CN103924764A - Stone dry hanging mounting system capable of being regulated and controlled - Google Patents

Stone dry hanging mounting system capable of being regulated and controlled Download PDF

Info

Publication number
CN103924764A
CN103924764A CN201410172313.5A CN201410172313A CN103924764A CN 103924764 A CN103924764 A CN 103924764A CN 201410172313 A CN201410172313 A CN 201410172313A CN 103924764 A CN103924764 A CN 103924764A
Authority
CN
China
Prior art keywords
side wall
abutment walls
main body
connector
matrix
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410172313.5A
Other languages
Chinese (zh)
Inventor
周福根
王学军
叶晶
陈磊
孙春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Merud Building Decoration Co Ltd
Original Assignee
Suzhou Merud Building Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Merud Building Decoration Co Ltd filed Critical Suzhou Merud Building Decoration Co Ltd
Priority to CN201410172313.5A priority Critical patent/CN103924764A/en
Publication of CN103924764A publication Critical patent/CN103924764A/en
Pending legal-status Critical Current

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a stone dry hanging mounting system capable of being regulated and controlled. The system comprises a first connecting piece, a second connecting piece and a height adjusting device, the first connecting piece is used for being connected with a wall, and the second connecting piece is used for mounting stone. The first connecting piece is provided an inserting portion, and the second connecting piece is provided with a containing groove. The inserting portion is inserted into the containing groove, and the height adjusting device is arranged between the inserting portion and the bottom of the containing groove. Therefore, the first connecting piece and the second connecting piece are relatively fixed after the inserting portion is inserted into the containing grove, and the relative motion of the first connecting piece and the second connecting piece can be limited, and the limiting function is achieved. The position between the first connecting piece and the second connecting piece is adjusted through the height adjusting device, the mounting mode can be flexible, the height adjusting device only needs to be placed in the containing groove of the second connecting device after being adjusted to the needed height, a bolt or a nut does not need to be screwed like the prior art, and therefore adjusting is convenient.

Description

Can regulate and control stone material dry suspending installation system
 
Technical field
The present invention relates to the stone material installation system in building machinery technology, relate in particular to and can regulate and control stone material dry suspending installation system.
Background technology
The cladding connector installation quality of tradition is affected by the factors such as the precision of execution conditions, constructor's skilled, testing tool.The quality that connector is installed has determined the quality (planeness, the gap uniformity etc.) of later stage stone material dry suspending.After changing for later stage this stone material of stone material cut size, need to reorientate and put installation.Specifically: conventional stone material is installed and utilized shaped steel welding manner fixed point to install.After fixing, cannot carry out position adjustments, like this, install dumbly, cost is high.
Regulated and controled stone material dry suspending installation system like this can be consulted Chinese patent application in No. 200920257578.X and 201320093196.4, this installation system includes the first connector for being connected with wall and the second connector for fixing stone, wherein the first connector and the second connector link together by nut and screw rod, the diverse location that the position adjustment of above-below direction is positioned at screw rod by nut regulates, and this makes to regulate very inconvenient.
Summary of the invention
The problem that the present invention solves is that cladding installation system of the prior art regulates inconvenience, problem dumb and that cost is high is installed.
For addressing the above problem, the invention provides one and can regulate and control stone material dry suspending installation system, this system comprises the first connector for being connected with wall, for the second connector and the arrangement for adjusting height of stone material are installed, described the first connector is provided with insertion section, the second connector is provided with holding tank, or, described the first connector is provided with holding tank, described the second connector is provided with insertion section, and described holding tank and described arrangement for adjusting height are inserted between insertion section and the bottom of holding tank in described insertion section.
In possibility, described holding tank comprises main body and the left side wall and the right side wall that are positioned at main body two ends, and main body, left side wall and right side wall surround U-shaped; Described insertion section comprises matrix, is positioned at left abutment walls and the right abutment walls at matrix two ends, and matrix, left abutment walls and right abutment walls surround inverted U-shaped; Described left abutment walls is resisted against left side wall, and right abutment walls is against right side wall.
In possibility, described holding tank comprises main body and the left side wall and the right side wall that are positioned at main body two ends, and main body, left side wall and right side wall surround trapezoidal; Described insertion section comprises matrix, is positioned at left abutment walls and the right abutment walls at matrix two ends, and matrix, left abutment walls and right abutment walls surround bucking ladder, and described left abutment walls is resisted against left side wall, and right abutment walls is against right side wall.
In possibility, described arrangement for adjusting height comprises screw rod and nut, and this screw flight is connected in described main body, and the end cap of described screw rod is resisted against matrix, and the terminal part of screw rod passes described main body and is connected with described nut thread.
In possibility, described arrangement for adjusting height comprises screw rod and is threaded connection upper backup pad and the lower supporting plate in screw rod, and upper backup pad, lower supporting plate and screw rod form I-shaped, and described upper backup pad is resisted against main body, and lower supporting plate is resisted against matrix.
Compared with prior art, the present invention has the following advantages:
Because described holding tank and described arrangement for adjusting height are inserted between insertion section and the bottom of holding tank in insertion section of the present invention, like this, insertion section makes the first connector relative fixing with the second connector after inserting holding tank, and, can also limit the relative motion between the first connector and the second connector, play spacing effect; Moreover, regulate the position between the first connector and the second connector to make mounting means flexible by arrangement for adjusting height, and, after only arrangement for adjusting height need to being adjusted to the height needing, be positioned in the holding tank of the second connector, need not as prior art, remove to screw screw bolt and nut, so, easy to adjust.
Brief description of the drawings
Fig. 1 is that the first installation system of the present invention is applied to the schematic diagram that stone material is installed;
Fig. 2 is the stereogram of the installation system shown in Fig. 1;
Fig. 3 is that the second installation system of the present invention is applied to the schematic diagram that stone material is installed.
