CN103866972A - Multi-story shaped stair construction method - Google Patents

Multi-story shaped stair construction method Download PDF

Info

Publication number
CN103866972A
CN103866972A CN201410099609.9A CN201410099609A CN103866972A CN 103866972 A CN103866972 A CN 103866972A CN 201410099609 A CN201410099609 A CN 201410099609A CN 103866972 A CN103866972 A CN 103866972A
Authority
CN
China
Prior art keywords
stair
construction
steel
straight
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410099609.9A
Other languages
Chinese (zh)
Inventor
周孟东
陈忠
徐立胜
周黎明
易才学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201410099609.9A priority Critical patent/CN103866972A/en
Publication of CN103866972A publication Critical patent/CN103866972A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention provides a multi-story shaped stair construction method, which belongs to the technical field of building construction and is characterized by comprising the following operation steps for implementation completion: 1, construction preparation is made; 2, a template is installed; 3, a stair or a steel mold device is installed; 4, the height and the inclination degree of a main beam are regulated; 5, concrete is cast, and in addition, steps are formed; 6, concrete fixing plates and connected parallel extending parts are cast; 7, after the concrete casting is completed, the stair steel mold device is dismounted; 8, the operation steps of 1 to 7 are repeated, the second floor stair construction is completed; 9, the operations are repeated in such a way until the erection and pavement construction of multi-story stairs is completed. After the implementation, the multi-story shaped stair construction method has the beneficial effects that the integral shaped stair steel mold device is adopted for replacing the existing wood mold scattered splicing method, the work production efficiency is greatly improved, the labor is saved, meanwhile, the materials are saved, the cost is reduced, more importantly, the construction quality is improved, the common quality fault is reduced, and the method belongs to a practical stair construction method.

Description

For many floors regularization stair construction method
Technical field
Belong to technical field of building construction, exactly relate to the design and construction technology of building operations aid.
Background technology
Stair template construction one is to more complicated, the maximum of large family expenses are to construct with loose spelling of wooden template before, but due to the complexity of construction, often quality can not be guaranteed, the a lot of of sideslip mark time, do not reach construction requirement, the mass defect of most stair constructions need to be covered by finishing reparation.For this reason, be badly in need of a kind of practical new technology that can improve stair construction quality and reduce labour cost of development.
Summary of the invention
The invention provides the one that can improve stair construction quality and reduce labour cost simple to operate for many floors regularization stair construction method.
The technical scheme that the present invention takes:
For many floors regularization stair construction method, comprise preparation of construction, its scheme is: comprise following operating procedure and implemented:
1) preparation of construction, described preparation of construction, is to build to provide fixing concrete support plate for stair two ends; On the upper and lower laminate of shelving stair, vertically stretch respectively straight-bar; Described straight-bar is threaded, is overlapping the nut that regulates girder height on screw thread, and the base plate with small sircle hole is vertically being welded in straight-bar lower end;
2) installation form, shelving two interlayers up and down of stair, shelves the installation form of the anchoring of tiling obliquely;
3) stair steel die device is installed: be arranged in template superimposed stair steel die device, and hole on the horizontal channel-section steel of two parallel channel-section steels is inserted respectively in upper and lower straight-bar;
4) regulate girder height and gradient: adjusting nut is adjusted the antenna height of girder, and be adjusted to and meet stair gradient;
5) concreting form step: build stair step concrete step; The floating formation step of marking time;
6) concreting fixed head and the coupled part that extends in parallel, as the new stair base plate of next level;
7) after completing, concreting removes stair steel die device;
8) repeat 1)-7) operating procedure, complete the construction of second layer stair;
9) aforesaid operations so repeatedly, until many floors stair frame paving has been constructed.
The good effect of implementing after the present invention is:
Adopt integral forming stair steel die device to replace the loose splicing method of wooden model in the past, greatly improved labor productivity, in economization labour, save material, reduced cost, the most important thing is to have promoted construction quality, having reduced common quality defect, is a practical stair construction method.
Brief description of the drawings
Fig. 1, on upper and lower floor plate, build the concrete support plate at stair two ends,
Fig. 2, in template closed assembly stair steel die device 11,
Fig. 3, concreting form stairway step,
Fig. 4, to last layer expansion stair,
Fig. 5, stair steel die device.
Detailed description of the invention
Now the invention will be further described by reference to the accompanying drawings
For many floors regularization stair construction method, comprise preparation of construction, it is characterized in that: implemented by following operating procedure:
1) preparation of construction, described preparation of construction, is to build to provide fixing concrete support plate for stair two ends; On the upper and lower laminate of shelving stair, vertically stretch respectively straight-bar 6,4; Described straight-bar is threaded, is overlapping the nut 8 that regulates girder height on screw thread, and the base plate 5 with small sircle hole 7 is vertically being welded in straight-bar lower end;
2) installation form, shelving two interlayers up and down of stair, shelves the installation form of the anchoring of tiling obliquely;
3) stair steel die device is installed: be arranged in template superimposed stair steel die device 11, and hole on the horizontal channel-section steel of two parallel channel-section steels is inserted respectively in upper and lower straight-bar 6,4;
4) regulate girder height and gradient: adjusting nut 8 is adjusted the antenna height of girder, and be adjusted to and meet stair gradient;
5) concreting form step: build stair step concrete step; The floating formation step of marking time;
6) concreting fixed head 10 and the coupled part that extends in parallel, as the new stair base plate of next level;
7) after completing, concreting removes stair steel die device;
8) repeat 1)-7) operating procedure, complete the construction of second layer stair;
9) aforesaid operations so repeatedly, until many floors stair frame paving has been constructed.
Described stair steel die device 11, there is carrying main beam, described carrying main beam 1 is settled by stair gradient, two parallel channel-section steels that both ends horizontal outwards extends in parallel, girder downside is by stair step spacing, equally spaced welding modification of right-angled triangle plate 2 hypotenuses that are made up of steel plate, the right-angle side of vertical ground is welding vertical step plate 3, substitutes welding modification of right-angled triangle plate hypotenuse at the horizontal initiating terminal of lower end by welding rectangular slab; On the channel-section steel of both ends horizontal epitaxial end, there are respectively two through holes on break-through channel-section steel limit, straight-bar 4 is through two through holes, the base plate 5 with small sircle hole 7 is vertically being welded in straight-bar lower end, four straight-bars 6 of two floor ladder connections, be positioned on the channel-section steel with holes that is called Bolt to position beam 9, entirety forms stair steel die device 11.
It is 16# channel-section steel that described girder 1 is taken specification.
It is 5mm steel plate that described modification of right-angled triangle plate and step plate are all got specification.
It is 20 millimeters of round steel of Φ that described screw rod is got specification.

Claims (5)

