CN103908766B - The pickup collection method of a kind of court Ball for training - Google Patents

The pickup collection method of a kind of court Ball for training Download PDF

Info

Publication number
CN103908766B
CN103908766B CN201410130296.9A CN201410130296A CN103908766B CN 103908766 B CN103908766 B CN 103908766B CN 201410130296 A CN201410130296 A CN 201410130296A CN 103908766 B CN103908766 B CN 103908766B
Authority
CN
China
Prior art keywords
shuttlecock
ball
racket
deck
training
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410130296.9A
Other languages
Chinese (zh)
Other versions
CN103908766A (en
Inventor
常媛媛
安宁
徐华
李晋
郝存忠
刘红晶
康颖卿
刘耀龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201410130296.9A priority Critical patent/CN103908766B/en
Publication of CN103908766A publication Critical patent/CN103908766A/en
Application granted granted Critical
Publication of CN103908766B publication Critical patent/CN103908766B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to athletic training field, be particularly useful for the pickup collection method of court Ball for training.A pickup collection method for court Ball for training, comprises the following steps: step one, racket is flat on ground; Step 2, pickup shuttlecock shuttlecock is put on racket; The handle of step 3, hand-held racket, is held up shuttlecock in immigration ball case by racket.Compared to prior art, after picking up a shuttlecock, first need be about to pick up again after ball case put into by this shuttlecock the mode of next shuttlecock, have that pickup velocity is fast, pickup efficiency is high, be easy to the beneficial effect that operates.

