The content of the invention
Technical problem to be solved of the embodiment of the present invention is, cargo handling process complexity is there is for solving prior art
The problem of.
To achieve these goals, the embodiment of the present invention provides following technical scheme:
On the one hand, a kind of combined hard disk drive bracket.The combined hard disk drive bracket includes main support, and the main support includes relative
The two side walls set, set at least two pair first installation portion on described two side walls, it is described it is each in the first installation portion two
The individual the first installation part is not oppositely disposed on two side walls, described each to be used for the first size that aligns to the first installation portion
Hard disk side positioning hole, first installation portion installs shockproof nail, described shockproof to follow closely for inserting in the hard of the first size
Disk side positioning hole;
Each side wall is made up of elastomeric material;Each first installation portion of correspondence sets a spanner on each side wall;
The one side of the spanner towards the hard disk of the first size includes a wedge-shaped snap-in structure, and the wedge-shaped snap-in structure clamps institute
State the hard disk of first size;
The combined hard disk drive bracket includes grip handle, and the grip handle is fixed on described main support one end, the grip handle
Both sides include two block tongues being oppositely arranged, and the block tongue is used to be snapped in frame.
The grip handle also includes a pressing piece, and the pressing piece includes two buttons being oppositely arranged, the button one
End is slidably connected on the grip handle, and the block tongue is fixed at another end of the button, when one end phase of described two buttons
To or when conversely moving, another end of described two buttons is toward each other or opposite mobile;
The pressing piece also includes two elastic components, and each elastic component is compressed in described button one end and the handle
Between frame, for providing the restoring force that described button one end resets.
In the first possible implementation, the combined hard disk drive bracket also includes on submounts, a side wall
At least one second installation portion is set, and at least one described second installation portion is used for the hard disk side positioning of the second size of alignment
Hole, second installation portion installs shockproof nail, the shockproof hard disk side positioning hole followed closely for inserting in second size, institute
Submounts are stated between described two side walls, the submounts include at least two Elastic buckles, at least two fixed columns, with
The corresponding fixed ear of first installation portion, the fixed ear be sheathed on respectively on each first installation portion it is shockproof nail on,
Direction arrangement of at least two Elastic buckles along the parallel side wall, at least two Elastic buckle includes and second chi
The banking pin that the side positioning hole of very little hard disk is engaged, the hard disk bottom of at least two fixed columns correspondence, second size
Portion's positioning hole, and be engaged with the hard disk bottom positioning hole of second size.
With reference to the first possible implementation, in second of possible implementation, the shockproof nail includes metal
The packing ring of nail and damping material, the packing ring is enclosed on the peg, and annular is formed between the packing ring and the peg
Groove, the shockproof hard disk side positioning hole for following closely the hard disk side positioning hole or the second size that insert in the first size, institute
The first installation portion is stated for hole clipping structure, first installation portion includes interconnected first through hole and the second through hole, described the
One through-hole aperture is more than second through-hole aperture, and the first through hole is engaged with the peg periphery, and described second leads to
Hole is engaged with the annular groove.
With reference to second of possible implementation, in the third possible implementation, second installation portion is scarce
Mouthful, second installation portion includes the first card and portion and the second card and portion, first card and portion and the peg periphery phase
Coordinate, second card and portion are engaged with the annular groove.
With reference to the first possible implementation, in the 4th kind of possible implementation, the fixed column is located at described
Elastic buckle bottom.
In the 5th kind of possible implementation, the block tongue is elastic piece structure.
The combined hard disk drive bracket that the present invention is provided, hard disk side is directly inserted in by the shockproof nail on flexible side wall
While fix, without instrument, convenient dismounting.
In addition, by increasing by a submounts, so as to insert the hard of small size by the banking pin of submounts and fixed column
The positioning hole of disk, the hard disk of fixed small size.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
In embodiments of the present invention, the positioning hole of hard disk side is inserted in by the shockproof nail on the wall of side, so as to solve
The problem of without instrument quick-replaceable.
Referring to Fig. 1, the combined hard disk drive bracket 100 that the present invention is provided, the hard disk support bracket 100 includes main support 10 and son
Support 20.The submounts 20 are contained in the main support 10.
Referring to Fig. 2, the main support 10 is used for the hard disk 200 for fixing first size and the carrying submounts 20 (please
Refering to Fig. 1).In present embodiment, the hard disk 200 of the first size is 3.5 cun of hard disks.Certainly, the first size is hard
Disk 200 is also not necessarily limited to 3.5 cun.
The main support 10 includes main floor 11, side wall 12a, a side wall 12b and the grip handle being oppositely arranged
13.The main floor 11 is hollow out frame structure.Certainly, in other embodiments, the main support 10 can also omit institute
Main floor 11 or grip handle 13 are stated, so as to be connected between the side wall 12a and side wall 12b by connecting rod.
The main floor 11 includes two relative side 11a and side 11b, and the side wall 12a is located at the main floor
11 side 11a, the side wall 12b are located at the side 11b of the main floor 11.The side wall 12a and side wall 12b are by elastic material
Material is made.In the side wall 12a, first installation portion 110a, 110b is set respectively, set respectively on the side wall 12b 110c and
110d, meanwhile, second installation portion 111 is set on the side wall 12b, wherein, the first installation portion 110a and first
Installation portion 110b is arranged on the side wall 12a, and the first installation portion 110c and the first installation portion 110d are arranged at the side
On wall 12b.The first installation portion 110a is oppositely arranged with the first installation portion 110c, the first installation portion 110c and institute
The first installation portion 110d is stated to be oppositely arranged..It is described each described for aliging to first installation portion 110a, 110b, 110c and 110d
The side positioning hole 201 of hard disk 200 of first size.Described first installation portion 110a, 110b, 110c and 110d install shockproof nail 9.
The side wall 12a and side wall 12b are strutted for convenience, correspondence each described the on the side wall 12a and side wall 12b
One installation portion 110a, 110b, 110c and 110d sets a spanner 14.In present embodiment, the spanner 14 is towards described first
The one side 140 of the hard disk 200 of size also includes a wedge-shaped snap-in structure 141 (referring to Fig. 4), the wedge-shaped snap-in structure 141
Clamp the hard disk 200 of the first size.Prevent the hard disk 200 of the first size from coming off.Certainly, in other embodiment
In, the spanner 14 can also be omitted, the side wall 12a and side wall 12b is directly pulled.The end of spanner 14 can also be processed
Into the coupler construction of the bending of hard disk 200 to the first size.
Referring to Fig. 2, the shockproof nail 9 is used for the side positioning hole 201 of hard disk 200 for inserting in the first size.This reality
Apply in mode, the shockproof nail 9 is made up of rubber coated peg, to reduce the extraneous vibrations transmitted to hard disk.Refer to figure
3, the shockproof nail 9 includes the packing ring 9b of peg 9a and damping material.The packing ring 9b is enclosed on the peg 9a, described
Annular groove 9c is formed between packing ring 9b and the peg 9a.Specifically, the outer rim cladding such as rubber of the peg 9a
The damping skin 9d (referring to Fig. 2) that material is made.The shockproof nail 9 inserts in the hard disk side positioning hole of the first size 200
201。
As shown in figure 3, described first installation portion 110a, 110b, 110c and 110d are hole clipping structure, installed with described first
Exemplified by portion 110a, the first installation portion 110a includes interconnected first through hole 110e and the second through hole 110f, and described the
One through hole 110e apertures are more than the second through hole 110f apertures, and the first through hole 110e matches with the peg 9a peripheries
Close, the second through hole 110f is engaged with the annular groove 9c.The shockproof nail 9 is installed to first installation portion
During 110a, first the peg 9a is inserted into the first through hole 110e, the peg 9a is then slided into described again
In two through hole 110f, the annular groove 9c is stuck in the second through hole 110f, the shockproof nail 9 institute in fig. 2 is completed
State the fixation on side wall 12a and side wall 12b.Certainly, in other embodiments, in order to further improve steadiness, described two
Individual side wall 12a and side wall 12b can set three couples of the first installation portion 110a, for setting six shockproof nails 9, by institute
In six positioning holes 201 for stating the hard disk side that shockproof nail 9 inserts in first size 200 described in Fig. 2 respectively
Referring to Fig. 4, the grip handle 13 is fixed on described one end of main support 10, the both sides of grip handle 13 include two
The block tongue 130 being oppositely arranged, the block tongue 130 is used to be snapped in frame 500.In present embodiment, the grip handle 13 is wrapped
A pressing piece (not shown) is included, the pressing piece includes two button being oppositely arranged 131a, and described button 131a one end is slided
It is connected on the grip handle 13, the block tongue 130 is fixed at described another end of button 131a.When described two button 131a's
When one end is opposite or conversely moves, described two button 131a another end is toward each other or opposite mobile.It is logical so as to realize
Cross and press or discharge the button 131a, realize that the block tongue 130 departs from or inserted from the lockhole of the frame 500.It is described to press
Key 131a can be made up of elastic component, so as to be automatically reset after pressing.Or the pressing piece can also include two elastic components
(not shown), each elastic component is compressed between described button 131a one end and the grip handle 13, described for providing
The restoring force that button 131a one end resets.
Referring to Fig. 5, second installation portion 111 is arranged on a side wall 12b, second installation portion 111
The side positioning hole 301 of hard disk 300 for the second size of aliging.Second installation portion 111 installs shockproof nail 8, described shockproof
Nail 8 is used for the side positioning hole 301 of hard disk 300 for inserting in second size.The shockproof nail 8 is used to positioning, damping and fixation
The hard disk 300 of second size, the shockproof nail 8 is identical with the shockproof nail 9.
The submounts 20 are used for the hard disk 300 for fixing the second size, and the hard disk 300 of second size is hard for 2.5 cun
Disk.The hard disk 300 of second size is also not necessarily limited to 2.5 cun.The submounts 20 are located at described two side wall 12a and side wall
Between 12b, the submounts 20 include daughter backplane 21, corresponding solid with described first installation portion 110a, 110b, 110c and 110d
Determine ear 22, two Elastic buckles 23 and two fixed columns 24.The daughter backplane 21 is U-shaped framework structure.Three fixed 22 points of ears
Not Wei Yu the daughter backplane 21 three angles 21a, 21b and 21c.Certainly, in other embodiments, the four of the daughter backplane 21
Individual angle can all install a fixed ear 22, to improve stability.The fixed ear 22 is sheathed on each described first respectively
On shockproof nail 9 on installation portion 110a, 110b, 110c and 110d, the fixed ear 22 opens up what is be engaged with the shockproof nail 9
Nail 22a (refers to Fig. 7).
Direction arrangement of described two Elastic buckles 23 along the parallel side wall 12a and side wall 12b, the Elastic buckle 23
The banking pin 230 being engaged including the side positioning hole 301 with the hard disk 300 of second size.It is described in present embodiment
The end of Elastic buckle 23 is pulled to the curving of the hard disk 300 away from second size with facilitating, and installs described second
The hard disk 300 of size.Certainly, in other embodiment, the submounts 20 can also be including described in three, four or more
Elastic buckle 23.
The bottom positioning hole (not shown) of hard disk 300 of the fixed column 24 correspondence second size, and with described second
The bottom positioning hole of hard disk 300 of size is engaged.So as to prevent the play of hard disk 300 of second size.Certainly, in other realities
Apply in mode, can also be including fixed column 24 described in three, four or more.
Referring to Fig. 6, second installation portion 111 is breach, second installation portion 111 includes the first card and portion 111a
And second card and portion 111b, it is described first card and portion 111a apertures be more than described second card and portion 111b apertures, it is described first card
It is engaged with portion 111a with the peg 8a peripheries of the shockproof nail 8, the ring of second card and portion 111b and the shockproof nail 8
Connected in star 8c is engaged.Certainly, in other embodiments, the side wall 12b can set two or three second installation portions
111.It is described it is shockproof nail 8 can also from it is described it is shockproof nail 9 structures it is different, for example, the length or thickness of the peg 8a according to
The side positioning hole 301 of hard disk 300 of second size described in Fig. 5 is changed.Second installation portion 111 can also with it is described
First installation portion 110a, 110b, 110c and 110d is identical.
Referring to Fig. 1, when assembling and disassembling the hard disk 200 of the first size, pulling the spanner of the shockproof top of nail 9 outwardly with hand
14, the hard disk 200 of the first size is loaded into the main support 10, when taking the hard disk 200 of the first size, with hand outwardly
The plastic cement spanner 14 of the shockproof top of nail 9 is pulled, the hard disk 300 of second size is taken out, so as to realize tool-free dismounting.
Referring to Fig. 5, when assembling and disassembling the hard disk 300 of second size, will pacify on the side wall 12a close to described second
One shockproof nail 9 in dress portion 111 is pulled down, and shockproof nail 8 is installed in second installation portion 111.Then by the submounts 20
Fixation ear 22 be set on three of described first installation portion 110a, 110b and 110c shockproof nails 9.Then the elastic card is pulled
Button 23, the side positioning hole 201 of the hard disk 300 of second size is attached on the shockproof nail 8 and the banking pin 230,
The bottom positioning hole of hard disk 300 of second size is set in the fixed column 24 simultaneously.
The combined hard disk drive bracket that the present invention is provided directly inserts in hard disk side by shockproof nail and fixed, without instrument,
Convenient dismounting.
In addition, by increasing by a submounts, so as to insert the hard of small size by the banking pin of submounts and fixed column
The positioning hole of disk, the hard disk of fixed small size.
Above disclosed is only a kind of preferred embodiment of the invention, can not limit the power of the present invention with this certainly
Sharp scope, therefore the equivalent variations made according to the claims in the present invention, still belong to the scope that the present invention is covered.