CN103806453B - The compound retaining structure that a kind of earth structure and friction pile combine - Google Patents

The compound retaining structure that a kind of earth structure and friction pile combine Download PDF

Info

Publication number
CN103806453B
CN103806453B CN201310734532.3A CN201310734532A CN103806453B CN 103806453 B CN103806453 B CN 103806453B CN 201310734532 A CN201310734532 A CN 201310734532A CN 103806453 B CN103806453 B CN 103806453B
Authority
CN
China
Prior art keywords
slope
reinforced
reinforced soil
wall
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310734532.3A
Other languages
Chinese (zh)
Other versions
CN103806453A (en
Inventor
夏飞
康智明
杨广庆
王旭龙
赵弋舟
周亦涛
戴征杰
周凯
陈丽丽
雷永智
褚景英
涂川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO BOSTD GEOSYNTHETICS Ltd
PowerChina Northwest Engineering Corp Ltd
Original Assignee
QINGDAO BOSTD GEOSYNTHETICS Ltd
PowerChina Northwest Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO BOSTD GEOSYNTHETICS Ltd, PowerChina Northwest Engineering Corp Ltd filed Critical QINGDAO BOSTD GEOSYNTHETICS Ltd
Priority to CN201310734532.3A priority Critical patent/CN103806453B/en
Publication of CN103806453A publication Critical patent/CN103806453A/en
Application granted granted Critical
Publication of CN103806453B publication Critical patent/CN103806453B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本发明涉及一种加筋土结构和抗滑桩结合的复合支挡结构,所述复合支挡结构中,抗滑桩所抵挡的上部填方为加筋土结构体及其后部填土,所述加筋土结构将上部填土整合、固结为一个相对密实的连续柔性体,防护坡体,保证该部分填土的稳定性,所述抗滑桩位于加筋土结构的底部墙趾或坡脚处,抵挡上部加筋土结构及其后部填土的下滑。该复合结构能解决一些单一的支挡结构和形式无法解决的难题,且具有良好的抗震性能,工程效果显著。

The invention relates to a composite retaining structure combining a reinforced soil structure and an anti-sliding pile. In the composite retaining structure, the upper filling that the anti-sliding pile resists is a reinforced soil structure and its rear filling. The reinforced soil structure integrates and consolidates the upper filling into a relatively dense continuous flexible body to protect the slope and ensure the stability of this part of the filling. The anti-slide pile is located at the bottom wall toe of the reinforced soil structure Or at the foot of the slope, resist the slide of the upper reinforced soil structure and its backfill. The composite structure can solve some difficult problems that cannot be solved by a single retaining structure and form, and has good seismic performance, and the engineering effect is remarkable.

Description

一种加筋土结构和抗滑桩结合的复合支挡结构 A Composite Retaining Structure Combined with Reinforced Soil Structure and Anti-slide Pile

技术领域 technical field

本发明涉及一种加筋土结构和抗滑桩结合的复合支挡结构。 The invention relates to a composite retaining structure combining reinforced soil structure and anti-slide pile.

背景技术 Background technique

随着经济的发展,工程建设的领域和区域和在不断的扩大,工程建设的自然环境和地质条件也越来越复杂,在一些地形复杂、工程有特殊要求的项目中会出现一些高填方工程,仅凭单一的支挡结构和措施已不能满足工程的要求,必须采用多种支挡结构或措施结合的方法,尤其在山区修建工程时,这种情况遇到较多。 With the development of the economy, the fields and areas of engineering construction are constantly expanding, and the natural environment and geological conditions of engineering construction are becoming more and more complex. In some projects with complex terrain and special engineering requirements, some high fill will appear. In engineering, only a single support structure and measures can no longer meet the requirements of the project, and a combination of multiple support structures or measures must be used, especially when building projects in mountainous areas, this situation is often encountered.

在山区修建工程时,常会遇到斜坡上的高填方或者滑坡治理的问题,由于各种外部条件的限制或者工程安全的考虑,往往不能将填方边坡进行自然放坡堆放,因此必须对其进行支挡加固,并要防止填土体沿斜坡下滑,传统的、单一的填土支护加固方法由于工程造价、施工难度和场地限制等因素,很难同时解决此类问题。 When building projects in mountainous areas, we often encounter the problem of high fill or landslide treatment on slopes. Due to various external conditions or engineering safety considerations, it is often impossible to stack fill slopes naturally. Therefore, it is necessary to It carries out support reinforcement and prevents the filling body from sliding down the slope. The traditional and single filling support reinforcement method is difficult to solve such problems at the same time due to factors such as project cost, construction difficulty and site constraints.

相对其他形式的传统支挡结构,加筋土结构具有结构简单、施工方便、工程适应性强,对地基承载力要求相对较低、造价较低、抗震性能良好等特点,同时土工格栅具有特有的网孔结构,增加了与土颗粒的嵌固与咬合作用,将填土更紧密的束缚在一起,形成更加稳定的整体柔性结构,缺点是单级墙高度不宜超过10m、施工不当易导致变形过大、不宜应用在浸水地区等,是目前处理高填方工程比较常用的一种方法。但土工格栅与填土共同组成的加筋土结构仅能固结加筋体范围内的填土,使之形成整体,保证加筋土体自身的稳定,结构体并不具有抵抗本身和后部填土沿斜坡整体下滑的能力,为避免加筋体及加筋体后部土体下滑,在加筋体下部采用抗滑桩是一种简单、有效地处理方法。 Compared with other forms of traditional retaining structures, reinforced soil structures have the characteristics of simple structure, convenient construction, strong engineering adaptability, relatively low requirements for foundation bearing capacity, low cost, and good seismic performance. At the same time, geogrids have unique The mesh structure increases the embedding and occlusal effect of the soil particles, binds the filling soil more tightly, and forms a more stable overall flexible structure. The disadvantage is that the height of the single-stage wall should not exceed 10m, and improper construction will easily lead to deformation. It is too large and not suitable for application in flooded areas. It is a common method for dealing with high fill projects at present. However, the reinforced soil structure composed of geogrid and filling soil can only consolidate the filling soil within the scope of the reinforced body to form a whole to ensure the stability of the reinforced soil body itself. The structure body does not have the resistance itself and the rear In order to prevent the reinforcement body and the soil behind the reinforcement body from sliding down, it is a simple and effective treatment method to use anti-slide piles at the bottom of the reinforcement body.

发明内容 Contents of the invention

针对上述的不足,本发明提供一种加筋土结构和抗滑桩结合的复合支挡结构,所述复合支挡结构中,抗滑桩所抵挡的上部填方为加筋土结构体及其后部填土,所述加筋土结构,通过分层碾压、格栅与土体颗粒的咬合固结,使加筋土范围内的土体土颗粒更加密实、紧凑,整个加筋体形成一个连续的、密实的整体结构,防护坡体,保证该部分填土的稳定性;所述抗滑桩位于加筋土结构的底部墙趾或坡脚处,抵挡上部加筋土结构及其后部填土的下滑。 In view of the above-mentioned deficiencies, the present invention provides a composite retaining structure combining reinforced soil structure and anti-slide piles. Backfilling, the reinforced soil structure, through layered rolling, meshing and consolidation of grids and soil particles, makes the soil particles within the range of the reinforced soil more dense and compact, and the entire reinforced body is formed A continuous and dense overall structure, protecting the slope body, ensuring the stability of this part of the fill; the anti-slide piles are located at the bottom wall toe or slope toe of the reinforced soil structure, resisting the upper reinforced soil structure and its rear The decline of the partial fill.

所述加筋土结构根据其坡面坡度可分为加筋土边坡和加筋土挡墙两种结构形式。 The reinforced soil structure can be divided into two structural forms: a reinforced soil slope and a reinforced soil retaining wall according to the gradient of the slope.

所述加筋土结构每层筋材均为水平铺设,上下两层筋材间的填土应做摊平并分层碾压,压实厚度0.2-0.3m,压实度应满足设计要求。 Each layer of reinforcement in the reinforced soil structure is laid horizontally. The fill between the upper and lower layers of reinforcement should be flattened and rolled in layers. The compacted thickness is 0.2-0.3m, and the compaction degree should meet the design requirements.

所述加筋土边坡结构,坡面坡度一般为30-70°,所述加筋土边坡结构优选采用包裹式坡面结构,坡面为加筋材料分层包裹形成。 The slope of the reinforced soil slope structure is generally 30-70°, and the reinforced soil slope structure preferably adopts a wrapped slope structure, and the slope is formed by layers of reinforcing materials.

所述加筋土挡墙结构,墙面坡度为70-90°,根据墙面形式可分为有面板挡墙和无面板加筋土挡墙两种结构形式。 The reinforced soil retaining wall structure has a wall slope of 70-90°, and can be divided into two structural forms of a panel retaining wall and a reinforced soil retaining wall without a panel according to the form of the wall.

所述的有面板式加筋土挡墙优选为混凝土模块的模块式加筋土挡墙,所述模块式加筋土挡墙结构的墙顶部设置有帽石,所述帽石采用现浇钢筋混凝土结构,其厚度不得小于0.4m,宽度不得小于0.6m,飞檐宽度为0.1m。 The panel-type reinforced earth retaining wall is preferably a modular reinforced earth retaining wall of a concrete module, and the top of the modular reinforced earth retaining wall structure is provided with a cap stone, and the cap stone adopts cast-in-place steel bars For concrete structures, the thickness shall not be less than 0.4m, the width shall not be less than 0.6m, and the cornice width shall be 0.1m.

所述无面板加筋土挡墙的墙面为筋材包裹式结构的挡墙,由加筋材料分层包裹形成。 The wall surface of the reinforced earth retaining wall without a panel is a retaining wall with a reinforcement material wrapping structure, which is formed by layered reinforcement material wrapping.

所述模块式加筋土挡墙的墙面为预置混凝土模块砌筑,所述墙面上设置向墙外坡度不小于4%的泄水孔,按上下左右每隔2-3m交错布置,折线墙背的易积水处必须设置泄水孔,所述泄水孔采用管型材料,预置于混凝土模块中。 The wall surface of the modular reinforced soil retaining wall is built with pre-set concrete modules, and the wall surface is provided with drain holes with a slope of not less than 4% to the outside of the wall, arranged in a staggered manner every 2-3m from top to bottom Weep holes must be provided at the places where water easily accumulates on the back of the broken line wall, and the weep holes are made of tubular materials and pre-installed in the concrete module.

所述模块式加筋土挡墙的所述泄水孔进水侧设置有非级配碎石或砂夹卵石反滤层,厚度大于0.3m,墙背为膨胀土的反滤层,厚度不小于0.5m;所述反滤层顶部设置0.3-0.5m厚的不渗水材料封闭,在靠近地面的最低一排泄水孔的进水口下部应设置隔水层。 The water inlet side of the drain hole of the modular reinforced soil retaining wall is provided with a filter layer of non-graded gravel or sand with pebbles, the thickness is greater than 0.3m, and the back of the wall is a filter layer of expansive soil, the thickness is not less than 0.5m m; the top of the reverse filter layer is sealed with a 0.3-0.5m thick impermeable material, and a water-resistant layer should be set at the lower part of the water inlet of the lowest drainage hole near the ground.

所述挡墙可设为多级挡土墙,各级平台顶部应设不小于2%的排水横坡,并用厚度不小于0.15m的C15混凝土板防护。 The retaining wall can be set as a multi-level retaining wall, and the top of the platform at each level should have a drainage slope of not less than 2%, and be protected by a C15 concrete slab with a thickness of not less than 0.15m.

所述模块式挡墙,沿墙长每隔10—20m或与其他建筑物相接处设有伸缩缝,在基底的底层变化处设有沉降缝;所述伸缩缝与沉降缝可合并设置,缝宽采用2-3cm,缝内沿墙的内、外、顶三边填塞沥青麻筋或沥青木板,塞入深度不得小于0.15m。 The modular retaining wall is provided with expansion joints every 10-20m along the length of the wall or at the joints with other buildings, and settlement joints are provided at the change of the bottom layer of the base; the expansion joints and settlement joints can be combined, The width of the joint shall be 2-3cm, and the inside, outside and top three sides of the joint shall be filled with asphalt hemp tendon or asphalt plank, and the filling depth shall not be less than 0.15m.

当上部加筋土结构为加筋土挡墙结构时,所述抗滑桩位置设置在所述加筋土挡墙的墙趾位置;当上部加筋土结构为加筋土边坡结构时,所述抗滑桩位置设置在所述加筋土边坡的坡脚位置。 When the upper reinforced soil structure is a reinforced soil retaining wall structure, the position of the anti-slide pile is set at the toe position of the reinforced soil retaining wall; when the upper reinforced soil structure is a reinforced soil slope structure, The position of the anti-slide pile is set at the toe of the reinforced soil slope.

所述的加筋土边坡结构,加筋土边坡多采用包裹式的坡面结构,也可采用混凝土结构或其他形式进行坡面防护。 As for the reinforced soil slope structure, the reinforced soil slope mostly adopts a wrapped slope structure, and a concrete structure or other forms can also be used for slope protection.

所述的包裹式的坡面结构,坡面为加筋材料分层包裹形成,坡面面层一般采用装满土并封口的麻袋、编织袋或者生态袋码砌为设计坡度。 The wrapped slope structure is formed by wrapping the reinforced material layer by layer, and the slope surface layer is generally made of sacks, woven bags or ecological bags filled with soil and sealed as the designed slope.

本发明的加筋土结构和抗滑桩结合的复合支挡结构,结合抗滑桩和加筋土结构各自特点和优势,相互弥补缺点,充分发挥各自优点,刚柔结合,适用于高填方支挡或滑坡治理。该复合结构既能使上部填土稳定,形成一个整体,收陡坡面坡度,节省坡底用地,增大上部场地面积,又能阻止整个坡体下滑,保证高填方结构体的稳定性,解决一些单一支挡结构和形式无法解决的难题,更重要的一点就是由于加筋体结构本身属于柔性结构,其特性决定了该复合结构具有良好的抗震性能,工程效果显著。 The composite retaining structure combining the reinforced soil structure and the anti-slide pile of the present invention combines the respective characteristics and advantages of the anti-slide pile and the reinforced soil structure, makes up for the shortcomings of each other, fully exerts their respective advantages, combines rigidity and flexibility, and is suitable for high filling Support block or landslide treatment. The composite structure can not only stabilize the upper filling, form a whole, reduce the slope of the steep slope, save the land at the bottom of the slope, increase the area of the upper site, but also prevent the entire slope from sliding down, ensuring the stability of the high filling structure and solving the problem Some problems that cannot be solved by a single retaining structure and form, more importantly, because the reinforced structure itself is a flexible structure, its characteristics determine that the composite structure has good seismic performance, and the engineering effect is remarkable.

附图说明 Description of drawings

图1是本发明的上部结构为加筋土挡墙形式的复合支挡结构示意图。 Fig. 1 is a schematic diagram of a composite retaining structure in which the superstructure of the present invention is in the form of a reinforced earth retaining wall.

图2是本发明的上部结构为加筋土边坡形式的复合支挡结构示意图。 Fig. 2 is a schematic diagram of a composite retaining structure in which the superstructure of the present invention is in the form of a reinforced soil slope.

图中:1-现浇钢筋混凝土压顶,2-预置混凝土模块,3-模块上预留的泄水孔,4-墙面后非级配碎石滤水层,5-台阶处的砼封闭层,6-抗滑桩,7-沙砾碎石垫层,8-回填土,9-加筋体结构。 In the figure: 1-cast-in-place reinforced concrete roofing, 2-prefabricated concrete modules, 3-weep holes reserved on the modules, 4-non-graded gravel water filter layer behind the wall, 5-concrete seal at the steps layer, 6-anti-slide pile, 7-gravel and gravel cushion, 8-backfill, 9-reinforced body structure.

具体实施方式 detailed description

本发明的加筋土结构和抗滑桩结合的复合结构中,所述抗滑桩所抵挡的上部填方为加筋土结构及其后部填土,加筋土结构根据其坡面坡度可分为加筋土边坡和加筋土挡墙两种结构形式。所述抗滑桩位于加筋土结构的底部墙趾或坡脚处,抵挡上部加筋土结构及其后部填土的下滑。当上部加筋土结构为加筋土挡墙结构时,所述抗滑桩位置设置在所述加筋土挡墙的墙趾位置。当上部加筋土结构为加筋土边坡结构时,所述抗滑桩位置设置在所述加筋土边坡的坡脚位置。当上部加筋土结构为加筋土挡墙结构时,所述抗滑桩位置设置在所述加筋土挡墙的墙趾位置;当上部加筋土结构为加筋土边坡结构时,所述抗滑桩位置设置在所述加筋土边坡的坡脚位置。所述加筋土结构将上部填土整合、固结为一个相对密实的连续柔性体,防护坡体,保证该部分填土的稳定性。所述加筋土结构每层筋材均为水平铺设,上下两层筋材间的填土应做摊平并分层碾压,压实厚度0.2-0.3m,压实度应满足设计要求。 In the composite structure combining the reinforced soil structure and the anti-slide pile of the present invention, the upper filling that the anti-slide pile resists is the reinforced soil structure and its rear filling. It is divided into two structural forms: reinforced soil slope and reinforced soil retaining wall. The anti-slide pile is located at the bottom wall toe or slope toe of the reinforced soil structure, and resists the sliding of the upper reinforced soil structure and its back filling. When the upper reinforced soil structure is a reinforced soil retaining wall structure, the position of the anti-slide pile is set at the toe of the reinforced soil retaining wall. When the upper reinforced soil structure is a reinforced soil slope structure, the position of the anti-slide pile is set at the foot of the reinforced soil slope. When the upper reinforced soil structure is a reinforced soil retaining wall structure, the position of the anti-slide pile is set at the toe position of the reinforced soil retaining wall; when the upper reinforced soil structure is a reinforced soil slope structure, The position of the anti-slide pile is set at the toe of the reinforced soil slope. The reinforced soil structure integrates and consolidates the upper filling soil into a relatively compact continuous flexible body, protects the slope body, and ensures the stability of this part of the filling soil. Each layer of reinforcement in the reinforced soil structure is laid horizontally, and the fill between the upper and lower layers of reinforcement should be flattened and rolled in layers. The compacted thickness is 0.2-0.3m, and the compaction degree should meet the design requirements.

所述加筋土结构根据其坡面坡度可分为加筋土边坡和加筋土挡墙两种结构形式。所述加筋土边坡结构,坡面坡度一般为30-70°,所述加筋土边坡结构优选采用包裹式坡面结构,坡面为加筋材料分层包裹形成。 所述加筋土挡墙结构,墙面坡度为70-90°,根据墙面形式可分为有面板挡墙和无面板加筋土挡墙两种结构形式。 The reinforced soil structure can be divided into two structural forms: a reinforced soil slope and a reinforced soil retaining wall according to the gradient of the slope. The slope of the reinforced soil slope structure is generally 30-70°, and the reinforced soil slope structure preferably adopts a wrapped slope structure, and the slope is formed by layers of reinforcing materials. The reinforced soil retaining wall structure has a wall slope of 70-90°, and can be divided into two structural forms of a panel retaining wall and a reinforced soil retaining wall without a panel according to the form of the wall.

所述的有面板式加筋土挡墙优选为混凝土模块的模块式加筋土挡墙,所述模块式加筋土挡墙结构的墙顶部设置有帽石,所述帽石采用现浇钢筋混凝土结构,其厚度不得小于0.4m,宽度不得小于0.6m,飞檐宽度为0.1m。所述模块式加筋土挡墙的墙面为预置混凝土模块砌筑,所述墙面上设置向墙外坡度不小于4%的泄水孔,按上下左右每隔2-3m交错布置,折线墙背的易积水处必须设置泄水孔,所述泄水孔采用管型材料,预置于混凝土模块中。所述模块式加筋土挡墙的所述泄水孔进水侧设置有非级配碎石或砂夹卵石反滤层,厚度大于0.3m,墙背为膨胀土的反滤层,厚度不小于0.5m;所述反滤层顶部设置0.3-0.5m厚的不渗水材料封闭,在靠近地面的最低一排泄水孔的进水口下部应设置隔水层。 The panel-type reinforced earth retaining wall is preferably a modular reinforced earth retaining wall of a concrete module, and the top of the modular reinforced earth retaining wall structure is provided with a cap stone, and the cap stone adopts cast-in-place steel bars For concrete structures, the thickness shall not be less than 0.4m, the width shall not be less than 0.6m, and the cornice width shall be 0.1m. The wall surface of the modular reinforced soil retaining wall is built with pre-set concrete modules, and the wall surface is provided with drain holes with a slope of not less than 4% to the outside of the wall, arranged in a staggered manner every 2-3m from top to bottom Weep holes must be provided at the places where water easily accumulates on the back of the broken line wall, and the weep holes are made of tubular materials and pre-installed in the concrete module. The water inlet side of the drain hole of the modular reinforced soil retaining wall is provided with a filter layer of non-graded gravel or sand with pebbles, the thickness is greater than 0.3m, and the back of the wall is a filter layer of expansive soil, the thickness is not less than 0.5m m; the top of the reverse filter layer is sealed with a 0.3-0.5m thick impermeable material, and a water-resistant layer should be set at the lower part of the water inlet of the lowest drainage hole near the ground.

所述的有面板式加筋土挡墙优根据挡墙的高度,所述挡墙可设为多级挡土墙,各级平台顶部应设不小于2%的排水横坡,并用厚度不小于0.15m的C15混凝土板防护。所述无面板加筋土挡墙的墙面为筋材包裹式结构的挡墙,由加筋材料分层包裹形成。 According to the height of the retaining wall with panel type reinforced soil, the retaining wall can be set as a multi-level retaining wall, and the tops of the platforms at all levels should be provided with drainage slopes not less than 2%, and with a thickness not less than 0.15m C15 concrete slab protection. The wall surface of the reinforced earth retaining wall without a panel is a retaining wall with a reinforcement material wrapping structure, which is formed by layered reinforcement material wrapping.

所述模块式挡墙,沿墙长每隔10—20m或与其他建筑物相接处设有伸缩缝,在基底的底层变化处设有沉降缝;所述伸缩缝与沉降缝可合并设置,缝宽采用2-3cm,缝内沿墙的内、外、顶三边填塞沥青麻筋或沥青木板,塞入深度不得小于0.15m。 The modular retaining wall is provided with expansion joints every 10-20m along the length of the wall or at the joints with other buildings, and settlement joints are provided at the change of the bottom layer of the base; the expansion joints and settlement joints can be combined, The width of the joint shall be 2-3cm, and the inside, outside and top three sides of the joint shall be filled with asphalt hemp tendon or asphalt plank, and the filling depth shall not be less than 0.15m.

所述的加筋土边坡结构,加筋土边坡多采用包裹式的坡面结构,也可采用混凝土结构或其他形式进行坡面防护。所述的包裹式的坡面结构,坡面为加筋材料分层包裹形成,坡面面层一般采用装满土并封口的麻袋、编织袋或者生态袋码砌为设计坡度。 As for the reinforced soil slope structure, the reinforced soil slope mostly adopts a wrapped slope structure, and a concrete structure or other forms can also be used for slope protection. In the wrapped slope structure, the slope is formed by layers of reinforced materials, and the slope surface layer is generally made of sacks, woven bags or ecological bags filled with soil and sealed as the designed slope.

所述抗滑桩以其刚度和抗剪切能力,阻挡上部填土的下滑。上部填土为加筋土结构,土体性质已发生很大变化,填土更加稳固,土拱效应更加明显和增强,能够更加有效的阻止填土从桩间挤出、滑下,因此可相应的增大桩间距,从而减少了桩的数量,节省工程造价,缩短工期。加筋土结构结构简单,施工方便,施工所需工程设备、人员较少,结构体为柔性结构,结构整体性好,具有良好的适应变形能力,抗震性能良好,但缺乏一定的刚性,易变形。抗滑桩属于刚性结构,变形小,抗震能力差,施工难度较大。两种结构刚柔结合,可以充分发挥各自的优势,并相互补充,弥补不足之处,复合体同时具有两种结构的优势,并可降低工程造价,缩短工期。 The anti-slide pile prevents the upper part of the filling from sliding down due to its rigidity and shear resistance. The upper filling is a reinforced soil structure, the properties of the soil have changed greatly, the filling is more stable, and the soil arch effect is more obvious and enhanced, which can more effectively prevent the filling from squeezing out and sliding down between the piles, so it can be used accordingly. Increase the pile spacing, thereby reducing the number of piles, saving project cost and shortening the construction period. The reinforced soil structure is simple in structure, convenient in construction, less engineering equipment and personnel are required for construction, the structure is a flexible structure, the structure has good integrity, it has good adaptability to deformation, and good seismic performance, but it lacks certain rigidity and is easy to deform . The anti-slide pile is a rigid structure with small deformation, poor earthquake resistance, and relatively difficult construction. The combination of rigidity and flexibility of the two structures can give full play to their respective advantages and complement each other to make up for the shortcomings. The complex has the advantages of the two structures at the same time, and can reduce the project cost and shorten the construction period.

抗滑桩6是穿过滑坡体深入于滑床的桩柱,利用抗滑桩6插入滑动面以下的稳定地层对桩的抗力(锚固力)平衡滑动体的推力,增加其稳定性,支挡滑体的滑动力,当滑坡体下滑时受到抗滑桩6的阻抗,使桩前滑体达到稳定状态,起稳定边坡的作用。适用于浅层和中厚层的滑坡,是一种抗滑处理广泛采用的措施。 The anti-slide pile 6 is a pile that goes through the landslide body and goes deep into the slide bed. The anti-slide pile 6 is inserted into the stable ground below the sliding surface to balance the thrust of the sliding body (anchor force) to increase its stability and support the block. The sliding force of the sliding body is subjected to the resistance of the anti-sliding pile 6 when the sliding body slides down, so that the sliding body in front of the pile reaches a stable state and plays the role of stabilizing the slope. It is suitable for shallow and medium-thick landslides, and is a widely used measure for anti-sliding treatment.

本发明的复合支挡结构中采用的抗滑桩6应保证上部坡体不从桩顶滑出,不从桩间挤出,上部土体与桩作用会产生土拱效应,约束土体下滑和挤出。上部土体的性质特征对土拱效应影响较大,影响到桩间距的取值,从而决定抗滑桩的设置数量。桩柱间距设计以保证滑动土体不在桩间滑出为原则。上部土体采用加筋土结构,增加了土体连续性和整体性,通过分层碾压、格栅与土体颗粒的咬合固结等,使加筋土范围内的土体土颗粒更加密实、紧凑,整个加筋体形成一个连续的、密实的整体结构。连续性和整体性的加筋体结构与抗滑桩结合后能充分的发挥和提高抗滑桩的阻滑能力,可一定程度上增大桩间距,减少抗滑桩的数量,降低工程造价,缩短工期。同时,由于加筋土结构的特性,也赋予了这种复合结构良好的抗震性能,尤其适用于地震多发区的山区高填方或滑坡治理项目。 The anti-slide pile 6 adopted in the composite retaining structure of the present invention should ensure that the upper slope body does not slide out from the top of the pile, and does not squeeze out from between the piles. extrude. The properties and characteristics of the upper soil have a great influence on the soil arching effect, which affects the value of the pile spacing, thus determining the number of anti-slide piles. The pile spacing design is based on the principle of ensuring that the sliding soil does not slip out between the piles. The upper soil body adopts reinforced soil structure, which increases the continuity and integrity of the soil body. Through layered rolling, grid and soil particle occlusal consolidation, etc., the soil particles within the reinforced soil range are more dense. , compact, the entire reinforced body forms a continuous, dense overall structure. The combination of the continuous and integral reinforced body structure and the anti-slide pile can fully exert and improve the anti-slide ability of the anti-slide pile, increase the distance between piles to a certain extent, reduce the number of anti-slide piles, and reduce the project cost. Shorten the construction period. At the same time, due to the characteristics of the reinforced soil structure, this composite structure is endowed with good seismic performance, especially suitable for mountainous high fill or landslide control projects in earthquake-prone areas.

在高填方边坡中合理的将加筋土结构和抗滑桩两者结合,有利于在保证安全的前提下,降低工程造价、缩短工期、减少施工难度等。该类复合结构既保证了斜坡上的高填方土体结构的稳定,又使填方结构物具有很好的抗震性能,并降低工程的施工难度和费用,具有很好的实用价值。 Reasonable combination of reinforced soil structure and anti-slide piles in high fill slope is conducive to reducing project cost, shortening construction period and reducing construction difficulty under the premise of ensuring safety. This type of composite structure not only ensures the stability of the high-fill soil structure on the slope, but also makes the fill structure have good seismic performance, and reduces the difficulty and cost of engineering construction, which has good practical value.

上面所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的构思和范围进行限定,在不脱离本发明设计构思的前提下,本领域中普通工程技术人员对本发明的技术方案作出的各种变型和改进,均应落入本发明的保护范围,本发明请求保护的技术内容,已经全部记载在权利要求书中。 The above-described embodiments are only described to the preferred implementation of the present invention, and are not intended to limit the concept and scope of the present invention. Various modifications and improvements made should fall within the protection scope of the present invention, and the technical content claimed in the present invention has been fully recorded in the claims.

Claims (7)

1.一种加筋土结构和抗滑桩结合的复合支挡结构,其特征在于,所述复合支挡结构中,抗滑桩所抵挡的上部填方为加筋土结构及其后部填土,所述加筋土结构,通过分层碾压、格栅与土体颗粒的咬合固结,使加筋土结构体范围内的土体土颗粒更加密实、紧凑,整个加筋土结构形成一个连续的、密实的整体结构,防护坡体,保证该部分填土的稳定性;所述抗滑桩位于加筋土结构的底部墙趾或坡脚处,以所述抗滑桩的刚度和抗剪切能力,抵挡上部加筋土结构及其后部填土的下滑;其中,所述加筋土结构根据其坡面坡度可分为加筋土边坡和加筋土挡墙两种结构形式;所述加筋土边坡结构,坡面坡度一般为 30-70°,所述加筋土边坡结构采用包裹式坡面结构,坡面为加筋材料分层包裹形成;所述加筋土挡墙结构,墙面坡度为 70-90°,根据墙面形式分为有面板加筋土挡墙和无面板加筋土挡墙两种结构形式;其中所述加筋土结构每层筋材均为水平铺设,上下两层筋材间的填土应做摊平并分层碾压,压实厚度0.2-0.3m,压实度应满足设计要求;有面板加筋土挡墙为混凝土模块的模块式加筋土挡墙,所述模块式加筋土挡墙结构的墙顶部设置有帽石,所述帽石采用现浇钢筋混凝土结构,其厚度不得小于0.4m,宽度不得小于0.6m,飞檐宽度为0.1m;所述加筋土结构的底部设有沙砾碎石垫层。 1. A composite retaining structure combined with a reinforced soil structure and anti-slide piles, characterized in that, in the composite retaining structure, the upper fill that the anti-slide piles resist is a reinforced soil structure and its rear fill Soil, the reinforced soil structure, through layered rolling and occlusal consolidation of grids and soil particles, makes the soil soil particles within the scope of the reinforced soil structure more dense and compact, and the entire reinforced soil structure is formed A continuous and dense overall structure, the protective slope body, ensures the stability of this part of the fill; the anti-slide pile is located at the bottom wall toe or slope toe of the reinforced soil structure, and the stiffness and the slope of the anti-slide pile Anti-shear ability, resisting the sliding of the upper reinforced soil structure and its backfill; wherein, the reinforced soil structure can be divided into two structures: reinforced soil slope and reinforced soil retaining wall according to its slope gradient Form; the slope of the reinforced soil slope structure is generally 30-70°, and the reinforced soil slope structure adopts a wrapped slope structure, and the slope surface is formed by layering and wrapping reinforced materials; Reinforced soil retaining wall structure, the slope of the wall is 70-90°, according to the form of the wall, it is divided into two structural forms: a reinforced soil retaining wall with a panel and a reinforced soil retaining wall without a panel; wherein each layer of the reinforced soil structure The reinforcements are all laid horizontally, and the filling between the upper and lower layers of reinforcements should be flattened and rolled in layers, with a compacted thickness of 0.2-0.3m, and the degree of compaction should meet the design requirements; The modular reinforced earth retaining wall of the concrete module, the top of the wall of the modular reinforced earth retaining wall structure is provided with a capstone, and the capstone adopts a cast-in-place reinforced concrete structure, and its thickness shall not be less than 0.4m, and its width shall not be less than 0.6m, and the width of the cornice is 0.1m; the bottom of the reinforced soil structure is provided with a cushion of sand and gravel. 2.如权利要求 1 所述的复合支挡结构,其中所述无面板加筋土挡墙的墙面为筋材包裹式结构的挡墙,由加筋材料分层包裹形成。 2. The composite retaining structure according to claim 1, wherein the wall surface of the reinforced earth retaining wall without faceplate is a retaining wall of a structure wrapped with reinforcement materials, which is formed by layers of reinforcement materials. 3.如权利要求 1 所述的复合支挡结构,其中所述模块式加筋土挡墙的墙面为预置混凝土模块砌筑,所述墙面上设置向墙外坡度不小于 4%的泄水孔,按上下左右每隔 2-3m 交错布置,折线墙背的易积水处必须设置泄水孔,所述泄水孔采用管型材料,预置于混凝土模块中。 3. The composite retaining structure as claimed in claim 1, wherein the wall surface of the modular reinforced earth retaining wall is built by pre-installed concrete modules, and the wall surface is provided with a slope not less than 4% to the outside of the wall. Drainage holes shall be arranged staggeredly at intervals of 2-3m from top to bottom, left and right. Drainage holes must be provided at the places where water easily accumulates on the back of the broken line wall. The drainage holes shall be made of tubular materials and pre-installed in the concrete module. 4.如权利要求 3 所述的复合支挡结构,其中所述模块式加筋土挡墙的所述泄水孔进水侧设置有非级配碎石或砂夹卵石反滤层,厚度大于0.3m,墙背为膨胀土的反滤层,厚度不小于0.5m;所述反滤层顶部设置0.3-0.5m厚的不渗水材料封闭,在靠近地面的最低一排泄水孔的进水口下部应设置隔水层。 4. The composite retaining structure as claimed in claim 3, wherein the water inlet side of the scupper hole of the modular reinforced earth retaining wall is provided with a non-graded crushed stone or a filter layer with sand and pebbles, and the thickness is greater than 0.3m , the back of the wall is a reverse filter layer of expansive soil, the thickness of which is not less than 0.5m; the top of the reverse filter layer is sealed with a 0.3-0.5m thick impermeable material, and the lower part of the water inlet of the lowest drainage hole near the ground should be installed water barrier. 5.如权利要求 1、3 或 4 所述的复合支挡结构,其中所述模块式加筋土挡墙可设为多级挡土墙,各级平台顶部应设不小于2%的排水横坡,并用厚度不小于0.15m的C15混凝土板防护。 5. The composite retaining structure as claimed in claim 1, 3 or 4, wherein the modular reinforced earth retaining wall can be set as a multi-stage retaining wall, and the top of each stage platform should be provided with a drainage horizontal wall of not less than 2%. slope, and protected by C15 concrete slabs with a thickness not less than 0.15m. 6.如权利要求 1、3或 4 所述的复合支挡结构,其中所述模块式加筋土挡墙,沿墙长每隔10—20m或与其他建筑物相接处设有伸缩缝,在基底的底层变化处设有沉降缝;所述伸缩缝与沉降缝合并设置,缝宽采用2-3cm,缝内沿墙的内、外、顶三边填塞沥青麻筋或沥青木板,塞入深度不得小于0.15m。 6. The composite retaining structure as claimed in claim 1, 3 or 4, wherein the modular reinforced earth retaining wall is provided with expansion joints at intervals of 10-20m along the length of the wall or at the joints with other buildings, Settlement joints are set at the bottom of the base; the expansion joints and settlement joints are set together, the joint width is 2-3cm, and the inner, outer and top three sides of the wall are filled with asphalt hemp tendons or asphalt planks in the joints. The depth shall not be less than 0.15m. 7.如权利要求 1 所述的复合支挡结构,当上部加筋土结构为加筋土挡墙结构时,所述抗滑桩位置设置在所述加筋土挡墙的墙趾位置;当上部加筋土结构为加筋土边坡结构时,所述抗滑桩位置设置在所述加筋土边坡的坡脚位置。 7. The composite retaining structure as claimed in claim 1, when the upper reinforced soil structure is a reinforced soil retaining wall structure, the position of the anti-slide pile is set at the toe position of the reinforced soil retaining wall; when When the upper reinforced soil structure is a reinforced soil slope structure, the position of the anti-slide pile is set at the foot of the reinforced soil slope.
CN201310734532.3A 2013-12-27 2013-12-27 The compound retaining structure that a kind of earth structure and friction pile combine Active CN103806453B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310734532.3A CN103806453B (en) 2013-12-27 2013-12-27 The compound retaining structure that a kind of earth structure and friction pile combine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310734532.3A CN103806453B (en) 2013-12-27 2013-12-27 The compound retaining structure that a kind of earth structure and friction pile combine

Publications (2)

Publication Number Publication Date
CN103806453A CN103806453A (en) 2014-05-21
CN103806453B true CN103806453B (en) 2016-08-17

Family

ID=50703805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310734532.3A Active CN103806453B (en) 2013-12-27 2013-12-27 The compound retaining structure that a kind of earth structure and friction pile combine

Country Status (1)

Country Link
CN (1) CN103806453B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790428B (en) * 2015-04-08 2017-02-01 贵州建工集团第一建筑工程有限责任公司 Ultrahigh integral steel-plastic grid reinforced earth abutment retaining wall structure and construction method thereof
CN107604940A (en) * 2017-09-22 2018-01-19 西南交通大学 A kind of steel pipe grid Expansive Soils Retaining Wall and its construction method
CN107882062A (en) * 2017-11-30 2018-04-06 中国冶集团有限公司 Massif hillside fields is based on gravity type and the compound Retaining wall method of Fill Reinforced With Geogrids
CN108166524A (en) * 2018-01-23 2018-06-15 湖南工业大学 Administer a wide range of, engineering method of tall earth fill and its thin-walled box type retaining wall
CN108978704A (en) * 2018-08-14 2018-12-11 中国十七冶集团有限公司 A kind of reinforced soil retaining wall and its construction method
CN110042848A (en) * 2019-04-25 2019-07-23 马钢集团矿业有限公司 A kind of reconstruction Artificial Side-slope method of openpit impervious consolidation
CN110820772A (en) * 2019-11-21 2020-02-21 中国长江三峡集团有限公司 A kind of combined reinforcement method and construction technology of anti-sliding piles and structural cementation for side slopes of granular accumulation
CN114277777B (en) * 2021-11-24 2023-07-28 中铁二院工程集团有限责任公司 Reinforced pile plate wall based on coordinated deformation and design and construction method thereof
CN117488833A (en) * 2023-10-25 2024-02-02 北京交通大学 A protective device for unstable slopes with overlying rock layers in high-cold areas
CN117822645B (en) * 2024-02-20 2026-06-09 中钢集团马鞍山矿山研究总院股份有限公司 Reinforcing treatment method suitable for double-structure-surface combined damaged road slope of strip mine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201330404Y (en) * 2008-12-25 2009-10-21 归真 Anti-displacement retaining wall
CN101851928A (en) * 2010-06-08 2010-10-06 中国科学院地质与地球物理研究所 Improvement and protection method of collapsible loess slope engineering
CN202416329U (en) * 2011-12-21 2012-09-05 中铁第四勘察设计院集团有限公司 Retaining structure of combined reinforced soil pile wall
CN202559376U (en) * 2012-04-28 2012-11-28 浙江润业建设有限公司 Near-river municipal administration road structure below viaduct bridge
CN203174626U (en) * 2012-12-05 2013-09-04 青岛旭域土工材料股份有限公司 Geogrid reinforced wall
CN103410167A (en) * 2013-08-29 2013-11-27 深圳市福田建安建设集团有限公司 Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201330404Y (en) * 2008-12-25 2009-10-21 归真 Anti-displacement retaining wall
CN101851928A (en) * 2010-06-08 2010-10-06 中国科学院地质与地球物理研究所 Improvement and protection method of collapsible loess slope engineering
CN202416329U (en) * 2011-12-21 2012-09-05 中铁第四勘察设计院集团有限公司 Retaining structure of combined reinforced soil pile wall
CN202559376U (en) * 2012-04-28 2012-11-28 浙江润业建设有限公司 Near-river municipal administration road structure below viaduct bridge
CN203174626U (en) * 2012-12-05 2013-09-04 青岛旭域土工材料股份有限公司 Geogrid reinforced wall
CN103410167A (en) * 2013-08-29 2013-11-27 深圳市福田建安建设集团有限公司 Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method

Also Published As

Publication number Publication date
CN103806453A (en) 2014-05-21

Similar Documents

Publication Publication Date Title
CN103410167B (en) Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN103669399B (en) Concrete slab reinforced soil retaining wall and construction method thereof
AU2016221315B2 (en) A retaining wall method of precast block to prevent landslide
CN204849509U (en) Highway roadbed structure of antidetonation sand prevention
CN111119229A (en) Multi-stage reinforced retaining wall comprehensive protection system suitable for large-scale waste slag yard and stability checking and calculating method and construction method thereof
CN105155558A (en) Combined retaining structure and construction method thereof
CN114703875B (en) Wave-shaped reinforced earth retaining structure for high and steep artificial slopes and its construction method
CN103806453A (en) Reinforced soil structure and slide-resistant pile combined composite retaining structure
CN111778793A (en) A cavity collapse prevention structure and construction method
CN115492160B (en) Full-flexible composite reinforced earth retaining wall structure in half-excavated and half-filled area and construction method thereof
CN109371919A (en) The native stone water-retaining structure of seepage prevention of core wall
CN112195965A (en) Expansive soil cutting retaining wall
CN113373949B (en) Protective structure for expansive soil slope and construction method
CN110080282A (en) A kind of self-anchored type band tooth grid reinforced retaining wall structure and its reinforcement means
CN106567404A (en) Expansive soil cutting semi-rigid top retaining wall design and construction method
CN202170498U (en) Reinforced concrete pile dike
CN111622240A (en) Trapezoidal toe-added drainage slide-resistant pile and construction method thereof
CN207646754U (en) A kind of pile body penetration type bankets body reinforcement bearing structure
CN207211063U (en) anti-scour embankment
CN212223948U (en) A comprehensive protection system for multi-level reinforced soil retaining walls suitable for large-scale spoil fields
CN109252541A (en) A kind of combination assembled supporting and retaining system construction
CN109653240B (en) Urban residual soil heaping body in ecological restoration engineering and construction method thereof
CN115710887B (en) Method for reinforcing asphalt core wall dam body located on deep coverage layer
CN107761668A (en) A kind of strand Bin Ku makes ground type bank protection structure and its construction process
CN219604048U (en) Existing railway high-filling roadbed widening structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA ELECTRIC POWER CONSTRUCTION GROUP NORTHWEST

Effective date: 20150113

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xia Fei

Inventor after: Lei Yongzhi

Inventor after: Chu Jingying

Inventor after: Tu Chuan

Inventor after: Kang Zhiming

Inventor after: Yang Guangqing

Inventor after: Wang Xulong

Inventor after: Zhao Gezhou

Inventor after: Zhou Yitao

Inventor after: Dai Zhengjie

Inventor after: Zhou Kai

Inventor after: Chen Lili

Inventor before: Xia Fei

Inventor before: Wang Xulong

Inventor before: Dai Zhengjie

Inventor before: Chen Lili

Inventor before: Chu Jingying

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: XIA FEI WANG XULONG DAI ZHENGJIE CHEN LILI CHU JINGYING TO: XIA FEI KANG ZHIMING YANG GUANGQING WANG XULONG ZHAO YIZHOU ZHOU YITAO DAI ZHENGJIE ZHOU KAI CHEN LILI LEI YONGZHI CHU JINGYING TU CHUAN

TA01 Transfer of patent application right

Effective date of registration: 20150113

Address after: 266000 Shandong Province, Qingdao city Chengyang District Green Industrial Park

Applicant after: Qingdao BOSTD Geosynthetics Ltd.

Applicant after: Co., Ltd of northwest survey and design research institute of electricity Jian group of China

Address before: 266000 Shandong Province, Qingdao city Chengyang District Green Industrial Park

Applicant before: Qingdao BOSTD Geosynthetics Ltd.

C14 Grant of patent or utility model
GR01 Patent grant