CN103911994A - Prestressed anchor construction technology - Google Patents

Prestressed anchor construction technology Download PDF

Info

Publication number
CN103911994A
CN103911994A CN201410156887.3A CN201410156887A CN103911994A CN 103911994 A CN103911994 A CN 103911994A CN 201410156887 A CN201410156887 A CN 201410156887A CN 103911994 A CN103911994 A CN 103911994A
Authority
CN
China
Prior art keywords
construction technology
prestressed anchor
grouting
hole
steel sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410156887.3A
Other languages
Chinese (zh)
Inventor
周同和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410156887.3A priority Critical patent/CN103911994A/en
Publication of CN103911994A publication Critical patent/CN103911994A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a prestressed anchor construction technology and belongs to the technical field of supports. The prestressed anchor construction technology includes the steps of 1), drilling a hole and grouting cement slurry into the hole for wall retaining; 2), pulling out a drill pipe and grouting the cement slurry; 3), inserting a steel sleeve in the free section range of an anchor; 4), inserting a anchor body and a grouting pipe in the hole and grouting; 5), pulling out the steel sleeve after grouting is completed; 6), supplementing the slurry; 7), tensioning and locking. The cement slurry is adopted for wall retaining, so that stability of the anchor hole can be greatly improved; the steel sleeve is inserted in the free section range, disturbance to a coating during pulling the sleeve is reduced to the greatest extend, and the prestressed anchor construction technology is quite applicable to construction of clay, floury soil and dense sand layers.

Description

A kind of prestressed anchor construction technology
Technical field
The invention belongs to support technology field, be specifically related to a kind of construction technology of prestressed anchor.
Background technology
In existing support technology field, for preventing occurring collapse hole phenomenon in lower rope process, often adopt casing pipe hole forming.When being lowered to anchor pole after pore-forming and anchor pole be arranged side by side two grouting pipes, in slip casting for the first time, extract Grouting Pipe used and steel sleeve; After slurry initial set, by carrying out secondary grouting in another pipeline, fill up pouring into a mould for the first time the space forming after initial set; After secondary grouting, also need mend slurry for the contraction of cement mortar; Mend slurry and finish, after slurry intensity reaches designing requirement, carry out tensioning fixation.
In above-mentioned work progress, when slip casting, steel sleeve is extracted from anchor hole depths, can be to the very large disturbance of soil layer generation around, the stability in hole is difficult to ensure, easily produces the phenomenons such as slurry folder mud, is therefore difficult to ensure workmanship.
Summary of the invention
The object of the invention is to for existing common bolt, a kind of new construction technology is provided.
Based on above-mentioned purpose, the present invention has taked following technical scheme: a kind of prestressed anchor construction technology, comprises the following steps: 1) boring, simultaneously injected water mud off; 2) rod pulling injected water mud simultaneously; 3) within the scope of free section, insert steel sleeve; 4) in hole, implant anchor rod body and Grouting Pipe, and carry out slip casting; 5) slip casting is extracted steel sleeve after finishing; 6) mend slurry; 7) tensioning fixation.
In described step 4), implant secondary grouting pipe, carry out secondary grouting.
Step 2) employing churning reaming.
In step 1), adopt auger boring.
Method provided by the invention, with cement paste dado, can significantly promote the stability of anchor hole; Only within the scope of free segment, insert steel sleeve, the disturbance while having reduced to greatest extent drawing sleeve pipe, coating having been produced is applicable to clay clay, silt, compared with the construction of dense sand stratum very much.
Brief description of the drawings
Fig. 1 is embodiment 1 rear the formed anchoring system schematic diagram of having constructed.
Detailed description of the invention
A kind of prestressed anchor construction technology, comprises the following steps:
1) adopt auger boring, simultaneously injected water mud off;
2) rod pulling injected water mud simultaneously, can carry out churning reaming while needing bellend;
3) within the scope of free section, insert steel sleeve;
4) in hole, implant anchor rod body and secondary grouting pipe, and carry out secondary grouting;
5) slip casting is extracted steel sleeve after finishing;
6), after slurry initial set, mend slurry for the contraction of cement paste;
7) after reaching designing requirement, slurry intensity carries out tensioning fixation.
As shown in Figure 1, in figure, 1 is anchor rod body to the anchoring system forming, and 2 is retaining wall cement paste, and 3 is slip casting anchorage zone.

