CN103722373A - 一种用于铣削主轴单元工作姿态模拟的机械装置 - Google Patents
一种用于铣削主轴单元工作姿态模拟的机械装置 Download PDFInfo
- Publication number
- CN103722373A CN103722373A CN201310736994.9A CN201310736994A CN103722373A CN 103722373 A CN103722373 A CN 103722373A CN 201310736994 A CN201310736994 A CN 201310736994A CN 103722373 A CN103722373 A CN 103722373A
- Authority
- CN
- China
- Prior art keywords
- ratchet
- big disk
- spring
- disk
- flange
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P21/00—Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M13/00—Testing of machine parts
- G01M13/02—Gearings; Transmission mechanisms
- G01M13/025—Test-benches with rotational drive means and loading means; Load or drive simulation
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Transmission Devices (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310736994.9A CN103722373B (zh) | 2013-12-28 | 2013-12-28 | 一种用于铣削主轴单元工作姿态模拟的机械装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310736994.9A CN103722373B (zh) | 2013-12-28 | 2013-12-28 | 一种用于铣削主轴单元工作姿态模拟的机械装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103722373A true CN103722373A (zh) | 2014-04-16 |
CN103722373B CN103722373B (zh) | 2015-11-18 |
Family
ID=50446797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310736994.9A Active CN103722373B (zh) | 2013-12-28 | 2013-12-28 | 一种用于铣削主轴单元工作姿态模拟的机械装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103722373B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106425630A (zh) * | 2016-12-09 | 2017-02-22 | 潘茜茜 | 用于配合刀具的引导装置 |
CN107702670A (zh) * | 2017-11-03 | 2018-02-16 | 常熟长城轴承有限公司 | 一种可调高的表架垫套 |
CN112518197A (zh) * | 2020-11-20 | 2021-03-19 | 成都航空职业技术学院 | 一种金属丝网管件自动焊接夹持装置 |
CN117620285A (zh) * | 2024-01-25 | 2024-03-01 | 廊坊市伊贝格机械有限公司 | 一种传动间隙调节控制方法、控制系统、设备及介质 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101458157A (zh) * | 2009-01-07 | 2009-06-17 | 西安交通大学 | 高速主轴动态性能综合测试的实验装置 |
KR20090127966A (ko) * | 2008-06-10 | 2009-12-15 | 한라정공 주식회사 | 터빈축의 성능시험을 위한 모의 측정장치 |
CN202066690U (zh) * | 2011-02-24 | 2011-12-07 | 国家机床质量监督检验中心 | 立/卧式加工中心可靠性试验主轴切削抗力模拟加载装置 |
CN202106199U (zh) * | 2011-03-24 | 2012-01-11 | 华仪风能有限公司 | 风力发电机的主轴与齿轮箱的装配设备 |
CN202382931U (zh) * | 2011-12-19 | 2012-08-15 | 国家机床质量监督检验中心 | 一种卧式加工中心可靠性试验主轴扭矩模拟加载装置 |
CN102645296A (zh) * | 2012-04-16 | 2012-08-22 | 哈尔滨工业大学 | 一种分体式高速电主轴测功机 |
CN103323234A (zh) * | 2013-05-28 | 2013-09-25 | 清华大学 | 一种实现位姿控制和主轴加载的风机增速箱试验台 |
CN203863338U (zh) * | 2013-12-28 | 2014-10-08 | 沈阳机床(集团)有限责任公司 | 一种用于铣削主轴单元工作姿态模拟的机械装置 |
-
2013
- 2013-12-28 CN CN201310736994.9A patent/CN103722373B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090127966A (ko) * | 2008-06-10 | 2009-12-15 | 한라정공 주식회사 | 터빈축의 성능시험을 위한 모의 측정장치 |
CN101458157A (zh) * | 2009-01-07 | 2009-06-17 | 西安交通大学 | 高速主轴动态性能综合测试的实验装置 |
CN202066690U (zh) * | 2011-02-24 | 2011-12-07 | 国家机床质量监督检验中心 | 立/卧式加工中心可靠性试验主轴切削抗力模拟加载装置 |
CN202106199U (zh) * | 2011-03-24 | 2012-01-11 | 华仪风能有限公司 | 风力发电机的主轴与齿轮箱的装配设备 |
CN202382931U (zh) * | 2011-12-19 | 2012-08-15 | 国家机床质量监督检验中心 | 一种卧式加工中心可靠性试验主轴扭矩模拟加载装置 |
CN102645296A (zh) * | 2012-04-16 | 2012-08-22 | 哈尔滨工业大学 | 一种分体式高速电主轴测功机 |
CN103323234A (zh) * | 2013-05-28 | 2013-09-25 | 清华大学 | 一种实现位姿控制和主轴加载的风机增速箱试验台 |
CN203863338U (zh) * | 2013-12-28 | 2014-10-08 | 沈阳机床(集团)有限责任公司 | 一种用于铣削主轴单元工作姿态模拟的机械装置 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106425630A (zh) * | 2016-12-09 | 2017-02-22 | 潘茜茜 | 用于配合刀具的引导装置 |
CN106425630B (zh) * | 2016-12-09 | 2018-06-15 | 黄乙金 | 用于配合刀具的引导装置 |
CN107702670A (zh) * | 2017-11-03 | 2018-02-16 | 常熟长城轴承有限公司 | 一种可调高的表架垫套 |
CN112518197A (zh) * | 2020-11-20 | 2021-03-19 | 成都航空职业技术学院 | 一种金属丝网管件自动焊接夹持装置 |
CN117620285A (zh) * | 2024-01-25 | 2024-03-01 | 廊坊市伊贝格机械有限公司 | 一种传动间隙调节控制方法、控制系统、设备及介质 |
CN117620285B (zh) * | 2024-01-25 | 2024-05-28 | 廊坊市伊贝格机械有限公司 | 一种传动间隙调节控制方法、控制系统、设备及介质 |
Also Published As
Publication number | Publication date |
---|---|
CN103722373B (zh) | 2015-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203863338U (zh) | 一种用于铣削主轴单元工作姿态模拟的机械装置 | |
CN103722373B (zh) | 一种用于铣削主轴单元工作姿态模拟的机械装置 | |
JP5737000B2 (ja) | 多軸仮締め工具 | |
CN102518689A (zh) | 并联机床用高精度球铰结构 | |
CN105307806A (zh) | 便携式斜切工具 | |
CN104002076B (zh) | 一种用于白车身焊装总拼夹具的旋转存储机构 | |
CN202240424U (zh) | 安装离合器片定位装置 | |
CN102645304A (zh) | 一种可调产品质量特性测量装置 | |
CN202240491U (zh) | 免校对的单向调节滑动支撑装置 | |
CN207564413U (zh) | 一种柴油机凸轮轴衬套的拆装工具 | |
CN202622676U (zh) | 一种飞机装配用水平调节装置 | |
CN102785164B (zh) | 一种立式磨床主轴传动系统 | |
CN213985486U (zh) | 一种启动力矩测试工装 | |
CN202219393U (zh) | 液力螺栓预紧器的装配机构 | |
CN109404490A (zh) | 一种链片传动结构 | |
CN207170970U (zh) | 可拆卸式顶尖 | |
CN203887433U (zh) | 一种用于白车身焊装总拼夹具的旋转存储机构 | |
CN105710834A (zh) | 一种用于装配或分离轴承的工具 | |
CN202499177U (zh) | 电子助力转向控制装置 | |
TWI403385B (zh) | 斷電煞車裝置 | |
CN102328296B (zh) | 液力螺栓预紧器的装配机构 | |
CN202322114U (zh) | 吊臂臂销机构及包含该臂销机构的起重设备 | |
CN210830253U (zh) | 盘式制动器中间隙自调机构的主调总成 | |
CN203304982U (zh) | 机床防滑保护装置 | |
CN203513162U (zh) | 一种手拉葫芦左墙板与左罩壳之间的支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Mechanical device for operation posture simulation of milling spindle unit Effective date of registration: 20190307 Granted publication date: 20151118 Pledgee: National Development Bank Pledgor: Shenyan Machine Tool (Group) Co., Ltd. Registration number: 2019210000006 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20200728 Granted publication date: 20151118 Pledgee: CHINA DEVELOPMENT BANK Pledgor: SHENYANG MACHINE TOOL (Group) Co.,Ltd. Registration number: 2019210000006 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A mechanical device for simulation of working attitude of milling spindle unit Effective date of registration: 20200730 Granted publication date: 20151118 Pledgee: China Development Bank Liaoning Branch Pledgor: SHENYANG MACHINE TOOL (Group) Co.,Ltd. Registration number: Y2020210000039 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |