重机主梁下表面的两端;所述拉杆的两端分别穿过两组支承架并安装在支承架上,拉杆的两末端设有螺纹;所述工作螺母安装于拉杆末端上位于支承架外侧的位置,所述构造螺母安装于拉杆末端上位于支承架内侧的位置。本发明的有益效果是:通过拉杆对固定在起重机主梁上的支承架的拉伸产生的预应力来恢复主梁的上拱度,解决了桥式起重机主梁下挠的问题,并且能够使起重机主梁的强度和刚度得到加强,提高起重量。
Description
技术领域
本发明涉及桥式起重机的修理装置,尤其涉及一种用于修复桥式起重机主梁下挠的装置。
背景技术
现有的桥式起重机由于各种原因造成桥式起重机主梁变形而产生下挠,如果不及时修复,将会使下挠变形继续扩大,不仅满足不了生产要求,可能导致重大的设备和人身事故。
现有箱型主梁下挠的修复方法有多种,目前主要有火焰、电焊两种方法,火焰矫正法相对电焊法更优,其通过对金属的某一变形部位进行加热,利用金属加热后具有的压缩塑性变形性质达到矫正金属变形的目的,这种方法的灵活性很强,可以矫正桥架结构的各种各样的复杂变形,如箱型主梁的整体和局部的下挠,端梁和主梁的水平弯曲,腹板的波浪变形以及桥架对角线的误差等,但缺点是需要把起重机落到地面上,或立桅杆才能修理,工作周期长。
发明内容
本发明主要解决的技术问题是提供一种用于修复桥式起重机主梁下挠的装置,通过预应力对主梁的下挠问题进行修复,工作周期短。
为解决上述技术问题,本发明采用的一个技术方案是:提供一种用于修复桥式起重机主梁下挠的装置,包括支承架、拉杆、工作螺母和构造螺母;所述支承架设有两组,分别固定于起重机主梁下表面的两端;所述拉杆的两端分别穿过两组支承架并安装在支承架上,拉杆的两末端设有螺纹;所述工作螺母安装于拉杆末端上位于支承架外侧的位置,所述构造螺母安装于拉杆末端上位于支承架内侧的位置。
本发明的有益效果是:通过拉杆对固定在起重机主梁上的支承架的拉伸产生的预应力来恢复主梁的上拱度,解决了桥式起重机主梁下挠的问题,并且能够使起重机主梁的强度和刚度得到加强,提高起重量。
附图说明
图1是本发明的用于修复桥式起重机主梁下挠的装置的一个实施方式的主视图;
图2是图1中A处的局部放大图;
图3是本发明的用于修复桥式起重机主梁下挠的装置的支承架的主视图;
图4是本发明的用于修复桥式起重机主梁下挠的装置的支承架的右视图。
主要元件符号说明:
100、起重机主梁;
10、支承架;11、水平金属板;12、垂直金属板;13、金属加强板;20、拉杆;21、末端;30、工作螺母;40、构造螺母;51、金属板;60、垫圈。
具体实施方式
为详细说明本发明的技术内容、构造特征、所实现目的及效果,以下结合实施方式并配合附图详予说明。
相对于现有技术采用火焰或电焊的方法使起重机主梁产生压缩塑性变形来恢复其上拱度的方式,本发明通过拉杆对固定在起重机主梁上的支承架的拉伸产生的预应力来恢复主梁的上拱度,只需在主梁上进行动作而不必改变起重机的位置,耗时短,操作便捷。
请参阅图1,本实施方式为一种用于修复桥式起重机主梁下挠的装置,包括支承架10、拉杆20、工作螺母30和构造螺母40。
所述支承架10设有两组,分别固定于起重机主梁100下表面的两端。
所述拉杆20的两端分别穿过两组支承架10并安装在支承架10上,拉杆20的两末端21设有螺纹。
所述工作螺母30安装于所述末端21上位于支承架10外侧的位置,所述构造螺母40安装于所述末端21上位于支承架10内侧的位置。
本实施方式在实际使用中,一般先将两支承架焊接在起重机主梁下方,然后将拉杆穿过支承架从而安装在起重机主梁下;然后,将工作螺母、构造螺母和垫圈装入拉杆的末端上的螺纹内,先将构造螺母锁定,然后向支承架的内侧方向紧锁工作螺母,工作螺母在紧锁过程中向两外侧拉动拉杆使拉杆保持平直,从而减少起重机主梁的下挠并恢复平直,这样的操作耗时短且操作便捷,解决了桥式起重机主梁下挠的问题,并且能够使起重机主梁的强度和刚度得到加强,提高起重量。
优选地,请参阅图2和图3,在另一实施方式中,所述支承架10主要由垂直地固定在一起的水平金属板11和垂直金属板12组成,所述水平金属板11焊接在起重机主梁100上,所述垂直金属板12用于安装所述拉杆20。支承架上还包括同时与水平金属板11和垂直金属板12垂直固定的金属加强板13,所述金属加强板13设有两片,拉杆20的安装位置位于两片金属加强板13之间。具体地,金属加强板13设于支承架10的内侧,即两组支承架10上的金属加强板13是相向设置的,金属加强板13承受的是拉杆20在工作螺母30和构造螺母40的固定作用下向内拉垂直金属板12而产生的作用于金属加强板13上的压应力,这样的结构设置能使得两支承架承受更大的预应力。
优选地,如图1所示,在另一实施方式中,还包括吊架,所述吊架包括多个等间距地设于两组支承架10之间的金属板51,所述金属板51垂直地焊接于起重机主梁100下表面,拉杆20垂直地穿过多个金属板51,吊架能够对拉杆20起到支撑作用,使拉杆20能够更好地促使起重机主梁100恢复上拱度。
优选地,在另一实施方式中,还包括垫圈60,所述垫圈60设于所述工作螺母30和支承架10之间,防止工作螺母30压坏支承架10的表面。
本发明在实际使用中,一般先将两支承架焊接在起重机主梁下方,然后将拉杆穿过支承架和吊架从而安装在起重机主梁下;然后,将工作螺母、构造螺母和垫圈装入拉杆的末端上的螺纹内,先将构造螺母锁定,然后向支承架的内侧方向紧锁工作螺母,工作螺母在紧锁过程中靠压在支承架的垂直金属板上从而向两外侧拉动拉杆使拉杆保持平直,而拉杆在吊架的支撑下向上顶起起重机主梁,从而减少起重机主梁的下挠并恢复平直,这样的操作耗时短且操作便捷,解决了桥式起重机主梁下挠的问题,并且能够使主梁的强度和刚度得到加强,提高起重量。
以上所述仅为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本发明的专利保护范围内。
Claims (5)
1.一种用于修复桥式起重机主梁下挠的装置,其特征在于,包括支承架、拉杆、工作螺母和构造螺母;所述支承架设有两组,分别固定于起重机主梁下表面的两端;所述拉杆的两端分别穿过两组支承架并安装在支承架上,拉杆的两末端设有螺纹;所述工作螺母安装于拉杆末端上位于支承架外侧的位置,所述构造螺母安装于拉杆末端上位于支承架内侧的位置。
2.根据权利要求1所述的用于修复桥式起重机主梁下挠的装置,其特征在于,所述支承架主要由垂直地固定在一起的水平金属板和垂直金属板组成,所述水平金属板焊接在起重机主梁上,所述垂直金属板用于安装所述拉杆。
3.根据权利要求2所述的用于修复桥式起重机主梁下挠的装置,其特征在于,所述支承架还包括同时与所述水平金属板和垂直金属板垂直固定的金属加强板,所述金属加强板设有至少两片,所述拉杆的安装位置位于两片金属加强板之间。
4.根据权利要求1所述的用于修复桥式起重机主梁下挠的装置,其特征在于,还包括吊架,所述吊架包括多个等间距地设于两组支承架之间的金属板,所述金属板垂直地焊接于起重机主梁下表面,所述拉杆垂直地穿过吊架。
5.根据权利要求1所述的用于修复桥式起重机主梁下挠的装置,其特征在于,还包括垫圈,所述垫圈设于所述工作螺母和支承架之间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410175624.7A CN103949501A (zh) | 2014-04-29 | 2014-04-29 | 用于修复桥式起重机主梁下挠的装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410175624.7A CN103949501A (zh) | 2014-04-29 | 2014-04-29 | 用于修复桥式起重机主梁下挠的装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103949501A true CN103949501A (zh) | 2014-07-30 |
Family
ID=51326925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410175624.7A Pending CN103949501A (zh) | 2014-04-29 | 2014-04-29 | 用于修复桥式起重机主梁下挠的装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103949501A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113000638A (zh) * | 2021-03-16 | 2021-06-22 | 上海神尹科技股份有限公司 | 一种桥式双梁起重机主梁结构恢复静刚度的装置及方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB109988A (en) * | 1916-09-02 | 1917-10-02 | Steel Utilities Corp | Apparatus for Controlling the Movement of Structural Shapes or Beams through a Punching Machine. |
CN86209683U (zh) * | 1986-11-29 | 1987-11-11 | 付敏华 | 预应力张拉器 |
CN87211619U (zh) * | 1987-08-12 | 1988-05-18 | 沈阳铁路局锦州工程处第二建筑工程段 | 一种可调受力均衡的拉紧装置 |
CN2061930U (zh) * | 1990-02-17 | 1990-09-12 | 付敏华 | 预应力张拉器 |
CN1067419A (zh) * | 1991-08-01 | 1992-12-30 | 刘培纯 | 修复桥吊主梁下挠的方法和设备 |
CN1093304A (zh) * | 1993-07-03 | 1994-10-12 | 张遇民 | 矫正钢梁及提高钢梁承载力的技术 |
CN203900172U (zh) * | 2014-04-29 | 2014-10-29 | 福建省环境工程有限公司 | 用于修复桥式起重机主梁下挠的装置 |
-
2014
- 2014-04-29 CN CN201410175624.7A patent/CN103949501A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB109988A (en) * | 1916-09-02 | 1917-10-02 | Steel Utilities Corp | Apparatus for Controlling the Movement of Structural Shapes or Beams through a Punching Machine. |
CN86209683U (zh) * | 1986-11-29 | 1987-11-11 | 付敏华 | 预应力张拉器 |
CN87211619U (zh) * | 1987-08-12 | 1988-05-18 | 沈阳铁路局锦州工程处第二建筑工程段 | 一种可调受力均衡的拉紧装置 |
CN2061930U (zh) * | 1990-02-17 | 1990-09-12 | 付敏华 | 预应力张拉器 |
CN1067419A (zh) * | 1991-08-01 | 1992-12-30 | 刘培纯 | 修复桥吊主梁下挠的方法和设备 |
CN1093304A (zh) * | 1993-07-03 | 1994-10-12 | 张遇民 | 矫正钢梁及提高钢梁承载力的技术 |
CN203900172U (zh) * | 2014-04-29 | 2014-10-29 | 福建省环境工程有限公司 | 用于修复桥式起重机主梁下挠的装置 |
Non-Patent Citations (1)
Title |
---|
魏智全等: "桥式起重机主梁下挠的修复", 《西铁科技》, no. 3, 31 March 2003 (2003-03-31), pages 42 - 43 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113000638A (zh) * | 2021-03-16 | 2021-06-22 | 上海神尹科技股份有限公司 | 一种桥式双梁起重机主梁结构恢复静刚度的装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103075020B (zh) | 一种钢托盘支撑传力系统 | |
CN203636271U (zh) | 桥梁顶板、底板及腹板焊接反变形胎架工装 | |
CN202224486U (zh) | 钢管内支撑结构 | |
CN102587689A (zh) | 一种既有钢筋混凝土梁柱节点的修复和加固方法 | |
CN104929148B (zh) | 风力发电塔基础环基础的倒装加固系统及其加固方法 | |
CN203764681U (zh) | 储罐底板焊接变形矫正装置 | |
CN103711066A (zh) | 新型钢箱梁顶板单元结构及制作方法 | |
CN203900172U (zh) | 用于修复桥式起重机主梁下挠的装置 | |
CN103760659B (zh) | 一种索桁架型定日镜支撑装置 | |
CN103669924B (zh) | 一种变电构架矩形截面角钢构架梁挂线板新型节点结构 | |
JP2009013765A (ja) | 鉄塔の部材取替工法およびその工法で用いられる装置 | |
CN103949501A (zh) | 用于修复桥式起重机主梁下挠的装置 | |
CN105201098A (zh) | 新型无屈曲耗能支撑 | |
CN202788024U (zh) | 一种高刚度混凝土梁结构 | |
CN102864746A (zh) | 一种桥梁施工用承重架 | |
CN204276581U (zh) | 一种接管法兰焊后变形校正装置 | |
CN104492868A (zh) | 钢结构工程箱型柱矫正系统及矫正方法 | |
CN206912516U (zh) | 一种利用千斤顶调节不锈钢焊接变形的装置 | |
CN205764626U (zh) | 防止筒体纵缝焊接变形的工装装置 | |
CN205046843U (zh) | 一种安装中间加固装置的楼梯踏步模板 | |
CN203867164U (zh) | 一种带有定位钢管的悬挑型脚手架结构 | |
CN203795609U (zh) | 一种横梁嵌入式卡箍 | |
CN204081536U (zh) | 一种建筑施工中用于钢结构安装的可拆卸安全装置 | |
CN209293225U (zh) | 一种自复位、快修复u型软钢消能支撑 | |
CN203361165U (zh) | 一种建筑基坑围护用支撑梁连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140730 |