Description

The pickup collection method of a kind of court Ball for training
Technical field
The present invention relates to athletic training field, be particularly useful for the pickup collection method of court Ball for training.
Background technology
In shuttlecock training process, especially multi-ball drill, normally service coach gets ball, service at half-court one by one from ball case, for sportsman's exercise of participating in training, can be scattered everywhere in training process a large amount of shuttlecock in the half-court of sportsman or service coach of participating in training, and when training long-pending ball on complete or place too much to hinder training, the shuttlecock be scattered in the venue manually collects and picks up one by one by the sportsman that participates in training, finally the shuttlecock on field is accommodated in ball case, trains for next time.
Concrete, the method that shuttlecock is collected in existing artificial pickup generally includes following several:
1, manpower picks up one by one: by manually bending over or scooping the mode of ball with racket, one by one picked up in goal case by the shuttlecock become scattered about on place, adopt in such a way, usually also exist workload large, pick up inefficient weak point;
2, pick up by specific fetcher: common pick device comprises shovel, broom or as publication number is: the Chinese utility model patent " a kind of badminton pickup device " of CN202289352U, above-mentioned extra means is utilized to pick up shuttlecock, although improve ten ball efficiency, but its weak point is: pick up in ball process, fetcher can extrude shuttlecock unavoidably, and the fragile frangibility of shuttlecock itself, very easily in pick process, damage shuttlecock, and the needs of pick device own are purchased separately, and cost is higher.
Summary of the invention
The object of the invention is to: provide a kind of and pick up that efficiency is high, the pickup collection method of the court Ball for training of not fragile shuttlecock in pick process.
The technical solution adopted in the present invention is: the pickup collection method of a kind of court Ball for training, comprises the following steps:
Step one, racket is flat on ground;
Step 2, pickup shuttlecock shuttlecock is put on racket;
The handle of step 3, hand-held racket, is held up shuttlecock in immigration ball case by racket.
As a kind of preferred embodiment: described step 2 to put step as follows:
The first step, placement first floor shuttlecock: the circumference along racket after picking up shuttlecock is one by one positioned on racket one by one, and shuttlecock is circular array on racket, completes first floor shuttlecock and places;
Second step, pick up shuttlecock one by one, shuttlecock is positioned over the gap of adjacent two shuttlecock upper surfaces in last layer shuttlecock.
As a kind of preferred embodiment: in the described first step, when putting shuttlecock, the ball holder of each shuttlecock is radially bounced the ball towards shuttlecock the central authorities of frame, and the feather part of each shuttlecock is radially outside ball frame.
As a kind of preferred embodiment: in described second step, the outer surface spacing in the horizontal direction of adjacent two shuttlecocks is less than the appearance and size of the single shuttlecock of its last layer shuttlecock.
As a kind of preferred embodiment: the shuttlecock being arranged in top one deck is positioned over the top of adjacent two shuttlecocks of one deck shuttlecock below it, the ball of shuttlecock being arranged in top one deck props up the top of the ball holder being placed in adjacent two shuttlecocks of one deck below it, and the feather part being arranged in the shuttlecock of top one deck is positioned over the top of the feather part of adjacent two shuttlecocks of one deck below it and the adjacent feather part of two shuttlecocks adjacent with one deck below it contacts simultaneously.
As a kind of preferred embodiment: be positioned at last layer shuttlecock circular array above lower one deck shuttlecock.
As a kind of preferred embodiment: the ball holder being positioned at the shuttlecock of last layer is tilted to down and is positioned on the shuttlecock of next layer.
As a kind of preferred embodiment: be 15 ° ~ 30 ° at the oblique angle between the shuttlecock of lower one deck that the shuttlecock of last layer contacts with it.
As a kind of preferred embodiment: be respectively placed with a shuttlecock above between adjacent two shuttlecocks of lower one deck shuttlecock.
The invention has the beneficial effects as follows: compared to prior art, after picking up a shuttlecock, first need be about to pick up again after ball case put into by this shuttlecock the mode of next shuttlecock, have that pickup velocity is fast, pickup efficiency is high, be easy to the beneficial effect that operates, and such pickup mode with utilize apparatus from having compared with the mode of place sliding tackle easy to implement and not easily losing the beneficial effect of feather.
Accompanying drawing explanation
Fig. 1 is the front view of first floor shuttlecock in the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the perspective view of first floor shuttlecock in the present invention;
Fig. 4 is the front view of first floor shuttlecock and top one deck shuttlecock thereof in the present invention;
Fig. 5 is the top view of Fig. 4;
Fig. 6 is the perspective view of first floor shuttlecock and top one deck shuttlecock thereof in the present invention;
Fig. 7 is in the upper and lower two-layer feather layers of balls of the present invention, the first concrete disposing way schematic diagram of each shuttlecock;
Fig. 8 is in the upper and lower two-layer feather layers of balls of the present invention, the concrete disposing way schematic diagram of the second of each shuttlecock.
Detailed description of the invention
Below in conjunction with test example and detailed description of the invention, the present invention is described in further detail.But this should be interpreted as that the scope of the above-mentioned theme of the present invention is only limitted to following embodiment, all technology realized based on content of the present invention all belong to scope of the present invention.
embodiment 1
As shown in Figures 1 to 8, the pickup collection method of the present embodiment court Ball for training, comprises following step: step one, racket is flat on ground; It should be noted that, in the present embodiment, shuttlecock becomes scattered about on court, and in order to not affect normal training, ball case is positioned at the outside in court.
Step 2, pickup shuttlecock shuttlecock is put on racket; In the present embodiment, by the method manually picked up, court shuttlecock is on the ground put the face in racket, out of sequence until the face of racket occupies by shuttlecock;
The handle of step 3, hand-held racket, is held up by racket shuttlecock, moves in ball case again.
Adopt the method for the present embodiment, compared in prior art, after a pickup shuttlecock, first need be about to pick up again after ball case put into by this shuttlecock the mode of next shuttlecock, have that pickup velocity is fast, pickup efficiency is high, be easy to the beneficial effect that operates, and such pickup mode with directly from the mode of place sliding tackle, there is the beneficial effect not easily losing feather.
embodiment 2
As shown in Figures 1 to 8, the pickup collection method of the present embodiment court Ball for training, comprises following step:
Step one, racket is flat on ground; It should be noted that, in the present embodiment, shuttlecock becomes scattered about on court, and in order to not affect normal training, ball case is positioned at the outside in court.
Step 2, pickup shuttlecock shuttlecock is put on racket;
In the present embodiment, stackingly on racket face more to stablize to make shuttlecock, avoiding shaking off in movement process, step 2 specifically comprises following step;
The first step, placement first floor shuttlecock: the circumference along racket after picking up shuttlecock is one by one positioned on racket one by one, shuttlecock is circular array on racket, complete first floor shuttlecock to place, first floor shuttlecock after putting as depicted in figs. 1 and 2, by the beneficial effect that circular array put by first floor shuttlecock be: each shuttlecock in annular array can only the circumference of annularly array roll relatively, and mutually interfere spacing after some shuttlecock arrangements ringwise, can effectively prevent shuttlecock from tumbling racket when shaking along racket radial direction.
As depicted in figs. 1 and 2, in the present embodiment, the first step is when putting shuttlecock, the ball holder of each shuttlecock is radially arranged towards the bounce the ball central authorities of frame of shuttlecock, the feather part of each shuttlecock is radially towards ball frame arranged outside, make shuttlecock overall in annular on racket, and because bulb is towards central authorities, circumferentially there is the feather part of other shuttlecocks in the relative movement direction of shuttlecock in racket plane in circumference, and interference is spacing with it, overall structure is more stable, not easily because shuttlecock drops relative to the rolling of racket.
In all the other embodiments, each shuttlecock also can adopt ball holder upward, feather part facing downward mode be positioned on racket face, the usefulness of placing like this is: the contact area of each shuttlecock and racket is comparatively greatly, contact stabilization not easily rocks.
Second step, pick up shuttlecock one by one, shuttlecock is positioned over the gap of adjacent two shuttlecock upper surfaces in last layer shuttlecock.
Concrete, as shown in Figure 3, in the present embodiment, after being well placed first floor shuttlecock, pick up shuttlecock one by one again, put the shuttlecock be well placed to last layer, the i.e. gap of first floor shuttlecock upper surface, space herein refers in first floor shuttlecock, space between adjacent two shuttlecock upper surfaces, adopt after placing first floor shuttlecock in such a way on racket, the space of adjacent two shuttlecock upper surfaces in first floor shuttlecock is utilized to put second layer shuttlecock, it is high that such mode not only picks up efficiency, and because second layer shuttlecock is located in the space in first floor shuttlecock between adjacent two shuttlecocks, place highly stable, avoid the racket carrying full shuttlecock in ball case moving process, shake the problem that shuttlecock is dropped, there is pickup efficiency high, the beneficial effect of good stability.
In the present embodiment, the shuttlecock being arranged in top one deck is arranged at the top of one deck shuttlecock below it, adjacent two shuttlecocks, the ball holder of shuttlecock being arranged in top one deck is arranged at the top of the ball holder of adjacent two shuttlecocks of one deck shuttlecock below it, and the feather part being arranged in the shuttlecock of top one deck is arranged at the top of the feather part of adjacent two shuttlecocks of one deck shuttlecock below it and the adjacent feather part of two shuttlecocks adjacent with one deck shuttlecock below it contacts simultaneously.Adopt in such a way, because upper and lower two-layer ball holder, bulb arrange in the same way and contact with each other, utilize the inclined-plane being positioned at below one deck shuttlecock upper surface to be just placed therein by the shuttlecock of the tapered profile being positioned at top one deck, such mode makes to have good structural stability between upper and lower two-layer shuttlecock.
As shown in Figures 4 to 6, in the present embodiment, be positioned at the top circular array of last layer shuttlecock (i.e. second layer shuttlecock) thereunder one deck shuttlecock (i.e. first floor shuttlecock), that is: on, lower two-layer shuttlecock all ringwise, the first floor shuttlecock being positioned at below is arranged on the face of racket, and the second layer shuttlecock be arranged in above first floor shuttlecock is arranged at first floor shuttlecock, in space between adjacent two shuttlecock upper surfaces, arrangement is in the annular suitable with first floor shuttlecock, such structure has good stability, and when placing second layer shuttlecock, process of putting is simple and easy.
As shown in Figure 7 and Figure 8, in order to ensure when loading second layer shuttlecock, first floor shuttlecock is enough stable, the appearance and size of the single shuttlecock of one deck shuttlecock above it is less than in the outer surface spacing in the horizontal direction of adjacent two shuttlecocks, in the present embodiment, that is: in first floor shuttlecock, the outer surface spacing in the horizontal direction of adjacent two shuttlecocks is less than the appearance and size of single shuttlecock in second layer shuttlecock, second layer shuttlecock can be avoided like this to clamp-on in first floor shuttlecock when loading due to excesssive gap, first floor shuttlecock is caused to move or drop from racket.
As shown in Figure 7 and Figure 8, the shuttlecock being positioned at last layer favours and is positioned at one deck shuttlecock below it, in the present embodiment, the second layer shuttlecock be positioned at above first floor shuttlecock favours first floor shuttlecock, adopt in such a way, utilize the gradient of first floor shuttlecock upper surface feather part that second layer shuttlecock is fitted tightly with it, not only make putting of second layer shuttlecock be more prone to, and such mode structure is more stable.
As shown in Figure 7 and Figure 8, in the present embodiment, be 15 ° ~ 30 °, after such angle is put at the oblique angle below it between one deck shuttlecock that the shuttlecock of last layer contacts with it, the contact area between upper and lower two-layer shuttlecock is comparatively large and stability is better.
As shown in Figure 5, in the present embodiment, a shuttlecock is respectively provided with above between adjacent two shuttlecocks of lower one deck shuttlecock, concrete, there is N-1 space in the top of the N number of ball be periphery in first floor shuttlecock, in this N-1 space, be respectively provided with a shuttlecock and form second layer shuttlecock, making each space above first floor shuttlecock all be utilized like this, and it is more stable to fill up rear overall structure.
Below existingly manually bend over to pick up one by one ball method of picking up, utilize machinery to pick up contrast experiment's data of the pickup collection method of ball method and court of the present invention Ball for training:
Table 1 is: existing and the present invention picks up the comprehensive condition contrast table of ball method
Table 2 is: existing and the present invention picks up the ball picking-up efficiency contrast experiment data of ball method.
The present invention is not limited to aforesaid detailed description of the invention.The present invention expands to any new feature of disclosing in this manual or any combination newly, and the step of the arbitrary new method disclosed or process or any combination newly.

