CN103711083B - A kind of double-deck comb shape template system and mounting method - Google Patents
A kind of double-deck comb shape template system and mounting method Download PDFInfo
- Publication number
- CN103711083B CN103711083B CN201410001616.0A CN201410001616A CN103711083B CN 103711083 B CN103711083 B CN 103711083B CN 201410001616 A CN201410001616 A CN 201410001616A CN 103711083 B CN103711083 B CN 103711083B
- Authority
- CN
- China
- Prior art keywords
- formwork
- comb
- shaped
- shaped formwork
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明是一种双层梳形模板系统及安装方法,其结构包括下侧模板,外层梳形模板,内层梳形模板,固定支架,螺杆,耳座,销子,底层钢筋网片,顶层钢筋网片,胡子钢筋,限位板,限位块,底模板,面板,竖向劲板,水平劲板,劲板,竖杆,斜杆,螺帽,耳板。本发明的有益效果在于:双层梳形模板系统,其安装简便,安装后即基本成型、无需调模;整体性好,预制的混凝土板棱角分明、精准度高;内层梳形模板与外层梳形模板互补,有效解决了设有胡子钢筋混凝土预制板施工时侧面漏浆严重、模板安拆极其不便的问题,使施工快捷,现场文明、整洁。
The present invention is a double-layer comb-shaped formwork system and an installation method. Its structure includes a lower side formwork, an outer layer comb-shaped formwork, an inner layer comb-shaped formwork, a fixing bracket, a screw rod, an ear seat, a pin, a bottom reinforcement mesh, Top layer steel mesh, beard steel bar, limit plate, limit block, bottom formwork, panel, vertical stiffener, horizontal stiffener, stiffener, vertical bar, inclined bar, nut, ear plate. The beneficial effects of the present invention are: the double-layer comb-shaped formwork system is easy to install, and it is basically formed after installation without mold adjustment; the integrity is good, the prefabricated concrete slab has clear edges and high precision; Layer comb-shaped formwork is complementary, which effectively solves the problems of serious side grout leakage and extremely inconvenient installation and removal of formwork during the construction of reinforced concrete prefabricated slabs with beards, making the construction fast and the site civilized and tidy.
Description
技术领域 technical field
本发明涉及的是一种双层梳形模板系统及安装方法,具体来讲是有效解决设有胡子钢筋混凝土预制板施工时侧面漏浆严重、模板安拆极其不便的问题。属于建筑施工领域。 The invention relates to a double-layer comb-shaped formwork system and an installation method. Specifically, it effectively solves the problems of serious side grout leakage and extremely inconvenient installation and disassembly of formwork during construction of reinforced concrete prefabricated slabs equipped with beards. It belongs to the field of building construction.
背景技术 Background technique
钢—混组合梁结构在我国的建筑和桥梁领域得到越来越多的应用,这其中混凝土预制板+钢箱梁的结构形式因施工方法简单,应用最为广泛。预制混凝土板厚度一般均小于60cm,有的混凝土预制板横截面采用变截面形式,为确保预制板在安装时相互之间的连接质量,混凝土板均设有胡子钢筋(胡子钢筋由上下两层钢筋网片的主筋延伸而成),且钢筋间距较为密集,有的上下两层胡子钢筋为封闭的环形结构,如此混凝土预制板的侧模板结构形式就显得尤为重要。现有技术中,设有胡子钢筋混凝土预制板侧模结构主要有如下三种方法: Steel-concrete composite beam structures are being used more and more in the fields of construction and bridges in my country. Among them, the structural form of concrete prefabricated slab + steel box girder is the most widely used because of its simple construction method. The thickness of prefabricated concrete slabs is generally less than 60cm. Some prefabricated concrete slabs adopt a variable cross-section. The main reinforcement of the mesh sheet is extended), and the spacing between the reinforcement bars is relatively dense, and some upper and lower layers of mustache reinforcement are closed ring structures, so the side formwork structure of the concrete prefabricated slab is particularly important. In the prior art, there are mainly three methods for the side formwork structure of the beard reinforced concrete prefabricated slab:
方法一,将侧模板分为三部分:下侧模板(即底层钢筋保护层模板)、上侧模板(即顶层钢筋保护层模板)、中侧模板(即上下两层钢筋网片间的模板),另采用木方或钢管对侧模板进行支撑、固定。此方法模板结构简易、加工简单,但因模板分块较多、支撑固定较为麻烦,预制的混凝土板侧面线形较差,同时对于胡子钢筋为封闭的环形结构或横截面为变截面形式的混凝土预制板,其中侧模板无法正常拆除。 Method 1: Divide the side formwork into three parts: the lower formwork (i.e. the formwork for the bottom steel bar protection layer), the upper side formwork (i.e. the formwork for the top layer of reinforcement protection layer), and the middle side formwork (i.e. the formwork between the upper and lower layers of steel mesh) , and use wooden squares or steel pipes to support and fix the side formwork. This method has a simple template structure and simple processing, but because the template is divided into many blocks and the support is troublesome, the side profile of the prefabricated concrete slab is poor. board, where the side formwork cannot be removed normally.
方法二,侧模板由下侧模板(即底层钢筋保护层模板)、梳形上侧模板(即底层钢筋以上部分模板)、堵漏块(用于塞堵梳形模板在上下两层钢筋间的条形缝隙)。其较方法一能够适应所有类型混凝土预制板侧模板施工,但因采用堵漏块逐缝堵漏,如此施工效率底、劳动强度大、堵漏效果差,且预制的混凝土板侧面线形较差,精准度较低。 Method 2, the side formwork consists of the lower formwork (i.e. the formwork for the protective layer of the bottom reinforcement), the comb-shaped upper side formwork (i.e. the formwork above the bottom reinforcement), and the plugging block (used to plug the comb-shaped formwork between the upper and lower layers of steel bars). strip gap). Compared with method 1, it can be applied to the construction of side formwork of all types of concrete precast slabs, but because the leak blocking blocks are used to seal leaks one by one, the construction efficiency is low, the labor intensity is high, the plugging effect is poor, and the side profile of the prefabricated concrete slab is poor. Less accurate.
方法三,侧模板采用快易收口网制作,此种模板安装及其简便,但是采用快易收口网模板,即允许渗出部分砂浆,如此现场文明施工将很难满足现代施工技术工业化的要求,且快易收口网刚度较差,使预制的混凝土板侧面线形较差,精准度较低。 Method 3, the side formwork is made of quick-easy closing net, which is extremely easy to install, but using quick-easy closing net formwork allows part of the mortar to seep out, so that civilized construction on site will hardly meet the requirements of modern construction technology industrialization, Moreover, the rigidity of the fast and easy closing net is poor, so that the side profile of the prefabricated concrete slab is poor and the accuracy is low.
发明内容 Contents of the invention
本发明提出的是一种双层梳形模板系统及安装方法,其目的旨在克服现有技术所存在的上述缺陷,能够有效堵漏、整体性较好、安拆简便,且能够预制较高精度高桥面板。 The present invention proposes a double-layer comb-shaped formwork system and installation method. Its purpose is to overcome the above-mentioned defects in the prior art. Precision high bridge panels.
本发明采取的技术方案是:其特征是包括下侧模板、外层梳形模板、内层梳形模板、固定支架,其中下侧模板位于内层梳形模板、外层梳形模板的下方,以底层钢筋为界;外层梳形模板支撑在下侧模板上,并由固定支架及A螺杆、B螺杆固定;内层梳形模板卡位于顶层钢筋;所述固定支架设置于胡子钢筋之间;所述外层梳形模板由面板、竖向劲板及水平劲板组成,其中面板上开有与胡子钢筋相对应的竖向槽口,竖向劲板的长度长于面板,以便于安装时抵住下侧模板的面板,从而实现限位;竖向劲板与螺杆对应位置处设置有劲板;所述内层梳形模板上开有与外层梳形模板对应的竖向槽口;所述固定支架由横杆、竖杆及斜杆组成,其中在横杆、竖杆上开有圆孔,并对应设置A螺帽、B螺帽,在竖杆及斜杆的下端设有连接耳板,横杆下方设有限位板;所述内层梳形模板的竖向槽口长度较外层梳形模板的竖向槽口长度短一倍于胡子钢筋的直径;所述内层梳形模板横向槽口长度大于所述外层梳形模板竖向槽口宽度,小于外层梳形模板竖向槽口的水平间距。 The technical scheme adopted by the present invention is: it is characterized in that it comprises a lower side formwork, an outer comb-shaped formwork, an inner layer comb-shaped formwork, and a fixing bracket, wherein the lower side formwork is located below the inner layer comb-shaped formwork and the outer layer comb-shaped formwork, The bottom layer of steel bars is used as the boundary; the outer comb-shaped formwork is supported on the lower side formwork and fixed by the fixing bracket, A screw and B screw; the inner layer comb-shaped formwork is clamped on the top layer of steel bars; the fixing bracket is set between the mustache bars; The outer layer comb-shaped formwork is composed of a panel, a vertical stiffener and a horizontal stiffener, wherein the panel is provided with a vertical notch corresponding to the beard steel bar, and the length of the vertical stiffener is longer than that of the panel, so as to facilitate installation. Hold the panel of the lower side formwork, so as to realize the limit; the vertical stiffener and the corresponding position of the screw rod are provided with a stiffener; the inner comb formwork is provided with a vertical notch corresponding to the outer comb formwork; The fixed bracket is composed of a horizontal bar, a vertical bar and a slanting bar, wherein there are round holes on the horizontal bar and the vertical bar, and correspondingly set A nuts and B nuts, and a connecting ear plate is provided at the lower end of the vertical bar and the slanting bar , a limit plate is provided below the cross bar; the vertical notch length of the inner layer comb formwork is shorter than the vertical notch length of the outer layer comb formwork twice the diameter of the beard steel bar; the inner layer comb formwork The length of the transverse notch is greater than the width of the vertical notch of the outer comb-shaped template, and smaller than the horizontal spacing of the vertical notches of the outer comb-shaped template.
本发明的有益效果在于:双层梳形模板系统,其安装简便,安装后即基本成型、无需调模;整体性好,预制的混凝土板棱角分明、精准度高;内层梳形模板与外层梳形模板互补,有效解决了设有胡子钢筋混凝土预制板施工时侧面漏浆严重、模板安拆极其不便的问题,使施工快捷,现场文明、整洁。 The beneficial effects of the present invention are: the double-layer comb-shaped formwork system is easy to install, and can be basically shaped after installation without mold adjustment; Layer comb-shaped formwork is complementary, which effectively solves the problems of serious side grout leakage and extremely inconvenient formwork installation and disassembly during the construction of reinforced concrete precast slabs with beards, making the construction fast and the site civilized and tidy.
附图说明 Description of drawings
图1为双层梳形模板系统的装配立面图。 Figure 1 is an assembled elevation view of the double-layer comb formwork system.
图2为图1中A-A截面示意图。 Fig. 2 is a schematic cross-sectional view of A-A in Fig. 1 .
图3为图1中外层梳形板结构图。 Fig. 3 is a structural diagram of the outer comb-shaped plate in Fig. 1 .
图4为图1中内层梳形板结构图。 Fig. 4 is a structural diagram of the inner layer comb plate in Fig. 1 .
图5为图1中固定支架结构图。 Fig. 5 is a structural diagram of the fixing bracket in Fig. 1 .
图6为图3与图4内、外层梳形板及图1中下侧模板配合安装后示意图。 Fig. 6 is a schematic diagram of Fig. 3, the inner and outer comb-shaped plates in Fig. 4 and the lower side formwork in Fig. 1 after cooperating and installing.
图7-①是下侧模板、外层梳形模板安装完成后状态图。 Figure 7-① is the state diagram after the installation of the lower formwork and the outer comb-shaped formwork is completed.
图7-②是沿竖向槽口插入内层梳形模板安装完成后状态图。 Figure 7-② is a state diagram after the installation of the inner comb formwork inserted along the vertical slot.
图7-③是沿横向槽口推动内层梳形模板,并使顶层钢筋卡入半圆槽口安装完成后状态图。 Figure 7-③ is the state diagram of pushing the inner comb-shaped formwork along the transverse notch and snapping the top layer of steel bars into the semicircular notch after installation.
图中的1是下侧模板,外层梳形模板2,内层梳形模板3,固定支架4,5是A螺杆,6是B螺杆,7是耳座,8是销子,9是底层钢筋网片,10是顶层钢筋网片,11是胡子钢筋(即底层钢筋网片9、顶层钢筋网片10露在混凝土桥面板外侧的钢筋),12是限位板,13是限位块,14是底模板,15是面板,16是竖向劲板,17是水平劲板,18是劲板,19是竖杆,20是斜杆,21是A螺帽、22是B螺帽,23是耳板,①是下侧模板、外层梳形模板安装完成后状态,②是沿竖向槽口插入内层梳形模板,③是沿横向槽口推动内层梳形模板,并使顶层钢筋卡入半圆槽口。 1 in the figure is the lower side formwork, the outer comb formwork 2, the inner comb formwork 3, the fixed bracket 4, 5 is the A screw, 6 is the B screw, 7 is the ear seat, 8 is the pin, and 9 is the bottom layer Reinforcement mesh, 10 is the top layer of reinforcement mesh, 11 is the mustache reinforcement (that is, the bottom reinforcement mesh 9 and the top layer of reinforcement mesh 10 are exposed on the outside of the concrete bridge deck), 12 is the limit plate, 13 is the limit block, 14 is the bottom template, 15 is the panel, 16 is the vertical stiffener, 17 is the horizontal stiffener, 18 is the stiffener, 19 is the vertical rod, 20 is the oblique rod, 21 is the A nut, 22 is the B nut, 23 It is the lug plate, ① is the state after the installation of the lower formwork and the outer comb-shaped formwork is completed, ② is inserted into the inner comb-shaped formwork along the vertical notch, and ③ is to push the inner comb-shaped formwork along the horizontal notch, and make the top layer The rebar snaps into the half-circle notch.
具体实施方式 Detailed ways
以下结合附图对本发明的实施例/方式作进一步详细说明。 Embodiments/modes of the present invention will be described in further detail below in conjunction with the accompanying drawings.
如图1-图6所示,双层梳形模板系统,其结构包括下侧模板1、外层梳形模板2、内层梳形模板3、固定支架4,其中下侧模板1位于内层梳形模板3、外层梳形模板2的下方,以底层钢筋9为界;外层梳形模板2支撑在下侧模板1上,并由固定支架4及A螺杆5、B螺杆6固定;内层梳形模板3卡位于顶层钢筋10;所述固定支架4设置于胡子钢筋11之间;所述外层梳形模板2由面板15、竖向劲板16及水平劲板17组成,其中面板15上开有与胡子钢筋11相对应的竖向槽口,竖向劲板16的长度长于面板15,以便于安装时抵住下侧模板1的面板,从而实现限位;竖向劲板16与螺杆5对应位置处设置有劲板18;所述内层梳形模板3上开有与外层梳形模板2对应的竖向槽口;所述固定支架4由横杆18、竖杆19及斜杆20组成,其中在横杆18、竖杆19上开有圆孔,并对应设置A螺帽21、B螺帽22,在竖杆19及斜杆20的下端设有连接耳板23,横杆18下方设有限位板12;所述内层梳形模板3的竖向槽口长度较外层梳形模板2的竖向槽口长度短一倍于胡子钢筋11的直径;所述内层梳形模板3横向槽口长度大于所述外层梳形模板2竖向槽口宽度,小于外层梳形模板竖向槽口的水平间距a。 As shown in Figures 1-6, the double-layer comb-shaped formwork system includes a lower formwork 1, an outer comb-shaped formwork 2, an inner comb-shaped formwork 3, and a fixed bracket 4, wherein the lower formwork 1 is located in the inner layer. The comb-shaped formwork 3 and the lower part of the outer layer comb-shaped formwork 2 are bounded by the bottom steel bar 9; the outer layer comb-shaped formwork 2 is supported on the lower side formwork 1, and is fixed by the fixed bracket 4 and the A screw rod 5 and the B screw rod 6; The layer comb formwork 3 is stuck on the top layer of steel bars 10; the