CN103865500A - Liquid rubber plug and method for pulling out coiled tubing velocity pipe column by using liquid rubber plug under pressure - Google Patents

Liquid rubber plug and method for pulling out coiled tubing velocity pipe column by using liquid rubber plug under pressure Download PDF

Info

Publication number
CN103865500A
CN103865500A CN201410112994.6A CN201410112994A CN103865500A CN 103865500 A CN103865500 A CN 103865500A CN 201410112994 A CN201410112994 A CN 201410112994A CN 103865500 A CN103865500 A CN 103865500A
Authority
CN
China
Prior art keywords
coiled tubing
liquid
gum plug
rubber plug
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410112994.6A
Other languages
Chinese (zh)
Other versions
CN103865500B (en
Inventor
罗鹏
卢秀德
李剑秋
蔡远红
罗致臻
宋丹
裴楚洲
邹先雄
李睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201410112994.6A priority Critical patent/CN103865500B/en
Publication of CN103865500A publication Critical patent/CN103865500A/en
Application granted granted Critical
Publication of CN103865500B publication Critical patent/CN103865500B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/40Spacer compositions, e.g. compositions used to separate well-drilling from cementing masses
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/22Handling reeled pipe or rod units, e.g. flexible drilling pipes

Abstract

The invention discloses a liquid rubber plug and a method for pulling out a coiled tubing velocity pipe column by using the liquid rubber plug under pressure. A glue solution used for preparing the liquid rubber plug comprises the following components in percentage by mass: 5-7% of a thickening agent, 0.11-0.22% of a sterilizing agent, 3-5% of a cosolvent, 1.5-2.0% of a pH value regulator, 1.0-2.0% of a cross-linking agent, and the balance of water. The liquid rubber plug and the method for pulling out the coiled tubing velocity pipe column by using the liquid rubber plug under pressure, disclosed by the invention, can meet the requirements for pulling out a coiled tubing which is used as a velocity pipe column in a well under pressure, does not cause damage to the coiled tubing at the same time, and can be widely applied to the fields of techniques for pulling out the coiled tubing velocity pipe column under pressure and the like.

Description

The method of liquid gum plug and with pressure coiled tubing speed tubing string of employing liquid gum plug
Technical field
The present invention relates to trip out the coiled tubing technology that is used as speed tubing string in Oil/gas Well in situation with pressure, a kind of method that relates in particular to liquid gum plug and with pressure coiled tubing speed tubing string of employing liquid gum plug, belongs to industrial gas oil underground construction technical field.
Background technology
It is all that bottomhole wellbore pressure reduces because the gas well in its region enters the exploitation later stage that current domestic each Oilfield using coiled tubing does speed flow string, and water production rate increases, gas production rate minimizing, and gas well fluid-carrying capability variation, the later stage that is seriously restricting these gas wells produces.The processing method that adopts coiled tubing to do speed flow string can reduce fluid flow area, increases rate of flow of fluid, improves the discharge opeing ability of gas well, and gas well is resumed production.For example, 03 phase in 2009 " oil drilling technology " disclosed gas well CT speed tubing string completion technique theoretical investigation.
And along with volume fracturing and coiled tubing do the utilization of speed tubing string combined tech, efficiently solve the contradiction of porous reservoir volume increase problem and large tubing string discharge opeing difficulty.The service requirements of simultaneously coiled tubing being done to speed tubing string is not only no longer confined in old well that bottomhole wellbore pressure reduces, and requires to be applicable to itself just in the recovery well with much higher formation pressures.
According to the change of the need of production of this type of well or discharge opeing system, likely need in situation with pressure, to trip out the coiled tubing that does speed tubing string in well.In situation with pressure, trip out and also cannot meet at present the coiled tubing that does speed tubing string in well.
Summary of the invention
The object of the invention is to overcome existing coiled tubing and do the problems referred to above that speed tubing string exists, a kind of method of liquid gum plug and with pressure coiled tubing speed tubing string of employing liquid gum plug is provided.The present invention can meet and in situation with pressure, trips out the requirement that is used as the coiled tubing of speed tubing string in well, can not cause damage to coiled tubing simultaneously, can be widely used in the fields such as with pressure coiled tubing speed string technology.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of liquid gum plug, is characterized in that, the glue that forms liquid gum plug comprises the component of following mass percent:
Viscosifying agent 5% ~ 7%;
Sterilant 0.11% ~ 0.22%;
Solubility promoter 3% ~ 5%;
PH adjusting agent 1.5% ~ 2.0%;
Linking agent 1.0% ~ 2.0%;
Surplus is water.
Described liquid gum plug resistance to compression is at least 15MPa; Temperature resistance is 70-90 degree; Temporarily stifled time≤24 hour.
Described viscosifying agent is modified plant gum, as melon glue or hydroxypropyl guar gum etc.
Described sterilant is dodecyl benzyl dimethyl ammonium chloride, tetradecyl dimethyl benzyl ammonium chloride, polyquaternium or Gemini surface active agent.
Described solubility promoter is formic acid, acetic acid, citric acid or hydrochloric acid.
Described pH adjusting agent is sodium hydroxide, sodium carbonate or sodium bicarbonate.
Described linking agent is Sodium Tetraborate, sodium metaaluminate or pyroantimonic acid.
A method that adopts with pressure coiled tubing speed tubing string of liquid gum plug, is characterized in that, comprises the steps:
A, prepare trip out the coiled tubing that is used as speed tubing string in Oil/gas Well with pressure before, to its internal pump injecting glue liquid, infusion amount is 700-900L, slow setting time≤30min, the glue pumping into form liquid gum plug, the oil gas of down-hole is kept apart;
B, coiled tubing access panel is arranged on the coiled tubing head or coiled tubing hanger of well head, then erecting equipment parts;
C, by remaining coiled tubing on cylinder down to coiled tubing well head operation window upper port, the junctor in coiled tubing is connected with coiled tubing flow string in well;
Coiled tubing is carried in d, examination, after confirming that junction is fricton-tight, above carries coiled tubing;
E, coiled tubing flow string rise to after more than large latus rectum gate, close large latus rectum gate, complete the coiled tubing that is used as speed tubing string in well is tripped out to the operation outside well.
In described step e, when liquid gum plug dissolved and becomes after liquid in 24 hours, replace out the plug that is dissolved as liquid in coiled tubing with pressurized air or liquid nitrogen, the liquid returning out arrives sewage lagoon through open flow flow process.
Employing the invention has the advantages that:
One, in the present invention, to the coiled tubing infusion glue that is used as speed tubing string in Oil/gas Well with pressure, through the slow setting of (≤30min), in coiled tubing, form one section of liquid gum plug, oil gas in well is kept apart completely, adopt this mode to make in the coiled tubing on liquid gum plug top without any pressure, can safe it be connected with the coiled tubing loading on equipment, thereby complete, the coiled tubing that is used as speed tubing string in well is tripped out to the operation outside well.
Two,, in the present invention, liquid gum plug resistance to compression reaches at least 15MPa; Temperature resistance reaches 70-90 degree; Temporarily the stifled time reach≤24 hours, and liquid gum plug can progressively dissolve and become liquid in 24 hours, was convenient to discharge.
Three, adopt after the present invention, the engineering time is few, operating cost is low, and operating efficiency is high; Security, reliability are high, can meet and in situation with pressure, trip out the requirement that is used as the coiled tubing of speed tubing string in well.
Four,, in the present invention, the glue that forms liquid gum plug comprises the component of following mass percent: viscosifying agent 5% ~ 7%; Sterilant 0.11% ~ 0.22%; Solubility promoter 3% ~ 5%; PH adjusting agent 1.5% ~ 2.0%; Linking agent 1.0% ~ 2.0%; Surplus is water; Adopt this component and proportion relation, can not only form fast liquid gum plug, and can meet and in situation with pressure, trip out the requirement that is used as the coiled tubing of speed tubing string in well, can not cause damage to coiled tubing simultaneously, can be widely used in the fields such as with pressure coiled tubing speed string technology, and the proportioning of each component is interrelated, if do not adopt aforementioned proportioning, cannot form liquid gum plug.
Embodiment
Embodiment 1
A kind of liquid gum plug, the glue that forms liquid gum plug comprises the component of following mass percent:
Viscosifying agent 5%;
Sterilant 0.11%;
Solubility promoter 3%;
PH adjusting agent 1.5%;
Linking agent 1.0%;
Surplus is water.
In the present embodiment, described liquid gum plug resistance to compression is at least 15MPa; Temperature resistance is 70 degree; Temporarily stifled time≤24 hour.
In the present embodiment, described viscosifying agent is modified plant gum, as melon glue etc.
In the present embodiment, described sterilant is dodecyl benzyl dimethyl ammonium chloride.
In the present embodiment, described solubility promoter is formic acid.
In the present embodiment, described pH adjusting agent is sodium hydroxide.Make the pH value of glue within the scope of 8-10.
Described linking agent is Sodium Tetraborate.
A method that adopts with pressure coiled tubing speed tubing string of liquid gum plug, comprises the steps:
A, prepare trip out the coiled tubing that is used as speed tubing string in Oil/gas Well with pressure before, to its internal pump injecting glue liquid, infusion amount is 700L, slow setting time≤30min, the glue pumping into form liquid gum plug, the oil gas of down-hole is kept apart;
B, coiled tubing access panel is arranged on the coiled tubing head or coiled tubing hanger of well head, then erecting equipment parts;
C, by remaining coiled tubing on cylinder down to coiled tubing well head operation window upper port, the junctor in coiled tubing is connected with coiled tubing flow string in well;
Coiled tubing is carried in d, examination, after confirming that junction is fricton-tight, above carries coiled tubing;
E, coiled tubing flow string rise to after more than large latus rectum gate, close large latus rectum gate, complete the coiled tubing that is used as speed tubing string in well is tripped out to the operation outside well.
In described step e, when liquid gum plug dissolved and becomes after liquid in 24 hours, replace out the plug that is dissolved as liquid in coiled tubing with pressurized air or liquid nitrogen, the liquid returning out arrives sewage lagoon through open flow flow process.
Embodiment 2
A kind of liquid gum plug, the glue that forms liquid gum plug comprises the component of following mass percent:
Viscosifying agent 7%;
Sterilant 0.22%;
Solubility promoter 5%;
PH adjusting agent 2.0%;
Linking agent 2.0%;
Surplus is water.
In the present embodiment, described liquid gum plug resistance to compression is at least 15MPa; Temperature resistance is 90 degree; Temporarily stifled time≤24 hour.
In the present embodiment, described viscosifying agent is modified plant gum, as hydroxypropyl guar gum etc.
In the present embodiment, described sterilant is tetradecyl dimethyl benzyl ammonium chloride.
In the present embodiment, described solubility promoter is acetic acid.
In the present embodiment, described pH adjusting agent is sodium carbonate.
In the present embodiment, described linking agent is sodium metaaluminate.
A method that adopts with pressure coiled tubing speed tubing string of liquid gum plug, comprises the steps:
A, prepare trip out the coiled tubing that is used as speed tubing string in Oil/gas Well with pressure before, to its internal pump injecting glue liquid, infusion amount is 900L, slow setting time≤30min, the glue pumping into form liquid gum plug, the oil gas of down-hole is kept apart;
B, coiled tubing access panel is arranged on the coiled tubing head or coiled tubing hanger of well head, then erecting equipment parts;
C, by remaining coiled tubing on cylinder down to coiled tubing well head operation window upper port, the junctor in coiled tubing is connected with coiled tubing flow string in well;
Coiled tubing is carried in d, examination, after confirming that junction is fricton-tight, above carries coiled tubing;
E, coiled tubing flow string rise to after more than large latus rectum gate, close large latus rectum gate, complete the coiled tubing that is used as speed tubing string in well is tripped out to the operation outside well.
Embodiment 3
A kind of liquid gum plug, the glue that forms liquid gum plug comprises the component of following mass percent:
Viscosifying agent 6%;
Sterilant 0.20%;
Solubility promoter 4%;
PH adjusting agent 1.8%;
Linking agent 1.5%;
Surplus is water.
In the present embodiment, described liquid gum plug resistance to compression is at least 15MPa; Temperature resistance is 80 degree; Temporarily stifled time≤24 hour.
In the present embodiment, described viscosifying agent is modified plant gum, as melon glue or hydroxypropyl guar gum etc.
In the present embodiment, described sterilant is polyquaternium or Gemini surface active agent.
In the present embodiment, described solubility promoter is citric acid or hydrochloric acid.
In the present embodiment, described pH adjusting agent is sodium bicarbonate.
In the present embodiment, described linking agent is pyroantimonic acid.
A method that adopts with pressure coiled tubing speed tubing string of liquid gum plug, comprises the steps:
1, before preparing to trip out the coiled tubing that is used as speed tubing string in Oil/gas Well with pressure, the glue preparing in advance to its inner infusion, infusion amount is 800L.Through the slow setting (≤30min) of certain hour, glue to be pumped into forms plug, completely the oil gas of down-hole is kept apart.
2, coiled tubing access panel is arranged on the coiled tubing head (coiled tubing hanger) of well head;
3, install the equipment unit such as injector head, preventer;
4, slowly by remaining coiled tubing on cylinder down to coiled tubing well head operation window upper port appropriate location, be connected with coiled tubing flow string in well with coiled tubing female connector;
5, coiled tubing is carried in examination, after confirming that junction is fricton-tight, carries coiled tubing on slowly, notices that suspending weight changes.
6, coiled tubing flow string rises to after more than large latus rectum gate, closes large latus rectum gate.After 24 hours, replace out with pressurized air or liquid nitrogen the plug that is dissolved as liquid in coiled tubing, the liquid returning out arrives sewage lagoon through open flow flow process.
The present invention is particularly useful for the coiled tubing of 1.5 inches and 1.75 in2 kind specifications.

Claims (9)

1. a liquid gum plug, is characterized in that, the glue that forms liquid gum plug comprises the component of following mass percent:
Viscosifying agent 5% ~ 7%;
Sterilant 0.11% ~ 0.22%;
Solubility promoter 3% ~ 5%;
PH adjusting agent 1.5% ~ 2.0%;
Linking agent 1.0% ~ 2.0%;
Surplus is water.
2. liquid gum plug according to claim 1, is characterized in that: described liquid gum plug resistance to compression is at least 15MPa; Temperature resistance is 70-90 degree; Temporarily stifled time≤24 hour.
3. liquid gum plug according to claim 1 and 2, is characterized in that: described viscosifying agent is modified plant gum, as melon glue or hydroxypropyl guar gum etc.
4. liquid gum plug according to claim 1 and 2, is characterized in that: described sterilant is dodecyl benzyl dimethyl ammonium chloride, tetradecyl dimethyl benzyl ammonium chloride, polyquaternium or Gemini surface active agent.
5. liquid gum plug according to claim 1 and 2, is characterized in that: described solubility promoter is formic acid, acetic acid, citric acid or hydrochloric acid.
6. liquid gum plug according to claim 1 and 2, is characterized in that: described pH adjusting agent is sodium hydroxide, sodium carbonate or sodium bicarbonate.
7. liquid gum plug according to claim 1 and 2, is characterized in that: described linking agent is Sodium Tetraborate, sodium metaaluminate or pyroantimonic acid.
8. a method that adopts with pressure coiled tubing speed tubing string of liquid gum plug, is characterized in that, comprises the steps:
A, prepare trip out the coiled tubing that is used as speed tubing string in Oil/gas Well with pressure before, to its internal pump injecting glue liquid, infusion amount is 700-900L, slow setting time≤30min, the glue pumping into form liquid gum plug, the oil gas of down-hole is kept apart;
B, coiled tubing access panel is arranged on the coiled tubing head or coiled tubing hanger of well head, then erecting equipment parts;
C, by remaining coiled tubing on cylinder down to coiled tubing well head operation window upper port, the junctor in coiled tubing is connected with coiled tubing flow string in well;
Coiled tubing is carried in d, examination, after confirming that junction is fricton-tight, above carries coiled tubing;
E, coiled tubing flow string rise to after more than large latus rectum gate, close large latus rectum gate, complete the coiled tubing that is used as speed tubing string in well is tripped out to the operation outside well.
9. the method for with pressure coiled tubing speed tubing string of employing liquid gum plug according to claim 8, it is characterized in that: in described step e, when liquid gum plug dissolved and becomes after liquid in 24 hours, replace out the plug that is dissolved as liquid in coiled tubing with pressurized air or liquid nitrogen, the liquid returning out arrives sewage lagoon through open flow flow process.
CN201410112994.6A 2014-03-25 2014-03-25 Liquid rubber plug and method for pulling out coiled tubing velocity pipe column by using liquid rubber plug under pressure Active CN103865500B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410112994.6A CN103865500B (en) 2014-03-25 2014-03-25 Liquid rubber plug and method for pulling out coiled tubing velocity pipe column by using liquid rubber plug under pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410112994.6A CN103865500B (en) 2014-03-25 2014-03-25 Liquid rubber plug and method for pulling out coiled tubing velocity pipe column by using liquid rubber plug under pressure

Publications (2)

Publication Number Publication Date
CN103865500A true CN103865500A (en) 2014-06-18
CN103865500B CN103865500B (en) 2017-01-11

Family

ID=50904526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410112994.6A Active CN103865500B (en) 2014-03-25 2014-03-25 Liquid rubber plug and method for pulling out coiled tubing velocity pipe column by using liquid rubber plug under pressure

Country Status (1)

Country Link
CN (1) CN103865500B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105419755A (en) * 2015-11-17 2016-03-23 中石化石油工程技术服务有限公司 Coiled tubing drilling-plug liquid system and preparing method thereof
CN108384522A (en) * 2018-02-10 2018-08-10 长江大学 A kind of deepwater drilling liquid displacement liquid
CN109294539A (en) * 2018-09-25 2019-02-01 中国石油天然气股份有限公司 A kind of fireflood well environmental protection envelope alters agent and the preparation method and application thereof
CN109294541A (en) * 2018-09-25 2019-02-01 中国石油天然气股份有限公司 A kind of fireflood well self-degradation diverting agent and the preparation method and application thereof
US10995563B2 (en) 2017-01-18 2021-05-04 Minex Crc Ltd Rotary drill head for coiled tubing drilling apparatus
CN113088271A (en) * 2021-04-09 2021-07-09 中国石油天然气股份有限公司 Sulfur-resistant liquid rubber plug and preparation method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102093875A (en) * 2010-12-08 2011-06-15 中国石油集团西部钻探工程有限公司 Super guar gum foamed fracturing fluid injected with liquid nitrogen for low-permeability gas reservoir and preparation method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102093875A (en) * 2010-12-08 2011-06-15 中国石油集团西部钻探工程有限公司 Super guar gum foamed fracturing fluid injected with liquid nitrogen for low-permeability gas reservoir and preparation method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105419755A (en) * 2015-11-17 2016-03-23 中石化石油工程技术服务有限公司 Coiled tubing drilling-plug liquid system and preparing method thereof
CN105419755B (en) * 2015-11-17 2018-10-26 中石化石油工程技术服务有限公司 A kind of continuous tubing drill plug liquid system and preparation method thereof
US10995563B2 (en) 2017-01-18 2021-05-04 Minex Crc Ltd Rotary drill head for coiled tubing drilling apparatus
US11136837B2 (en) 2017-01-18 2021-10-05 Minex Crc Ltd Mobile coiled tubing drilling apparatus
CN108384522A (en) * 2018-02-10 2018-08-10 长江大学 A kind of deepwater drilling liquid displacement liquid
CN109294539A (en) * 2018-09-25 2019-02-01 中国石油天然气股份有限公司 A kind of fireflood well environmental protection envelope alters agent and the preparation method and application thereof
CN109294541A (en) * 2018-09-25 2019-02-01 中国石油天然气股份有限公司 A kind of fireflood well self-degradation diverting agent and the preparation method and application thereof
CN109294541B (en) * 2018-09-25 2021-03-09 中国石油天然气股份有限公司 Fire flooding well self-degradation temporary plugging agent and preparation method and application thereof
CN109294539B (en) * 2018-09-25 2021-03-09 中国石油天然气股份有限公司 Fire flooding well environment-friendly channeling sealing agent and preparation method and application thereof
CN113088271A (en) * 2021-04-09 2021-07-09 中国石油天然气股份有限公司 Sulfur-resistant liquid rubber plug and preparation method thereof

Also Published As

Publication number Publication date
CN103865500B (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN103865500A (en) Liquid rubber plug and method for pulling out coiled tubing velocity pipe column by using liquid rubber plug under pressure
CN104695927B (en) A kind of coiled tubing and production tube compound tube string pressure break and completion integral method
CN106014330B (en) A method of improving leakage casing damaged well chemical plugging success rate
CN101158280A (en) Oil well high water-bearing layer pressure blocking method
CN105317417B (en) A kind of fracturing process of middle high-order coalbed methane reservoir
CN106837268B (en) Control water gas-injection oil-production integration method for increasing
CN104989356A (en) Underground coal mine coal seam drilling high-pressure gas fracturing and permeability increasing method and system
CN108756806A (en) Pipe leakage administering method is altered outside a kind of production of hydrocarbons well casing
CN110344809B (en) Horizontal well intersegment multi-slit temporary plugging acidification method
US20210017445A1 (en) Carbonate reservoir filtration-loss self-reducing acid
CN105178910A (en) Water-plugging process tubing string and method of horizontal wells
CN104653136A (en) General tubing downhole composite bridge plug drilling and grinding method
CN111058824B (en) Temporary plugging and shunting acidification method for strong heterogeneous sandstone reservoir through sieve tube
CN202745854U (en) Hard shut-in simulation experiment device for petroleum drilling
CN102817594B (en) Horizontal well water pumping gas production method and device
CN104121000B (en) Water plugging method for low-permeability fractured reservoir casing completion horizontal well
CN203626682U (en) SAGD (steam assisted gravity drainage) steam injection well head device
CN204782945U (en) Double -barrelled oil production pipe of sleeve pipe absorption well
CN112796728A (en) Acid fracturing method for improving water yield of limestone reservoir geothermal well
US11041112B2 (en) Breaker systems for wellbore treatment operations for use at varying temperatures
CN204591240U (en) Natural gas well pressure break or acidifying foam return comb post
CN208845157U (en) Gas lift liquid drainage system
CN103952130A (en) Temporary blocking gel for low-pressure oil-gas well and preparation method thereof
CN210798899U (en) Shale gas horizontal well high pressure pumping bridging plug device
CN205025423U (en) Horizontal well water blocking process tubular column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200914

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee after: CNPC Chuanqing Drilling Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Address before: The 1 section of No. 3 company Chuanqing Drilling Technology Information Office Chenghua District Green Road 610051 Chengdu City, Sichuan Province

Patentee before: CNPC Chuanqing Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right