CN103821378B - Large-scale steel tubular pillar two-way center line control method - Google Patents

Large-scale steel tubular pillar two-way center line control method Download PDF

Info

Publication number
CN103821378B
CN103821378B CN201410082627.6A CN201410082627A CN103821378B CN 103821378 B CN103821378 B CN 103821378B CN 201410082627 A CN201410082627 A CN 201410082627A CN 103821378 B CN103821378 B CN 103821378B
Authority
CN
China
Prior art keywords
steel column
steel
centrage
center line
plane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410082627.6A
Other languages
Chinese (zh)
Other versions
CN103821378A (en
Inventor
赵永杰
潘石泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Jinhai Modern Construction Technology Co ltd
Original Assignee
HUNAN JINHAI STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN JINHAI STEEL STRUCTURE CO Ltd filed Critical HUNAN JINHAI STEEL STRUCTURE CO Ltd
Priority to CN201410082627.6A priority Critical patent/CN103821378B/en
Publication of CN103821378A publication Critical patent/CN103821378A/en
Application granted granted Critical
Publication of CN103821378B publication Critical patent/CN103821378B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to an environment protecting building construction technology, in particular to a large-scale steel tubular pillar two-way center line control technology method. According to the existing large-scale steel tubular pillar or latticed column two-way center line control technology, side sway and torsion are generated due to improper precision control in the manufacturing process, aiming at the above defects and aiming to solve the technical problem, the invention provides the large-scale steel tubular pillar two-way center line control technology for enabling manufacturing of steel pillars and tubular pillars to meet the requirements of safety, economy and reliable use. The large-scale steel tubular pillar two-way center line control technology consists of a lofting measurement and a temporary fixation measurement.

