CN103817752B - A kind of artificial board hot pressing is with cold pressing can the Unit erriger equipment of automatic circulating operation - Google Patents

A kind of artificial board hot pressing is with cold pressing can the Unit erriger equipment of automatic circulating operation Download PDF

Info

Publication number
CN103817752B
CN103817752B CN201410110739.8A CN201410110739A CN103817752B CN 103817752 B CN103817752 B CN 103817752B CN 201410110739 A CN201410110739 A CN 201410110739A CN 103817752 B CN103817752 B CN 103817752B
Authority
CN
China
Prior art keywords
slab
plate
pallet
unload
cage
Prior art date
Application number
CN201410110739.8A
Other languages
Chinese (zh)
Other versions
CN103817752A (en
Inventor
黄成存
Original Assignee
黄成存
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 黄成存 filed Critical 黄成存
Priority to CN201410110739.8A priority Critical patent/CN103817752B/en
Publication of CN103817752A publication Critical patent/CN103817752A/en
Application granted granted Critical
Publication of CN103817752B publication Critical patent/CN103817752B/en

Links

Abstract

The present invention relates to a kind of artificial board hot pressing and cold pressing can the Unit erriger equipment of automatic circulating operation, belong to wood based panel manufacturing machinery field; It is by hot press and cold press serial arrangement, and establish dress Slab element and feed unit device before hot press orientation successively, cold press rear end is established and unloaded Slab element; Dress Slab element has slab pusher and loading cage; Feed unit is by assembly platform, transition platform and acceleration transporter, and slab pallet forms; Unload Slab element successively by its unloading plate cage, unload plate hook device and beneath ejecting plate transporter and ejecting plate transition roller table thereof and form near cold press; Loading cage, hot press, cold press, to unload plate cage consistent with the number of plies of unloading plate hook, can move up and down; Present device hot pressing is without backing plate, and action is accurate, the time is short; Each cycle saving time 5-10 minute, as taken resin film as cementing layer, can raise the efficiency about 25%, once can simultaneously hot pressing and 20-40 laminate base of colding pressing, and reaches the target of efficient energy-saving.

