CN103938608B - A kind of method preventing discrete material pile bulging destruction in composite foundation - Google Patents
A kind of method preventing discrete material pile bulging destruction in composite foundation Download PDFInfo
- Publication number
- CN103938608B CN103938608B CN201410131757.4A CN201410131757A CN103938608B CN 103938608 B CN103938608 B CN 103938608B CN 201410131757 A CN201410131757 A CN 201410131757A CN 103938608 B CN103938608 B CN 103938608B
- Authority
- CN
- China
- Prior art keywords
- pile
- foundation wall
- pile body
- foundation
- discrete material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of method preventing discrete material pile bulging destruction in composite foundation, on the outer top of the pile body of discrete material pile, one circle first foundation wall is set, the second foundation wall is connected with between the first foundation wall that adjacent studs is external, first foundation wall, the second foundation wall from pile body top to the degree of depth for leaving pile body top 2D, D is pile body diameter, the present invention makes full use of the mutual constraint between adjacent pile body, and economy is practical again.
Description
Technical field
The invention belongs to composite foundation discrete material pile technical field, be specifically related to a kind of method preventing discrete material pile bulging destruction in composite foundation.
Background technology
Discrete material pile (broken stone pile, sand pile, sand-gravel pile etc.).For broken stone pile, it is the good method of consolidation process pine, soft foundation, and the composite foundation formed by broken stone pile method can improve bearing capacity of foundation soil and reduce sedimentation.Broken stone pile pile body has good water permeability, is conducive to excess pore pressure dissipation, has good economic benefit and social benefit.The depth that to take broken stone pile as the mode of failure overwhelming majority of the discrete material pile body of representative be, and top occurs that bulging destroys (experimentally result, being easy to occur place that bulging destroys most is that to push up down 2/3D(D from stake be stake footpath)).This is because the material of on the one hand composition pile body is noncohesive, has discrete material power diffusion effect and the own intensity degree of depth of pile body and increasing, and increases produce the possibility that plasticity bloats and diminish with the degree of depth; The resistance bloated due to inter-pile soil opposing pile body on the other hand also increases with the degree of depth.At present, the method for employing has geosynthetics to add hoop method, tubular type grill reinforce method etc. at stake top, but the material of these methods itself can deformed in tension, can produce certain lateral displacement adding hoop section pile body; Also have employing prestressed reinforced concrete to wrap and add the method at hoop pile body top, but this method expense material is taken a lot of work.
Summary of the invention
In order to overcome the shortcoming of above-mentioned prior art, the object of the present invention is to provide a kind of not only economy but also practical method---a kind of method preventing discrete material pile bulging destruction in composite foundation.
In order to achieve the above object, the technical scheme that the present invention takes is:
Prevent the method that in composite foundation, discrete material pile bulging is destroyed, comprise the following steps: one circle first foundation wall 2 is set on the outer top of pile body 1 of discrete material pile, between the first foundation wall 2 outside adjacent pile body 1, be connected with the second foundation wall 3.
The first described foundation wall 2, second foundation wall 3 is from pile body 1 top to the degree of depth for leaving pile body 1 top 2D, and D is pile body 1 diameter.
The thickness of the first described foundation wall 2, second foundation wall 3 is 120-370mm.
The first described foundation wall 2, second foundation wall 3 all adopts solid plain brick.
If pile layout lays out pile with square or rectangle, then the second foundation wall 3 is set at the four direction of pile body 1.
If pile layout lays out pile with triangle, then the second foundation wall 3 is set at the six direction of pile body 1.
Beneficial effect of the present invention: make full use of the mutual constraint between adjacent pile body 1, gather materials on the spot, easy construction, economy are practical again.
Accompanying drawing explanation
Fig. 1 is the first foundation wall 2, second foundation wall 3 horizontal cross of single pile body 1.
Fig. 2 is the first foundation wall 2, second foundation wall 3 vertical sectional view of single pile body 1.
Fig. 3 arranges the horizontal cross that the first foundation wall 2 and four direction arrange the second foundation wall 3 when laying out pile with quadrangle at pile body 1 place.
Fig. 4 arranges the horizontal cross that the first foundation wall 2 and six direction arrange the second foundation wall 3 when laying out pile with triangle at pile body 1 place.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in detail.
A kind of method preventing discrete material pile bulging destruction in composite foundation, comprise the following steps: on the outer top of pile body 1 of discrete material pile, one circle first foundation wall 2 is set, the second foundation wall 3 is connected with, as depicted in figs. 1 and 2 between the first foundation wall 2 outside adjacent pile body 1.
The first described foundation wall 2, second foundation wall 3 is from pile body 1 top to the degree of depth for leaving pile body 1 top 2D, and D is pile body 1 diameter.
The thickness of the first described foundation wall 2, second foundation wall 3 is 120-370mm.
The first described foundation wall 2, second foundation wall 3 all adopts solid plain brick.
As shown in Figure 3, if pile layout lays out pile with square or rectangle, then the second foundation wall 3 is set at the four direction of pile body 1.
As shown in Figure 4, if pile layout lays out pile with triangle, then the second foundation wall 3 is set at the six direction of pile body 1.
The above, it is only the preferred embodiment preventing discrete material pile bulging destruction methods in composite foundation of the present invention, not any pro forma restriction is done to the present invention, although the present invention discloses as above with preferred embodiment, any those skilled in the art, do not departing within the scope of technical solution of the present invention, when the method preventing composite foundation medium stone stake bulging from destroying and technology contents that can utilize above-mentioned announcement make the Equivalent embodiments changing or be modified to equivalent variations a bit, in every case be the content not departing from technical solution of the present invention, according to any simple modification that technical spirit of the present invention is done above embodiment, equivalent variations and modification, still belong in the scope of technical solution of the present invention.
Claims (3)
1. one kind prevents the method that in composite foundation, discrete material pile bulging is destroyed, it is characterized in that, comprise the following steps: one circle first foundation wall (2) is set on pile body (1) the outer top of discrete material pile, between adjacent pile body (1) the first foundation wall (2) outward, be connected with the second foundation wall (3);
Described the first foundation wall (2), the degree of depth of the second foundation wall (3) are from pile body (1) top to the degree of depth for leaving pile body (1) top 2D, and D is pile body (1) diameter;
Described the first foundation wall (2), the thickness of the second foundation wall (3) are 120-370mm;
Described the first foundation wall (2), the second foundation wall (3) all adopt solid plain brick.
2. a kind of method preventing discrete material pile bulging destruction in composite foundation according to claim 1, is characterized in that: if pile layout lays out pile with rectangle, then arranges the second foundation wall (3) at the four direction of pile body (1).
3. a kind of method preventing discrete material pile bulging destruction in composite foundation according to claim 1, is characterized in that: if pile layout lays out pile with triangle, then arranges the second foundation wall (3) at the six direction of pile body (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410131757.4A CN103938608B (en) | 2014-04-02 | 2014-04-02 | A kind of method preventing discrete material pile bulging destruction in composite foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410131757.4A CN103938608B (en) | 2014-04-02 | 2014-04-02 | A kind of method preventing discrete material pile bulging destruction in composite foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103938608A CN103938608A (en) | 2014-07-23 |
CN103938608B true CN103938608B (en) | 2016-01-20 |
Family
ID=51186463
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410131757.4A Expired - Fee Related CN103938608B (en) | 2014-04-02 | 2014-04-02 | A kind of method preventing discrete material pile bulging destruction in composite foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103938608B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107964947A (en) * | 2017-12-25 | 2018-04-27 | 武汉广益交通科技股份有限公司 | Method for processing foundation and structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11140889A (en) * | 1997-11-05 | 1999-05-25 | Tone Geo Tech Co Ltd | Foundation pile reinforcing method |
JP2001011848A (en) * | 1999-06-30 | 2001-01-16 | Nkk Corp | Gravel drain |
CN1619061A (en) * | 2004-06-01 | 2005-05-25 | 西北农林科技大学 | Broken stone stake composite ground loading force postengineering regulating method |
CN1928250A (en) * | 2006-07-25 | 2007-03-14 | 兰州理工大学 | Method for reinforcing dispersive materials pile |
CN102828498A (en) * | 2012-05-10 | 2012-12-19 | 湖南大学 | Method for constructing gravel pile of hoop of immersed tube for reinforcing soft foundation |
-
2014
- 2014-04-02 CN CN201410131757.4A patent/CN103938608B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11140889A (en) * | 1997-11-05 | 1999-05-25 | Tone Geo Tech Co Ltd | Foundation pile reinforcing method |
JP2001011848A (en) * | 1999-06-30 | 2001-01-16 | Nkk Corp | Gravel drain |
CN1619061A (en) * | 2004-06-01 | 2005-05-25 | 西北农林科技大学 | Broken stone stake composite ground loading force postengineering regulating method |
CN1928250A (en) * | 2006-07-25 | 2007-03-14 | 兰州理工大学 | Method for reinforcing dispersive materials pile |
CN102828498A (en) * | 2012-05-10 | 2012-12-19 | 湖南大学 | Method for constructing gravel pile of hoop of immersed tube for reinforcing soft foundation |
Also Published As
Publication number | Publication date |
---|---|
CN103938608A (en) | 2014-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103526721B (en) | A kind of permeable pile foundation groynes | |
CN207891857U (en) | Bidirectional screw soil compaction stake handles collapsible loess composite foundation | |
CN105200879A (en) | Water-permeable foam concrete pile compound foundation | |
CN205475201U (en) | A device for constructing steel plate concrete ground is wall even | |
CN207934028U (en) | The foundation structure of serious Collapsible Loess District basement process | |
CN103938608B (en) | A kind of method preventing discrete material pile bulging destruction in composite foundation | |
CN104074183A (en) | Drilling and concrete injected root composite pile implanting pile structure and construction method | |
CN203977409U (en) | A kind of prefabricated assembled concrete pile foundation | |
CN203247597U (en) | Construction structure of deep soft soil foundation bridge abutment | |
CN202124863U (en) | Screw anchor excavated composite foundation | |
CN204370400U (en) | The two-way Reinforced Gravel Pile of a kind of geosynthetics | |
CN201620413U (en) | Composite foundation with PTC perforated tubular piles with caps | |
CN205677030U (en) | A kind of drainage inspection well backfill structure | |
CN204224945U (en) | Beam and slab type paving structure | |
CN205532633U (en) | Tunnel bottom plate reinforcerment system | |
CN203947469U (en) | Two carrying helical burr ram for building | |
CN103437326A (en) | Composite material dam | |
CN204676565U (en) | A kind of novel pit backfill structure | |
CN203960843U (en) | Broken stone pile and CFG stake combined composite foundation | |
CN203475394U (en) | Composite material dam | |
CN204000846U (en) | Floral tube slip casting uplift pile | |
CN204418189U (en) | A kind of pit backfill structure | |
CN207092156U (en) | A kind of seepage proof curtain for releasing collapsible loess foundation settlement by soaking is with level every infiltration level structure | |
CN205223769U (en) | Structure is restoreed fast to mountain area slope road bed | |
CN104895095A (en) | A method of reinforcing deep water foundation pit steel sheet pile cofferdams |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160120 Termination date: 20180402 |
|
CF01 | Termination of patent right due to non-payment of annual fee |