Claims (4)

1. a prestressed anchor construction technology, is characterized in that, comprises the following steps: 1) boring, simultaneously injected water mud off; 2) rod pulling injected water mud simultaneously; 3) within the scope of free section, insert steel sleeve; 4) in hole, implant anchor rod body and Grouting Pipe, and carry out slip casting; 5) slip casting is extracted steel sleeve after finishing; 6) mend slurry; 7) tensioning fixation.
2. prestressed anchor construction technology as claimed in claim 1, is characterized in that, implants secondary grouting pipe in described step 4), carries out secondary grouting.
3. prestressed anchor construction technology as claimed in claim 1 or 2, is characterized in that step 2) employing churning reaming.
4. prestressed anchor construction technology as claimed in claim 3, is characterized in that, adopts auger boring in step 1).
CN201410156887.3A 2014-04-18 2014-04-18 Prestressed anchor construction technology Pending CN103911994A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410156887.3A CN103911994A (en) 2014-04-18 2014-04-18 Prestressed anchor construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410156887.3A CN103911994A (en) 2014-04-18 2014-04-18 Prestressed anchor construction technology

Publications (1)

Publication Number Publication Date
CN103911994A true CN103911994A (en) 2014-07-09

Family

ID=51037965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410156887.3A Pending CN103911994A (en) 2014-04-18 2014-04-18 Prestressed anchor construction technology

Country Status (1)

Country Link
CN (1) CN103911994A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013141A (en) * 2016-07-15 2016-10-12 周同和 Polyurethane anchor rod and construction process thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330431A (en) * 2011-06-16 2012-01-25 兰州理工大学 Flexible support structure of pre-stress anchor rod for lattice type frame and construction method of flexible support structure
CN102704478A (en) * 2012-06-08 2012-10-03 黄水森 Building anchor rod construction technology
CN103088819A (en) * 2013-02-22 2013-05-08 北京市公路桥梁建设集团有限公司 Pre-stressed anchor cable construction method
CN103266609A (en) * 2013-04-25 2013-08-28 中天建设集团有限公司 Process for constructing prestressed anchor rod in deep foundation pit supporting system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330431A (en) * 2011-06-16 2012-01-25 兰州理工大学 Flexible support structure of pre-stress anchor rod for lattice type frame and construction method of flexible support structure
CN102704478A (en) * 2012-06-08 2012-10-03 黄水森 Building anchor rod construction technology
CN103088819A (en) * 2013-02-22 2013-05-08 北京市公路桥梁建设集团有限公司 Pre-stressed anchor cable construction method
CN103266609A (en) * 2013-04-25 2013-08-28 中天建设集团有限公司 Process for constructing prestressed anchor rod in deep foundation pit supporting system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
樊朝金等: "无嵌固支护桩在深基坑支护工程中的运用", 《探矿工程(岩土钻掘工程)》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013141A (en) * 2016-07-15 2016-10-12 周同和 Polyurethane anchor rod and construction process thereof

Similar Documents

Publication Publication Date Title
CN104452749B (en) The constructional method of a kind of reinforced concrete cast-in-situ pile tube
CN105569560B (en) A full set of tubular type long auger stake machine and the method for utilizing the ram machine construction
CN103541352B (en) A kind of at ground, sandy soil stratum major diameter Vertical spots underground continuous construction method
CN104631438B (en) Long auger guncreting uplift pile construction method
CN103911993B (en) A kind of PHA anchor pole and construction method thereof
CN108265706A (en) A kind of engineering pile and pile-formation process in solution cavity geology
CN104762981A (en) Hole forming method of precipitation well
CN107653878A (en) Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction
CN103031847A (en) Reducing overlap joint combined type orifice pipe grouting method
CN105297710A (en) High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method
JP2013164103A (en) Embedded pipe structure and method for constructing embedded pipe structure
CN107100160A (en) A kind of construction technology for lower storage reservoir check dam vibro-replacement stone column
CN110080779A (en) Tunnel tunnel bottom karst cave treatment construction method
CN104196488B (en) Underwater exploration hole hole-sealing technology
CN206942786U (en) A kind of advanced pre-add fixing structure of high-moisture percentage loess tunnel
CN103924592B (en) A kind of pressure-type PHA anchor pole and construction method thereof
CN104196021A (en) Uplift pile structure and construction method thereof
CN102535462A (en) Method for constructing anchor cable on sand layer
CN103911994A (en) Prestressed anchor construction technology
CN102979105A (en) Underground water control method of wellhole grouting and seepage insulation
CN205713982U (en) A kind of pile foundation construction drilling equipment being applicable to karst area
CN206916733U (en) The diaphram wall reserved grouting tubular construction of steel reinforcement cage
CN102296597A (en) Construction method of steel pipe piles in shallow soil layer
CN203834479U (en) Pressure type PHA bolt
CN104727305B (en) Boring high-pressure slip-casting uplift pile construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140709