Description

A kind of artificial board hot pressing is with cold pressing can the Unit erriger equipment of automatic circulating operation
Technical field
The invention belongs to wood based panel manufacturing machinery field, particularly relate to a kind of artificial board hot pressing and cold pressing can the Unit erriger equipment of automatic circulating operation.
Background technology
At present in bamboo plywood production process, all adopt cold and hot cold technique, and all carry out at same hot press, water consumption is large, time that energy consumption is also large, required is long, therefore usefulness is all lower.CN101733813A patent, disclose " a kind of wood-based plate hot pressing cold pressing production method for transferring and realize the equipment of the method ", it adopts 2 press (1 hot press and 1 cold press) parallel mode to improve usefulness preferably.But this patented technology exists four large not enough: one is the slot type backing plate using metal, and circulation consolidation is cumbersome, easy generation buckling deformation that backing plate is thin, thick then heavier simultaneously, weighed for the production of time power consumption also larger; Two is that the push rod of its feeding push bracket device needs long and cold press, and the plate in cold press is pushed unloader, long like this push rod easily produces distortion, and then the accurate push pedal of impact in hot press, cold press, complete these actions and also need the more time, have influence on the further raising of efficiency; Three is that feeding push bracket device push pedal base enters hot press and the slab after pushing away hot pressing enters cold press, needs twice action, consuming time more, also affects the further raising of efficiency; Four is that its dress grillage needs move at ground level and cannot move up and down, therefore can not be too high, and the number of plies of dress slab is subject to a definite limitation, therefore also limit hot press or the cold press number of plies, and efficiency may also can be affected.Therefore, be badly in need of a kind of hot pressing of exploitation without backing plate, once can hot pressing 20-40 layer left and right slab, dockboard accurately, the action of turnover plate is fast and the time is short, a kind of artificial board hot pressing of efficient energy-saving is with cold pressing can the equipment of automatic circulating operation.
Summary of the invention
The object of this invention is to provide a kind of artificial board hot pressing and cold pressing can the Unit erriger equipment of automatic circulating operation, its hot pressing without backing plate, once can hot pressing 20-40 laminate base, dockboard accurately, the action of turnover plate is fast short if having time, a kind of artificial board hot pressing of efficient energy-saving is with cold pressing can the equipment of automatic circulating operation.
The object of the invention is to realize as follows: a kind of artificial board hot pressing is with cold pressing can the Unit erriger equipment of automatic circulating operation, hot press and cold press are adopted forward and backward serial arrangement, dress Slab element device and feed unit device is set gradually before hot press orientation, cold press rear end arranges and unloads Slab element device, and various device contact is as follows:
A, described dress Slab element device include slab pusher and loading cage, and this loading cage bracket number of plies is consistent with the number of plies of hot press, and loading cage is driven by hydraulic jack (29), can move up and down; By 1, platen base assembly platform, transition platform and 1 acceleration transporter, slab pusher, slab pallet form described feed unit device at the most, assembly platform connects transition platform, accelerate transporter accept the slab of transition platform and it sent on the slab pallet in loading cage, slab pallet is positioned on loading cage bracket, slab cannot be delivered to completely slab pallet desired position because accelerating transporter, need adopt and accelerate the precalculated position that slab is shifted onto slab pallet by transporter slab propelling head; The front end of slab pusher is provided with convex column slab pallet bolt, slab pallet is rectangular wood based panel, upper and lower surface smooth abrasion-proof, thick 15-18mm, in one end of backup plate base pusher convex column slab pallet bolt, central authorities are provided with a breach pallet keyhole (28) corresponding with convex column slab pallet bolt, when loading cage rises one deck, convex column slab pallet bolt, namely inserts in pallet keyhole (28) corresponding to convex column slab pallet bolt; Successively slab is filled loading cage, slab pusher slides through loading cage along one group of slab propelling track, to hot press is other, slab in loading cage and slab pallet is pushed hot press, and slab pallet is taken back loading cage, loading cage is each device reset before declining; Described slab propelling track is same as hot press and cold press orientation, and the side entering plate at hot press is provided with buffered tower, and object blocks the slab on slab pallet, and when slab pallet is recalled, slab to be stayed in hot press on heating platen;
B, cold press rear end arrange and unload Slab element device, successively by its unloading plate cage, unload plate hook device and beneath ejecting plate transporter and ejecting plate transition roller table thereof and form near cold press; Cold press, to unload the plate cage bracket number of plies consistent with the number of plies of hot press, unloads plate cage and driven by hydraulic jack (30), can be moved up and down; Unload plate hook device be provided with cold press, unload the plate cage bracket number of plies consistent unload plate hook, unload plate hook by unload plate hook elevating mechanism cylinder (20) drive, can move up and down; Unload plate hook device to slide through unload by plate cage to cold press along unloading plate hook device guide rail, unload and to unload plate hook when plate hook device slides forward and stretching in cold press by unloading plate hook guiding mechanism, unloading plate hook guiding mechanism and exit reset, unload plate hook to drop on slab and slide, unload after plate hook gib head slips over slab and decline, unload plate hook and hook the retrogressing of the slab after colding pressing, slab after colding pressing hook from cold press is gone out, and feeding unloads plate cage; The described plate hook device guide rail that unloads is same as hot press and cold press orientation, ejecting plate transporter is positioned at the below of unloading plate cage He unloading plate hook device, when unload plate cage decline time, can from unload at the bottom of plate cage slab take out of unload plate cage to ejecting plate transition roller table export, enter next program.
A kind of artificial board hot pressing with cold pressing can the production application step of Unit erriger equipment of automatic circulating operation as follows:
A, after assembly platform carries out assembly, after transition platform is risen to assembly platform same level by cylinder, slab moves to acceleration transporter from assembly platform, accelerating transporter sends on the slab pallet in loading cage fast by slab, slab cannot be delivered to completely slab pallet desired position because accelerating transporter, need adopt and accelerate the precalculated position that slab is shifted onto slab pallet by transporter slab propelling head; After loading cage to rise on slab pallet plane from the bottom up and accelerates transporter same level, accelerate transporter and send in slab pallet fast by another slab, rising one deck refills another slab successively, till filling;
The quantity of assembly platform can increase according to the needs of assembly speed and press or reduce;
In B, slab cage, slab pallet layer number is identical with hot press (heating platen) number of plies, slab cage rises to slab pallet lower plane and exceeds heating platen and be about 3-5mm, the slab pallet installing slab pushes in hot press by slab pusher, buffered tower is down on every laminate base pallet, slab pusher band pallet shrinks back, and slab gear is in hot press by every layer of pallet for buffered tower, and buffered tower exits reset, the heating platen quick-make compacting of hot press, to the time needed for hot pressing, is opened fast;
C, the slab pallet of loading cage and blank are pushed into machine when pushing hot press, blanket after hot pressing on heating platen is pushed cold press by slab pallet termination, when pallet shrinks back and leaves cold press cold drawing, cold press quick-make is boosted, wait to cold pressing and be cooled to the time of setting, cold press unloads drops, unload the work of plate hook guiding mechanism, unload the propelling of plate hook device and unload plate hook by unloading plate hook guiding mechanism in cold press, unload plate hook guiding mechanism and exit reset, unload plate hook to drop on slab and slide, the gib head unloading plate hook exceedes slab limit and declines, slab after all colding pressing is pulled outward simultaneously to unloading plate cage, unload plate hook device reset to original height and retreat to desired location, unload plate cage be down to successively on ejecting plate transporter export cold pressing after slab to ejecting plate transition roller table, export formation complete alternation workflow again,
Adopt above-mentioned a kind of artificial board hot pressing and cold pressing can the equipment of automatic circulating operation, hot pressing without backing plate, dress plate with unload plate and completed by two devices, action is accurately, the action of turnover plate is fast, the time is short; Each wood-based plate hot pressing with to cold pressing cycle saving time 5-10 minute, as taken resin film as cementing layer, about 25% can be raised the efficiency, once can hot pressing and 20-40 laminate base of colding pressing simultaneously, really reach the target of efficient energy-saving.
Below in conjunction with accompanying drawing, the present invention is described further.
A kind of artificial board hot pressing of Fig. 1 is with cold pressing can the Unit erriger capital equipment side view of automatic circulating operation
A kind of artificial board hot pressing of Fig. 2 is with cold pressing can the Unit erriger capital equipment floor map of automatic circulating operation
Fig. 3 assembly platform and transition platform schematic diagram
Fig. 4 accelerates transporter and schematic diagram of cutting somebody's hair
Fig. 5 hot press enters plate damper status schematic diagram
Fig. 6 hot press buffered tower withdraws slab view
Fig. 7 slab pallet and keyhole schematic diagram
Fig. 8 slab pusher pushes away slab in loading cage and enters hot press operating diagram
Fig. 9 unloads Slab element structural representation
Figure 10 cold press unloads plate hook guiding mechanism schematic diagram
Figure 11 unloads plate hook device and unloads plate cage structure relation schematic diagram
Figure 12 oriented movable unloads plate hook schematic diagram
Figure 13 fixedly unloads plate hook schematic diagram
1-5, assembly platform 6, transition platform 7, accelerate transporter 8, slab advances 9, slab pallet
10, slab 11, slab pusher 12, loading cage 13, pallet bolt 14, buffered tower
15, hot press 16, cold press 17, unload plate hook guiding mechanism 18, unload plate cage 19, unload plate hook device
20, unload plate hook elevating mechanism cylinder 21, ejecting plate transporter 22, ejecting plate transition roller table 23, unload plate cage bracket
24, loading cage bracket 25, unload plate hook 26, oriented movable unloads plate hook 27, fixedly unload plate hook head
28, pallet keyhole 29, loading cage hydraulic jack 30, unload plate cage hydraulic jack
specific embodiment:
embodiment 1
As shown in Fig. 1,2,4,8,10,13,20 layers of hot press and 20 layers of cold press are adopted forward and backward serial arrangement, set gradually dress Slab element device and feed unit device before hot press orientation, cold press rear end arranges and unloads Slab element device, and various device contact is as follows:
Dress Slab element device: be made up of slab pusher and loading cage, this loading cage has 20 layers of bracket, loading cage establishes 20 layers of bracket to be driven by loading cage hydraulic jack (29), can move up and down;
Feed unit device: join 1 transition platform by 1 assembly platform and form one group, 5 groups of series connection, last 1 transition platform and 1 acceleration transporter, 1 platen base pusher and 20 pieces of slab pallet compositions, assembly platform connects transition platform, totally 5 groups of series connection, as the needs of hot press can not be met, can increase as required, as surplus then reduces; Last 1 transition platform connects acceleration transporter, accelerates transporter and accepts the slab of transition platform and its is sent on the slab pallet of loading cage; The front end of slab pusher is provided with convex column slab pallet bolt; Slab pallet is rectangular wood based panel, upper and lower surface smooth abrasion-proof, thick 18mm, in one end of backup plate base pusher convex column slab pallet bolt, central authorities are provided with a breach pallet keyhole (28) corresponding with convex column slab pallet bolt, when loading cage rises one deck, namely convex column slab pallet bolt inserts in pallet keyhole (28) corresponding to convex column slab pallet bolt; Successively slab is filled loading cage, slab pusher slides through loading cage along one group of slab propelling track, to hot press is other, slab in loading cage and slab pallet is pushed hot press, and slab pallet is taken back loading cage, loading cage is each device reset before declining; Described slab propelling track is same as hot press and cold press orientation, and the side entering plate at hot press is provided with buffered tower, and object blocks the slab on slab pallet, and when slab pallet is recalled, slab to be stayed in hot press on heating platen;
Cold press rear end arranges and unloads Slab element device: successively by its unloading plate cage, unload plate hook device and the ejecting plate transporter under it and transition roller table and form near cold press, the described plate cage that unloads is provided with 20 layers of bracket, unload plate cage to drive by unloading plate cage hydraulic jack (30), can move up and down, unload plate hook device to be provided with 20 layers and to unload plate hook, unload plate hook to drive by unloading plate hook elevating mechanism cylinder (20), can move up and down, unload plate hook device to slide through and unload by plate cage to cold press along unloading plate hook device guide rail, unload unloading plate hook and can stretching in cold press by unloading plate hook guiding mechanism of plate hook device, unload plate hook guiding mechanism and exit reset, unload plate hook to drop on slab and slide, unload after plate hook slips over slab and decline, unload plate hook and hook the retrogressing of the slab after colding pressing, slab after colding pressing hook from cold press is gone out, and feeding unloads plate cage, the described plate hook device guide rail that unloads is same as hot press and cold press orientation, ejecting plate transporter is positioned at the below of unloading plate cage He unloading plate hook device, when unloading plate cage and declining, plate cage can be unloaded export to slab after colding pressing is taken out of to ejecting plate transition roller table from unloading at the bottom of plate cage.Unload plate hook head such as Figure 12 oriented movable and unload plate hook, adopt oriented movable to unload plate hook head (26).
Above-mentioned a kind of artificial board hot pressing with cold pressing can the production application step of Unit erriger equipment of automatic circulating operation as follows:
A, after assembly platform carries out assembly, after transition platform is risen to assembly platform same level by cylinder, slab moves to acceleration transporter from assembly platform, accelerating transporter sends on the slab pallet in loading cage fast by slab, slab cannot be delivered to completely slab pallet desired position because accelerating transporter, need adopt and accelerate the precalculated position that slab is shifted onto slab pallet by transporter slab propelling head; After loading cage to rise on slab pallet plane from the bottom up and accelerates transporter same level, accelerate transporter and sent into fast in pallet by another slab, rising one deck refills another slab successively, until filling till 20 layers;
In B, slab cage, slab pallet layer number is identical with the hot press heating platen number of plies, slab cage rises to slab pallet lower plane and exceeds heating platen and be about 5mm, the slab pallet installing slab pushes in hot press by slab pusher, buffered tower is down on every laminate base pallet, slab pusher band pallet shrinks back, and slab gear is in hot press by every layer of pallet for buffered tower, and buffered tower exits reset, the heating platen quick-make compacting of hot press, to the time needed for hot pressing, is opened fast;
C, when the slab pallet of loading cage and slab are pushed hot press by slab pusher, blanket after hot pressing on heating platen is pushed cold press by slab pallet termination, when slab pallet shrinks back and leaves cold press cold drawing, cold press quick-make is boosted, time to setting to be cooled, cold press unloads drops, unload the work of plate hook guiding mechanism, the plate hook that unloads unloading plate hook device puts in in cold press, unload plate hook guiding mechanism and return reset, unload plate hook to drop on slab and slide, unload plate hook gib head and slip over (gib head unloading plate hook should exceed slab on limit) under after slab, slab after all colding pressing is pulled outward simultaneously to unloading plate cage, unload plate hook device reset to original height and retreat to desired location, unload plate cage be down to successively on ejecting plate transporter export cold pressing after slab export again to ejecting plate transition roller table, form a complete alternation workflow.
embodiment 2
As embodiment 1, its slab pallet 18mm, unload plate hook if Figure 13 is for fixedly to unload plate hook, adopt and fixedly unload plate hook head (27).