Detailed description of the invention
By describing technology contents of the present invention, structural feature in detail, being reached object and effect, below in conjunction with embodiment and coordinate accompanying drawing to be described in detail.
Refer to Fig. 1 and Fig. 2, the present invention can regulate and control stone material dry suspending installation system comprise the first connector 2 for being connected with wall 1, for the second connector 4 and the arrangement for adjusting height 5 of stone material 3 are installed.Described the first connector 2 is provided with insertion section 21, the second connector 4 is provided with holding tank 41, described holding tank 41 and described arrangement for adjusting height 5 are inserted between insertion section 21 and the bottom of holding tank 41 in described insertion section 21, like this, insertion section 21 makes the first connector 2 relative fixing with the second connector 4 after inserting holding tank 41, and, can also limit the relative motion between the first connector 2 and the second connector 4, play spacing effect; Moreover, regulate the position between the first connector 2 and the second connector 4 to make mounting means flexible by arrangement for adjusting height 5, and, after only arrangement for adjusting height 5 need to being adjusted to the height needing, be positioned in the holding tank 41 of the second connector 4, need not as prior art, remove to screw screw bolt and nut, so, easy to adjust.
Refer to Fig. 2 and in conjunction with Fig. 1, as a kind of detailed description of the invention of above-mentioned holding tank 41 and insertion section 21, described holding tank 41 comprises main body 411A and the left side wall 412A and the right side wall 412B that are positioned at main body 411A two ends, and main body 411, left side wall 412A and right side wall 412B surround U-shaped.Described insertion section 21 comprises matrix 211A, is positioned at left abutment walls 212A and the right abutment walls 212B at matrix 211A two ends, and matrix 211A, left abutment walls 212A and right abutment walls 212B surround inverted U-shaped; Described left abutment walls 212A is resisted against left side wall 412A, and right abutment walls 212B is against right side wall 412B.As a kind of detailed description of the invention of above-mentioned arrangement for adjusting height 5, this arrangement for adjusting height 5 comprises screw rod 51 and nut 52, the end cap of screw rod 51 is resisted against matrix 211A, and terminal part is threaded with nut 52 through described main body 411A, can makes between main body 411A and matrix 211A one section of screw rod 51 there is different length by the threaded adjusting of screw rod 52 and main body 411A and realize height adjustment.It will be appreciated by those skilled in the art that, the object of arrangement for adjusting height 5 is regulate the distance between insertion section 21 and the bottom of holding tank 41 and support insertion section 21 and holding tank, all can be applied to the present invention as long as can realize the device of this purpose, such as, as the another kind of embodiment of above-mentioned arrangement for adjusting height 5, described arrangement for adjusting height comprises screw rod and is threaded connection upper backup pad and the lower supporting plate in screw rod, upper backup pad, lower supporting plate and screw rod form I-shaped, in such cases, described upper backup pad is resisted against main body, lower supporting plate is resisted against matrix, the diverse location that corresponding gripper shoe is positioned on screw rod by rotation upper backup pad or lower supporting plate is realized highly adjusting.
Refer to Fig. 3, the object of insertion section 21 and holding tank 41 is directly will to be hung on the insertion section 21 of the first connector 2 with the stone material of this second connector 4 by the second connector 4 by the cooperation of insertion section 21 and holding tank 41, so, all can be for this invention as long as can realize the insertion section 21 of this object and the structure of holding tank 41, such as, described holding tank 41 comprises main body 411B and is positioned at left side wall 413A and the right side wall 413B at main body 411B two ends, main body 411B, left side wall 413A and right side wall 413B surround trapezoidal, Figure 3 shows that right-angled trapezium, as variation, other shapes trapezoidal also passable, such as, isosceles trapezoid.Described insertion section 21 comprises matrix 211B, is positioned at left abutment walls 213A and the right abutment walls 213B at matrix 211B two ends, matrix 211B, left abutment walls 213A and right abutment walls 213B surround bucking ladder, described left abutment walls 213A is resisted against left side wall 413A, and right abutment walls 213B is against right side wall 413B.
In above-mentioned embodiment,, on the first connector, insertion section is set, at the second connector, holding tank is set, technician is appreciated that, as long as the cooperation of insertion section and holding tank realize both be connected and spacing mode all can be applied to the present invention, so, also can holding tank be set at the first connector, at the second connector, insertion section is set.The shape of holding tank and insertion section can adopt aforesaid, also can adopt other shape.

Claims (5)

1. can regulate and control stone material dry suspending installation system, this system comprises the first connector for being connected with wall and for the second connector of stone material is installed, it is characterized in that: described the first connector is provided with insertion section, the second connector is provided with holding tank, or, described the first connector is provided with holding tank, described the second connector is provided with insertion section, described installation system also comprises arrangement for adjusting height, and described holding tank and described arrangement for adjusting height are inserted between insertion section and the bottom of holding tank in described insertion section.
2. can regulate and control according to claim 1 stone material dry suspending installation system, it is characterized in that: described holding tank comprises main body and the left side wall and the right side wall that are positioned at main body two ends, and main body, left side wall and right side wall surround U-shaped; Described insertion section comprises matrix, is positioned at left abutment walls and the right abutment walls at matrix two ends, and matrix, left abutment walls and right abutment walls surround inverted U-shaped; Described left abutment walls is resisted against left side wall, and right abutment walls is against right side wall.
3. can regulate and control according to claim 1 stone material dry suspending installation system, it is characterized in that: described holding tank comprises main body and the left side wall and the right side wall that are positioned at main body two ends, and main body, left side wall and right side wall surround trapezoidal; Described insertion section comprises matrix, is positioned at left abutment walls and the right abutment walls at matrix two ends, and matrix, left abutment walls and right abutment walls surround bucking ladder, and described left abutment walls is resisted against left side wall, and right abutment walls is against right side wall.
4. according to regulating and controlling stone material dry suspending installation system described in claim 2 or 3, it is characterized in that: described arrangement for adjusting height comprises screw rod and nut, this screw flight is connected in described main body, the end cap of described screw rod is resisted against matrix, and the terminal part of screw rod passes described main body and is connected with described nut thread.
5. according to regulating and controlling stone material dry suspending installation system described in claim 2 or 3, it is characterized in that: described arrangement for adjusting height comprises screw rod and is threaded connection upper backup pad and the lower supporting plate in screw rod, upper backup pad, lower supporting plate and screw rod form I-shaped, described upper backup pad is resisted against main body, and lower supporting plate is resisted against matrix.
CN201410172313.5A 2014-04-28 2014-04-28 Stone dry hanging mounting system capable of being regulated and controlled Pending CN103924764A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410172313.5A CN103924764A (en) 2014-04-28 2014-04-28 Stone dry hanging mounting system capable of being regulated and controlled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410172313.5A CN103924764A (en) 2014-04-28 2014-04-28 Stone dry hanging mounting system capable of being regulated and controlled

Publications (1)

Publication Number Publication Date
CN103924764A true CN103924764A (en) 2014-07-16

Family

ID=51143142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410172313.5A Pending CN103924764A (en) 2014-04-28 2014-04-28 Stone dry hanging mounting system capable of being regulated and controlled

Country Status (1)

Country Link
CN (1) CN103924764A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350739A (en) * 2015-10-13 2016-02-24 宁波翰室阁雅集成家居有限公司 Wall panel installation assembly
CN105350694A (en) * 2015-11-26 2016-02-24 苏州金螳螂幕墙有限公司 Metal plate assembly for inner connection of outer assembly and installing method
CN108442637A (en) * 2018-03-06 2018-08-24 上海欧缘科技有限公司 Connection accessory, fitment combination and the attachment device of fixed plate
RU198382U1 (en) * 2020-04-17 2020-07-02 Евгений Юрьевич Чернышев AGRAF FOR FASTENING THE FACING PANEL
CN112523458A (en) * 2021-01-08 2021-03-19 杨媚媚 Dry hanging component for building outer wall board
CN113431252A (en) * 2021-06-29 2021-09-24 中建七局建筑装饰工程有限公司 Hoist and mount stone material installation pendant

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10036157A1 (en) * 2000-07-25 2002-02-07 Schneider Fensterfabrik Geb Device to support facade elements; has bracket element fixed to building and bracket element fixed to facade element and to support unit on first element with height adjustment and ball
CN2642883Y (en) * 2003-10-08 2004-09-22 徐跃华 Stone suspension back lock member
CN201381566Y (en) * 2009-01-05 2010-01-13 深圳市方大装饰工程有限公司 Back bolt type stone curtain wall
CN101956438A (en) * 2010-10-22 2011-01-26 泛华建设集团有限公司 Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof
CN102518235A (en) * 2011-12-30 2012-06-27 上海玻机幕墙工程有限公司 Dry-hang structure for stone curtain wall
CN202544171U (en) * 2011-12-30 2012-11-21 上海玻机幕墙工程有限公司 Stone curtain wall dry hanging structure
CN202731035U (en) * 2012-06-25 2013-02-13 沈阳远大铝业工程有限公司 Curtain wall hanging connecting assembly adjustable in angle
CN202866072U (en) * 2012-11-02 2013-04-10 上海江河幕墙系统工程有限公司 Slippage preventing back bolt dry hanging system
CN203160479U (en) * 2013-03-01 2013-08-28 深圳市方大装饰工程有限公司 Drop prevention hooking system of back-bolt type stone curtain wall
CN203270869U (en) * 2013-02-06 2013-11-06 深圳市华南装饰设计工程有限公司 Impact-resistant stone curtain wall system
CN203462621U (en) * 2013-08-01 2014-03-05 斯泰科技(杭州)有限公司 Curtain wall hook piece
CN203924573U (en) * 2014-04-28 2014-11-05 苏州美瑞德建筑装饰有限公司 Can regulate and control stone material dry suspending installation system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10036157A1 (en) * 2000-07-25 2002-02-07 Schneider Fensterfabrik Geb Device to support facade elements; has bracket element fixed to building and bracket element fixed to facade element and to support unit on first element with height adjustment and ball
CN2642883Y (en) * 2003-10-08 2004-09-22 徐跃华 Stone suspension back lock member
CN201381566Y (en) * 2009-01-05 2010-01-13 深圳市方大装饰工程有限公司 Back bolt type stone curtain wall
CN101956438A (en) * 2010-10-22 2011-01-26 泛华建设集团有限公司 Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof
CN102518235A (en) * 2011-12-30 2012-06-27 上海玻机幕墙工程有限公司 Dry-hang structure for stone curtain wall
CN202544171U (en) * 2011-12-30 2012-11-21 上海玻机幕墙工程有限公司 Stone curtain wall dry hanging structure
CN202731035U (en) * 2012-06-25 2013-02-13 沈阳远大铝业工程有限公司 Curtain wall hanging connecting assembly adjustable in angle
CN202866072U (en) * 2012-11-02 2013-04-10 上海江河幕墙系统工程有限公司 Slippage preventing back bolt dry hanging system
CN203270869U (en) * 2013-02-06 2013-11-06 深圳市华南装饰设计工程有限公司 Impact-resistant stone curtain wall system
CN203160479U (en) * 2013-03-01 2013-08-28 深圳市方大装饰工程有限公司 Drop prevention hooking system of back-bolt type stone curtain wall
CN203462621U (en) * 2013-08-01 2014-03-05 斯泰科技(杭州)有限公司 Curtain wall hook piece
CN203924573U (en) * 2014-04-28 2014-11-05 苏州美瑞德建筑装饰有限公司 Can regulate and control stone material dry suspending installation system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350739A (en) * 2015-10-13 2016-02-24 宁波翰室阁雅集成家居有限公司 Wall panel installation assembly
CN105350694A (en) * 2015-11-26 2016-02-24 苏州金螳螂幕墙有限公司 Metal plate assembly for inner connection of outer assembly and installing method
CN108442637A (en) * 2018-03-06 2018-08-24 上海欧缘科技有限公司 Connection accessory, fitment combination and the attachment device of fixed plate
RU198382U1 (en) * 2020-04-17 2020-07-02 Евгений Юрьевич Чернышев AGRAF FOR FASTENING THE FACING PANEL
CN112523458A (en) * 2021-01-08 2021-03-19 杨媚媚 Dry hanging component for building outer wall board
CN112523458B (en) * 2021-01-08 2023-05-02 山东省嘉禾悦家装饰工程有限公司 Building external wall board dry hanging component
CN113431252A (en) * 2021-06-29 2021-09-24 中建七局建筑装饰工程有限公司 Hoist and mount stone material installation pendant

Similar Documents

Publication Publication Date Title
CN203924573U (en) Can regulate and control stone material dry suspending installation system
CN103924764A (en) Stone dry hanging mounting system capable of being regulated and controlled
CN204435644U (en) Height Adjustable furred ceiling
CN204786225U (en) A adjustable jib for LED lamp
CN203747356U (en) Omni-bearing rotation support for cable tunnel
CN204588538U (en) A kind of tower crane attached wall anchor fitting of novel improved
CN105650355A (en) Inclined bracing multi-tube gantry hanging bracket
CN203595889U (en) Installation device preventing projection screen against deformation caused by heat-expansion and cold-contraction
CN104500563A (en) Spliced guide rail
CN204324328U (en) A kind of printing plate material loading guide piece
CN103883860A (en) Liquid crystal splicing support and liquid crystal splicing system
CN202602189U (en) Cable fixing device
CN103590565A (en) Glass tile cladding mounting structure
CN203129393U (en) Efficient air supply port box installation structure
CN104514920A (en) Novel cable bridge
CN204187846U (en) The adjustable for height fixed support of a kind of water heater
CN204611236U (en) A kind of cable bearer
CN202769052U (en) Pipeline movable cradle
CN102304944A (en) Omnidirectional regulating support
CN203838094U (en) Electrode stand
CN205809544U (en) A kind of installing mechanism adapting to multiple capacity paper feed
CN104456012A (en) Display hanging piece with adjustable height
CN204437638U (en) Safe projector hanger
CN204609317U (en) A kind of building smoother
CN105239707B (en) Hyperboloid keel connecting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140716