A kind of blasting method of concrete hollow column
Technical field
The invention belongs to blasting technique field, particularly a kind of concrete hollow column or blasting method.
Background technology
In buildings or structures demolition blasting, on concrete column, drillhole blasting is the method generally using.In some engineering, for saving material, the deadweight that alleviates concrete column, accelerates speed of application, is designed with hollow hole or continuous cavity in the column of being everlasting.Carry out drillhole blasting on this column time, because there is hollow parts in concrete column, big gun hole hole quality and cause the leakage of detonation gas while affecting explosion, even breakage while being unfavorable for concrete material drillhole blasting, easily cause fried and not broken or part concrete explosion not destroy, and because the change of burden forms a large amount of explosion flyings, cause demolition accident.
Summary of the invention
The object of the invention is provides a kind of and in concrete column, has hollow hole or when cavity carries out explosion continuously, ensure the blasting method of blasting quality for addressing the above problem.
The technical solution adopted in the present invention is:
A blasting method for concrete hollow column, comprises the following steps:
(1) bore apical pore at the top of described concrete hollow column, described apical pore is to the hollow area of described concrete hollow column, to water filling in described hollow area;
(2) bore bottom outlet in the bottom of described concrete hollow column, described bottom outlet, to the hollow area of described concrete hollow column, is discharged the water in described hollow area;
(3) by described apical pore to described hollow area injected water mud, in the time that described cement mortar arrives described bottom outlet position, described bottom outlet is stopped up, described cement mortar fills whole described hollow area;
(4) after the cement mortar in described hollow area is fixed, by engineering design requirement, described concrete hollow column is holed, implement explosion.
Further, the water in described step (1) can be determined the seal of size and the hollow area of hollow area.
Further, the water in described step (2) can rinse the foreign material in hollow area.
Preferably, the pore diameter size of described apical pore and described bottom outlet is 4~6cm.
Preferably, described cement mortar is the mixture of water and cement.
Further, the bottom outlet in described step (3) stops up with old and useless newspaper.
The present invention has the following advantages:
(1) adopt slip casting to repair hollow column, convenient and swift, reduced the problem of boring big gun hole because of cavity some effects more, therefore save construction cost, saved engineering time, improve efficiency of construction; (2) construction equipment, material are comparatively general, are easy to buy lease and use, and versatility is stronger;
(3) the column Drilling big gun hole hole quality after repairing is good, and the number of the boring hole obviously reduces, and shot hole blasting service efficiency is high; (4) after in concrete column cavity, injected water mud solidifies, better with original concrete material cementability, be beneficial to explosive placement and explosion and concrete column produced evenly broken.
Brief description of the drawings
Structural representation when injected water mud not in the blasting method of a kind of concrete hollow column that Fig. 1 provides for the embodiment of the present invention 1;
Structural representation in the blasting method of a kind of concrete hollow column that Fig. 2 provides for the embodiment of the present invention 1 when injected water mud.
Detailed description of the invention
Below in conjunction with drawings and embodiments, the present invention will be further described in detail.
Embodiment 1
The present embodiment provides a kind of blasting method of concrete hollow column, and the method is used in certain viaduct pier and implements drillhole blasting dismounting.In drilling construction process, find that bridge pier center is hollow and continuous cavity, so adopt blasting method of the present invention, this comprises the following steps:
(1) bore apical pore 3 at the top of concrete hollow column 1, apical pore 3 is to the hollow area 2 of concrete hollow column 1, to the interior water filling of hollow area 2, to determine the seal of size and hollow area 2 of hollow area 2;
(2) bore bottom outlet 4 in the bottom of concrete hollow column 1, bottom outlet 4 is to the hollow area 2 of concrete hollow column 1, and water can rinse the foreign material in hollow area 2, finally the water in hollow area 2 is discharged;
(3) pass through apical pore 3 to hollow area 2 injected water mud 5, cement mortar 3 is the mixture of water and cement.In the time that cement mortar 5 arrives bottom outlet 4 position, bottom outlet 4 is stopped up with old and useless newspaper, cement mortar 5 fills whole hollow area 2.The pore diameter size of apical pore 3 and bottom outlet 4 is 4cm;
(4) after the cement mortar 5 in hollow area 2 is fixed, by engineering design requirement, concrete hollow column 1 is bored to big gun hole 6, implement explosion.
Embodiment 2
As different from Example 1, the pore diameter size of apical pore 3 and bottom outlet 4 is 5cm to the present embodiment.
The present invention adopts slip casting rehabilitating concrete hollow column 1, convenient and swift, has reduced the problem of boring big gun hole because of cavity some effects more, has therefore saved construction cost, has saved engineering time, has improved efficiency of construction; Construction equipment, material are comparatively general, are easy to buy lease and use, and versatility is stronger; Concrete hollow column 1 Drilling big gun hole hole quality after repairing is good, and the number of the boring hole obviously reduces, and shot hole blasting service efficiency is high; After in concrete hollow column 1 cavity, injected water mud 5 solidifies, better with original concrete material cementability, be beneficial to explosive placement and explosion and concrete hollow column 1 produced evenly broken.
It should be noted last that, above embodiment is only unrestricted in order to technical scheme of the present invention to be described, although the present invention is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify or be equal to replacement technical scheme of the present invention, and not departing from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of claim scope of the present invention.