CN103803394A - 混凝土井塔外套装竖立大型箱型钢结构井架的起吊方法 - Google Patents
混凝土井塔外套装竖立大型箱型钢结构井架的起吊方法 Download PDFInfo
- Publication number
- CN103803394A CN103803394A CN201410057433.0A CN201410057433A CN103803394A CN 103803394 A CN103803394 A CN 103803394A CN 201410057433 A CN201410057433 A CN 201410057433A CN 103803394 A CN103803394 A CN 103803394A
- Authority
- CN
- China
- Prior art keywords
- headframe
- oblique frame
- cement concrete
- frame
- foot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 22
- 239000010959 steel Substances 0.000 title claims abstract description 22
- 239000004568 cement Substances 0.000 claims description 58
- 239000000725 suspension Substances 0.000 claims description 30
- 238000003032 molecular docking Methods 0.000 claims description 7
- 238000010168 coupling process Methods 0.000 claims description 4
- 238000005859 coupling reaction Methods 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 4
- 230000001808 coupling Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 3
- 230000000087 stabilizing Effects 0.000 abstract 2
- 238000010586 diagram Methods 0.000 description 8
- OKTJSMMVPCPJKN-UHFFFAOYSA-N carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 2
- 239000003245 coal Substances 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 230000002860 competitive Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410057433.0A CN103803394B (zh) | 2014-02-20 | 2014-02-20 | 混凝土井塔外套装竖立大型箱型钢结构井架的起吊方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410057433.0A CN103803394B (zh) | 2014-02-20 | 2014-02-20 | 混凝土井塔外套装竖立大型箱型钢结构井架的起吊方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103803394A true CN103803394A (zh) | 2014-05-21 |
CN103803394B CN103803394B (zh) | 2015-11-18 |
Family
ID=50700853
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410057433.0A Active CN103803394B (zh) | 2014-02-20 | 2014-02-20 | 混凝土井塔外套装竖立大型箱型钢结构井架的起吊方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103803394B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104499432A (zh) * | 2014-10-14 | 2015-04-08 | 中铁四局集团钢结构有限公司 | 曲面斜塔空中对接万能移动平台施工方法 |
CN104555756A (zh) * | 2015-01-26 | 2015-04-29 | 唐山开滦建设(集团)有限责任公司 | 单桅杆单滑轮组起吊井架及其施工方法 |
CN106695151A (zh) * | 2017-03-17 | 2017-05-24 | 铜陵有色建安钢构有限责任公司 | 箱型井架的安装方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4744710A (en) * | 1986-11-24 | 1988-05-17 | Parco Mast And Substructures | Drilling derrick with external pipe storage |
CN101581198A (zh) * | 2009-04-25 | 2009-11-18 | 中煤第七十一工程处 | 箱型井架空中吊装对接方法 |
EP2243922A2 (en) * | 2009-04-13 | 2010-10-27 | Services Pétroliers Schlumberger | Spooled device guide system |
CN101922257A (zh) * | 2010-08-06 | 2010-12-22 | 中煤第三建设公司机电安装工程处 | 三付抱杆“一”字形站位竖立井架 |
US20100326672A1 (en) * | 2007-02-23 | 2010-12-30 | Atwood Oceanics, Inc. | Simultaneous tubular handling system |
EP2336481A1 (en) * | 2009-12-21 | 2011-06-22 | Soilmec S.p.A. | Multifunction machine adaptable for drilling, boring and lifting |
CN201874475U (zh) * | 2010-11-23 | 2011-06-22 | 宝鸡石油机械有限责任公司 | 低位安装套装型井架 |
CN202144681U (zh) * | 2011-07-19 | 2012-02-15 | 煤炭工业济南设计研究院有限公司 | 一种橹式钢井架 |
CN102910532A (zh) * | 2012-05-23 | 2013-02-06 | 中煤第三建设(集团)有限责任公司 | 大型箱型井架空中对接起吊方法 |
-
2014
- 2014-02-20 CN CN201410057433.0A patent/CN103803394B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4744710A (en) * | 1986-11-24 | 1988-05-17 | Parco Mast And Substructures | Drilling derrick with external pipe storage |
US20100326672A1 (en) * | 2007-02-23 | 2010-12-30 | Atwood Oceanics, Inc. | Simultaneous tubular handling system |
US8186455B2 (en) * | 2007-02-23 | 2012-05-29 | Atwood Oceanics, Inc. | Simultaneous tubular handling system and method |
EP2243922A2 (en) * | 2009-04-13 | 2010-10-27 | Services Pétroliers Schlumberger | Spooled device guide system |
CN101581198A (zh) * | 2009-04-25 | 2009-11-18 | 中煤第七十一工程处 | 箱型井架空中吊装对接方法 |
EP2336481A1 (en) * | 2009-12-21 | 2011-06-22 | Soilmec S.p.A. | Multifunction machine adaptable for drilling, boring and lifting |
CN101922257A (zh) * | 2010-08-06 | 2010-12-22 | 中煤第三建设公司机电安装工程处 | 三付抱杆“一”字形站位竖立井架 |
CN201874475U (zh) * | 2010-11-23 | 2011-06-22 | 宝鸡石油机械有限责任公司 | 低位安装套装型井架 |
CN202144681U (zh) * | 2011-07-19 | 2012-02-15 | 煤炭工业济南设计研究院有限公司 | 一种橹式钢井架 |
CN102910532A (zh) * | 2012-05-23 | 2013-02-06 | 中煤第三建设(集团)有限责任公司 | 大型箱型井架空中对接起吊方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104499432A (zh) * | 2014-10-14 | 2015-04-08 | 中铁四局集团钢结构有限公司 | 曲面斜塔空中对接万能移动平台施工方法 |
CN104555756A (zh) * | 2015-01-26 | 2015-04-29 | 唐山开滦建设(集团)有限责任公司 | 单桅杆单滑轮组起吊井架及其施工方法 |
CN104555756B (zh) * | 2015-01-26 | 2016-08-24 | 唐山开滦建设(集团)有限责任公司 | 单桅杆单滑轮组起吊井架及其施工方法 |
CN106695151A (zh) * | 2017-03-17 | 2017-05-24 | 铜陵有色建安钢构有限责任公司 | 箱型井架的安装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103803394B (zh) | 2015-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105604334B (zh) | 一种用于大跨度钢桁架整体安装的快速施工方法 | |
CN103967284B (zh) | 预留柱头对接的钢柱安装方法 | |
CN204185120U (zh) | 移动式设备就位小车 | |
CN205778918U (zh) | 黄土隧道开挖及初支模筑混凝土施工复合式台车 | |
CN103803394B (zh) | 混凝土井塔外套装竖立大型箱型钢结构井架的起吊方法 | |
CN102910532B (zh) | 大型箱型井架空中对接起吊方法 | |
CN103194977B (zh) | 运架一体式架桥机架设首孔箱梁前导梁机就位方法 | |
CN104989111A (zh) | 钢结构高层吊装施工方法 | |
CN109081247A (zh) | 一种连廊大跨度钢梁的吊装方法 | |
CN204000830U (zh) | 分节接管式砂井机 | |
CN102251483A (zh) | 自提升附着式吊机吊装钢管混凝土格构桥墩的施工方法 | |
CN103147406B (zh) | 一种小曲线穿越山岭隧道箱梁运架一体机及其首末孔箱梁架设方法 | |
CN203113793U (zh) | 一种倾斜结构大模板安装系统 | |
CN104110002A (zh) | 一种更换钢桁梁桥桥面板的方法 | |
CN205382488U (zh) | 一种水工混凝土坝体专用模板 | |
CN105019664A (zh) | 箱房式电气室的高空滑移安装法 | |
CN103669882A (zh) | 工业厂房内利用钢丝绳做轨道进行构件安装的方法 | |
CN206654647U (zh) | 一种钢丝绳平衡系统 | |
CN205241086U (zh) | 模板吊装和安拆用炮车 | |
CN105625732B (zh) | 超高悬挑钢结构桁架无支撑施工方法 | |
CN204983692U (zh) | 一种混凝土墙板的吊装装置 | |
CN101858165B (zh) | 塔桅结构分段套装、穿心抽出式整体安装技术 | |
CN209353734U (zh) | 用于安装幕墙的双轨道装置 | |
CN203320922U (zh) | 电梯井模板定型支撑装置 | |
CN204199691U (zh) | 一种螺旋楼梯的扶手浇筑模板结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Jue Shengli Inventor after: Wu Xiangdong Inventor after: Yu Feng Inventor after: Li Hongbin Inventor after: Ji Hui Inventor after: Chou Min Inventor after: Wu Shiquan Inventor before: Jue Shengli Inventor before: Wu Xiangdong Inventor before: Ji Hui Inventor before: Chou Min Inventor before: Wu Shiquan |