Claims (3)

1. an artificial board hot pressing is with cold pressing can the Unit erriger equipment of automatic circulating operation, hot press and cold press are adopted forward and backward serial arrangement, set gradually dress Slab element device and feed unit device before hot press orientation, cold press rear end arranges and unloads Slab element device, it is characterized in that:
A, described dress Slab element device include slab pusher and loading cage, and this loading cage bracket number of plies is consistent with the number of plies of hot press, and loading cage is driven by hydraulic jack (29), can move up and down; By 1, platen base assembly platform, 1 to multiple stage transition platform, 1 acceleration transporter, 1 platen base pusher and polylith slab pallet form described feed unit device at the most, assembly platform connects transition platform, accelerate transporter accept the slab of transition platform and it sent on the slab pallet in loading cage, slab pallet is positioned on loading cage bracket, slab cannot be delivered to completely slab pallet desired position because accelerating transporter, need adopt and accelerate the precalculated position that slab is shifted onto slab pallet by transporter slab propelling head; The front end of slab pusher is provided with convex column slab pallet bolt, slab pallet is rectangular wood based panel, upper and lower surface smooth abrasion-proof, thick 15-18mm, in one end of backup plate base pusher convex column slab pallet bolt, central authorities are provided with a breach pallet keyhole (28) corresponding with convex column slab pallet bolt, when loading cage rises one deck, convex column slab pallet bolt, namely inserts in pallet keyhole (28) corresponding to convex column slab pallet bolt; Successively slab is filled loading cage, slab pusher slides through loading cage along one group of slab propelling track, to hot press is other, slab in loading cage and slab pallet is pushed hot press, and slab pallet is taken back loading cage, loading cage is each device reset before declining; Described slab propelling track is same as hot press and cold press orientation, and the side entering plate at hot press is provided with buffered tower, and object blocks the slab on slab pallet, and when slab pallet is recalled, slab to be stayed in hot press on heating platen;
B, cold press rear end arrange and unload Slab element device, successively by its unloading plate cage, unload plate hook device and beneath ejecting plate transporter and ejecting plate transition roller table thereof and form near cold press; Cold press, to unload the plate cage bracket number of plies consistent with the number of plies of hot press, unloads plate cage and driven by hydraulic jack (30), can be moved up and down; Unload plate hook device be provided with cold press, unload the plate cage bracket number of plies consistent unload plate hook, unload plate hook by unload plate hook elevating mechanism cylinder (20) drive, can move up and down; Unload plate hook device to slide through unload by plate cage to cold press along unloading plate hook device guide rail, unload and unload plate hook when plate hook device slides forward and stretch in cold press by unloading plate hook guiding mechanism, unload plate hook guiding mechanism and exit reset, unload plate hook to drop on slab and slide, unload after plate hook gib head slips over slab and decline, unload plate hook and hook the retrogressing of the slab after colding pressing, the hook from cold press of the slab after colding pressing is gone out, and feeding unloads plate cage; The described plate hook device guide rail that unloads is same as hot press and cold press orientation, ejecting plate transporter is positioned at the below of unloading plate cage He unloading plate hook device, when unload plate cage decline time, can from unload at the bottom of plate cage slab take out of unload plate cage to ejecting plate transition roller table export, enter next program.
2. a kind of artificial board hot pressing according to claim 1 is with cold pressing can the Unit erriger equipment of automatic circulating operation, it is characterized in that cold press ejecting plate side, is provided with and unloads plate hook guiding mechanism, and object allows unload plate hook and can stretch in cold press smoothly.
3. artificial board hot pressing is with cold pressing can the Unit erriger equipment of automatic circulating operation, it is characterized in that production application step is as follows:
A, after assembly platform carries out assembly, after transition platform is risen to assembly platform same level by cylinder, slab moves to acceleration transporter from assembly platform, accelerating transporter sends on the slab pallet in loading cage fast by slab, slab cannot be delivered to completely slab pallet desired position because accelerating transporter, need adopt and accelerate the precalculated position that slab is shifted onto slab pallet by transporter slab propelling head; After loading cage to rise on slab pallet plane from the bottom up and accelerates transporter same level, accelerate transporter and sent into fast by slab in slab pallet, rising one deck refills slab successively, till filling;
In B, loading cage, slab pallet layer number is identical with the hot press heating platen number of plies, loading cage rises to slab pallet lower plane and exceeds heating platen 3-5mm, the slab pallet installing slab pushes in hot press by slab pusher, buffered tower is down on every laminate base pallet, slab pusher band pallet shrinks back, and slab gear is in hot press by every layer of pallet for buffered tower, and buffered tower exits reset, heating platen quick-make compacting, to the time needed for hot pressing, is opened fast;
C, the slab pallet of loading cage and slab are pushed hot press by slab pusher, blanket after hot pressing on heating platen is pushed cold press by slab pallet termination, when pallet shrinks back and leaves cold press cold drawing, cold press quick-make is boosted, during the time to setting to be cooled, cold press unloads drops, the plate hook that unloads unloading plate hook device stretches in cold press by unloading plate hook guiding mechanism, unload plate hook guiding mechanism and exit reset, unload plate hook to slide on cold press slab, unload after plate hook gib head slips over slab and decline, unload plate hook and hook the retrogressing of the slab after colding pressing, slab after all colding pressing is pulled outward simultaneously to unloading plate cage, unload plate hook device reset to original height and retreat to desired location, unloading plate cage is down on ejecting plate transporter successively, export slab to export again to ejecting plate transition roller table, form a complete alternation workflow.
CN201410110739.8A 2014-03-24 2014-03-24 A kind of artificial board hot pressing is with cold pressing can the Unit erriger equipment of automatic circulating operation CN103817752B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410110739.8A CN103817752B (en) 2014-03-24 2014-03-24 A kind of artificial board hot pressing is with cold pressing can the Unit erriger equipment of automatic circulating operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410110739.8A CN103817752B (en) 2014-03-24 2014-03-24 A kind of artificial board hot pressing is with cold pressing can the Unit erriger equipment of automatic circulating operation

Publications (2)

Publication Number Publication Date
CN103817752A CN103817752A (en) 2014-05-28
CN103817752B true CN103817752B (en) 2015-12-09

Family

ID=50753172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410110739.8A CN103817752B (en) 2014-03-24 2014-03-24 A kind of artificial board hot pressing is with cold pressing can the Unit erriger equipment of automatic circulating operation

Country Status (1)

Country Link
CN (1) CN103817752B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104742201B (en) * 2015-03-17 2017-01-04 福建省永安林业(集团)股份有限公司 Bamboo curtain splint material wood-based plate assembly automatic packing device with spreading head
CN104723455B (en) * 2015-03-25 2016-11-16 福建省大田县金门油压机制造有限公司 A kind of wood-based plate is colded pressing, molding, unload plate recycle unit
CN104827740A (en) * 2015-05-20 2015-08-12 卓达新材料科技集团有限公司 Hot press device
CN105235049B (en) * 2015-10-26 2020-04-17 黄成存 Automatic circulation pressing vehicle for artificial boards and automatic button-removing machine equipment
CN106403577A (en) * 2016-11-17 2017-02-15 广州市俊金机械有限公司 Semiautomatic multi-layer dryer

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2972423A (en) * 1957-04-15 1961-02-21 Washington Iron Works Art of feeding mats to a hot-press
US3799366A (en) * 1973-02-21 1974-03-26 Mac Millan Bloedel Ltd Hot press loader apparatus and method
US4188730A (en) * 1978-03-20 1980-02-19 Weyerhaeuser Company Method for veneer redrying and handling
CN2352317Y (en) * 1998-11-18 1999-12-08 福建省大田县金门油压机制造有限公司 Non-packing sheet type loading-unloading machine for artificial board hot-press
CN201304675Y (en) * 2008-11-04 2009-09-09 穆国君 Multilayer mould-pressing production device for massive flakeboard
CN101733813A (en) * 2009-12-02 2010-06-16 中国林业科学研究院木材工业研究所 Production method for transferring hot press and cold press of artificial boards and equipment for realizing method
CN201613576U (en) * 2009-12-02 2010-10-27 中国林业科学研究院木材工业研究所 Hot press and cold press connected feeding equipment for man-made board

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2972423A (en) * 1957-04-15 1961-02-21 Washington Iron Works Art of feeding mats to a hot-press
US3799366A (en) * 1973-02-21 1974-03-26 Mac Millan Bloedel Ltd Hot press loader apparatus and method
US4188730A (en) * 1978-03-20 1980-02-19 Weyerhaeuser Company Method for veneer redrying and handling
CN2352317Y (en) * 1998-11-18 1999-12-08 福建省大田县金门油压机制造有限公司 Non-packing sheet type loading-unloading machine for artificial board hot-press
CN201304675Y (en) * 2008-11-04 2009-09-09 穆国君 Multilayer mould-pressing production device for massive flakeboard
CN101733813A (en) * 2009-12-02 2010-06-16 中国林业科学研究院木材工业研究所 Production method for transferring hot press and cold press of artificial boards and equipment for realizing method
CN201613576U (en) * 2009-12-02 2010-10-27 中国林业科学研究院木材工业研究所 Hot press and cold press connected feeding equipment for man-made board

Also Published As

Publication number Publication date
CN103817752A (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN201419424Y (en) Plate moving machine
CN201031084Y (en) Empty bracket tray buck stacker
CN205397379U (en) Automatic plate feeder
CN103692097B (en) A kind of Full-automatic welding method of photovoltaic panel and realize the photovoltaic panel automatic welding machine of said method
CN103895073B (en) A kind of plate joggling apparatus
CN104669366B (en) A kind of sheet material automatic positioning equipment
CN105234251A (en) Punching machine for steel discs of clutch speed reducers
CN204954608U (en) Automatic propelling movement of grinder meets material system
CN103624137B (en) Full-automatic numerical control high-speed punch machine
US4065003A (en) Raisable and lowerable mat-loading and press-tray unloading device for a multi-lever press
CN102699970B (en) Modified production method for poplar pencil board
CN202877884U (en) Multi-station full-automatic horizontal multi-shaft milling and drilling machine
CN206842568U (en) The step feeder structure of bolt automatic charging machine
CN103949558A (en) Feeding mechanism of stamping equipment for motor rotor piece
CN201969794U (en) Riveting machine for contact point
CN105109171A (en) Brake lining laminating apparatus with characteristic of automatic feeding
CN103112724B (en) Hacking machine for bricks
CN102729041B (en) Automatic pipe penetrating machine
CN201895348U (en) Automatic charging device of floor hot press
CN202807863U (en) Automatic chip feeding machine
CN102013360B (en) Riveting machine for short-circuit ring of relay
CN108908538A (en) A kind of thick china hot-press equipment
CN103406946A (en) Novel full-automatic sheet material edge cutter
CN102060183B (en) Automatic production process for post production flow of concrete blocks
CN107186467A (en) A kind of magnet steel automatic charging and applying method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181126

Address after: 366100 Houbanyang 4, Junxi Town, Datian County, Sanming City, Fujian Province

Patentee after: Jinmen Hydraulic Press Mfg. Co., Ltd., Datian County, Fujian Prov.

Address before: 366100 Chengguan Houbanyang 4, Junxi Town, Datian County, Sanming City, Fujian Province

Patentee before: Huang Chengcun