1. for many floors regularization stair construction method, comprise preparation of construction, it is characterized in that: implemented by following operating procedure:
1) preparation of construction, described preparation of construction, is to build to provide fixing concrete support plate for stair two ends; On the upper and lower laminate of shelving stair, vertically stretch respectively straight-bar (6,4); Described straight-bar is threaded, is overlapping the nut (8) that regulates girder height on screw thread, and the base plate (5) of band small sircle hole (7) is vertically being welded in straight-bar lower end;
2) installation form, shelving two interlayers up and down of stair, shelves the installation form of the anchoring of tiling obliquely;
3) stair steel die device is installed: by superimposed being arranged in template of stair steel die device (11), and hole on the horizontal channel-section steel of two parallel channel-section steels is inserted respectively in upper and lower straight-bar (6,4);
4) regulate girder height and gradient: adjusting nut (8) is adjusted the antenna height of girder, and be adjusted to and meet stair gradient;
5) concreting form step: build stair step concrete step; The floating formation step of marking time;
6) concreting fixed head (10) and the coupled part that extends in parallel, as the new stair base plate of next level;
7) after completing, concreting removes stair steel die device;
8) repeat 1)-7) operating procedure, complete the construction of second layer stair;
9) aforesaid operations so repeatedly, until many floors stair frame paving has been constructed.
2. according to claim 1 for many floors regularization stair construction method, it is characterized in that: described stair steel die device (11), there is carrying main beam, described carrying main beam (1) is settled by stair gradient, two parallel channel-section steels that both ends horizontal outwards extends in parallel, girder downside is by stair step spacing, equally spaced welding modification of right-angled triangle plate (2) hypotenuse being formed by steel plate, the right-angle side of vertical ground is welding vertical step plate (3), substitutes welding modification of right-angled triangle plate hypotenuse at the horizontal initiating terminal of lower end by welding rectangular slab; On the channel-section steel of both ends horizontal epitaxial end, there are respectively two through holes on break-through channel-section steel limit, straight-bar (4) is through two through holes, the base plate (5) of band small sircle hole (7) is vertically being welded in straight-bar lower end, four straight-bars (6) of two floor ladder connections, be positioned on the channel-section steel with holes that is called Bolt to position beam (9), entirety forms stair steel die devices (11).
3. according to claim 1 and 2 for many floors regularization stair construction method, it is characterized in that: it is 16# channel-section steel that described girder (1) is taken specification.
4. according to claim 1 and 2 for many floors regularization stair construction method, it is characterized in that: it is 5mm steel plate that described modification of right-angled triangle plate and step plate are all got specification.
5. according to claim 1 and 2 for many floors regularization stair construction method, it is characterized in that: it is 20 millimeters of round steel of Φ that described screw rod is got specification.
CN201410099609.9A 2014-03-18 2014-03-18 Multi-story shaped stair construction method Pending CN103866972A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410099609.9A CN103866972A (en) 2014-03-18 2014-03-18 Multi-story shaped stair construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410099609.9A CN103866972A (en) 2014-03-18 2014-03-18 Multi-story shaped stair construction method

Publications (1)

Publication Number Publication Date
CN103866972A true CN103866972A (en) 2014-06-18

Family

ID=50905951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410099609.9A Pending CN103866972A (en) 2014-03-18 2014-03-18 Multi-story shaped stair construction method

Country Status (1)