Claims (8)

1. a pickup collection method for court Ball for training, is characterized in that, comprise the following steps:
Step one, racket is flat on ground;
Step 2, pickup shuttlecock put on racket by shuttlecock, specifically comprise the following steps
The first step, placement first floor shuttlecock: the circumference along racket after picking up shuttlecock is one by one positioned on racket one by one, and shuttlecock is circular array on racket, completes first floor shuttlecock and places;
Second step, pick up shuttlecock one by one, shuttlecock is positioned over the gap of adjacent two shuttlecock upper surfaces in last layer shuttlecock;
The handle of step 3, hand-held racket, is held up shuttlecock in immigration ball case by racket.
2. the pickup collection method of court according to claim 1 Ball for training, it is characterized in that: in the described first step, when putting shuttlecock, the ball holder of each shuttlecock is radially bounced the ball towards shuttlecock the central authorities of frame, and the feather part of each shuttlecock is radially outside ball frame.
3. the pickup collection method of court according to claim 2 Ball for training, is characterized in that: in described second step, and the outer surface spacing in the horizontal direction of adjacent two shuttlecocks is less than the appearance and size of the single shuttlecock of its last layer shuttlecock.
4. the pickup collection method of court according to claim 3 Ball for training, it is characterized in that: the shuttlecock being arranged in top one deck is positioned over the top of adjacent two shuttlecocks of one deck shuttlecock below it, the ball of shuttlecock being arranged in top one deck props up the top of the ball holder being placed in adjacent two shuttlecocks of one deck below it, and the feather part being arranged in the shuttlecock of top one deck is positioned over the top of the feather part of adjacent two shuttlecocks of one deck below it and the adjacent feather part of two shuttlecocks adjacent with one deck below it contacts simultaneously.
5. the pickup collection method of court according to claim 4 Ball for training, is characterized in that: be positioned at last layer shuttlecock circular array above lower one deck shuttlecock.
6. the pickup collection method of court according to claim 5 Ball for training, is characterized in that: the ball holder being positioned at the shuttlecock of last layer is tilted to down and is positioned on the shuttlecock of next layer.
7. the pickup collection method of court according to claim 6 Ball for training, is characterized in that: be 15 ° ~ 30 ° at the oblique angle between the shuttlecock of lower one deck that the shuttlecock of last layer contacts with it.
8. the pickup collection method of court according to claim 7 Ball for training, is characterized in that: be respectively placed with a shuttlecock above between adjacent two shuttlecocks of lower one deck shuttlecock.
CN201410130296.9A 2014-04-02 2014-04-02 The pickup collection method of a kind of court Ball for training Expired - Fee Related CN103908766B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410130296.9A CN103908766B (en) 2014-04-02 2014-04-02 The pickup collection method of a kind of court Ball for training

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410130296.9A CN103908766B (en) 2014-04-02 2014-04-02 The pickup collection method of a kind of court Ball for training

Publications (2)

Publication Number Publication Date
CN103908766A CN103908766A (en) 2014-07-09
CN103908766B true CN103908766B (en) 2016-02-03

Family

ID=51034958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410130296.9A Expired - Fee Related CN103908766B (en) 2014-04-02 2014-04-02 The pickup collection method of a kind of court Ball for training

Country Status (1)

Country Link
CN (1) CN103908766B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107661610A (en) * 2017-10-24 2018-02-06 三峡大学 A kind of tennis picks up telecar and application method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB820197A (en) * 1956-12-05 1959-09-16 Rotel A G Improvements in and relating to shuttlecocks and rackets
FR2719492A3 (en) * 1994-03-25 1995-11-10 Shao Chia Mu Adhesive band for picking up shuttlecock by badminton racquet
CN202410036U (en) * 2011-12-31 2012-09-05 姜思宇 Shuttlecock racket with function of picking up shuttlecock
CN203090373U (en) * 2013-03-14 2013-07-31 刘时友 Novel badminton racket

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006110093A (en) * 2004-10-14 2006-04-27 Kawa Kikai Kogyo Kk Badminton set

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB820197A (en) * 1956-12-05 1959-09-16 Rotel A G Improvements in and relating to shuttlecocks and rackets
FR2719492A3 (en) * 1994-03-25 1995-11-10 Shao Chia Mu Adhesive band for picking up shuttlecock by badminton racquet
CN202410036U (en) * 2011-12-31 2012-09-05 姜思宇 Shuttlecock racket with function of picking up shuttlecock
CN203090373U (en) * 2013-03-14 2013-07-31 刘时友 Novel badminton racket

Also Published As

Publication number Publication date
CN103908766A (en) 2014-07-09

Similar Documents

Publication Publication Date Title
US7731198B2 (en) Ball returning tent net
CN207307094U (en) A kind of shuttlecock intelligence pickup
CN105749513A (en) Badminton net fixture with storage function
CN103908766B (en) The pickup collection method of a kind of court Ball for training
CN205095360U (en) A ball release device is picked up in portable automation for table tennis
CN206896766U (en) A kind of shot transporter
CN104001317B (en) The method of a kind of court Ball for training pick device and pickup shuttlecock thereof
KR200475553Y1 (en) Pile putting hole cup
CN210933654U (en) Volleyball ball picker for sports
CN204050887U (en) Fixed point shooting exerciser
CN205586492U (en) Badminton net mount with storing function
CN204428731U (en) A kind of table tennis balls collecting device
CN205373542U (en) A new generation's international tournament target
CN205672475U (en) Pingpong ball picker
CN111530056B (en) Material probability statistics extractor based on time series analysis
CN111195421A (en) Table tennis ball picking device
CN214512593U (en) Basketball shooting training device
CN202113555U (en) Table tennis ball picker
CN102847284A (en) Automatic golf ball picking robot
CN206045344U (en) A kind of pre-buried buffer unit of service robot
CN214319046U (en) Multifunctional football training goal
CN211273452U (en) Table tennis ball collecting net
CN207119121U (en) Basketball shooting supplemental training device
CN205287474U (en) Bobble is recovery unit in batches based on elasticity net mechanism
CN201055673Y (en) Athletic ground periphery strip

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

Termination date: 20180402

CF01 Termination of patent right due to non-payment of annual fee