CN103774692A - 一种管节接头处预应力钢束剪断装置及方法 - Google Patents

一种管节接头处预应力钢束剪断装置及方法 Download PDF

Info

Publication number
CN103774692A
CN103774692A CN201310631739.8A CN201310631739A CN103774692A CN 103774692 A CN103774692 A CN 103774692A CN 201310631739 A CN201310631739 A CN 201310631739A CN 103774692 A CN103774692 A CN 103774692A
Authority
CN
China
Prior art keywords
pipe
prestressed steel
shaped
tube
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310631739.8A
Other languages
English (en)
Other versions
CN103774692B (zh
Inventor
杨绍斌
刘经国
刘全
杨永宏
周光强
罗霜
吕杰元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Fourth Harbor Engineering Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Fourth Harbor Engineering Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Fourth Harbor Engineering Co Ltd, China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd, No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201310631739.8A priority Critical patent/CN103774692B/zh
Publication of CN103774692A publication Critical patent/CN103774692A/zh
Application granted granted Critical
Publication of CN103774692B publication Critical patent/CN103774692B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及沉管隧道领域,特别涉及一种管节接头处预应力钢束剪断装置及方法,该剪断装置包括U型管,所述U型管绕过预应力钢束并与沉管内的钢筋固定。进一步地,所述U型管内预留钢丝。该剪断方法是采用该剪断装置所进行的方法,本发明设置U型管绕过预应力钢束,链锯可沿该U型管的管道绕过预应力钢束并切割预应力钢束,该结构简单,易于操作,可降低钢束剪断时对沉管内的钢筋的破坏性,并提高工作效率。

Description

一种管节接头处预应力钢束剪断装置及方法
技术领域
本发明涉及沉管隧道领域,尤其涉及一种管节接头处预应力钢束剪断装置及方法。
背景技术
港珠澳大桥海底隧道沉管预制,每标准管节长约200m,由多个节段依次预制成型,每节段长约22m。在管节浮运和沉放前,需通过体内临时预应力张拉,使各节段纵向连为一个整体。待管节沉放到位、管顶回填完成后一段时间,经设计方确认后将节段接头处的临时预应力钢束剪断,释放预应力,使节段接头成为可适应一定变形的柔性接头。
预应力剪断通常做法是在预应力剪断点处设置一个截面约20*40cm2的洞室5,直接对预应力钢束进行切除作业,如图1和图2所示,但是洞室埋设操作不便,对周围沉管内的钢筋破坏较大,且剪断时安全风险大,剪断后对洞室封堵工作量大。
发明内容
(一)要解决的技术问题
本发明的目的是提供一种管节接头处预应力钢束剪断装置及方法,以降低钢束剪断时对沉管内的钢筋的破坏性,并提高工作效率。
(二)技术方案
为了解决上述技术问题,本发明提供了一种管节接头处预应力钢束剪断装置,其包括U型管,所述U型管绕过预应力钢束并与沉管内的钢筋固定。
进一步地,所述U型管内预留钢丝。
进一步地,所述U型管为100-150°的弯管。
进一步地,所述U型管为135°的弯管。
进一步地,所述U型管为塑料管。
进一步地,所述U型管的管口处采用可插拔的封堵件进行封堵。
进一步地,所述U型管的直径为5-7cm。
本发明还提供一种管节接头处预应力钢束剪断方法,其包括以下步骤:
S1、将U型管绕过预应力钢束并与沉管内的钢筋固定;
S2、拔出U型管管口处的封堵件,链锯绕过所述U型管的管道切割预应力钢束;
S3、预应力钢束被切断后,退出链锯,往所述U型管内灌浆封堵。
进一步地,所述U型管的管道内预埋有钢丝,所述钢丝用于引导所述链锯绕过所述U型管
(三)有益效果
本发明提供的一种管节接头处预应力钢束剪断装置及方法,设置U型管绕过预应力钢束,链锯可沿该U型管的管道绕过预应力钢束并切割预应力钢束,该结构简单,易于操作,可降低钢束剪断时对沉管内的钢筋的破坏性,并提高工作效率。
附图说明
图1为现有技术预应力钢束剪断的工作原理图;
图2为图1中A-A向视图;
图3为本发明预应力钢束剪断的工作原理图;
图4为图3中B-B向视图。
图中:1、已安管节;2、待安管节;3、预应力钢束;4、止水带;5、洞室;6、U型管。
具体实施方式
下面结合附图和实施例,对本发明的具体实施方式作进一步详细描述。以下实施例用于说明本发明,但不用来限制本发明的范围。
如图3和图4所示,本发明的一种管节接头处预应力钢束剪断装置,其包括U型管6,U型管6绕过预应力钢束3并与沉管内的钢筋固定。
U型管内预留钢丝,用于引导链锯绕过预应力钢束剪断钢束。
本实施例的U型管为100-150°的弯管。优选地,U型管为135°的弯管。该U型管的作用是:①可实现钢筋笼内分段安装,便于施工;②弯度变化较小,管道线形变化近似圆弧形,后期切割损伤混凝土截面较小。优选地,U型管为PE塑料管。
U型管的管口处采用可插拔的封堵件进行封堵,该封堵件类似瓶塞,可由弹性材料或刚性材料制成,可插拔的目的是:一方面是防止钢筋笼浇注混凝土过程中被堵塞,另一方面为了方便打开管口使得链锯沿管道进入以切割预应力钢束。
U型管的直径为5-7cm,小直径的U型管便于后期的封堵。
本发明还涉及上述技术方案所提供的管节接头处预应力钢束剪断装置的剪断方法,其包括以下步骤:
S1、将U型管绕过预应力钢束并与沉管内的钢筋固定;
S2、拔出U型管管口处的封堵件,链锯绕过U型管的管道切割预应力钢束;具体地,U型管6的管道内预埋有钢丝,该钢丝用于引导所述链锯绕过所述U型管;
S3、预应力钢束被切断后,退出链锯,往U型管6内灌浆封堵。
如图4所示,E1为链锯刚开始切割预应力钢束时所处的位置,E2为切断预应力钢束后链锯所处的位置。
上述的管节接头处预应力钢束剪断装置及方法,设置U型管绕过预应力钢束,钢筋笼混凝土浇注时,采用封堵件堵塞管口,切割预应力钢束时,拔出该封堵件,链锯在U型管内设置的钢丝的引导下,链锯沿着U型管的管道绕过预应力钢束,此时,链锯转动切断预应力钢束,由于U型管绕过预应力钢束,使得在剪断预应力钢束时,不会割伤钢筋,且对混凝土割除的端面较小,在钢束被剪断后再U型管的管道内灌浆封堵。本发明结构简单,易于操作,可降低钢束剪断时对沉管内的钢筋的破坏性,并提高工作效率。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和替换,这些改进和替换也应视为本发明的保护范围。

Claims (9)

1.一种管节接头处预应力钢束剪断装置,其特征在于,包括U型管,所述U型管绕过预应力钢束并与沉管内的钢筋固定。
2.如权利要求1所述的管节接头处预应力钢束剪断装置,其特征在于,所述U型管内预留钢丝。
3.如权利要求1所述的管节接头处预应力钢束剪断装置,其特征在于,所述U型管为100-150°的弯管。
4.如权利要求3所述的管节接头处预应力钢束剪断装置,其特征在于,所述U型管为135°的弯管。
5.如权利要求1所述的管节接头处预应力钢束剪断装置,其特征在于,所述U型管为塑料管。
6.如权利要求1所述的管节接头处预应力钢束剪断装置,其特征在于,所述U型管的管口处采用可插拔的封堵件进行封堵。
7.如权利要求1-6任一项所述的管节接头处预应力钢束剪断装置,其特征在于,所述U型管的直径为5-7cm。
8.一种管节接头处预应力钢束剪断方法,其特征在于,包括以下步骤:
S1、将U型管绕过预应力钢束并与沉管内的钢筋固定;
S2、拔出U型管管口处的封堵件,链锯绕过所述U型管的管道切割预应力钢束;
S3、预应力钢束被切断后,退出链锯,往所述U型管内灌浆封堵。
9.如权利要求8所述的管节接头预应力钢束剪断方法,其特征在于,所述U型管的管道内预埋有钢丝,所述钢丝用于引导所述链锯绕过所述U型管。
CN201310631739.8A 2013-11-29 2013-11-29 一种管节接头处预应力钢束剪断装置及方法 Active CN103774692B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310631739.8A CN103774692B (zh) 2013-11-29 2013-11-29 一种管节接头处预应力钢束剪断装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310631739.8A CN103774692B (zh) 2013-11-29 2013-11-29 一种管节接头处预应力钢束剪断装置及方法

Publications (2)

Publication Number Publication Date
CN103774692A true CN103774692A (zh) 2014-05-07
CN103774692B CN103774692B (zh) 2016-02-03

Family

ID=50567403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310631739.8A Active CN103774692B (zh) 2013-11-29 2013-11-29 一种管节接头处预应力钢束剪断装置及方法

Country Status (1)

