CN103836899B - Waste heat utilization technology of cluster intermittent refractory brick drying kiln - Google Patents
Waste heat utilization technology of cluster intermittent refractory brick drying kiln Download PDFInfo
- Publication number
- CN103836899B CN103836899B CN201410096931.6A CN201410096931A CN103836899B CN 103836899 B CN103836899 B CN 103836899B CN 201410096931 A CN201410096931 A CN 201410096931A CN 103836899 B CN103836899 B CN 103836899B
- Authority
- CN
- China
- Prior art keywords
- kiln
- temperature
- waste heat
- heat
- refractory brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Furnace Details (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种集群间歇式耐火砖干燥窑余热利用工艺。 The invention relates to a cluster intermittent refractory brick drying kiln waste heat utilization process.
背景技术 Background technique
目前钢铁行业使用的镁碳砖、轻质砖等耐火材料普遍是将配料压制成型,然后经过约220℃低温干燥处理而成。干燥工艺分为升温、保温及降温三个过程。干燥采用电加热方式加热,消耗大量电能。现有干燥窑各窑独立周期性运行,属间歇式加热设备,干燥周期结束后打开炉门自然散热冷却至出窑温度(如图1所示)。据中国耐火材料协会的初步统计,电干燥仍为目前的主流干燥工艺。 At present, refractory materials such as magnesia-carbon bricks and lightweight bricks used in the iron and steel industry are generally formed by pressing the ingredients and then drying them at a low temperature of about 220 °C. The drying process is divided into three processes: heating, heat preservation and cooling. Drying is heated by electric heating, which consumes a lot of electric energy. Each kiln of the existing drying kiln operates independently and periodically, which is an intermittent heating equipment. After the drying cycle is over, the furnace door is opened to naturally dissipate heat and cool down to the temperature of the kiln (as shown in Figure 1). According to the preliminary statistics of China Refractories Association, electric drying is still the current mainstream drying process.
现有干燥工艺存在的问题如下: The problems existing in the drying process are as follows:
1) 大量物理显热浪费,余热没有得到充分利用,热效率低; 1) A large amount of physical sensible heat is wasted, the waste heat is not fully utilized, and the thermal efficiency is low;
2) 自然冷却速度慢、生产效率低、设备利用率不高; 2) The natural cooling speed is slow, the production efficiency is low, and the equipment utilization rate is not high;
3) 夏季高温,热烟气呈无组织排放状态排到车间里,造成车间高温效应,工人劳动条件恶化; 3) High temperature in summer, hot flue gas is discharged into the workshop in an unorganized state, causing high temperature effect in the workshop and deteriorating working conditions of workers;
4) 废气向车间无组织排放,污染车间空气,影响工人身体健康。 4) Exhaust gas is unorganizedly discharged to the workshop, polluting the air in the workshop and affecting the health of workers.
发明内容 Contents of the invention
本发明的目的在于克服上述不足,提供一种采用余热回收技术回收窑体和耐火砖在降温段排放的物理显热,用来对刚刚进入升温段的冷窑和冷砖坯进行预热,然后将预热后排放的烟气加热热水的集群间歇式耐火砖干燥窑余热利用工艺。 The purpose of the present invention is to overcome the above-mentioned shortcomings, and to provide a method of recovering the physical sensible heat discharged by the kiln body and refractory bricks in the cooling section by waste heat recovery technology, which is used to preheat the cold kiln and cold bricks that have just entered the heating section, and then A cluster intermittent refractory brick drying kiln waste heat utilization process for heating hot water with flue gas discharged after preheating.
为实现上述技术目的,本发明提供的方案是:一种集群间歇式耐火砖干燥窑余热利用工艺,包括如下步骤。 In order to achieve the above technical purpose, the solution provided by the present invention is: a cluster intermittent refractory brick drying kiln waste heat utilization process, including the following steps.
步骤一,高温余热利用,A窑作业完毕后到达降温期,通过具有循环风机的循环管道将A窑中的高温气体送入处于升温期的B窑内进行循环换热,直到A窑与B窑基本无温差。 Step 1: Utilization of high-temperature waste heat. After the operation of kiln A reaches the cooling period, the high-temperature gas in kiln A is sent to kiln B in the heating period through the circulation pipeline with a circulating fan for heat exchange until kiln A and kiln B Basically no temperature difference.
步骤二,电加热,关闭A窑与B窑之间的循环管道,并对B窑进行电加热至工艺额定要求,完成B窑的加热及保温过程。 Step 2, electric heating, close the circulation pipeline between A kiln and B kiln, and conduct electric heating on B kiln to the rated process requirements, and complete the heating and heat preservation process of B kiln.
步骤三,低温余热利用,向A窑内通入少量常温空气调节A窑内的余温,然后通过具有排烟机的余热管引导A窑内的余温气体与气/水换热器进行热交换,最后将尾气排出。 Step 3, low-temperature waste heat utilization, a small amount of normal temperature air is introduced into A kiln to adjust the waste temperature in A kiln, and then the waste heat gas in A kiln is guided through the waste heat pipe with a smoke exhauster to be heated by the air/water heat exchanger. Exchange, and finally discharge the exhaust gas.
步骤四,强制冷却,A窑温度过低时,关闭余热管,向A窑内通入常温空气并由低温管排出,直到A窑到达出窑工艺要求的温度,完成降温工艺过程。 Step 4: Forced cooling. When the temperature of kiln A is too low, close the waste heat pipe, let the normal-temperature air into the kiln A and discharge it from the low-temperature pipe until the kiln A reaches the temperature required by the kiln exit process, and complete the cooling process.
步骤五,下一循环,B窑作业完毕后,向下一作业窑循环前述A窑的余热利用工艺,如此循环。 Step 5, the next cycle, after the operation of the B kiln is completed, the above-mentioned waste heat utilization process of the A kiln is circulated to the next working kiln, and the cycle is like this.
而且,所述高温气体温度为220℃,A窑与B窑基本无温差的温度为110℃,A窑内的余温气体与气/水换热器进行热交换的温度约为80~110℃,A窑温度过低时的温度为80℃以下。 Moreover, the temperature of the high-temperature gas is 220°C, the temperature with almost no temperature difference between A kiln and B kiln is 110°C, and the temperature at which the residual temperature gas in A kiln exchanges heat with the gas/water heat exchanger is about 80-110°C , A kiln temperature is too low when the temperature is below 80 ℃.
本发明还提供一种使用上述集群间歇式耐火砖干燥窑余热利用工艺的集群间歇式耐火砖干燥窑,包括由若干窑组成的窑群组,所述窑群组中的每个窑均具有电加热设备,每个窑分别通过循环管道、余热管、低温管连通,循环管道、余热管、低温管与每个窑连通处均设有阀门,循环管道内设有循环风机,余热管经过气/水换热器后与具有排风机的烟囱连通,低温管连通具有排烟机的烟囱。 The present invention also provides a cluster intermittent refractory brick drying kiln using the waste heat utilization process of the cluster intermittent refractory brick drying kiln, including a kiln group consisting of several kilns, each kiln in the kiln group has an electric Heating equipment, each kiln is connected through circulation pipes, waste heat pipes, and low-temperature pipes, valves are installed at the points where the circulation pipes, waste heat pipes, and low-temperature pipes are connected to each kiln, circulation fans are installed in the circulation pipes, and waste heat pipes pass through the gas/ After the water heat exchanger, it is connected with the chimney with exhaust fan, and the low temperature pipe is connected with the chimney with smoke exhaust machine.
而且,所述循环管道与每个窑的窑头和窑尾均通过电控三通阀门连通,所述余热管、低温管与每个窑通过两通阀门连通。 Moreover, the circulation pipeline communicates with the kiln head and kiln tail of each kiln through an electronically controlled three-way valve, and the waste heat pipe and low temperature pipe communicate with each kiln through a two-way valve.
本发明的有益效果在于: The beneficial effects of the present invention are:
1、按理论计算,砖的升温物理吸热量折合电耗38.14kW·h/吨砖,余热按理论利用率50%计,每吨砖节电19kW·h,现有干燥窑的用电单耗实测值为54.67 kW·h/每吨砖,节能率=19/54.67=34.75%(注:此数据未考虑余热回收过程中产生的正泄漏:余热产生的可利用热水;亦未考虑余热回收过程中产生的负泄漏:如增加的风机电耗、窑与窑之间升温期与降温期的对应性等,正负泄漏有对冲性且对节能率的影响有限); 1. According to theoretical calculations, the physical heat absorption of bricks is equivalent to power consumption of 38.14kW·h/ton of bricks, and the waste heat is calculated according to the theoretical utilization rate of 50%, saving 19kW·h of electricity per ton of bricks, and the electricity bill of the existing drying kiln The measured value of power consumption is 54.67 kW·h/per ton of bricks, and the energy saving rate=19/54.67=34.75% (Note: This data does not take into account the positive leakage generated in the waste heat recovery process: the usable hot water generated by waste heat; waste heat is also not considered Negative leakage generated during the recovery process: such as increased fan power consumption, correspondence between heating up period and cooling period between kilns, etc., positive and negative leakage have hedging properties and have limited impact on energy saving rate);
据中国耐火材料协会提供的数据,全国年产这种耐火砖800多万吨,可节电15200万kW·h,折合标煤5.32万吨,减排二氧化碳13.26万吨,经济效益约1.52亿元; According to the data provided by the China Refractory Materials Association, the annual output of this refractory brick in the country is more than 8 million tons, which can save 152 million kW h of electricity, equivalent to 53,200 tons of standard coal, reduce 132,600 tons of carbon dioxide emissions, and economic benefits of about 152 million yuan ;
2、提高窑的工作效率,由于采用强制对流换热,窑内温度均匀性提高降温时间比传统工艺缩短;由于采用余热预热,升温时间比传统工艺缩短; 2. Improve the working efficiency of the kiln. Due to the use of forced convection heat exchange, the temperature uniformity in the kiln is improved and the cooling time is shortened compared with the traditional process; due to the use of waste heat preheating, the heating time is shortened compared with the traditional process;
3、废气有组织排放,消除了车间热污染和烟气污染,改善了工人劳动条件。 3. The exhaust gas is discharged in an organized manner, which eliminates the heat pollution and smoke pollution in the workshop, and improves the working conditions of the workers.
附图说明 Description of drawings
图1是传统耐火砖干燥窑示意图。 Figure 1 is a schematic diagram of a traditional refractory brick drying kiln.
图2是本发明高温余热利用示意图。 Fig. 2 is a schematic diagram of high temperature waste heat utilization in the present invention.
图3是本发明低温余热利用示意图。 Fig. 3 is a schematic diagram of low-temperature waste heat utilization in the present invention.
图4强制冷却示意图。 Figure 4 Schematic diagram of forced cooling.
其中,1、循环总管,2、循环出口支管,3、电控三通阀门,4、窑,5、低温管,6、两通阀门,7、循环风机,8、循环进口支管,10、余热管,11、排烟机,12、气/水换热器,14、冷水进口,15、热水出口。 Among them, 1. Circulation main pipe, 2. Circulation outlet branch pipe, 3. Electric control three-way valve, 4. Kiln, 5. Low temperature pipe, 6. Two-way valve, 7. Circulation fan, 8. Circulation inlet branch pipe, 10. Waste heat Pipe, 11, exhaust machine, 12, air/water heat exchanger, 14, cold water inlet, 15, hot water outlet.
具体实施方式 Detailed ways
下面结合附图及实施例对本发明作进一步说明。 The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
本实施例提供一种集群间歇式耐火砖干燥窑余热利用工艺,包括如下步骤。 This embodiment provides a cluster intermittent refractory brick drying kiln waste heat utilization process, which includes the following steps.
步骤一,高温余热利用,如图2所示,A窑作业完毕后到达降温期,通过具有循环风机的循环管道将A窑中的高温气体送入处于升温期的B窑内进行循环换热,直到A窑与B窑基本无温差。A窑把窑体和耐火砖的物理显热传递给B窑,供B窑预热窑体和耐火砖,以提高余热利用率,减少B窑升温期的电耗。 Step 1: Utilization of high-temperature waste heat. As shown in Figure 2, after the operation of kiln A reaches the cooling period, the high-temperature gas in kiln A is sent to kiln B in the heating period through the circulation pipeline with a circulating fan for heat exchange. Until there is basically no temperature difference between A kiln and B kiln. A kiln transfers the physical sensible heat of the kiln body and refractory bricks to B kiln to preheat the kiln body and refractory bricks for B kiln, so as to improve the utilization rate of waste heat and reduce the power consumption of B kiln during the heating period.
实际运行中,对于多条窑形成的组群,某些窑的降温期与另一些窑的升温期不一定正好对应,相互的组合换热是一个动态的过程,过程的优化可以通过科学的生产调度和智能化的控制手段配套来实现。 In actual operation, for a group formed by multiple kilns, the cooling period of some kilns does not necessarily correspond to the heating period of other kilns. The mutual combined heat exchange is a dynamic process, and the optimization of the process can be achieved through scientific production. Scheduling and intelligent control means matching to achieve.
步骤二,电加热,关闭A窑与B窑之间的循环管道,并对B窑进行电加热至工艺额定要求,完成B窑的加热及保温过程。此阶段有量少高温烟气,经高温排烟管道、换热器、烟囱排入大气。 Step 2, electric heating, close the circulation pipeline between A kiln and B kiln, and conduct electric heating on B kiln to the rated process requirements, and complete the heating and heat preservation process of B kiln. At this stage, there is a small amount of high-temperature flue gas, which is discharged into the atmosphere through high-temperature exhaust pipes, heat exchangers, and chimneys.
步骤三,低温余热利用,如图3所示,向A窑内通入少量常温空气调节A窑内的余温,然后通过具有排烟机的余热管引导A窑内的余温气体与气/水换热器进行热交换,最后将尾气排出。低温余热加热热水,可供洗澡、采暖等生活用,使余热得到充分利用。 Step 3, low-temperature waste heat utilization, as shown in Figure 3, a small amount of normal temperature air is introduced into kiln A to adjust the waste temperature in kiln A, and then the waste heat gas in kiln A and air/ The water heat exchanger performs heat exchange, and finally discharges the exhaust gas. Low-temperature waste heat can be used to heat hot water, which can be used for bathing, heating, etc., so that the waste heat can be fully utilized.
步骤四,强制冷却,如图4所示,A窑温度过低时,关闭余热管阀门,向A窑内通入常温空气并由低温管排出,直到A窑到达出窑工艺要求的温度,完成降温工艺过程。此过程的目的是加快窑的周转,提高炉窑利用率,提高生产效率,同时有组织地排放废气有利于减少车间热污染及烟气污染,改善工人生产条件。 Step 4, forced cooling, as shown in Figure 4, when the temperature of kiln A is too low, close the valve of the waste heat pipe, pass air at normal temperature into kiln A and discharge it from the low-temperature pipe until kiln A reaches the temperature required by the kiln process, and the process is completed Cooling process. The purpose of this process is to speed up the turnover of the kiln, improve the utilization rate of the kiln, and increase the production efficiency. At the same time, the organized exhaust gas is conducive to reducing the heat pollution and smoke pollution of the workshop and improving the production conditions of the workers.
步骤五,下一循环,B窑作业完毕后,向下一作业窑循环余热利用工艺,如此循环。 Step 5, the next cycle, after the operation of kiln B is completed, the waste heat utilization process is circulated to the next working kiln, and so on.
进一步的,上述高温气体温度为220℃,A窑与B窑基本无温差的温度为110℃,A窑内的余温气体与气/水换热器进行热交换的温度约为80~110℃,A窑温度过低时的温度为80℃以下。 Further, the temperature of the above-mentioned high-temperature gas is 220°C, the temperature with almost no temperature difference between A kiln and B kiln is 110°C, and the temperature of the heat exchange between the residual temperature gas in A kiln and the gas/water heat exchanger is about 80~110°C , A kiln temperature is too low when the temperature is below 80 ℃.
本实施例还提供一种使用上述集群间歇式耐火砖干燥窑余热利用工艺的集群间歇式耐火砖干燥窑,包括由若干窑4组成的窑群组,所述窑群组中的每个窑4均具有电加热设备,每个窑4分别通过循环管道、余热管10、低温管5连通,循环管道、余热管10、低温管5与每个窑4连通处均设有阀门,循环管道内设有循环风机7,余热管10经过气/水换热器12后与具有排风机的烟囱连通,低温管5连通具有排烟机11的烟囱。循环管道包括循环总管1、循环出口支管2、循环进口支管8。 This embodiment also provides a cluster intermittent refractory brick drying kiln using the waste heat utilization process of the cluster intermittent refractory brick drying kiln, including a kiln group consisting of several kilns 4, each kiln 4 in the kiln group All have electric heating equipment, and each kiln 4 is connected through the circulation pipeline, waste heat pipe 10, and low temperature pipe 5 respectively, and the circulation pipeline, waste heat pipe 10, low temperature pipe 5 are connected with each kiln 4. There is a circulating fan 7, and the waste heat pipe 10 communicates with the chimney with the exhaust fan after passing through the air/water heat exchanger 12, and the low temperature pipe 5 communicates with the chimney with the exhaust machine 11. The circulation pipeline includes a circulation main pipe 1 , a circulation outlet branch pipe 2 and a circulation inlet branch pipe 8 .
进一步的,上述循环管道与每个窑4的窑头和窑尾均通过电控三通阀门3连通,所述余热管10、低温管5与每个窑4通过两通阀门6连通。 Further, the above-mentioned circulation pipeline communicates with the kiln head and the kiln tail of each kiln 4 through an electronically controlled three-way valve 3 , and the waste heat pipe 10 and low temperature pipe 5 communicate with each kiln 4 through a two-way valve 6 .
高温余热利用过程为:一个窑群组中,当某A窑到达降温期、某B窑处于升温期时,打开A、B窑两端通向循环管道的阀门,在风机抽力的作用下开始循环换热,A窑的温度由220℃逐步向110℃趋近,B窑的温度由环境温度逐步向110℃趋近,经过热风循环,A窑把窑体和耐火砖的物理显热传递给B窑,供B窑预热窑体和耐火砖。 The high-temperature waste heat utilization process is as follows: in a kiln group, when a certain kiln A reaches the cooling period and a certain B kiln is in the heating period, open the valves leading to the circulation pipeline at both ends of the A and B kilns, and start under the action of the fan suction. Circulating heat exchange, the temperature of kiln A gradually approaches from 220°C to 110°C, and the temperature of kiln B gradually approaches from ambient temperature to 110°C. After hot air circulation, kiln A transfers the physical sensible heat of the kiln body and refractory bricks to Kiln B, for kiln B to preheat the kiln body and refractory bricks.
电加热过程为:经过循环换热,B窑的温度由环境温度逐步趋近110℃,需要用电加热升温到220℃并进行保温,以满足工艺要求。此时关闭B窑两端通向循环管道的阀门,打开B窑通向高温排烟管道的阀门,打开电加热,直至炉温升至220℃进行保温。 The electric heating process is: after cyclic heat exchange, the temperature of kiln B gradually approaches 110°C from the ambient temperature, and electric heating is required to raise the temperature to 220°C and keep it warm to meet the process requirements. At this time, close the valves at both ends of the B kiln leading to the circulation pipeline, open the valve of the B kiln leading to the high-temperature exhaust pipe, and turn on the electric heating until the furnace temperature rises to 220°C for heat preservation.
低温余热利用过程为:经过循环换热,A窑的温度由220℃逐步趋近110℃,打开A窑两端阀门的冷风档及A窑通向高温排烟管道的阀门,让冷风经窑两端进入,经高温排烟管道、换热器、烟囱排入大气(见图3中箭头所示),直至离开A窑的烟温降到80℃,此过程是利用80℃-110℃的低温余热加热热水,供洗澡、采暖等生活用。 The low-temperature waste heat utilization process is as follows: after heat exchange, the temperature of A kiln gradually approaches 110 °C from 220 °C, and the cold air gear of the valve at both ends of A kiln and the valve leading to the high-temperature exhaust pipe of A kiln are opened, so that the cold air passes through both sides of the kiln. It enters through the high-temperature exhaust pipe, heat exchanger, and chimney into the atmosphere (as shown by the arrow in Figure 3), until the temperature of the smoke leaving A kiln drops to 80°C. This process uses a low temperature of 80°C-110°C The waste heat is used to heat hot water for daily use such as bathing and heating.
强制冷却过程为:当A窑的温度由110℃逐步趋近80 ℃,已经没有利用价值,此时打开A窑通向低温排烟管道的阀门,关闭A窑通向高温排烟管道的阀门,让冷风经窑两端进入,经低温排烟管道、烟囱排入大气,直至离开A窑的烟温降到出窑工艺要求温度,砖成品出窑。 The forced cooling process is: when the temperature of kiln A gradually approaches 80 ℃ from 110 ℃, it is no longer useful. At this time, open the valve of kiln A leading to the low-temperature exhaust pipe, and close the valve of kiln A leading to the high-temperature exhaust pipe. Let the cold air enter through both ends of the kiln, and discharge into the atmosphere through the low-temperature exhaust pipe and chimney until the temperature of the smoke leaving A kiln drops to the temperature required by the kiln process, and the finished bricks leave the kiln.
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进或变形,包括对传统干燥窑按照本发明进行的改进,这些改进或变形也应视为本发明的保护范围。 The above description is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements or deformations can be made, including the traditional drying kiln Improvements made according to the present invention, these improvements or deformations should also be regarded as the protection scope of the present invention.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410096931.6A CN103836899B (en) | 2014-03-18 | 2014-03-18 | Waste heat utilization technology of cluster intermittent refractory brick drying kiln |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410096931.6A CN103836899B (en) | 2014-03-18 | 2014-03-18 | Waste heat utilization technology of cluster intermittent refractory brick drying kiln |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103836899A CN103836899A (en) | 2014-06-04 |
| CN103836899B true CN103836899B (en) | 2015-10-21 |
Family
ID=50800633
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410096931.6A Active CN103836899B (en) | 2014-03-18 | 2014-03-18 | Waste heat utilization technology of cluster intermittent refractory brick drying kiln |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103836899B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AT527136A4 (en) * | 2023-10-12 | 2024-11-15 | Wienerberger Ag | METHOD FOR OPERATING AT LEAST TWO BATCH FURNACES |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109654896A (en) * | 2019-01-04 | 2019-04-19 | 孟津青城古建制品有限公司 | A kind of application method of the hot cigarette circulation recycling device for brickmaking |
| CN112611213A (en) * | 2020-12-19 | 2021-04-06 | 安徽龙鼎家居工贸有限公司 | Airflow circulating equipment for drying kiln |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2569067Y (en) * | 2002-09-23 | 2003-08-27 | 邹文浩 | Energy saving batch car type kiln |
| US20100122533A1 (en) * | 2008-11-20 | 2010-05-20 | Kalex, Llc | Method and system for converting waste heat from cement plant into a usable form of energy |
| CN101818993A (en) * | 2010-04-29 | 2010-09-01 | 山东新阳能源有限公司 | Fast cooling and residual-heat utilization method of baked brick furnace |
| CN102878808A (en) * | 2012-10-26 | 2013-01-16 | 赵树壮 | Series connection industrial kiln |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0443286A (en) * | 1990-06-06 | 1992-02-13 | Murata Mfg Co Ltd | Continuous baking furnace |
-
2014
- 2014-03-18 CN CN201410096931.6A patent/CN103836899B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2569067Y (en) * | 2002-09-23 | 2003-08-27 | 邹文浩 | Energy saving batch car type kiln |
| US20100122533A1 (en) * | 2008-11-20 | 2010-05-20 | Kalex, Llc | Method and system for converting waste heat from cement plant into a usable form of energy |
| CN101818993A (en) * | 2010-04-29 | 2010-09-01 | 山东新阳能源有限公司 | Fast cooling and residual-heat utilization method of baked brick furnace |
| CN102878808A (en) * | 2012-10-26 | 2013-01-16 | 赵树壮 | Series connection industrial kiln |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AT527136A4 (en) * | 2023-10-12 | 2024-11-15 | Wienerberger Ag | METHOD FOR OPERATING AT LEAST TWO BATCH FURNACES |
| AT527136B1 (en) * | 2023-10-12 | 2024-11-15 | Wienerberger Ag | METHOD FOR OPERATING AT LEAST TWO BATCH FURNACES |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103836899A (en) | 2014-06-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202066385U (en) | Novel waste heat recycling device | |
| CN205209223U (en) | Continuous automatic production foamed ceramics energy saving and emission reduction tunnel cave | |
| CN203534159U (en) | Atmosphere protection black brick tunnel kiln | |
| CN105403061B (en) | An energy-saving kiln that recycles cooling waste heat to increase the temperature of combustion-supporting air | |
| CN104913652A (en) | Shaft furnace pellet clinker waste heat recycling method and device | |
| CN201740411U (en) | Residual-heat utilization device of ceramic calcining kiln | |
| CN205316352U (en) | RTO system with tail gas waste heat recovery function | |
| CN207062135U (en) | A kind of float glass annealing kiln edge heat riser | |
| CN103836899A (en) | Process for utilizing waste heat of clustering intermittent-type refractory brick drying kiln | |
| CN104515402B (en) | A kind of residual-heat utilization method of sintering system and device | |
| CN202692728U (en) | Waste heat utilization system of calcination furnace | |
| CN201916922U (en) | Preheating device for combustion air of smelting furnace | |
| CN104501611B (en) | Smoke gas circulating type saving energy in kiln system and power-economizing method | |
| CN205066483U (en) | Combustion -supporting heat energy -saving device that adds of kiln | |
| CN206618280U (en) | A kind of waste heat of annealing kiln steam electric power generator | |
| CN201285212Y (en) | Low temperature flue gas waste heat reuse device | |
| CN205245779U (en) | Take waste heat recovery device's shuttle kiln | |
| CN115371451A (en) | Waste heat utilization method and system for open ring type roasting furnace | |
| CN204115496U (en) | A kind of residual heat of tunnel kiln utilize device | |
| CN210198108U (en) | Gradient utilization device for kiln waste heat | |
| CN201907972U (en) | Energy-saving consumption-reducing production line for carbon products | |
| CN209443226U (en) | Steam waste heat reclamation set | |
| CN109355507B (en) | Energy-saving system of high-efficiency smelting furnace and energy-saving smelting process | |
| CN201753361U (en) | Recycling device for waste heat of flue gas of annealing furnace in continuous annealing unit | |
| CN206724469U (en) | A kind of device for flue gas conversion heating thermal cycle |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |