CN103741588B - 板梁桥的预制箱梁横向预应力钢筋安装结构 - Google Patents

板梁桥的预制箱梁横向预应力钢筋安装结构 Download PDF

Info

Publication number
CN103741588B
CN103741588B CN201310747227.8A CN201310747227A CN103741588B CN 103741588 B CN103741588 B CN 103741588B CN 201310747227 A CN201310747227 A CN 201310747227A CN 103741588 B CN103741588 B CN 103741588B
Authority
CN
China
Prior art keywords
prefabricated case
strength wire
prefabricated
girder bridge
case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310747227.8A
Other languages
English (en)
Other versions
CN103741588A (zh
Inventor
魏建东
韩耀华
赵瑜
邢毅
薛保清
金伟
朱玉东
孙礼永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201310747227.8A priority Critical patent/CN103741588B/zh
Publication of CN103741588A publication Critical patent/CN103741588A/zh
Application granted granted Critical
Publication of CN103741588B publication Critical patent/CN103741588B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

板梁桥的预制箱梁横向预应力钢筋安装结构,包括并排设置的预制箱梁,所述每个预制箱梁内在相同位置预制有横向的通孔,在并排的全部或部分预制箱梁相对应的通孔内穿设有高强预应力钢筋,高强预应力钢筋两端通过螺母和垫圈将串联的所有预制箱梁固定为一体。本发明提高板梁桥的横向整体性,延长桥梁使用年限,节约投资。板梁桥在使用过程中若需调整横向预应力的大小或更换高强预应力钢筋,也不必中断交通。

Description

板梁桥的预制箱梁横向预应力钢筋安装结构
技术领域
[0001]本发明属于桥梁施工技术领域,尤其涉及一种板梁桥的预制箱梁横向预应力钢筋安装结构。
背景技术
[0002]目前,桥梁的预制拼装箱梁靠铰缝连接,狭小而深的铰缝的施工质量得不到保证,而且铰缝混凝土与预制梁混凝土之间新旧混凝土的连接是薄弱面。在车辆荷载(特别是超载车辆)作用下,铰缝容易开裂,进而雨水渗入,加速铰缝的破坏。破坏的铰缝易引起“单板受力”,从而在车辆荷载作用下箱梁发生断裂。现有的加固技术是沿箱梁底板张拉横向预应力,保证各箱梁整体受力,这种加固方法使预应力筋外露,影响观瞻,且可能侵入下方道路的净空,也有在维修时凿除桥面板或在桥面板开槽,安装横向预应力筋的,这种方法增加了施工难度,且施工时需中断道路交通。
发明内容
[0003]本发明为了解决现有技术中的不足之处,增加板梁桥的横向整体性,提供一种在施工时采用高强钢筋作为预应力筋、对拼装预制箱梁施加横向预应力的板梁桥的预制箱梁横向预应力钢筋安装结构。
[0004]为解决上述技术问题,本发明采用如下技术方案:板梁桥的预制箱梁横向预应力钢筋安装结构,包括并排设置的预制箱梁,所述每个预制箱梁内在相同位置预制或钻有横向的通孔,在并排的全部或部分预制箱梁相对应的通孔内穿设有高强预应力钢筋,高强预应力钢筋两端通过螺母和垫圈将并排的所有预制箱梁固定为一体。
[0005]所述高强预应力钢筋在预制箱梁下部水平设置一排。
[0006]所述高强预应力钢筋在预制箱梁上部水平设置一排。
[0007]所述高强预应力钢筋由若干段串联而成,每段的高强预应力钢筋与预制箱梁的宽度相当,相邻两段的高强预应力钢筋之间通过具有内螺纹的套筒串联,套筒外设有穿套在相邻两段的高强预应力钢筋上的连接筒,连接筒的两端分别插设在相邻两个预制箱梁对应的通孔内。
[0008]所述预制箱梁包括实心板梁、空心板梁和空心箱梁,板梁桥左右两侧的预制箱梁的外侧面设有与通孔外端连接的凹槽。
[0009]所述同一道通孔内的高强预应力钢筋并排穿设单根或两根以上。
[0010]所述高强预应力钢筋外露的端部设有保护罩。
[0011]采用上述技术方案,本发明对于新设计的桥梁,可直接在预制箱梁的腹板上预留通孔。在拼装预制箱梁时,架设第一块预制箱梁后,在其通孔内穿入高强预应力钢筋,每段高强预应力钢筋与预制箱梁的宽度相当。在准备架设的、相邻的第二块预制箱梁侧的高强预应力钢筋端头拧上连接套筒,在套筒外安装连接筒。第二块相邻的预制箱梁架设到位后,穿入相应的各段高强预应力钢筋,将各段高强预应力钢筋旋入已安装的套筒内。在准备架设的、相邻的第三块预制箱梁侧的高强预应力钢筋端头拧上连接套筒,在套筒外安装连接筒。如此循作业,直至全跨预制箱梁架设完毕,在桥两侧外露的预应力钢筋端头安装螺母。向相邻两个预制箱梁之间的缝隙内浇注铰缝混凝土,待其强度达到设计强度后,张拉串联的高强预应力钢筋,形成横向预应力。或者使用扭矩扳手将左右两端的螺母拧紧,使串联的高强预应力钢筋具有一定的预应力,形成横向预应力。
[0012]凹槽的设置用于隐蔽安装螺母,使螺母不受侵蚀而生锈。
[0013]对既有的拼装板梁桥,为增加结构整体性,可在纵向的一些截面上,沿桥梁的横向在腹板上部和下部打孔,穿入高强预应力钢筋,张拉高强预应力钢筋形成横向预应力。此时,锚具一般在边梁外侧面外侧,锚具及附近钢筋作防腐处理后,可加用保护罩保护。
[0014]本发明提高板梁桥的横向整体性,延长桥梁使用年限,节约投资。板梁桥在使用过程中若需调整横向预应力的大小或更换高强预应力钢筋,也不必中断交通。
附图说明
[0015]图1是本发明实施例一的结构示意图;
[0016]图2是图1中A处的放大图;
[0017]图3是图1中B处的放大图;
[0018]图4是本发明实施例二的结构示意图。
具体实施方式
[0019]实施例一,如图1、图2和图3所示,本发明的板梁桥的预制箱梁横向预应力钢筋安装结构,包括并排设置的预制箱梁I,每个预制箱梁I内在相同位置预制或钻有横向的通孔7,在并排的全部或部分预制箱梁I相对应的通孔7内穿设有高强预应力钢筋2,高强预应力钢筋2两端通过螺母3和垫圈4将并排的所有预制箱梁I固定为一体。
[0020]高强预应力钢筋2在预制箱梁I下部水平设置一排。
[0021]高强预应力钢筋2由若干段串联而成,每段的高强预应力钢筋2与预制箱梁I的宽度相当,相邻两段的高强预应力钢筋2之间通过具有内螺纹的套筒5串联,套筒5外设有穿套在相邻两段的高强预应力钢筋2上的连接筒6,连接筒6的两端分别插设在相邻两个预制箱梁I对应的通孔7内。
[0022]预制箱梁I包括实心板梁、空心板梁和空心箱梁,板梁桥左右两侧的预制箱梁I的外侧面设有与通孔7外端连接的凹槽8。凹槽8的设置用于隐蔽安装螺母3。
[0023]同一道通孔7内的高强预应力钢筋2并排穿设单根或两根以上。
[0024]本发明对于新设计的桥梁,可直接在预制箱梁I的腹板上预留通孔7。在拼装预制箱梁I时,架设第一块预制箱梁I后,在其通孔7内穿入高强预应力钢筋2,每段高强预应力钢筋2与预制箱梁I的宽度相当。在准备架设的、相邻的第二块预制箱梁I侧的高强预应力钢筋2端头拧上套筒5,在套筒5外安装连接筒6。第二块相邻的预制箱梁I架设到位后,穿入相应的各段高强预应力钢筋I,将各段高强预应力钢筋I旋入已安装的套筒5内。在准备架设的、相邻的第三块预制箱梁I侧的高强预应力钢筋2端头拧上套筒5,在套筒5外安装连接筒6。如此循作业,直至全跨预制箱梁I架设完毕,在桥两侧外露的预应力钢筋端头安装螺母3。向相邻两个预制箱梁I之间的缝隙内浇注铰缝混凝土,待其强度达到设计强度后,张拉串联的高强预应力钢筋2,形成横向预应力。或者使用扭矩扳手将左右两端的螺母3拧紧,使串联的高强预应力钢筋2具有一定的预应力,形成横向预应力。
[0025]对既有的拼装板梁桥,为增加结构整体性,可在纵向的一些截面上,沿桥梁的横向在腹板上部和下部打孔,穿入高强预应力钢筋2,张拉高强预应力钢筋2形成横向预应力。
[0026]另外,若最外侧的一块预制箱梁I上不设置凹槽8,则可以在高强预应力钢筋2外露的端部设置保护罩(图中未示意出来)。
[0027]实施例二,如图4所示,该实施例与实施例一的不同之处在于:高强预应力钢筋2在预制箱梁I上部和下部分别水平设置一排。
[0028]本实施例并非对本发明的形状、材料、结构等作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均属于本发明技术方案的保护范围。

Claims (5)

1.板梁桥的预制箱梁横向预应力钢筋安装结构,包括并排设置的预制箱梁,其特征在于:所述每个预制箱梁内在相同位置预制或钻有横向的通孔,在并排的部分预制箱梁相对应的通孔内穿设有高强预应力钢筋,高强预应力钢筋两端通过螺母和垫圈将并排的部分预制箱梁固定为一体; 所述高强预应力钢筋由若干段串联而成,每段的高强预应力钢筋与预制箱梁的宽度相当,相邻两段的高强预应力钢筋之间通过具有内螺纹的套筒串联,套筒外设有穿套在相邻两段的高强预应力钢筋上的连接筒,连接筒的两端分别插设在相邻两个预制箱梁对应的通孔内; 所述预制箱梁为实心板梁、空心板梁或空心箱梁,板梁桥左右两侧的预制箱梁的外侧面设有与通孔外端连接的凹槽。
2.根据权利要求1所述的板梁桥的预制箱梁横向预应力钢筋安装结构,其特征在于:所述高强预应力钢筋在预制箱梁下部水平设置一排。
3.根据权利要求2所述的板梁桥的预制箱梁横向预应力钢筋安装结构,其特征在于:所述高强预应力钢筋在预制箱梁上部水平设置一排。
4.根据权利要求1或2或3所述的板梁桥的预制箱梁横向预应力钢筋安装结构,其特征在于:所述同一道通孔内的高强预应力钢筋并排穿设单根或两根以上。
5.根据权利要求4所述的板梁桥的预制箱梁横向预应力钢筋安装结构,其特征在于:所述高强预应力钢筋外露的端部设有保护罩。
CN201310747227.8A 2013-12-31 2013-12-31 板梁桥的预制箱梁横向预应力钢筋安装结构 Expired - Fee Related CN103741588B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310747227.8A CN103741588B (zh) 2013-12-31 2013-12-31 板梁桥的预制箱梁横向预应力钢筋安装结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310747227.8A CN103741588B (zh) 2013-12-31 2013-12-31 板梁桥的预制箱梁横向预应力钢筋安装结构

Publications (2)

Publication Number Publication Date
CN103741588A CN103741588A (zh) 2014-04-23
CN103741588B true CN103741588B (zh) 2016-06-08

Family

ID=50498647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310747227.8A Expired - Fee Related CN103741588B (zh) 2013-12-31 2013-12-31 板梁桥的预制箱梁横向预应力钢筋安装结构

Country Status (1)

Country Link
CN (1) CN103741588B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805763B (zh) * 2015-04-08 2016-06-22 中铁六局集团天津铁路建设有限公司 一种带有辅助张拉孔洞的超大规模道岔梁及其施工方法
CN105672115B (zh) * 2016-04-11 2017-10-20 福州大学 分批横向张拉加强铰缝的空心板宽桥构造及其施工方法
CN110593096A (zh) * 2019-10-22 2019-12-20 杨新增 预制桥面板的便于接驳的预应力结构

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004218429A (ja) * 1998-02-12 2004-08-05 Nippon Steel Corp 橋梁構造
CN101603281A (zh) * 2009-07-02 2009-12-16 中铁二院工程集团有限责任公司 整体式无砟轨道
CN101824799A (zh) * 2010-02-09 2010-09-08 衡水橡胶股份有限公司 T型混凝土简支组合桥梁横向连接的施工方法
CN101935983A (zh) * 2010-08-27 2011-01-05 郑州大学 一种装配整体式空心板桥的建造方法
CN102352606A (zh) * 2011-08-05 2012-02-15 天津城市建设学院 公路铰接空心板桥横向体外预应力加固方法
CN202194082U (zh) * 2011-08-05 2012-04-18 天津城市建设学院 公路铰接横向体外预应力加固空心桥板
CN102587267A (zh) * 2012-04-06 2012-07-18 浙江大学 一种中设横隔张拉装配的预应力空心板梁桥及施工方法
CN202416148U (zh) * 2011-12-20 2012-09-05 浙江省交通规划设计研究院 一种预应力混凝土空心板桥梁结构
CN102953347A (zh) * 2012-12-04 2013-03-06 华汇工程设计集团股份有限公司 横向预应力加固的铰接空心板梁桥的设计内力分析方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004218429A (ja) * 1998-02-12 2004-08-05 Nippon Steel Corp 橋梁構造
CN101603281A (zh) * 2009-07-02 2009-12-16 中铁二院工程集团有限责任公司 整体式无砟轨道
CN101824799A (zh) * 2010-02-09 2010-09-08 衡水橡胶股份有限公司 T型混凝土简支组合桥梁横向连接的施工方法
CN101935983A (zh) * 2010-08-27 2011-01-05 郑州大学 一种装配整体式空心板桥的建造方法
CN102352606A (zh) * 2011-08-05 2012-02-15 天津城市建设学院 公路铰接空心板桥横向体外预应力加固方法
CN202194082U (zh) * 2011-08-05 2012-04-18 天津城市建设学院 公路铰接横向体外预应力加固空心桥板
CN202416148U (zh) * 2011-12-20 2012-09-05 浙江省交通规划设计研究院 一种预应力混凝土空心板桥梁结构
CN102587267A (zh) * 2012-04-06 2012-07-18 浙江大学 一种中设横隔张拉装配的预应力空心板梁桥及施工方法
CN102953347A (zh) * 2012-12-04 2013-03-06 华汇工程设计集团股份有限公司 横向预应力加固的铰接空心板梁桥的设计内力分析方法

Also Published As

Publication number Publication date
CN103741588A (zh) 2014-04-23

Similar Documents

Publication Publication Date Title
US10590610B2 (en) Composite railway sleeper
CN103741832B (zh) 一种建筑物截柱置换隔震支座施工方法及支撑装置
CN204849802U (zh) 一种输电线路空心板式杆塔基础
CN101613997B (zh) 一种钢-混凝土组合加宽方法
CA2639701C (en) Bridge deck panel
KR100950715B1 (ko) 교량용 프리캐스트 코핑부의 시공 방법
CN204530418U (zh) 一种钢板组合梁桥
CN101952514B (zh) 组合型的预制混凝土衬砌的和桥接的建筑本体
CN202718022U (zh) 一种装配式预应力混凝土路面
DE202007009474U1 (de) Offshore-Plattform
JP3999114B2 (ja) 橋梁の主桁の切欠きコーナー部の補強方法及び補強構造
KR100537264B1 (ko) 도로 시설물 보호용 안전커버
KR100948358B1 (ko) 스틸박스 거더교 및 이의 시공방법
CN203603029U (zh) 一种剪力连接件及含该剪力连接件的组合梁
CN204715224U (zh) 一种基于工字钢横隔梁的箱梁加固构造
KR101053485B1 (ko) ㄷ자형 플레이트를 이용한 조립식 신축이음장치 및 이를 이용한 신설/보수 시공공법
CN104153289B (zh) 可更换模数式桥梁伸缩装置及其安装和检修更换方法
JP5785258B2 (ja) 根かせ補強
CN105421235B (zh) 一种装配式桥梁桥面铺装钢筋混凝土横向预应力施加方法
CN102797219B (zh) 一种方便更换的拱桥吊杆组件及其用于更换吊杆的方法
KR20120073858A (ko) 프리플렉스 합성빔과 피에스씨빔을 이용한 구조용 빔 및 이를 이용한 구조물 시공방법
CN105113405B (zh) 一种基于钢和uhpc的组合桥面
JP2014009461A (ja) Spc橋梁架設方法
KR100946739B1 (ko) 피에스씨 거더를 이용한 장지간 교량 시공방법
KR101317926B1 (ko) 모노셀형 교량 신축 이음장치 및 이를 이용한 교량 이음부의 보수방법

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
CB03 Change of inventor or designer information

Inventor after: Wei Jiandong

Inventor after: Han Yaohua

Inventor after: Zhao Yu

Inventor after: Xing Yi

Inventor after: Xue Baoqing

Inventor after: Jin Wei

Inventor after: Zhu Yudong

Inventor after: Sun Liyong

Inventor before: Wei Jiandong

Inventor before: Wang Li

Inventor after: Wei Jiandong

Inventor after: Han Yaohua

Inventor after: Zhao Yu

Inventor after: Xing Yi

Inventor after: Xue Baoqing

Inventor after: Jin Wei

Inventor after: Zhu Yudong

Inventor after: Sun Liyong

Inventor before: Wei Jiandong

Inventor before: Wang Li

COR Change of bibliographic data
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20181231

CF01 Termination of patent right due to non-payment of annual fee