CN103835295B - 一种深基坑污水管下穿石油管道施工方法 - Google Patents

一种深基坑污水管下穿石油管道施工方法 Download PDF

Info

Publication number
CN103835295B
CN103835295B CN201410017246.XA CN201410017246A CN103835295B CN 103835295 B CN103835295 B CN 103835295B CN 201410017246 A CN201410017246 A CN 201410017246A CN 103835295 B CN103835295 B CN 103835295B
Authority
CN
China
Prior art keywords
petroleum pipeline
soil pipe
deep basal
basal pit
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410017246.XA
Other languages
English (en)
Other versions
CN103835295A (zh
Inventor
马皓杰
张科星
贺对喜
罗皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Shenzhen Engineering Co Ltd
Original Assignee
China Railway Port and Channel Engineering Group Co Ltd
Shenzhen Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Port and Channel Engineering Group Co Ltd, Shenzhen Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd filed Critical China Railway Port and Channel Engineering Group Co Ltd
Priority to CN201410017246.XA priority Critical patent/CN103835295B/zh
Publication of CN103835295A publication Critical patent/CN103835295A/zh
Application granted granted Critical
Publication of CN103835295B publication Critical patent/CN103835295B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种深基坑污水管下穿石油管道施工方法,在石油管道下方的岩层中顶进污水管,所述污水管与石油管道之间成锐角或直角。通过“管涵直接顶进”的工法,在石油管道下方的岩层中顶进污水管,实现污水管穿过石油管道,避免将石油管道迁改后进行明挖埋管,节省人力、财力、物力,较大缩短工期,同时也保证工程质量,避免造成较大经济损失及社会影响。

Description

一种深基坑污水管下穿石油管道施工方法
技术领域
本发明涉及一种深基坑污水管下穿石油管道施工方法。
背景技术
利用顶管技术穿越既有建筑,是管道施工的常用方法。但通常情况下是穿越公路、铁路等既有大型建筑,对于穿越易燃易爆的石油管道暂未发现,为确保石油管道安全,避免造成较大经济损失及社会影响,一般处理都是先将石油管道迁改后进行明挖施工,比较耽误工期。
发明内容
本发明的目的,在于提供一种深基坑污水管下穿石油管道施工方法。
本发明解决其技术问题的解决方案是:一种深基坑污水管下穿石油管道施工方法,在石油管道下方的岩层中顶进污水管,所述污水管与石油管道之间成锐角或直角。
作为上述技术方案的进一步改进,上述方法包括以下步骤,
1)、确定石油管道下方的污水管要通过的位置和线路,在石油管道旁开挖深基坑,深基坑深度比污水管的高程深0.4米,施工工作井,待混凝土强度达到100%时,进行下步工序施工;
2)、将深基坑铺设轨道,并将污水管吊装在轨道上;
3)、在深基坑内布置顶铁,安装后的顶铁的轴线与污水管的轴线平行;
4)、根据污水管穿过的线路开挖顶管通道,开挖时,顶管通道的截面上端允许超挖1.5厘米,顶管通道的截面下端135°范围内不得超挖,不能超挖的顶管通道的岩层与污水管的管壁基本吻合;
5)、将利用无轨斗车将顶管通道内渣土运输至深基坑处,再通过吊车将渣土运至自然地面;
6)千斤顶推动顶铁将污水管逐节段顶入顶管通道内;
7)砂浆密封管节处,向污水管与岩面空隙处压浆;
8)观测地表沉降。
作为上述技术方案的进一步改进,在步骤1中,所述深基坑的深度大于6米时,在深基坑内安装平台。
作为上述技术方案的进一步改进,在步骤1中,所述深基坑的边缘挖集水坑,并将深基坑和集水坑内的积水抽排。
作为上述技术方案的进一步改进,在步骤3中,所述顶铁与导轨之间的接触面保持干净。
作为上述技术方案的进一步改进,在步骤4中,所述顶管通道位于石油管道下方的岩层内且其直线贯通石油管道两侧。
作为上述技术方案的进一步改进,在步骤6中,顶管通道内通过人工采用风镐开挖,每挖一段,将污水管顶进一段。
作为上述技术方案的进一步改进,所述顶管通道位于石油管道下方4~6米的岩层中。
作为上述技术方案的进一步改进,所述污水管道的直径2.0米。
本发明的有益效果是:本发明通过 “管涵直接顶进”的工法,在石油管道下方的岩层中顶进污水管后,实现污水管下穿石油管道,避免将石油管道迁改后进行明挖施工,节省人力、财力、物力,较大缩短工期,同时也保证工程质量,确保石油管道安全。
具体实施方式
以下将结合实施案例对本发明的构思、具体结构及产生的技术效果进行清楚、完整地描述,以充分地理解本发明的目的、特征和效果。显然,所描述的实施案例只是本发明的一部分实施例,而不是全部实施例,基于本发明的实施例,本领域的技术人员在不付出创造性劳动的前提下所获得的其他实施例,均属于本发明保护的范围。另外,文中所提到的所有联接/连接关系,并非单指构件直接相接,而是指可根据具体实施情况,通过添加或减少联接辅件,来组成更优的联接结构。
一种深基坑污水管下穿石油管道施工方法,在石油管道下方的岩层中顶进污水管,所述污水管与石油管道之间成锐角或直角。这里污水管与石油管道之间成直角,指的是污水管在岩层下垂直穿过石油管道,垂直穿过的方式,污水管和石油管道相对重合的部件最少;污水管与石油管道之间成锐角,指的是污水管在岩层下成0~90°穿过石油管道。
通常穿过石油管道的污水管只有一节,故无需考虑在顶进时,进行相邻的污水管密封处理。只需在顶进完成后,才对相邻的污水管进行密封处理。
通过 “管涵直接顶进”的工法,在石油管道下方的岩层中顶进污水管,实现污水管穿过石油管道,无需将石油管道迁改后进行明挖施工,节省人力、财力、物力,较大缩短工期,同时也保证工程质量,避免造成较大经济损失及社会影响。
进一步作为优选的实施方式,上述方法包括以下步骤,
1)、确定石油管道下方的污水管要通过的位置和线路,在石油管道旁开挖深基坑,深基坑深度比污水管的高程深0.4米,施工工作井,待混凝土强度达到100%时,进行下步工序施工;
2)、将深基坑铺设轨道,并将污水管吊装在轨道上,人工配合,安装完毕后,最后检测;
3)、在深基坑内布置顶铁,安装后的顶铁的轴线与污水管的轴线平行,顶铁布置较为简单,方便顶进的质量控制;
4)、根据污水管穿过的线路开挖顶管通道,开挖时,顶管通道的截面上端允许超挖1.5厘米,顶管通道的截面下端135°范围内不得超挖,不能超挖的顶管通道的岩层与污水管的管壁基本吻合;
5)、将利用无轨斗车将顶管通道内渣土运输至深基坑处,再通过吊车将渣土运至自然地面;
6)千斤顶推动顶铁将污水管逐节段顶入顶管通道内;
7)砂浆密封管节处,向污水管与岩面空隙处压浆;
8)观测地表沉降。
进一步作为优选的实施方式,在步骤1中,所述深基坑的深度大于6米时,在深基坑内安装平台。
进一步作为优选的实施方式,在步骤1中,所述深基坑的边缘挖集水坑,并将深基坑和集水坑内的积水抽排。
进一步作为优选的实施方式,在步骤3中,所述顶铁与导轨之间的接触面保持干净。
进一步作为优选的实施方式,在步骤4中,所述顶管通道位于石油管道下方的岩层内且其直线贯通石油管道两侧。
进一步作为优选的实施方式,在步骤6中,顶管通道内通过人工采用风镐开挖,每挖一段,将污水管顶进一段。超挖长度不大于10㎝,严禁超挖过长。
进一步作为优选的实施方式,所述顶管通道位于石油管道下方4~6米的岩层中。一般石油管道的埋设深度是1.5米,污水管的埋设深度是4.5米,纵波0.8%。
进一步作为优选的实施方式,所述污水管道的直径2.0米。优选直径2米的污水管,直径2米的污水管较为方便,易于操作。
以上是对本发明的较佳实施方式进行了具体说明,但本发明创造并不限于所述实施案例,熟悉本领域的技术人员在不违背本发明精神的前提下还可作出种种的等同变型或替换,这些等同的变型或替换均包含在本申请权利要求所限定的范围内。

Claims (7)

1.一种深基坑污水管下穿石油管道施工方法,在石油管道下方的岩层中顶进污水管,其特征在于:所述污水管与石油管道之间成锐角或直角,还包括以下步骤,
1)、确定石油管道下方的污水管要通过的位置和线路,在石油管道旁开挖深基坑,深基坑深度比污水管的高程深0.4米,施工工作井,待混凝土强度达到100%时,进行下步工序施工;
2)、将深基坑铺设轨道,并将污水管吊装在轨道上;
3)、在深基坑内布置顶铁,安装后的顶铁的轴线与污水管的轴线平行;
4)、根据污水管穿过的线路开挖顶管通道,开挖时,顶管通道的截面上端允许超挖1.5厘米,顶管通道的截面下端135°范围内不得超挖,不能超挖的顶管通道的岩层与污水管的管壁吻合;
5)、将利用无轨斗车将顶管通道内渣土运输至深基坑处,再通过吊车将渣土运至自然地面;
6)千斤顶推动顶铁将污水管逐节段顶入顶管通道内,顶管通道内通过人工采用风镐开挖,每挖一段,将污水管顶进一段;
7)砂浆密封管节处,向污水管与岩面空隙处压浆;
8)观测地表沉降。
2.根据权利要求1所述的深基坑污水管下穿石油管道施工方法,其特征在于:在步骤1中,所述深基坑的深度大于6米时,在深基坑内安装平台。
3.根据权利要求1所述的深基坑污水管下穿石油管道施工方法,其特征在于:在步骤1中,所述深基坑的边缘挖集水坑,并将深基坑和集水坑内的积水抽排。
4.根据权利要求1所述的深基坑污水管下穿石油管道施工方法,其特征在于:在步骤3中,所述顶铁与轨道之间的接触面保持干净。
5.根据权利要求1所述的深基坑污水管下穿石油管道施工方法,其特征在于:在步骤4中,所述顶管通道位于石油管道下方的岩层内且其直线贯通石油管道两侧。
6.根据权利要求1或4或5所述的深基坑污水管下穿石油管道施工方法,其特征在于:所述顶管通道位于石油管道下方4~6米的岩层中。
7.根据权利要求1或4或5所述的深基坑污水管下穿石油管道施工方法,其特征在于:所述污水管道的直径2.0米。
CN201410017246.XA 2014-01-15 2014-01-15 一种深基坑污水管下穿石油管道施工方法 Active CN103835295B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410017246.XA CN103835295B (zh) 2014-01-15 2014-01-15 一种深基坑污水管下穿石油管道施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410017246.XA CN103835295B (zh) 2014-01-15 2014-01-15 一种深基坑污水管下穿石油管道施工方法

Publications (2)

Publication Number Publication Date
CN103835295A CN103835295A (zh) 2014-06-04
CN103835295B true CN103835295B (zh) 2016-11-02

Family

ID=50799160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410017246.XA Active CN103835295B (zh) 2014-01-15 2014-01-15 一种深基坑污水管下穿石油管道施工方法

Country Status (1)

Country Link
CN (1) CN103835295B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409453A (zh) * 2019-06-27 2019-11-05 广州地铁设计研究院股份有限公司 一种在地下管廊下方施工基坑的方法
CN111335441A (zh) * 2020-03-16 2020-06-26 广西建工集团第四建筑工程有限责任公司 一种污水管在坚硬岩石穿越石油管道区域的施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
HU186880B (en) * 1982-12-29 1985-10-28 Melyepitoe Vallalat Apparatus and method for building linear engineering structures being aelow surface soil
KR20060092193A (ko) * 2006-08-02 2006-08-22 (주)동양엠티 강관 추진 공법을 위한 추진기지 구축방법
CN201581902U (zh) * 2010-01-14 2010-09-15 中铁六局集团有限公司 砂层顶管盾构机
CN102425423A (zh) * 2011-12-31 2012-04-25 上海市机械施工有限公司 一种盾构在穿越管线过程中进洞的施工方法
CN103046638A (zh) * 2011-04-28 2013-04-17 朱奎 一种顶管施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
HU186880B (en) * 1982-12-29 1985-10-28 Melyepitoe Vallalat Apparatus and method for building linear engineering structures being aelow surface soil
KR20060092193A (ko) * 2006-08-02 2006-08-22 (주)동양엠티 강관 추진 공법을 위한 추진기지 구축방법
CN201581902U (zh) * 2010-01-14 2010-09-15 中铁六局集团有限公司 砂层顶管盾构机
CN103046638A (zh) * 2011-04-28 2013-04-17 朱奎 一种顶管施工方法
CN102425423A (zh) * 2011-12-31 2012-04-25 上海市机械施工有限公司 一种盾构在穿越管线过程中进洞的施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
大口径超长距离刚顶管穿越既有航油管的施工技术;乐勤;《建筑施工》;20120430(第4期);第341页左栏第1行-右栏最后1行,第342页左栏第1行-右栏最后1行,第349页上接第342页左栏第1行-右栏最后1行 *

Also Published As

Publication number Publication date
CN103835295A (zh) 2014-06-04

Similar Documents

Publication Publication Date Title
CN107060796B (zh) 一种采用泥水平衡顶管施工工艺
CN106369223B (zh) 一种粉砂土地层顶管施工方法
CN106194218B (zh) 高水头深厚砂层地区的盾构端头土体加固体系
CN105952475B (zh) 一种煤矿残采区冒落废巷注浆加固工艺与方法
CN103292035B (zh) 一种地下顶管的施工方法
CN1215276C (zh) 土压平衡矩形顶管施工工艺
CN205778883U (zh) 一种隧道内顶管施工与盾构施工的连接转换装置
CN103711492B (zh) 一种顶进式电缆套管通道施工方法
CN109630151A (zh) 矩形顶管掘进施工方法
CN113833480A (zh) 一种盾构始发掘进与到达施工方法
CN111075478A (zh) 采掘工作面构造破碎带地面施工预注浆加固工艺
CN104776268B (zh) 大口径钢筋混凝土排水管道安装的机械化施工方法
CN217841648U (zh) 一种基于wss工法隧道下穿既有盾构地层注浆加固体系
CN110864162B (zh) 泥质砂岩地质顶管施工工艺
CN103835295B (zh) 一种深基坑污水管下穿石油管道施工方法
CN102623931A (zh) 一种过道地下管线敷设方法及其专用设备
CN203822311U (zh) 对盾构下穿既有站超前探测及预加固结构
CN203161238U (zh) 一种电缆隧道中长距离曲线顶管用注浆装置
CN105546213A (zh) 一种柔性复合管快速施工装置及施工方法
CN201581902U (zh) 砂层顶管盾构机
CN104315251B (zh) 土石组合地质条件下人工顶管施工方法
CN203757176U (zh) 非开挖式管道更换装置
CN109119943A (zh) 电缆在顶管两端的敷设方式优化方法
CN206608195U (zh) 曲线型竹筋注浆锚杆
CN105134069A (zh) 一种涉及瓦斯立井穿越强富水岩层反井法施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180130

Address after: Nansha District Nansha street Guangzhou city Guangdong province 510032 Port Street No. 1 Port Avenue South of Hong Kong Air China court office building No. 1 room 2502

Co-patentee after: CRPCEC SHENZHEN ENGINEERING CO.,LTD.

Patentee after: CHINA RAILWAY GUANGZHOU ENGINEERING GROUP Co.,Ltd.

Address before: 510660 Xiangshan Road, Luogang District Science City, Guangzhou City, Guangdong Province, No. 11

Co-patentee before: CRPCEC SHENZHEN ENGINEERING CO.,LTD.

Patentee before: CHINA RAILWAY PORT AND CHANNEL ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 510032 Room 2502, Office Complex Building No. 1, Nansha Street, Nansha District, Guangzhou City, Guangdong Province

Co-patentee after: CHINA RAILWAY GUANGZHOU ENGINEERING BUREAU GROUP SHENZHEN ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY GUANGZHOU ENGINEERING GROUP Co.,Ltd.

Address before: 510032 Room 2502, Office Complex Building No. 1, Nansha Street, Nansha District, Guangzhou City, Guangdong Province

Co-patentee before: CRPCEC SHENZHEN ENGINEERING CO.,LTD.

Patentee before: CHINA RAILWAY GUANGZHOU ENGINEERING GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: 518054 East Block, 13th Floor, South Headquarters Building of China Railway, 3333 Central Road, Nanshan District, Shenzhen City, Guangdong Province

Co-patentee after: CHINA RAILWAY GUANGZHOU ENGINEERING GROUP Co.,Ltd.

Patentee after: CHINA RAILWAY GUANGZHOU ENGINEERING BUREAU GROUP SHENZHEN ENGINEERING Co.,Ltd.

Address before: 510032 Room 2502, Office Complex Building No. 1, Nansha Street, Nansha District, Guangzhou City, Guangdong Province

Co-patentee before: CHINA RAILWAY GUANGZHOU ENGINEERING BUREAU GROUP SHENZHEN ENGINEERING Co.,Ltd.

Patentee before: CHINA RAILWAY GUANGZHOU ENGINEERING GROUP Co.,Ltd.

CP03 Change of name, title or address