CN103850260A - 一种桩井一体化降水井 - Google Patents
一种桩井一体化降水井 Download PDFInfo
- Publication number
- CN103850260A CN103850260A CN201410111510.6A CN201410111510A CN103850260A CN 103850260 A CN103850260 A CN 103850260A CN 201410111510 A CN201410111510 A CN 201410111510A CN 103850260 A CN103850260 A CN 103850260A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- turbination
- well
- tube
- steel tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Filtration Of Liquid (AREA)
Abstract
本发明涉及基坑降水领域,尤其涉及一种桩井一体化降水井,包括:倒圆锥形钢管,其顶部为大开口端,底部为封闭的小口端,侧壁和底部均开设有多个开孔,侧壁的每一开孔处均连接有一紫铜毛细管,紫铜毛细管的轴向与倒圆锥形钢管的轴向平行,每一紫铜毛细管均通过连接件与倒圆锥形钢管的开孔密封连通;一对拉环,其安装在倒圆锥形钢管侧壁的上部;内管,其设置在倒圆锥形钢管内部,并与倒圆锥形钢管的侧壁及底部形成一个水流集中空间,内管的管壁外侧附着有过滤层;水泵,其安装在内管的底部,且进水口与水流集中空间连通,出水口连接有导水管。本发明提供了一种施工简单,生产成本低,降水效果好,且井管可以多次利用的桩井一体化降水井。
Description
技术领域
本发明涉及基坑降水领域,尤其涉及一种桩井一体化降水井。
背景技术
在含水地层中进行地下工程建设,往往要首先进行工程降水。目前常规基坑工程降水,沿着基坑周边先做护坡桩,在护坡桩的外围再做一圈降水井,降水井多采用无沙管作为井管,工程完工后,将井回填,井管永久留在地层中,给后续工程施工和地下空间开发利用留下隐患。
在同一场地既打设护坡桩又施工降水井,占用场地较大,不利用场地的综合规划利用。另外,在场地狭小的地段,往往只有打桩的位置,没有成井的位置,造成无法成井。现有的井管均为带孔的圆柱形混凝土管,不但不利于工程结束后将井管顺利拔出,且由于井管的开孔较大,地层中的水分并不能及时有效地集中到井管中。且现有的井管过滤装置的过滤效果不甚理想,过滤装置拆卸工程量较大。
发明内容
针对上述技术问题,本发明设计开发了一种桩井一体化降水井,目的在于提供一种施工简单,生产成本低,降水效果好,且井管可以多次利用的桩井一体化降水井。
本发明提供的技术方案为:
一种桩井一体化降水井,包括:
倒圆锥形钢管,其顶部为大开口端,底部为封闭的小口端,且所述底部为一水平面,所述倒圆锥形钢管的侧壁和底部均开设有多个开孔,多个开孔呈层状分布,侧壁的每一开孔处均连接有一紫铜毛细管,所述紫铜毛细管的内径为0.6~1.5mm,所述紫铜毛细管的轴向与所述倒圆锥形钢管的轴向平行,每一紫铜毛细管均通过连接件与所述倒圆锥形钢管的开孔密封连通;
一对拉环,其安装在所述倒圆锥形钢管侧壁的上部;
内管,其设置在所述倒圆锥形钢管内部,并与所述倒圆锥形钢管的侧壁及底部形成一个水流集中空间,所述内管的管壁外侧附着有过滤层,所述过滤层与所述内管的管壁可拆卸连接,所述过滤层为两层,外面的一层为开设有方形孔的第一过滤层,里面的一层为开设有圆形孔的第二过滤层,且第一过滤层的方形孔和第二过滤层的圆形孔交错设置;
水泵,其安装在所述内管的底部,且进水口与所述水流集中空间连通,出水口连接有导水管,所述导水管延伸至所述倒圆锥形钢管的顶部。
优选的是,所述的桩井一体化降水井中,所述连接件为一直角形连通管,所述连通管的一端与所述倒圆锥形钢管的开孔螺纹连接,所述连通管的另一端与所述紫铜毛细管螺纹连接,所述连通管的每一端均设置有密封圈,所述倒圆锥形钢管的每层开孔连接连接件后形成的大圆盘直径均小于所述倒圆锥形钢管的大开口端直径。
优选的是,所述的桩井一体化降水井中,所述倒圆锥形钢管的底部与侧壁可拆卸连接。
优选的是,所述的桩井一体化降水井中,所述倒圆锥形钢管的侧壁下端安装有多个锁扣,所述锁扣的固定端安装在所述倒圆锥形钢管的侧壁上,所述锁扣的活动端安装在所述倒圆锥形钢管的底部。
优选的是,所述的桩井一体化降水井中,所述一对拉环与所述倒圆锥形钢管一体成型,所述一对拉环连接降水井拔出装置。
本发明所述的桩井一体化降水井中,由于所述倒圆锥形钢管的开孔处连接有多个紫铜毛细管,紫铜毛细管的内径较小,有利于地层中的水及时有效的富集到倒圆锥形钢管的水流集中空间,再经过内管管壁外侧过滤层的作用进入内管,同时将砂砾阻隔在外,两层过滤层交错设置,过滤效果更好,水泵通过导水管将水流排出,再次利用。当工程结束后,将拔管器连接到所述倒圆锥形钢管的一对拉环上,从而将倒圆锥形钢管拔出,由于所述倒圆锥形钢管的顶部开口最大,整个管体的直径从上到小逐渐减小,当顶部与地层脱离接触后,管体下部由于不再与地层接触,则会在外力作用下沿着顶部开口顺利拔出。打开所述倒圆锥形钢管侧壁的锁扣,将底部拆除,清除水流集中空间内的砂砾,并拆除过滤层进行清洗,以备下次使用,从而降低了生产成本,由于不再需要先做护坡桩,选用带孔钢管既保证了护坡桩所需要的刚度,同时又可以当做降水井用,节约了场地空间。
附图说明
图1是本发明所述的桩井一体化降水井的结构示意图。
具体实施方式
下面结合附图对本发明做进一步的详细说明,以令本领域技术人员参照说明书文字能够据以实施。
本发明提供一种桩井一体化降水井,包括:
倒圆锥形钢管1,其顶部为大开口端,底部为封闭的小口端,且所述底部为一水平面,底部横截面的面积为顶部横截面的面积的1/2,所述倒圆锥形钢管的侧壁和底部均开设有多个开孔,多个开孔呈层状分布,侧壁的每一开孔处均连接有一紫铜毛细管5,所述紫铜毛细管的内径为0.6~1.5mm,所述紫铜毛细管的轴向与所述倒圆锥形钢管的轴向平行,当开挖基坑时,只需开挖与倒圆锥形钢管等大体积的基坑,紫铜毛细管由于刚性作用直接插入地层中,减少了开挖工程量,若紫铜毛细管的轴向垂直于倒圆锥形钢管的轴向,则需要开挖较大的基坑,工程量较大,每一紫铜毛细管均通过连接件与所述倒圆锥形钢管的开孔密封连通,也可将紫铜毛细管直接焊接在倒圆锥形钢管的开孔处,由于直接焊接后倒圆锥形钢管存放时占用的空间较大,因此本实施例中优选通过连接件连通;
一对拉环2,其安装在所述倒圆锥形钢管侧壁的上部,方便拔管器的安装,也可在倒圆锥形钢管侧壁的上部设置多个拉环,以使得拔管时管体受力更加均匀;
内管3,其设置在所述倒圆锥形钢管内部,并与所述倒圆锥形钢管的侧壁及底部形成一个水流集中空间6,所述内管的管壁外侧附着有过滤层7,所述过滤层与所述内管的管壁可拆卸连接,所述过滤层为两层,外面的一层为开设有方形孔的第一过滤层8,里面的一层为开设有圆形孔的第二过滤层9,且第一过滤层的方形孔和第二过滤层的圆形孔交错设置,从而将通过倒圆锥形钢管的开孔进入到水流集中空间的砂砾10有效阻隔,进入到内管内部的水质较好,可进行再次利用;
水泵4,其安装在所述内管的底部,且进水口与所述水流集中空间连通,出水口连接有导水管11,所述导水管延伸至所述倒圆锥形钢管的顶部。
所述的桩井一体化降水井中,所述连接件12为一直角形连通管,所述连通管的一端与所述倒圆锥形钢管的开孔螺纹连接,所述连通管的另一端与所述紫铜毛细管螺纹连接,所述连通管的每一端均设置有密封圈,保证了水流通道的密封性,所述倒圆锥形钢管的每层开孔连接连接件后形成的大圆盘直径均小于所述倒圆锥形钢管的大开口端直径,以利于倒圆锥形钢管顶部脱离地层后,管体下部顺利拔出基坑,相对于普通圆柱形管体,拔出钢管时做功较少,降低了劳动强度。
所述的桩井一体化降水井中,所述倒圆锥形钢管的底部与侧壁可拆卸连接,方便清除水流集中空间内部的砂砾,而不需要清除工具从管口一直延伸到管底。
所述的桩井一体化降水井中,所述倒圆锥形钢管的侧壁下端安装有多个锁扣13,所述锁扣的固定端安装在所述倒圆锥形钢管的侧壁上,所述锁扣的活动端安装在所述倒圆锥形钢管的底部,当需要对水流集中空间进行清洗时,只需将锁扣打开,拆除底部即可。
所述的桩井一体化降水井中,所述一对拉环与所述倒圆锥形钢管一体成型,所述一对拉环连接降水井拔出装置。
尽管本发明的实施方案已公开如上,但其并不仅仅限于说明书和实施方式中所列运用,它完全可以被适用于各种适合本发明的领域,对于熟悉本领域的人员而言,可容易地实现另外的修改,因此在不背离权利要求及等同范围所限定的一般概念下,本发明并不限于特定的细节和这里示出与描述的图例。
Claims (5)
1.一种桩井一体化降水井,其特征在于,包括:
倒圆锥形钢管,其顶部为大开口端,底部为封闭的小口端,且所述底部为一水平面,所述倒圆锥形钢管的侧壁和底部均开设有多个开孔,多个开孔呈层状分布,侧壁的每一开孔处均连接有一紫铜毛细管,所述紫铜毛细管的内径为0.6~1.5mm,所述紫铜毛细管的轴向与所述倒圆锥形钢管的轴向平行,每一紫铜毛细管均通过连接件与所述倒圆锥形钢管的开孔密封连通;
一对拉环,其安装在所述倒圆锥形钢管侧壁的上部;
内管,其设置在所述倒圆锥形钢管内部,并与所述倒圆锥形钢管的侧壁及底部形成一个水流集中空间,所述内管的管壁外侧附着有过滤层,所述过滤层与所述内管的管壁可拆卸连接,所述过滤层为两层,外面的一层为开设有方形孔的第一过滤层,里面的一层为开设有圆形孔的第二过滤层,且第一过滤层的方形孔和第二过滤层的圆形孔交错设置;
水泵,其安装在所述内管的底部,且进水口与所述水流集中空间连通,出水口连接有导水管,所述导水管延伸至所述倒圆锥形钢管的顶部。
2.如权利要求1所述的桩井一体化降水井,其特征在于,所述连接件为一直角形连通管,所述连通管的一端与所述倒圆锥形钢管的开孔螺纹连接,所述连通管的另一端与所述紫铜毛细管螺纹连接,所述连通管的每一端均设置有密封圈,所述倒圆锥形钢管的每层开孔连接连接件后形成的大圆盘直径均小于所述倒圆锥形钢管的大开口端直径。
3.如权利要求1所述的桩井一体化降水井,其特征在于,所述倒圆锥形钢管的底部与侧壁可拆卸连接。
4.如权利要求3所述的桩井一体化降水井,其特征在于,所述倒圆锥形钢管的侧壁下端安装有多个锁扣,所述锁扣的固定端安装在所述倒圆锥形钢管的侧壁上,所述锁扣的活动端安装在所述倒圆锥形钢管的底部。
5.如权利要求1所述的桩井一体化降水井,其特征在于,所述一对拉环与所述倒圆锥形钢管一体成型,所述一对拉环连接降水井拔出装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410111510.6A CN103850260B (zh) | 2014-03-24 | 2014-03-24 | 一种桩井一体化降水井 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410111510.6A CN103850260B (zh) | 2014-03-24 | 2014-03-24 | 一种桩井一体化降水井 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103850260A true CN103850260A (zh) | 2014-06-11 |
CN103850260B CN103850260B (zh) | 2015-10-28 |
Family
ID=50858373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410111510.6A Active CN103850260B (zh) | 2014-03-24 | 2014-03-24 | 一种桩井一体化降水井 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103850260B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105178289A (zh) * | 2015-10-10 | 2015-12-23 | 江西建工第二建筑有限责任公司 | 建筑基坑内预制降水管桩及其使用方法 |
CN110685292A (zh) * | 2019-09-25 | 2020-01-14 | 广东乾兴建设工程有限公司 | 一种基坑排水系统及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5526378A (en) * | 1978-08-15 | 1980-02-25 | Tsuneo Nanba | Method of foundation construction of soft ground |
CN101161947A (zh) * | 2007-08-27 | 2008-04-16 | 大连理工大学 | 一种用于基坑支护的护壁桩与降水井合一的方法 |
JP2009052202A (ja) * | 2007-08-23 | 2009-03-12 | Takenaka Komuten Co Ltd | ディープウェル設置方法 |
CN102535490A (zh) * | 2012-03-06 | 2012-07-04 | 北京交通大学 | 一种利用钻孔灌注桩进行基坑降水的方法 |
CN102912797A (zh) * | 2012-10-19 | 2013-02-06 | 中国建筑第六工程局有限公司 | 一种含有降水功能的基坑支护方法 |
CN203049601U (zh) * | 2013-01-18 | 2013-07-10 | 辽宁金帝第二建筑工程有限公司岩土工程分公司 | 钢管过滤式支护桩 |
-
2014
- 2014-03-24 CN CN201410111510.6A patent/CN103850260B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5526378A (en) * | 1978-08-15 | 1980-02-25 | Tsuneo Nanba | Method of foundation construction of soft ground |
JP2009052202A (ja) * | 2007-08-23 | 2009-03-12 | Takenaka Komuten Co Ltd | ディープウェル設置方法 |
CN101161947A (zh) * | 2007-08-27 | 2008-04-16 | 大连理工大学 | 一种用于基坑支护的护壁桩与降水井合一的方法 |
CN102535490A (zh) * | 2012-03-06 | 2012-07-04 | 北京交通大学 | 一种利用钻孔灌注桩进行基坑降水的方法 |
CN102912797A (zh) * | 2012-10-19 | 2013-02-06 | 中国建筑第六工程局有限公司 | 一种含有降水功能的基坑支护方法 |
CN203049601U (zh) * | 2013-01-18 | 2013-07-10 | 辽宁金帝第二建筑工程有限公司岩土工程分公司 | 钢管过滤式支护桩 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105178289A (zh) * | 2015-10-10 | 2015-12-23 | 江西建工第二建筑有限责任公司 | 建筑基坑内预制降水管桩及其使用方法 |
CN105178289B (zh) * | 2015-10-10 | 2017-10-31 | 江西建工第二建筑有限责任公司 | 建筑基坑内预制降水管桩及其使用方法 |
CN110685292A (zh) * | 2019-09-25 | 2020-01-14 | 广东乾兴建设工程有限公司 | 一种基坑排水系统及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103850260B (zh) | 2015-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210105805U (zh) | 一种定向钻孔瓦斯综合防喷装置 | |
CN106215543A (zh) | 便于固定装配的立式气液分离方法 | |
CN103758144B (zh) | 一种用于同时疏干和减压降水的管井及其降水方法 | |
CN203201503U (zh) | 钻井液滤清器 | |
CN103850260B (zh) | 一种桩井一体化降水井 | |
CN203173911U (zh) | 一种沉淀装置 | |
CN205617401U (zh) | 一种井点降水装置 | |
CN201137152Y (zh) | 密封多管地层降水装置 | |
CN203768924U (zh) | 一种用于同时疏干和减压降水的管井 | |
CN204002651U (zh) | 一种锚杆钻机 | |
CN203362134U (zh) | 防砂防气除泥装置 | |
CN202000365U (zh) | 地下连续墙防渗结构 | |
CN208633830U (zh) | 一种岩石顶管机泥仓清渣装置 | |
CN107663876A (zh) | 一种新型结构的同层积水排除器 | |
CN204543668U (zh) | 一种水下气冲排泥设备 | |
CN203978355U (zh) | 多功能局部反循环工作筒 | |
CN210140838U (zh) | 一种多用降水井结构 | |
CN209083217U (zh) | 水力冲孔式检波器埋置工具 | |
CN203066077U (zh) | 一种用于涌水孔灌浆封闭的装置 | |
CN206070548U (zh) | 深基坑降水井盖板套件 | |
CN207295748U (zh) | 一种水利工程施工用的井点降水装置 | |
CN113666517A (zh) | 一种市域铁路车站基坑降水回收利用系统 | |
CN206184102U (zh) | 除砂装置 | |
CN201419046Y (zh) | 注水井来水过滤器 | |
CN104120783A (zh) | 排水排淤装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20140611 Assignee: Beijing Geotechnical Engineering Association Assignor: Beijing Urban Construction Exploration & Surveying Design Research Institute Co.,Ltd. Contract record no.: 2017990000245 Denomination of invention: Pile-well integration dewatering well Granted publication date: 20151028 License type: Exclusive License Record date: 20170627 |