Country Link
CN (1) CN103866972A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060824A (en) * 2014-07-07 2014-09-24 广西壮族自治区冶金建设公司 Integral type stair mold and construction method of integral type stair mold
CN108532945A (en) * 2018-05-22 2018-09-14 宁夏力丰农机制造有限公司 A kind of highway slope protection is marked time template
CN109680937A (en) * 2017-10-18 2019-04-26 五冶集团上海有限公司 Regularization steel stair is marked time construction method
CN110039641A (en) * 2019-04-04 2019-07-23 湖北广盛建筑产业化科技有限公司 Precast stair shaping mould and application method
CN114033173A (en) * 2021-12-15 2022-02-11 山东长泰建设集团工程有限公司 Cast-in-place stair steel-wood composite formwork based on BIM technology
CN117646552A (en) * 2023-12-18 2024-03-05 中建二局第三建筑工程有限公司 Shaped stair tread steel template and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860825A (en) * 1994-08-18 1996-03-05 Taisei Prefab Kk Construction method of staircase
CN201292663Y (en) * 2008-10-20 2009-08-19 中建三局第一建设工程有限责任公司 Stereotype stairway steel formwork
KR20100055900A (en) * 2008-11-18 2010-05-27 박덕용 Construction frame for staircase tail of structure and constructing mathod using the same
CN201649633U (en) * 2010-04-01 2010-11-24 中铁十局集团建筑工程有限公司 Steel formwork for forming building stair treads
CN102140839A (en) * 2011-01-28 2011-08-03 四川省建筑机械化工程公司 Staircase shaping support formwork
CN102251664A (en) * 2011-04-26 2011-11-23 湖南省沙坪建筑有限公司 One-time forming construction method for cast-in-place stair tread template
CN203361642U (en) * 2013-07-24 2013-12-25 中国建筑一局(集团)有限公司 Cast-in-place stair steel formwork of assembled structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860825A (en) * 1994-08-18 1996-03-05 Taisei Prefab Kk Construction method of staircase
CN201292663Y (en) * 2008-10-20 2009-08-19 中建三局第一建设工程有限责任公司 Stereotype stairway steel formwork
KR20100055900A (en) * 2008-11-18 2010-05-27 박덕용 Construction frame for staircase tail of structure and constructing mathod using the same
CN201649633U (en) * 2010-04-01 2010-11-24 中铁十局集团建筑工程有限公司 Steel formwork for forming building stair treads
CN102140839A (en) * 2011-01-28 2011-08-03 四川省建筑机械化工程公司 Staircase shaping support formwork
CN102251664A (en) * 2011-04-26 2011-11-23 湖南省沙坪建筑有限公司 One-time forming construction method for cast-in-place stair tread template
CN203361642U (en) * 2013-07-24 2013-12-25 中国建筑一局(集团)有限公司 Cast-in-place stair steel formwork of assembled structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060824A (en) * 2014-07-07 2014-09-24 广西壮族自治区冶金建设公司 Integral type stair mold and construction method of integral type stair mold
CN104060824B (en) * 2014-07-07 2017-06-13 广西壮族自治区冶金建设公司 A kind of monoblock type stairway die and its construction method
CN109680937A (en) * 2017-10-18 2019-04-26 五冶集团上海有限公司 Regularization steel stair is marked time construction method
CN108532945A (en) * 2018-05-22 2018-09-14 宁夏力丰农机制造有限公司 A kind of highway slope protection is marked time template
CN108532945B (en) * 2018-05-22 2024-08-23 宁夏力丰农机制造有限公司 Highway bank protection template of marking time
CN110039641A (en) * 2019-04-04 2019-07-23 湖北广盛建筑产业化科技有限公司 Precast stair shaping mould and application method
CN114033173A (en) * 2021-12-15 2022-02-11 山东长泰建设集团工程有限公司 Cast-in-place stair steel-wood composite formwork based on BIM technology
CN114033173B (en) * 2021-12-15 2023-01-17 山东长泰建设集团工程有限公司 Cast-in-place stair steel-wood composite formwork based on BIM technology
CN117646552A (en) * 2023-12-18 2024-03-05 中建二局第三建筑工程有限公司 Shaped stair tread steel template and construction method

Similar Documents

Publication Publication Date Title
CN103866972A (en) Multi-story shaped stair construction method
CN201649633U (en) Steel formwork for forming building stair treads
CN204040056U (en) A kind of location and installation support of pre-embedded anchoring bolts
CN202194244U (en) Positioning support for embedding of ultra-high steel-work pedestals
CN103669865A (en) Stair construction method through shaped supports
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN104264984A (en) Formwork for concrete structure pouring and pouring construction method
CN103821361B (en) Stair studding formwork construction method is built in the gradation improved
CN203452266U (en) Fixing and leveling structure of H section steel column
CN201891260U (en) Hanging template
CN105332506A (en) Formwork support system for parallel multi-section stair and method for constructing same
CN104164951A (en) Stair rest platform and construction method thereof
CN103321423A (en) Cast-in-place concrete stair construction method
CN203878991U (en) Staircase steel mold device for multi-storied shaped staircase construction
CN203878995U (en) Side wall stair formwork
CN203175052U (en) Leveler for building floor beam slab construction
CN204510816U (en) The stair template of adjustable angle
CN203640278U (en) Stair construction die shelf
CN204510813U (en) L-type cladding panel structure under a kind of novel frame Liang Liang
CN204174854U (en) A kind of vertical fragmentation Assembled rotary cat ladder
CN204826626U (en) But reuse's concatenation formula typical forms
CN204552115U (en) For the floating screed part that structure flooring high accuracy is levelling
CN203769332U (en) Building form or floor construction control device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140618