CN103939112A - Down-cross cheuch tunnel double-layer forepoling structure - Google Patents
Down-cross cheuch tunnel double-layer forepoling structure Download PDFInfo
- Publication number
- CN103939112A CN103939112A CN201410189986.1A CN201410189986A CN103939112A CN 103939112 A CN103939112 A CN 103939112A CN 201410189986 A CN201410189986 A CN 201410189986A CN 103939112 A CN103939112 A CN 103939112A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- self
- cheuch
- rock mass
- pipe
- Prior art date
Links
- 239000010410 layers Substances 0.000 title abstract description 4
- 239000011435 rock Substances 0.000 claims abstract description 16
- 230000002787 reinforcement Effects 0.000 claims description 5
- 239000004570 mortar (masonry) Substances 0.000 claims description 4
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injections Substances 0.000 claims description 3
- 239000002002 slurries Substances 0.000 claims description 3
- 239000007921 sprays Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 8
- 239000002352 surface water Substances 0.000 abstract description 3
- 239000011257 shell materials Substances 0.000 abstract description 2
- 239000011440 grout Substances 0.000 abstract 3
- 229910000831 Steel Inorganic materials 0.000 abstract 2
- 239000011378 shotcrete Substances 0.000 abstract 2
- 239000010959 steel Substances 0.000 abstract 2
- 238000010586 diagrams Methods 0.000 description 2
- 238000005516 engineering processes Methods 0.000 description 2
- 239000000243 solutions Substances 0.000 description 2
- 239000011901 water Substances 0.000 description 2
- 230000036536 Cave Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000006243 chemical reactions Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 201000010099 diseases Diseases 0.000 description 1
- 238000005755 formation reactions Methods 0.000 description 1
- 239000000203 mixtures Substances 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Abstract
Description
Technical field
the invention belongs to tunnel traffic field of engineering technology, be specifically related to wear under one the double-deck advance support structure in cheuch tunnel.
Background technology
The traffic engineering such as mountain railway, highway need to be built a large amount of construction of tunnel, to improve line standard and to improve operation condition, grow on the earth's surface, mountain range that tunnel passes often gully, many cheuches also have long-term flowing water, when construction of tunnel is passed through below cheuch, the main problem existing is: tunnel top buried depth is smaller, mostly is alluvial deposit in ditch, subterrane is also weathered layer, and formation stability is poor; Stratum self-stable ability is low, the time is short, and construction needs quick supporting sealing, is often difficult to accomplish.Slightly improper, be easy to collapse and cave-in, surface water pours in down a chimney into tunnel, construction safety is caused to significant damage, build up rear tunnel structure and also have the disease hidden danger such as cracking, percolating water, therefore, select rational advance support measure, make full use of self, reduce to greatest extent disturbance, most important to the construction of safety cheuch section.
Summary of the invention
The object of this invention is to provide under one and wear the double-deck advance support structure in cheuch tunnel, effectively prevent collapse and cave-in and surface water to pour in down a chimney into tunnel.
The technical solution adopted in the present invention is:
Under wear the double-deck advance support structure in cheuch tunnel, it is characterized in that:
The steelframe of multiple tracks hoop is longitudinally set in tunnel inner wall, and sprays sprayed mortar covering steelframe;
In the country rock of arch, tunnel, longitudinally set many ring self-advancing type pipe canopies, laterally between adjacent self-advancing type pipe canopy, set a ductule, longitudinally between adjacent self-advancing type pipe canopy, set four ductules; The fixed slurries of pressure injection in ductule, are combined with top, arch rock mass and form grouting reinforcement rock mass.
The extrapolation angle of ductule is greater than the extrapolation angle of self-advancing type pipe canopy.
The present invention has the following advantages:
The present invention has fully studied topographic and geologic condition and the difficulty of construction of time wearing cheuch section; by abundant the advantage of long pipe shed and tubulature combination; and by pre-grouting reinforcement rock mass; take full advantage of rock stratum self-supporting ability; thereby form a kind of economical rationality, safe and reliable containment vessel, make constructing tunnel in a safe condition.
Brief description of the drawings
Fig. 1 is front of the present invention arrangement diagram.
Fig. 2 is longitudinal surface arrangement diagram of the present invention.
In figure, 1-grouting reinforcement rock mass, 2-sprayed mortar, 3-steelframe, 4-self-advancing type pipe canopy, 5-ductule.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the present invention will be described in detail.
The present invention relates to wear under one the double-deck advance support structure in cheuch tunnel, the steelframe 3 of multiple tracks hoop is longitudinally set in tunnel inner wall, and spray sprayed mortar 2 and cover steelframe 3, form one deck protection.In the country rock of arch, tunnel, longitudinally set many ring self-advancing type pipe canopies 4, self-advancing type pipe canopy 4 is for carrying drill bit device, directly punching is installed, and laterally between adjacent self-advancing type pipe canopy 4, sets a ductule 5, longitudinally between adjacent self-advancing type pipe canopy 4, sets four ductules 5; At the fixed slurries of the interior pressure injection of ductule 5, be combined with top, arch rock mass and form grouting reinforcement rock mass 1, form another layer of protection; finally complete double-deck supporting measure; form safeguard protection shell in arch, can effectively control arch, tunnel and cave in, guarantee construction and structural safety.The extrapolation angle (10~15 °) of ductule 5 is greater than the extrapolation angle (3~5 °) of self-advancing type pipe canopy 4.Tunnel excavation should carry out under the protection of a upper ring, and self-advancing type pipe canopy 4 longitudinally all should suitably overlap overlapping certain limit with ductule 5.
It is cited that content of the present invention is not limited to embodiment, and the conversion of any equivalence that those of ordinary skill in the art take technical solution of the present invention by reading manual of the present invention, is claim of the present invention and contains.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410189986.1A CN103939112A (en) | 2014-05-07 | 2014-05-07 | Down-cross cheuch tunnel double-layer forepoling structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410189986.1A CN103939112A (en) | 2014-05-07 | 2014-05-07 | Down-cross cheuch tunnel double-layer forepoling structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103939112A true CN103939112A (en) | 2014-07-23 |
Family
ID=51186958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410189986.1A CN103939112A (en) | 2014-05-07 | 2014-05-07 | Down-cross cheuch tunnel double-layer forepoling structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103939112A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105781557A (en) * | 2016-03-25 | 2016-07-20 | 广东水电二局股份有限公司 | Method for constructing underground excavated tunnel by adopting chemical grouting for sand layer consolidation |
CN108798718A (en) * | 2018-07-09 | 2018-11-13 | 中铁十七局集团第四工程有限公司 | Subsequent grouting method is held before tunnel |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201241712Y (en) * | 2008-08-22 | 2009-05-20 | 中铁第一勘察设计院集团有限公司 | Primary support structure of large deformation formation tunnel |
CN101614125A (en) * | 2009-07-23 | 2009-12-30 | 中铁九局集团有限公司 | V level surrounding rock tunnel job practices |
CN201786361U (en) * | 2010-08-09 | 2011-04-06 | 中铁第一勘察设计院集团有限公司 | Supporting structure for railway crossing under loess tunnel with extra-large section |
CN102213099A (en) * | 2011-05-23 | 2011-10-12 | 中铁二院工程集团有限责任公司 | Composite liner structure of four-track large-span wall-foundation arched tunnel |
CN203476347U (en) * | 2013-07-24 | 2014-03-12 | 中南大学 | Preliminary bracing device for collapsible loess tunnel |
CN203835406U (en) * | 2014-05-07 | 2014-09-17 | 中铁第一勘察设计院集团有限公司 | Double-layer forepoling structure for underneath pass valley tunnel |
-
2014
- 2014-05-07 CN CN201410189986.1A patent/CN103939112A/en not_active Application Discontinuation
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201241712Y (en) * | 2008-08-22 | 2009-05-20 | 中铁第一勘察设计院集团有限公司 | Primary support structure of large deformation formation tunnel |
CN101614125A (en) * | 2009-07-23 | 2009-12-30 | 中铁九局集团有限公司 | V level surrounding rock tunnel job practices |
CN201786361U (en) * | 2010-08-09 | 2011-04-06 | 中铁第一勘察设计院集团有限公司 | Supporting structure for railway crossing under loess tunnel with extra-large section |
CN102213099A (en) * | 2011-05-23 | 2011-10-12 | 中铁二院工程集团有限责任公司 | Composite liner structure of four-track large-span wall-foundation arched tunnel |
CN203476347U (en) * | 2013-07-24 | 2014-03-12 | 中南大学 | Preliminary bracing device for collapsible loess tunnel |
CN203835406U (en) * | 2014-05-07 | 2014-09-17 | 中铁第一勘察设计院集团有限公司 | Double-layer forepoling structure for underneath pass valley tunnel |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105781557A (en) * | 2016-03-25 | 2016-07-20 | 广东水电二局股份有限公司 | Method for constructing underground excavated tunnel by adopting chemical grouting for sand layer consolidation |
CN105781557B (en) * | 2016-03-25 | 2018-10-02 | 广东水电二局股份有限公司 | A kind of construction method of bored tunnel chemical grouting consolidation layer of sand |
CN108798718A (en) * | 2018-07-09 | 2018-11-13 | 中铁十七局集团第四工程有限公司 | Subsequent grouting method is held before tunnel |
CN108798718B (en) * | 2018-07-09 | 2020-11-10 | 中铁十七局集团第四工程有限公司 | Tunnel front-bearing subsequent grouting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105041325B (en) | Construction method of high-tension water-rich extra-large-section weak breccia tunnel | |
CN103089275B (en) | Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections | |
CN102128035B (en) | Construction method of bilateral biased small-clear distance tunnel | |
CN102493822B (en) | Method for performing curtain grouting construction on tunnel by water rich fault influence zone | |
CN203756182U (en) | Support structure applied to shallow road tunnel in weak rock area | |
CN102606167B (en) | Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel | |
CN103696803B (en) | A kind of for mine down-hole tailing cemented filling barricade device | |
CN102758632B (en) | Rock stratum double initial support layering method for establishing large-scale underground structure | |
CN102021911B (en) | Side slope reinforcing method and structure | |
CN101858220B (en) | Tunnel double upper sidewall heading construction method | |
CN103161480B (en) | Initiatively support the method for roadside packing gob side entry retaining | |
CN101408106B (en) | Small tube shed pre-grouting method | |
CN104929648B (en) | A kind of tunnel branch base tunnel construction method | |
CN101864987B (en) | Building method of filled wall body for gob-side entry retaining of large-inclination coal seam | |
CN104196537A (en) | Construction method of three parallel metro tunnels with ultra-small clear distance | |
CN105888703B (en) | Super Shallow Covered Metro Station construction method under lateral canopy lid is performed in micro- pilot tunnel | |
CN104675403A (en) | Underground space construction method and supporting structure | |
CN202882943U (en) | Yielding type restrained concrete arc frame high-strength three-dimensional supporting and protecting system | |
CN105781571A (en) | Construction method for soft rock deformation tunnel lining support dismantling-replacing arch | |
CN204572015U (en) | A kind of tunnel shunting combined type waterproof and water drainage system | |
CN205422813U (en) | Detachable filling and retaining wall | |
CN202707075U (en) | Long-span subway station main structure constructed based on column and arch method | |
CN105971606B (en) | A kind of thick sandstone coal wall recovery method | |
CN104452809B (en) | A kind of super shallow tunnel cover and cut construction method | |
CN102251777B (en) | Large-scale karst cavity treatment method for karst tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140723 |
|
C12 | Rejection of a patent application after its publication |