CN103821073A - 一种小型桥梁及其施工方法 - Google Patents
一种小型桥梁及其施工方法 Download PDFInfo
- Publication number
- CN103821073A CN103821073A CN201410092618.5A CN201410092618A CN103821073A CN 103821073 A CN103821073 A CN 103821073A CN 201410092618 A CN201410092618 A CN 201410092618A CN 103821073 A CN103821073 A CN 103821073A
- Authority
- CN
- China
- Prior art keywords
- bridge
- bolt
- steel plate
- steel
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410092618.5A CN103821073B (zh) | 2014-03-14 | 2014-03-14 | 一种小型桥梁及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410092618.5A CN103821073B (zh) | 2014-03-14 | 2014-03-14 | 一种小型桥梁及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103821073A true CN103821073A (zh) | 2014-05-28 |
CN103821073B CN103821073B (zh) | 2018-08-28 |
Family
ID=50756341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410092618.5A Expired - Fee Related CN103821073B (zh) | 2014-03-14 | 2014-03-14 | 一种小型桥梁及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103821073B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507164A (zh) * | 2014-09-26 | 2016-04-20 | 任丘市永基建筑安装工程有限公司 | 预制钢桥安装方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0649962B2 (ja) * | 1988-05-14 | 1994-06-29 | ブルマン株式会社 | 重仮設物構築法 |
CN1335433A (zh) * | 2000-07-24 | 2002-02-13 | 陈彦平 | 采用复合地基的架空路 |
KR100666704B1 (ko) * | 2006-03-07 | 2007-01-09 | 비비엠코리아(주) | 강관거더를 이용한 일체식 교대 |
KR20070062746A (ko) * | 2005-12-13 | 2007-06-18 | (주)씨디텍엔지니어링 | 원형강관을 이용한 가설시스템 |
CN101793006A (zh) * | 2009-12-23 | 2010-08-04 | 中铁大桥局集团第一工程有限公司 | 一种支架现浇连续梁快速施工的施工方法 |
-
2014
- 2014-03-14 CN CN201410092618.5A patent/CN103821073B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0649962B2 (ja) * | 1988-05-14 | 1994-06-29 | ブルマン株式会社 | 重仮設物構築法 |
CN1335433A (zh) * | 2000-07-24 | 2002-02-13 | 陈彦平 | 采用复合地基的架空路 |
KR20070062746A (ko) * | 2005-12-13 | 2007-06-18 | (주)씨디텍엔지니어링 | 원형강관을 이용한 가설시스템 |
KR100666704B1 (ko) * | 2006-03-07 | 2007-01-09 | 비비엠코리아(주) | 강관거더를 이용한 일체식 교대 |
CN101793006A (zh) * | 2009-12-23 | 2010-08-04 | 中铁大桥局集团第一工程有限公司 | 一种支架现浇连续梁快速施工的施工方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507164A (zh) * | 2014-09-26 | 2016-04-20 | 任丘市永基建筑安装工程有限公司 | 预制钢桥安装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103821073B (zh) | 2018-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202689031U (zh) | 深基坑支护挡墙 | |
CN104532868B (zh) | 高陡变形斜坡区桥梁锚拉式高承台群桩基础修建方法 | |
CN103711056B (zh) | 钢质工具式临时施工道路及其施工方法 | |
CN201598647U (zh) | 一种输变电铁塔自立塔基础 | |
CN201843135U (zh) | 送电线路复合基础桩 | |
CN105569067A (zh) | 适用于预应力岩石锚杆风机基础的地基结构及施工方法 | |
CN206768861U (zh) | 一种加筋环挡土墙 | |
CN103821073A (zh) | 一种小型桥梁及其施工方法 | |
CN203475486U (zh) | 一种不产生水浮力的地下室 | |
CN215630021U (zh) | 一种公路桥梁施工基坑防护装置 | |
CN201738286U (zh) | 一种四脚架墩式结构 | |
CN206457838U (zh) | 一种用于输电塔的装配式基础 | |
CN215715392U (zh) | 一种边坡支护结构 | |
CN201169781Y (zh) | 一种盖挖基坑结构 | |
CN204326119U (zh) | 一种桩筏基础抗浮结构 | |
CN204401462U (zh) | 用于水中墩超长预应力盖梁施工支撑体系的支架 | |
CN209816577U (zh) | 一种滨海软土地基傍河路堤的拓宽结构 | |
CN206385502U (zh) | 一种快速施工的组合式预制河道护岸 | |
RU2464381C2 (ru) | Предварительно напряженный фундамент мелкого заложения | |
CN201495554U (zh) | 一种锚杆联合掏挖复合基础 | |
CN206245321U (zh) | 路堑边坡复合支护结构 | |
CN109487750A (zh) | 桩承式半圆体防波堤结构及施工方法 | |
CN204803740U (zh) | 预制钢筋混凝土埋置式直立框架桥 | |
CN211446970U (zh) | 顺层岩质边坡组合式加固结构 | |
CN103089023A (zh) | 一种房屋抗震石墙加固结构及其构建方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180716 Address after: 215222 1911, Yun Li Road, Songling Town, Wujiang City, Suzhou, Jiangsu Applicant after: JIANGSU SITONG ROAD AND BRIDGE ENGINEERING CO., LTD. Address before: 150060 Heilongjiang Harbin Nangang District Bridge North Bridge North District 7 buildings 1 units 701 doors Applicant before: Zhang Meijiao Applicant before: Zhang Yinshan |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180828 Termination date: 20200314 |
|
CF01 | Termination of patent right due to non-payment of annual fee |