fixed bracket 4 is arranged between the beard steel bars 11; the outer layer comb formwork 2 is composed of a panel 15, a vertical stiffener 16 and a horizontal stiffener 17, wherein the panel 15 is provided with a vertical notch corresponding to the beard steel bar 11, and the length of the vertical stiffener 16 is longer than that of the panel 15, so as to be against the panel of the lower formwork 1 during installation, so as to realize the limit; the vertical stiffener 16 A stiffener 18 is provided at the position corresponding to the screw rod 5; a vertical notch corresponding to the outer layer comb template 2 is provided on the inner layer comb template 3; Diagonal rod 20 is formed, wherein on horizontal rod 18, vertical rod 19, there are circular holes, and A nut 21, B nut 22 are arranged correspondingly, and the lower end of vertical rod 19 and oblique rod 20 is provided with connecting ear plate 23, Cross bar 18 belows are provided with limiting plate 12; The vertical notch length of described inner layer comb formwork 3 is shorter than the vertical notch length of outer layer comb formwork 2 twice the diameter of beard reinforcing bar 11; The length of the transverse notch of the layer comb template 3 is greater than the width of the vertical notch of the outer comb template 2, and is smaller than the horizontal spacing a of the vertical notches of the outer comb template.
所述下侧模板设有半圆槽口,且倾斜有一个角度。 The lower template is provided with a semicircular notch and is inclined at an angle.
所述外层梳形模板2设有竖向槽口与内层梳形模板3设有横向槽口形成倒“L”形,内层梳形模板横向槽口末端设有向上的半圆槽口。 The outer comb formwork 2 is provided with a vertical notch and the inner comb formwork 3 is provided with a transverse notch to form an inverted "L" shape, and the end of the inner comb formwork transverse notch is provided with an upward semicircular notch.
所述螺杆含竖向、水平向两种螺杆,所述固定支架设有与竖向、水平向两种螺杆对应的固定螺母。 The screw includes two kinds of vertical and horizontal screws, and the fixing bracket is provided with fixing nuts corresponding to the two kinds of vertical and horizontal screws.
所述内层梳形模板3的横向槽口间距与外层梳形模板2的竖向槽口间距相同,两者均与胡子钢筋水平间距相同。 The horizontal notch spacing of the inner layer comb formwork 3 is the same as the vertical notch spacing of the outer layer comb formwork 2, both of which are the same as the horizontal spacing of the mustache reinforcing bars.
所述内层梳形模板3的竖向槽口长度较外层梳形模板的竖向槽口长度短一倍的胡子钢筋直径,内层梳形模板3横向槽口长度大于外层梳形模板2竖向槽口宽度,小于外层梳形模板2竖向槽口的水平间距。 The vertical notch length of the inner layer comb formwork 3 is shorter than the vertical notch length of the outer layer comb formwork 1 times the beard steel bar diameter, and the inner layer comb formwork 3 horizontal notch lengths are greater than the outer comb formwork 2 The width of the vertical notch is less than the horizontal distance between the 2 vertical notches of the outer layer comb formwork.
其安装方法,包括如下步骤: Its installation method includes the following steps:
(1)根据混凝土桥面板放线情况将下侧模板1、耳座7与底模板14固定; (1) Fix the lower formwork 1, ear seat 7 and bottom formwork 14 according to the setting out of the concrete bridge deck;
(2)安装底层钢筋网片9,顶层钢筋网片10,并将其底层钢筋9卡入下侧模板1的半圆槽口; (2) Install the bottom reinforcement mesh 9 and the top reinforcement mesh 10, and snap the bottom reinforcement 9 into the semicircular notch of the lower formwork 1;
(3)外层梳形模板2的竖向槽口插入底层钢筋网片9,顶层钢筋网片10的外露胡子钢筋11; (3) The vertical notch of the outer comb-shaped template 2 is inserted into the bottom reinforcement mesh 9, and the exposed beard reinforcement 11 of the top reinforcement mesh 10;
(4)安装固定支架4,通过销子8将耳板23与耳座7销接,在外层梳形模板2的水平劲板17与对应位置焊接限位块13,并用固定支架4的限位板12卡住限位块13,施拧A螺杆5、B螺杆6分别顶紧劲板18、限位块13; (4) Install the fixed bracket 4, pin the ear plate 23 and the ear seat 7 through the pin 8, weld the limit block 13 on the horizontal stiffener 17 of the outer comb formwork 2 and the corresponding position, and use the limit of the fixed bracket 4 The plate 12 clamps the limit block 13, and the A screw 5 and the B screw 6 are respectively pressed against the strength plate 18 and the limit block 13;
(5)内层梳形模板3与外层梳形模板2对应的竖向槽口插入底层钢筋网片9,顶层钢筋网片10,至内层梳形模板3横向槽口挂于顶层钢筋10,沿内层梳形模板3横向槽口方向推动内层梳形模板3,至顶层钢筋10卡入内层梳形模板3的半圆槽口内; (5) Insert the bottom reinforcement mesh 9 and the top reinforcement mesh 10 into the vertical notch corresponding to the inner comb formwork 3 and the outer comb formwork 2, and hang on the top reinforcement mesh 10 to the horizontal notch of the inner comb formwork 3 , push the inner comb formwork 3 along the direction of the transverse notch of the inner comb formwork 3, until the top layer of reinforcement 10 snaps into the semicircular notch of the inner comb formwork 3;
(6)将内层梳形模板3与外层梳形模板2贴紧,完成外层梳形模板竖向槽口的堵漏,完成模板安装。 (6) Closely attach the inner comb formwork 3 to the outer comb formwork 2 to complete the plugging of the vertical notch of the outer comb formwork and complete the formwork installation.
本发明不仅局限于上述最佳实施方式,本领域技术人员在本发明的启示下无论做出任何变化,凡是具有与本发明相同或相近似的技术方案,均在其保护范围之内。 The present invention is not limited to the above-mentioned best implementation mode, and no matter what changes are made by those skilled in the art under the enlightenment of the present invention, all technical solutions that are the same as or similar to the present invention are within the scope of protection.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410001616.0A CN103711083B (en) | 2014-01-03 | 2014-01-03 | A kind of double-deck comb shape template system and mounting method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410001616.0A CN103711083B (en) | 2014-01-03 | 2014-01-03 | A kind of double-deck comb shape template system and mounting method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103711083A CN103711083A (en) | 2014-04-09 |
| CN103711083B true CN103711083B (en) | 2015-10-28 |
Family
ID=50404403
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410001616.0A Expired - Fee Related CN103711083B (en) | 2014-01-03 | 2014-01-03 | A kind of double-deck comb shape template system and mounting method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103711083B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108867373B (en) * | 2018-08-01 | 2024-02-27 | 中铁大桥局集团第六工程有限公司 | Template system for reinforced concrete bridge deck and construction method |
| CN113090015B (en) * | 2021-04-14 | 2022-10-25 | 中冶建工集团有限公司 | Beam plate post-cast strip formwork supporting method |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2883591A1 (en) * | 2005-03-25 | 2006-09-29 | Armand Francois Santonja | Comb-like split formwork for reinforced concrete beam end, has teeth with pivoting bars revealing slits, and front sides having crenated contour forming orifices between them for passage and positioning of beam`s longitudinal reinforcements |
| CN101435221A (en) * | 2008-12-19 | 2009-05-20 | 张晶廷 | Internal thermal insulation house of integral spray finishing costalia concrete structure and construction method thereof |
| CN201292662Y (en) * | 2008-11-12 | 2009-08-19 | 郎佃富 | Dense rib beam hollow floor composition board frock mold |
| KR101004617B1 (en) * | 2010-08-12 | 2011-01-03 | 이엔이건설주식회사 | Construction method of steel slab base plate and composite bridge using temporary steel reinforcement rib and permanent concrete reinforcement rib |
| CN202706550U (en) * | 2012-04-16 | 2013-01-30 | 鲍威 | Two-way comb reinforcing plate used to install mold for concrete stair segment |
| CN203700961U (en) * | 2014-01-03 | 2014-07-09 | 中铁大桥局集团第四工程有限公司 | Double-layer comb-shaped template system |
-
2014
- 2014-01-03 CN CN201410001616.0A patent/CN103711083B/en not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2883591A1 (en) * | 2005-03-25 | 2006-09-29 | Armand Francois Santonja | Comb-like split formwork for reinforced concrete beam end, has teeth with pivoting bars revealing slits, and front sides having crenated contour forming orifices between them for passage and positioning of beam`s longitudinal reinforcements |
| CN201292662Y (en) * | 2008-11-12 | 2009-08-19 | 郎佃富 | Dense rib beam hollow floor composition board frock mold |
| CN101435221A (en) * | 2008-12-19 | 2009-05-20 | 张晶廷 | Internal thermal insulation house of integral spray finishing costalia concrete structure and construction method thereof |
| KR101004617B1 (en) * | 2010-08-12 | 2011-01-03 | 이엔이건설주식회사 | Construction method of steel slab base plate and composite bridge using temporary steel reinforcement rib and permanent concrete reinforcement rib |
| CN202706550U (en) * | 2012-04-16 | 2013-01-30 | 鲍威 | Two-way comb reinforcing plate used to install mold for concrete stair segment |
| CN203700961U (en) * | 2014-01-03 | 2014-07-09 | 中铁大桥局集团第四工程有限公司 | Double-layer comb-shaped template system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103711083A (en) | 2014-04-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
| CN205840047U (en) | A kind of precast shear wall novel perps attachment structure | |
| CN103741597B (en) | Expansion joint device and installation method of concrete bridge without transition section | |
| CN102296812A (en) | Building template molding structure, fastening piece and building template construction method | |
| CN204299039U (en) | A kind of for after water the concrete prefabricated board of assembling | |
| CN103711083B (en) | A kind of double-deck comb shape template system and mounting method | |
| CN107795040B (en) | Double-steel-plate connecting member for building double-steel-plate concrete structure | |
| CN208137447U (en) | The construction anti-cast in situs deflection device of CL network frame plate | |
| CN222667192U (en) | Assembled wall panel and wall panel system | |
| CN106013596B (en) | Disconnected rib prestressed reinforced concrete superimposed sheet of band and preparation method thereof | |
| CN204551172U (en) | A kind of prefabricated road surface of assembled steel reinforced concrete hollow | |
| CN105178986B (en) | Variable curve mold for lining positioning of earth-sheltered dwelling and construction technology of variable-curve mold | |
| CN110847598B (en) | A thin-walled hollow pier diaphragm bottom template and construction method | |
| CN209538526U (en) | Anchor-type snap-fit device for prefabricated steel truss floor slab | |
| CN204919968U (en) | Ceramsite concrete metal rack light weight wallboard | |
| CN203700961U (en) | Double-layer comb-shaped template system | |
| CN109853366B (en) | A fast positioning highly waterproof ultra-high performance concrete combined permanent formwork | |
| CN205089332U (en) | Immature soil kiln occupies lining cutting location with variable curve mould | |
| CN207268034U (en) | Z-shaped combined shear wall with aluminum shells with staggered rib plates | |
| CN205295916U (en) | RPC leveling board | |
| CN104727553B (en) | Aluminum alloy shear wall and floor template adopted construction method and device | |
| CN202148687U (en) | Building template forming structure and fastening piece | |
| CN207673351U (en) | A kind of tunnel lining trolley end mould | |
| CN207620379U (en) | A kind of side mould fixing device | |
| CN206487066U (en) | A kind of inserting steel restrains combining structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151028 |