Description

Large Steel tubular pillar two-way center line control method
Technical field:
The technology of the present invention is related to Green environmental-protection building construction technology, refers specifically to Large Steel tubular pillar two-way centrage controlling party Method.
Background technology:
Current Large Steel tubular pillar or lattice column two-way center line control method be not because in manufacturing process, precision controlling is Defect when meeting generation is following:
1: manufacturing process flatness control has error, after leading to lower prop docking, side sway and distortion easily occur.
2: in manufacturing process, steel column center line traffic control is improper, leads to lower prop off-centring, directly affect live post beam Install and connect, after causing to connect, steel column bending or live steel crane beam distortion, increase site construction difficulty and to whole work The safety of journey hides some dangers for.
3: in manufacturing process, single tubular pillar two ends center line traffic control is improper, lead to bracket to tilt, cause the crane girder cannot Install.Post bottom connecting plate and capital connecting plate center deflection, impact steel column be connected with cast-in fixing bolt or with girder steel or both Upper one can be connected.
Content of the invention:
For drawbacks described above, for solving above-mentioned technical problem, it is an object of the invention to provide a kind of novel large steel circle Tubing string two-way center line control method, makes steel column, the making of tubular pillar reaches safety, economy, service-strong require.
The two-way center of Large Steel tubular pillar of the present invention line control method is made up of setting-out measure and interim fixation, and it is special Levy and be:
A: lofting control:
. on measuring levelling steel platform tooling bracket, bullet releases steel column respectively to centrage it is ensured that position of center line misses Difference meets Construction of Steel Structure inspection of quality code requirement;
. first confirm two main limb single tube cross centre lines and portray in steel tube end part, two single tubes are propped up in steel platform frock Put in place on frame it is desirable to 270 ° of location points of steel pipe cross centre line are overlapped with tooling bracket steel column centrage in steel platform, Fallen using messenger wire and check;Other each limbs of blanking steel column are put formation steel column main body rectangle in place, between frock and pipe Non-slipping block on pad, prevents steel pipe movement;
. check distance between 90 ° of location points of two limbs it is ensured that steel column main body rectangle in the steel column upper surface of assembled formation Size, then the centrage of the lower prop made is extended it is ensured that the centrage of upper prop is parallel with the distance of lower prop centrage;
. measured with level indicator and control 6 point depth of parallelisms, prevent side sway in steel column plane;
. check steel column respectively to size comprehensively, carry out spot welding after confirmation is errorless and fix, tack weld thickness >=3mm, length Degree
40mm, spacing 300~600mm;
B: temperature pier control measure:. produce plane inner bending for steel column upper prop during preventing steel column welding procedure Deformation, special steel column plane inner section centrage of making corrects temporarily, reinforces mold, and Steel for Large Steel Column upper prop and lower prop are corrected With positioning it is ensured that steel column welding procedure process steel column plane inner section position of center line is constant, reinforce mold and install using welding Fixing;
. for preventing steel column upper prop during steel column welding procedure from producing out-of plane bending deformation, special make steel column plane Outer kernel of section line corrects temporarily, reinforces mold, Steel for Large Steel Column upper prop and lower prop is corrected and positions it is ensured that steel column welds The outer kernel of section line position of work progress steel column plane is constant;
. steel column is reinforced to finish and is proceeded by steel column welding procedure, and work progress carries out the inside and outside change of steel column plane at any time Shape checks and adjusts centrage and corrects temporarily, reinforces bolt on mold and be corrected it is ensured that steel column plane medial-lateral centerline straight line Degree;
. steel column welding is removed centrage after finishing 24 hours and is corrected temporarily, reinforces mold.
The technology of the present invention compared with prior art, under equal execution conditions, can reduce making correction cost and improve Factory makes and site construction efficiency, improves installation quality.Eliminate because component connect have some setbacks and bring to building distortion, The potential safety hazards such as unbalance stress.
Brief description:
Accompanying drawing 1 is upper prop bending schematic diagram in the plane that prior art leads to;
Accompanying drawing 2 is the plane outer upper prop bending schematic diagram that prior art leads to;
Accompanying drawing 3 is that the two-way center of Large Steel tubular pillar of the present invention line control method determines centrage alignment schematic diagram;
Accompanying drawing 4 is Large Steel tubular pillar of the present invention two-way center line control method control point schematic diagram;
Accompanying drawing 5 is control measure schematic diagram in the line control method plane of Large Steel tubular pillar of the present invention two-way center;
Accompanying drawing 6 is the outer measure schematic diagram of Large Steel tubular pillar of the present invention two-way center line control method plane;
Accompanying drawing 7 is that the two-way center of Large Steel tubular pillar of the present invention line control method reinforces mold schematic diagram.
Specific embodiment:
Visible referring to the drawings 1, accompanying drawing 2, original technology makes because of moulding bed, and center line traffic control is unreasonable, causes quality difficult To protect
Card.Often issue in upper prop plane or out-of-plane bending, the present invention combines accompanying drawing 3 accompanying drawing 7, further Description, this
Invention Large Steel tubular pillar two-way center line control method is made up of setting-out measure and interim fixation, setting-out The step controlling is:
. on measuring levelling steel platform tooling bracket bullet release steel column 1 each to centrage it is ensured that centrage position Put error and meet Construction of Steel Structure inspection of quality code requirement;
. first confirm two main limb single tube cross centre lines and portray in steel pipe 1 end, by two single tubes in steel platform work Put on dress support in place it is desirable to tooling bracket steel column centrage weight in 270 ° of location points of steel pipe cross centre line and steel platform Close, fallen using messenger wire and check;Other each limbs of blanking steel column are put formation steel column main body rectangle in place, frock and pipe it Between the upper non-slipping block 2 of pad, prevent steel pipe movement;
. check distance between 90 ° of location points of two limbs it is ensured that steel column main body square in steel column 1 upper surface of assembled formation Shape size, then the centrage of the lower prop made is extended it is ensured that the centrage of upper prop is parallel with the distance of lower prop centrage;
. measured with level indicator and control 6 point depth of parallelisms, prevent side sway in steel column 1 plane;
. check steel column respectively to size comprehensively, confirm that errorless temperature pier control measure step is:. for preventing steel column 1 During welding procedure, steel column 1 upper prop 4 produces plane inner bending deformation, special makees the interim school of steel column plane inner section centrage Just, reinforce mold 3, Steel for Large Steel Column upper prop 4 and lower prop 5 are corrected and position it is ensured that steel column welding procedure process steel column Plane inner section position of center line is constant, reinforces mold and installs using being welded and fixed;
. for preventing steel column 1 upper prop 4 during steel column 1 welding procedure from producing out-of plane bending deformation, special make steel column The outer kernel of section line of plane corrects temporarily, reinforces mold 3, Steel for Large Steel Column upper prop 4 and lower prop 5 are corrected and position it is ensured that The outer kernel of section line position of steel column welding procedure process steel column plane is constant;
. steel column is reinforced to finish and is proceeded by steel column welding procedure, and work progress is carried out inside and outside steel column plane at any time Deformation checking simultaneously adjusts centrage and corrects temporarily, reinforces bolt on mold 3 and be corrected it is ensured that steel column plane medial-lateral centerline Linearity;
. steel column welding is removed centrage after finishing 24 hours and is corrected temporarily, reinforces mold 3.
Therefore, the structure that novel large cylindrical steel tube post two-way center line control method produces during solving project installation Stress problem, reduces Construction Cost it is ensured that engineering construction quality.

Claims (1)

1. Large Steel tubular pillar two-way center line control method, be made up of setting-out measure and interim fixation it is characterised in that:
A: lofting control:
. on measuring levelling steel platform tooling bracket, bullet releases steel column respectively to centrage it is ensured that position of center line error is full Sufficient Construction of Steel Structure inspection of quality code requirement;
. first confirm two main limb single tube cross centre lines and portray in steel tube end part, by two single tubes on steel platform tooling bracket Put in place it is desirable to 270 ° of location points of steel pipe cross centre line are overlapped with tooling bracket steel column centrage in steel platform, using hanging Line pendant is checked;Other each limbs of blanking steel column are put formation steel column main body rectangle in place, anti-on pad between frock and pipe Slide block, prevents steel pipe movement;
. check distance between 90 ° of location points of two limbs it is ensured that steel column main body rectangle chi in the steel column upper surface of assembled formation Very little, then the centrage of the lower prop made is extended it is ensured that the centrage of upper prop is parallel with the distance of lower prop centrage;
. measured with level indicator and control 6 point depth of parallelisms, prevent side sway in steel column plane;
. check steel column respectively to size comprehensively, carry out spot welding after confirmation is errorless and fix, tack weld thickness >=3mm, length 40mm, spacing 300~600mm;
B: temperature pier control measure:. produce plane inner bending deformation for steel column upper prop during preventing steel column welding procedure, Special steel column plane inner section centrage of making corrects temporarily, reinforces mold, Steel for Large Steel Column upper prop and lower prop is corrected and determines Position, it is ensured that steel column welding procedure process steel column plane inner section position of center line is constant, reinforces mold and installs using being welded and fixed ;
. for preventing steel column upper prop during steel column welding procedure from producing out-of plane bending deformation, special make to cut outside steel column plane Face centrage corrects temporarily, reinforces mold, Steel for Large Steel Column upper prop and lower prop is corrected and positions it is ensured that steel column welding procedure The outer kernel of section line position of process steel column plane is constant;
. steel column is reinforced to finish and is proceeded by steel column welding procedure, and work progress carries out the inside and outside deformation inspection of steel column plane at any time Look into and adjust centrage to correct temporarily, reinforce bolt on mold and be corrected it is ensured that steel column plane medial-lateral centerline linearity;
. steel column welding is removed centrage after finishing 24 hours and is corrected temporarily, reinforces mold.
CN201410082627.6A 2014-03-10 2014-03-10 Large-scale steel tubular pillar two-way center line control method Active CN103821378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410082627.6A CN103821378B (en) 2014-03-10 2014-03-10 Large-scale steel tubular pillar two-way center line control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410082627.6A CN103821378B (en) 2014-03-10 2014-03-10 Large-scale steel tubular pillar two-way center line control method

Publications (2)

Publication Number Publication Date
CN103821378A CN103821378A (en) 2014-05-28
CN103821378B true CN103821378B (en) 2017-01-25

Family

ID=50756643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410082627.6A Active CN103821378B (en) 2014-03-10 2014-03-10 Large-scale steel tubular pillar two-way center line control method