Country Link
CN (1) CN103774692B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447784A (zh) * 2017-08-30 2017-12-08 中交公路规划设计院有限公司 一种预应力管节构造及其施工方法
CN116084458A (zh) * 2022-12-27 2023-05-09 中交天津港湾工程研究院有限公司 一种沉管隧道柔性管节钢绞线剪断时机及顺序的确定方法
CN116927203A (zh) * 2023-07-27 2023-10-24 中交第一航务工程局有限公司 沉管预应力钢绞线切断管及其施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164590A (ja) * 1999-12-06 2001-06-19 Sumitomo Rubber Ind Ltd 可撓ゴム継手
JP2003064709A (ja) * 2001-08-28 2003-03-05 Ishikawajima Harima Heavy Ind Co Ltd 沈埋函の継手構造及びそれに用いる止水材
JP2004285578A (ja) * 2003-03-19 2004-10-14 Nippon Steel Corp 沈埋函の最終函および最終接合工法
CN202689040U (zh) * 2012-05-25 2013-01-23 中铁十八局集团有限公司 一种大型沉管隧道钢端封墙结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164590A (ja) * 1999-12-06 2001-06-19 Sumitomo Rubber Ind Ltd 可撓ゴム継手
JP2003064709A (ja) * 2001-08-28 2003-03-05 Ishikawajima Harima Heavy Ind Co Ltd 沈埋函の継手構造及びそれに用いる止水材
JP2004285578A (ja) * 2003-03-19 2004-10-14 Nippon Steel Corp 沈埋函の最終函および最終接合工法
CN202689040U (zh) * 2012-05-25 2013-01-23 中铁十八局集团有限公司 一种大型沉管隧道钢端封墙结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨绍斌等: "自动化生产线在港珠澳大桥沉管预制中的运用", 《中国港湾建设》, no. 3, 30 June 2013 (2013-06-30), pages 66 - 70 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447784A (zh) * 2017-08-30 2017-12-08 中交公路规划设计院有限公司 一种预应力管节构造及其施工方法
CN116084458A (zh) * 2022-12-27 2023-05-09 中交天津港湾工程研究院有限公司 一种沉管隧道柔性管节钢绞线剪断时机及顺序的确定方法
CN116084458B (zh) * 2022-12-27 2025-09-09 中交天津港湾工程研究院有限公司 一种沉管隧道柔性管节钢绞线剪断时机及顺序的确定方法
CN116927203A (zh) * 2023-07-27 2023-10-24 中交第一航务工程局有限公司 沉管预应力钢绞线切断管及其施工方法
CN116927203B (zh) * 2023-07-27 2026-02-03 中交第一航务工程局有限公司 沉管预应力钢绞线切断管及其施工方法

Also Published As

Publication number Publication date
CN103774692B (zh) 2016-02-03

Similar Documents

Publication Publication Date Title
CN101384774B (zh) 用于对建筑或土木工程的拉索之类进行防火的装置
CN103774692B (zh) 一种管节接头处预应力钢束剪断装置及方法
CN203233131U (zh) 线缆保护套
BR0112053B1 (pt) conduto tubular flexÍvel.
CN204491425U (zh) 一种t型桥梁横隔板的体外预应力加固结构
CN108333109A (zh) 一种混凝土结构内部裂缝监测装置及方法
CN206052548U (zh) 一种公路桥梁施工用预应力锚具
CN108316318A (zh) 一种适用于岩质边坡支护锚索注浆止浆装置及其使用方法
CN205954622U (zh) 用于后张法抗浮锚杆的止水装置
CN205349414U (zh) 一种隧道施工事故中的快速逃生装置
CN203879516U (zh) 隧道注浆模型试验分序次分段注浆装置
CN205955759U (zh) 一种锁脚锚管机械连接定位装置
CN203593530U (zh) 吊车梁曲线预应力组合波纹管
CN202474788U (zh) 一种电缆管口封堵装置
CN203334285U (zh) 一种地下混凝土结构工程接缝防水预备注浆系统
CN201474306U (zh) 卸料平台吊环装置
CN204720895U (zh) 一种电缆敷设辅助装置
CN102522718A (zh) 一种利用迪尼玛绳将电缆穿入保护管的方法
CN202125678U (zh) 一种hdpe增强牵引管
CN214944333U (zh) 一种隧道管棚堵水注浆装置
CN211735353U (zh) 一种便于地铁盾构穿越的地下连续墙结构
CN103114723B (zh) 一种固定模板用装置的使用方法
CN107447991B (zh) 下弦钢管内预应力拱架节点的施工方法
CN104005340A (zh) 连续梁通长预应力钢绞线束穿束施工方法
CN204783057U (zh) 一种隧道钢拱架的u形纵向连接装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant