CN103938623A - Tubular pile construction method - Google Patents

Tubular pile construction method Download PDF

Info

Publication number
CN103938623A
CN103938623A CN201310016474.0A CN201310016474A CN103938623A CN 103938623 A CN103938623 A CN 103938623A CN 201310016474 A CN201310016474 A CN 201310016474A CN 103938623 A CN103938623 A CN 103938623A
Authority
CN
China
Prior art keywords
pile
tubular pile
pile top
bearing capacity
expanded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310016474.0A
Other languages
Chinese (zh)
Inventor
张超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI PUDONG NEW ZONE INTELLECTUAL PROPERTY PROTECTION ASSOCIATION
Original Assignee
SHANGHAI PUDONG NEW ZONE INTELLECTUAL PROPERTY PROTECTION ASSOCIATION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI PUDONG NEW ZONE INTELLECTUAL PROPERTY PROTECTION ASSOCIATION filed Critical SHANGHAI PUDONG NEW ZONE INTELLECTUAL PROPERTY PROTECTION ASSOCIATION
Priority to CN201310016474.0A priority Critical patent/CN103938623A/en
Publication of CN103938623A publication Critical patent/CN103938623A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a construction method of a tubular pile with a mechanically expanded pile toe and a twice expanded head and particularly relates to a tubular pile construction method. According to the method, a jet-grouted solid in a fixed shape is formed through the jet grouting technology. In this way, the twice expanded head at the bottom end of a precast tubular pile is formed, so that the single-pile bearing capacity of the precast tubular pile is improved substantially. The effective end area of the precast tubular pile is increased by multiple times than that of a common grouting tubular pile, so the single-pile bearing capacity of the precast tubular pile can be improved substantially, and the pile end area of the precast tubular pile can be expanded; since foundation construction is conducted on the precast tubular pile through the construction method of the tubular pile with the twice expanded head, compared with a common high-pressure rotary jet grouting tubular pile, the tubular pile with the mechanically expanded pile toe and the twice expanded head has the advantages that the bearing capacity of per unit length is increased, and the cost of the unit bearing capacity is lowered; compared with a common precast tubular pile, the tubular pile with the mechanically expanded pile toe and the twice expanded head has the advantage that the project period is greatly shortened because the length of the tubular pile is reduced.

Description

A kind of construction method of pile tube
Technical field
The present invention relates to building engineering field, particularly a kind of construction method of construction method pile tube of pile tube.
Background technology
Pile tube is high with its easy construction, bearing capacity as the new stake of one type, reliable in quality, comparatively economic dispatch advantage is more and more widely used.Pile tube processes as a kind of ground and pile foundation form just produces and obtained till now very large development from eighties of last century, is applied widely, and bringing into play huge effect in various building foundations.
In patent CN 201288325 Y, disclose a kind of high-pressure rotary-spray enlarged head pre-stress pipe pile, comprised prestressed concrete pipe, it is characterized in that stirring coagulation by high-pressure rotary-spray cement paste and pile pipe front end soil layer forms induration expansion pile head.Both produced with pile pipe end and be bonded to induration at the end of pile pipe, in pile pipe, utilize again and enter intraluminal soil plug manufacture induration, and itself and pile pipe end induration around can be bonded to entirety, and the area of the induration of pile pipe end is determined by designing requirement, its bearing capacity is strengthened, expand induration area, increase its bearing capacity of pile tip.But this invention effect in practice is not fairly obvious, and unit length bearing capacity is lower, and unit bearing capacity expense is higher, and the duration used is longer.
Summary of the invention
The present invention first carries out machinery rotation to pile top and expands, and improves a stake end area, then uses high pressure jet grouting technology in the stake end bottom having expanded, and forms the figurate induration of tool.So form twice of prefabricated tubular pile bottom enlarged footing, thereby improve greatly prefabricated tubular pile bearing capacity of single pile.
The present invention is based on and improve pipe pile end portion bearing capacity and give full play to pile body ability, and improve the target that existing slurry injection technique is limited by pipe pile floor space, so twice enlarged footing construction of experience, form twice of prefabricated tubular pile bottom enlarged footing, the common slip casting pipe pile of its live end Area Ratio improves several times, thereby can improve greatly prefabricated tubular pile bearing capacity of single pile, can expand pipe pile end area, utilize the construction method of twice enlarged footing pile tube, carry out prefabricated tubular pile foundation construction, compared with common high-pressure rotary-spray pile tube, improve unit length bearing capacity, reduce unit bearing capacity expense, compared with common prefabricated tubular pile, owing to reducing, stake is long, greatly shorten the duration.
Brief description of the drawings
The pile top of Fig. 1 mechanical amplification
Fig. 1: 1-sheath rod clamp, steel pipe in 2-, the outer steel pipe of 3-, 4-inner tube fixation clamp, 5-inner tube push rod, 6-outer tube push rod, the outer triangular steel plate of 7-, folding steel hinge plate in 8-, 9-pile top sheath, 10-sheath rod, 11-sheath rod shrinks clamp, and 12-shrinks clamp contact, 13-stay hook, 14-retainer ring
Fig. 2 pile top is opened completely
Fig. 2: 1-pushes away Zhang Gangguan
Detailed description of the invention
First pile top is carried out to machinery rotation and expand, improve a stake end area, then use high pressure jet grouting technology in the stake end bottom having expanded, form the figurate induration of tool.So form twice of prefabricated tubular pile bottom enlarged footing, thereby improve greatly prefabricated tubular pile bearing capacity of single pile.
As shown in Figure 1, pile top of the present invention adopts the design of " umbrella three blocks an ejector sleeve ": the principle that opens an umbrella, three have the clamp of special function, a multiplex Zhang Gangguan of pushing away.Three clamps are respectively sheath rod clamp, inner tube fixation clamp, sheath rod contraction clamp.
As shown in Figure 2, be lowered to and push away Zhang Gangguan, pile top is strutted as the shape that opens an umbrella, pile top is carried out to machinery rotation and expand, improve a stake end area.Carry out pile top rotation and push away while expansion, answer held stationary speed, ensure that once-through operation puts in place; And pay close attention to the pressure, moment of torsion, displacement situation etc. of monitoring.
The stake end bottom expanding in machinery rotation is used high pressure jet grouting technology, forms twice of prefabricated tubular pile bottom enlarged footing, thereby improves greatly prefabricated tubular pile bearing capacity of single pile.In common high pressure jet grouting technology, increase the pile top of mechanical amplification, improve by a relatively large margin prefabricated tubular pile bearing capacity of single pile.An enlarged footing concreting is complete, and the concrete such as need reach some strength, just can carry out high pressure jet grouting construction; Also can not be too late, cause concrete to harden completely, cannot penetrate.
Twice enlarged footing pile tube, is applicable to the following geological conditions of medium sand, is not suitable for for coarse sand and above stratum, need to strengthen geologic prospect; Twice enlarged footing pile tube, should not design longly, and conventionally stake is long should, in 30m, make use to bring into play its end
Specific embodiment: the pile top that uses machinery rotation to expand, the enlarged footing of formation, can expand pipe pile end area 300%; Utilize the construction method of twice enlarged footing pile tube, carry out prefabricated tubular pile foundation construction, compared with common high-pressure rotary-spray pile tube, unit length bearing capacity improves 140%, and unit bearing capacity expense reduces by 37%; Compared with common prefabricated tubular pile, due to reduce stake long, greatly shortened the duration.

Claims (4)

1. a construction method for pile tube, is characterized in that: first pile top is carried out to machinery rotation and expand, improve a stake end area, then use high pressure jet grouting technology in the stake end bottom having expanded, form the figurate induration of tool.
2. the pile top of mechanical amplification according to claim 1, is characterized in that: pile top of the present invention adopts the design of " umbrella three blocks an ejector sleeve ": the principle that opens an umbrella, three have the clamp of special function, a multiplex Zhang Gangguan of pushing away;
According to claim 2, the pile top of mechanical amplification, is characterized in that: three clamps are respectively sheath rod clamp, inner tube fixation clamp, sheath rod contraction clamp.
3. method according to claim 1, is characterized in that: be lowered to and push away Zhang Gangguan, pile top is strutted as the shape that opens an umbrella, pile top is carried out to machinery rotation and expand, improve a stake end area.
4. method according to claim 1, is characterized in that: carry out pile top rotation and push away while expansion, answer held stationary speed, ensure that once-through operation puts in place; And pay close attention to the pressure, moment of torsion, displacement situation etc. of monitoring.
CN201310016474.0A 2013-01-17 2013-01-17 Tubular pile construction method Pending CN103938623A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310016474.0A CN103938623A (en) 2013-01-17 2013-01-17 Tubular pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310016474.0A CN103938623A (en) 2013-01-17 2013-01-17 Tubular pile construction method

Publications (1)

Publication Number Publication Date
CN103938623A true CN103938623A (en) 2014-07-23

Family

ID=51186478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310016474.0A Pending CN103938623A (en) 2013-01-17 2013-01-17 Tubular pile construction method

Country Status (1)

Country Link
CN (1) CN103938623A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178324A (en) * 2015-09-25 2015-12-23 广州市市政工程设计研究总院 Construction device for umbrella tray type special-shaped pile
CN105568964A (en) * 2016-02-22 2016-05-11 上海宝冶集团有限公司 Umbrella-shaped assistant device for construction of tubular pile expanded-foot
CN106638570A (en) * 2016-11-23 2017-05-10 南京工业大学 Hinge enlarging head steel pipe pile
CN108252298A (en) * 2018-01-19 2018-07-06 河海大学 A kind of reexpansion stake and its construction method
CN112832234A (en) * 2020-12-31 2021-05-25 山东大学 Rotary expansion pile for foundation stabilization and construction method thereof
CN113684823A (en) * 2021-09-29 2021-11-23 延安大学 Tubular pile composite foundation suitable for high-fill collapsible loess field and construction method thereof
CN114839205A (en) * 2022-05-11 2022-08-02 中国矿业大学 Umbrella-shaped opening-closing sectional type low-strain integrity testing device and method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178324A (en) * 2015-09-25 2015-12-23 广州市市政工程设计研究总院 Construction device for umbrella tray type special-shaped pile
CN105568964A (en) * 2016-02-22 2016-05-11 上海宝冶集团有限公司 Umbrella-shaped assistant device for construction of tubular pile expanded-foot
CN106638570A (en) * 2016-11-23 2017-05-10 南京工业大学 Hinge enlarging head steel pipe pile
CN106638570B (en) * 2016-11-23 2018-11-27 南京工业大学 A kind of hinge enlarged footing steel-pipe pile
CN108252298A (en) * 2018-01-19 2018-07-06 河海大学 A kind of reexpansion stake and its construction method
CN108252298B (en) * 2018-01-19 2019-09-10 河海大学 A kind of reexpansion stake and its construction method
CN112832234A (en) * 2020-12-31 2021-05-25 山东大学 Rotary expansion pile for foundation stabilization and construction method thereof
CN112832234B (en) * 2020-12-31 2022-04-12 山东大学 Rotary expansion pile for foundation stabilization and construction method thereof
CN113684823A (en) * 2021-09-29 2021-11-23 延安大学 Tubular pile composite foundation suitable for high-fill collapsible loess field and construction method thereof
CN114839205A (en) * 2022-05-11 2022-08-02 中国矿业大学 Umbrella-shaped opening-closing sectional type low-strain integrity testing device and method
CN114839205B (en) * 2022-05-11 2024-01-23 中国矿业大学 Umbrella-shaped opening and closing sectional type low-strain integrity testing device and method

Similar Documents

Publication Publication Date Title
CN103938623A (en) Tubular pile construction method
CN104131556B (en) The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN201686986U (en) Pre-stressed anchor bar with detachable main bar
CN109930609A (en) A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground
CN103590408A (en) Novel double-row pile beam vertical anchor supporting system and construction method thereof
CN102605773B (en) Construction method of slip-casting expanded-base cast-in-situ bored pile and extruding-extending device thereof
CN102191772A (en) Prefabricated reaming pile and construction method thereof
CN102535458A (en) Reinforced cement-soil anchor bolt and construction method thereof
CN201835276U (en) Prefabricated reaming pile
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN203256748U (en) Pre-stressed concrete pipe/square pile grouting device
CN104594360A (en) Composite double-row pile foundation pit supporting structure
CN204040041U (en) A kind of front close rear thin Double-row Piles Support system being provided with vertical anchor pole
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN202055244U (en) Soil compaction type anchor bolt
CN105804072A (en) Slip casting pipe device, Y-shaped abnormal-shape pile with device in prefabricated manner and slip casting method of device
CN103924592B (en) A kind of pressure-type PHA anchor pole and construction method thereof
CN103243721A (en) Raft foundation and core tube excavation construction method of high-rise building under weak geological conditions
CN203583496U (en) Novel double-row-pile-beam vertical anchor supporting system
CN202787275U (en) Tubular soil nailing wall of novel pneumatic impact anchor
CN205116168U (en) End grout static pressure tubular pile construction equipment is expanded in drilling
CN204803898U (en) Subway station basement supporting construction
CN208039240U (en) A kind of built pile
CN103397630B (en) Stiffening pile with grouting bags
CN209443463U (en) Spiral heat pipe ring-like ribs first drain grouting behind shaft or drift lining bamboo joint pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140723