Country Status (1)

Country Link
CN (1) CN103821378B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6709638B2 (en) 2016-03-10 2020-06-17 日立造船株式会社 Welding method of steel pipe and joint in steel pipe structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09189132A (en) * 1996-01-10 1997-07-22 Tokyu Constr Co Ltd Fixing method of column base for steel frame column
CN102434003A (en) * 2011-08-29 2012-05-02 山东寿光第一建筑有限公司 Heavy battened steel column construction process
CN102720371A (en) * 2012-07-04 2012-10-10 中国机械工业建设集团有限公司 Butt joint method for multiple upright posts of steel structure module and temporary butt joint fixing device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09189132A (en) * 1996-01-10 1997-07-22 Tokyu Constr Co Ltd Fixing method of column base for steel frame column
CN102434003A (en) * 2011-08-29 2012-05-02 山东寿光第一建筑有限公司 Heavy battened steel column construction process
CN102720371A (en) * 2012-07-04 2012-10-10 中国机械工业建设集团有限公司 Butt joint method for multiple upright posts of steel structure module and temporary butt joint fixing device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
超高层钢结构建筑圆管柱的制作技术探讨;杨秀雷;《青岛理工大学学报》;20090430;第30卷(第2期);第135-138页 *

Also Published As

Publication number Publication date
CN103821378A (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN102433841B (en) Method for installing abnormal-shape curve steel box girder
CN101886401B (en) Segmented assembly component of steel end housings of underwater tunnel immersed segment and construction method
CN103821372A (en) Method for installing trusses with different heights
CN105019665A (en) Method for mounting long-span structure beam based on total station
CN101347703B (en) Installation technique of metallurgical gas desulfuration absorbing tower
CN101440667A (en) Mounting method for wide span single layer rain shed reticulated shell structure
CN107806205B (en) Mounting structure and mounting method of lining-free steel dome
CN102828470A (en) Method for locating main girder cable sleeve of cable-stayed bridge
CN106826081B (en) A kind of major diameter corrugated pipe pipeline counterpart installation method
CN104763156A (en) Assembling method of steel safety housing bottom seal head of nuclear power plant
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN107336346A (en) A kind of beam making bench
CN106223623A (en) Steel construction box arched roof truss installation method
CN105133881A (en) Modular construction method for high temperature gas cooled reactor nuclear power plant containment bracket section wall
CN105648923A (en) Stay cable saddle positioning device and positioning method thereof
CN107386125B (en) A kind of construction method that Steel Box Girder of Self-Anchored Suspension beam closes up
CN103821378B (en) Large-scale steel tubular pillar two-way center line control method
CN106836829A (en) The mounting structure and its installation method of a kind of ring crane corbel
WO2020259469A1 (en) Welded overhead line system hard cross beam and construction method therefor
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN106320186B (en) A kind of skewback embedded anchor bar positioning system and construction method
CN100366855C (en) Inclined triangular pyramid truss type frame construction and method for making, mounting and measuring the same
CN101831916A (en) Method for mounting large-size sleeve bolt framework in combined type
CN109967975A (en) The method of construction of large-scale floating ship service machine
CN109252526A (en) Assembled support construction technique based on prestressing force fish belly sill support technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 411100 Jinhai Road, Jiuhua demonstration area, Xiangtan, Hunan 1

Patentee after: HUNAN JINHAI STEEL STRUCTURE CO.,LTD.

Address before: 410000 Jinhai Road, Jiuhua demonstration area, Xiangtan, Hunan 1

Patentee before: HUNAN JINHAI STEEL STRUCTURE Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221215

Address after: 416014 Ma'an Industrial Park, Hexi Town, Jishou City, Xiangxi Tujia and Miao Autonomous Prefecture, Hunan Province

Patentee after: Hunan Jinhai Modern Construction Technology Co.,Ltd.

Address before: 411100 Jinhai Road, Jiuhua demonstration area, Xiangtan, Hunan 1

Patentee before: HUNAN JINHAI STEEL STRUCTURE CO.,LTD.