CN103701201A - System for blocking spare power automatic switching device during load shedding of power system safety and stability control device - Google Patents

System for blocking spare power automatic switching device during load shedding of power system safety and stability control device Download PDF

Info

Publication number
CN103701201A
CN103701201A CN201310752478.5A CN201310752478A CN103701201A CN 103701201 A CN103701201 A CN 103701201A CN 201310752478 A CN201310752478 A CN 201310752478A CN 103701201 A CN103701201 A CN 103701201A
Authority
CN
China
Prior art keywords
auto restart
prepared auto
communication interface
control device
load side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310752478.5A
Other languages
Chinese (zh)
Other versions
CN103701201B (en
Inventor
陈锦昌
陈兴华
杨文佳
吴国炳
李力
林少华
李新超
魏宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd filed Critical Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority to CN201310752478.5A priority Critical patent/CN103701201B/en
Publication of CN103701201A publication Critical patent/CN103701201A/en
Application granted granted Critical
Publication of CN103701201B publication Critical patent/CN103701201B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a system for blocking a spare power automatic switching device during load shedding of a power system safety and stability control device. Through information interaction between communication interface devices at a power supply end and a load end, the requirements of blocking the spare power automatic switching device when the safety and stability control device acts for load shedding are met, the system is suitable for the application form of blocking the spare power automatic switching device of at least one or more load substations when the safety and stability control device acts for load shedding, only one set of power supply end spare power automatic switching device blocking communication interface device needs to be arranged when the spare power automatic switching devices of multiple load end substations need to be blocked due to the fact that the safety and stability control device acts for load shedding, and connection between the devices preferably selects optical fiber communication channels, so that the investment in secondary loops and the devices is reduced, the safety of a power grid and the power supply reliability are improved, and the system has good economic benefit.

Description

The system of locking prepared auto restart while realizing stability control device action cutting load
Technical field
The present invention relates to Power System and its Automation technical field, particularly relate to a kind of system of locking prepared auto restart while realizing stability control device action cutting load.
Background technology
Power system safety and stability control device (abbreviation stability control device) is the device of realizing system security controls measure, generally by taking cutting load, cut machine, the measure such as off-the-line to be to ensure the safe and stable operation of electric power system.When safety and stability control device is implemented cutting load measure, a kind of typical design is to take the cutting load actuating station that is installed on 220kV transformer station to implement the 110kV load circuit that this station load importance of excision is lower.When cut 110kV substation power loss, as this station is provided with the automatic switching device of standby power supply (abbreviation prepared auto restart) starting by judgement decompression, thereby backup auto-activating device meets operation condition load is thrown to telegram in reply net again, cause security and stability control measurement to lose efficacy, have the risk of electrical network unstability.
While moving cutting load for realizing safety and stability control device, cut load website prepared auto restart is failure to actuate, and has the start-up criterion by judging whether the busbar voltage of prepared auto restart installation website exists unbalance voltage, whether exists the criterions such as reclosing process to form before decompression in engineering application.According to said method can to the inlet wire fault of our station or the measure of higher level's safety and stability control device of electric network enforcement cutting load, distinguish roughly, but be confined to only have the information of our station busbar voltage, judged result is inaccurate, has the risk of security and stability control measurement inefficacy or prepared auto restart tripping.
For realizing the accurate differentiation of backup auto-activating device, whether be that higher level's safety and stability control device of electric network is implemented cutting load measure, in engineering application, also have by transmitting-receiving and believe that interface arrangement is sent to the cutting load information of safety and stability control device respectively the scheme of load side transformer substation spare power automatic switching device, but by this scheme mains side transformer station, need install a plurality of identical transmitting-receivings letter interface arrangements and believe that with the transmitting-receiving of corresponding a plurality of load side transformer station interface arrangement docks, cause the wiring of transformer station secondary system complicated, invest significantly increase, economic benefit is poor.
Therefore, be necessary to provide a kind of reliable and economic system of locking automatic closing while realizing safety and stability control device action cutting load.
Summary of the invention
The invention provides a kind of system of locking prepared auto restart while realizing safety and stability control device action cutting load, in the time of can realizing safety and stability control device action cutting load, reliable locking load is hauled oneself willingly into telegram in reply net again, has good economic benefit.
For achieving the above object, the present invention by the following technical solutions:
A system for locking prepared auto restart while realizing stability control device action cutting load, comprising:
Power end locking prepared auto restart communication interface, be installed in power end transformer station, the stability control device of Yu Gai transformer station is connected, for receiving the excision load line information that stability control device sends, to the load side locking prepared auto restart communication interface of corresponding load side transformer station, send locking prepared auto restart action message;
Several load side locking prepared auto restart communication interfaces, each load side locking prepared auto restart communication interface is installed in Yi Ge load side transformer station, the prepared auto restart of Yu Gai transformer station is connected, for receiving the action outlet junction closure of locking prepared auto restart action message rear drive relay, connect the electric discharge locked loop of load side prepared auto restart, realize the electric discharge locking of prepared auto restart.
The system of locking prepared auto restart when the present invention realizes stability control device action cutting load, by the information interaction between communication interface, the demand of reliable locking automatic closing while having realized safety and stability control device action cutting load, and the Load Substation being applicable to more than 1 or 1 needs the application form of locking automatic closing when safety and stability control device action cutting load, when needing the automatic closing of a plurality of load side of locking transformer station, only need install safety and stability control device action cutting load a set of power end locking prepared auto restart communication interface, and the connection between device preferably adopts optical-fiber communication channel, saved the investment of secondary circuit and device, improved the reliability of fail safe and the power supply of electrical network, there is good economic benefit.
Accompanying drawing explanation
Fig. 1 is the system configuration schematic diagram of the present invention's locking prepared auto restart while realizing stability control device action cutting load;
Fig. 2 is the workflow schematic diagram of the present invention's locking backup auto-activating device while realizing stability control device action cutting load.
Embodiment
The system of locking prepared auto restart when the present invention realizes stability control device action cutting load, as shown in Figure 1, comprising:
Power end locking prepared auto restart communication interface, be installed in power end transformer station, the stability control device of Yu Gai transformer station is connected, for receiving the excision load line information that stability control device sends, to the load side locking prepared auto restart communication interface of corresponding load side transformer station, send locking prepared auto restart action message;
Several load side locking prepared auto restart communication interfaces, each load side locking prepared auto restart communication interface is installed in Yi Ge load side transformer station, the prepared auto restart of Yu Gai transformer station is connected, for receiving the action outlet junction closure of locking prepared auto restart action message rear drive relay, connect the electric discharge locked loop of load side prepared auto restart, realize the electric discharge locking of prepared auto restart.
Provided by the invention a kind of while realizing safety and stability control device action cutting load the system of locking automatic closing to have the application mode that 1 or 1 above Load Substation configured backup auto-activating device and load side locking prepared auto restart communication interface all applicable to similar.
Fig. 1 shows the typical application scenarios of 1 Yu16Ge of power end transformer station load side transformer station, power end locking prepared auto restart communication interface only needs 1, but it possesses 16 output communication ports, can be connected work with the load side locking prepared auto restart communication interface of 16 Load Substation.Fig. 2 is the workflow diagram of native system, below in conjunction with the further interpretation work flow process of example.
Safety and stability control device exemplary configuration as shown in Figure 1 16 pairs of tripping operation outlet contacts, corresponding access can realize the switch trip loop of 16 go back tos load circuits controlling cutting load respectively.During safety and stability control device action cutting load, to power end locking prepared auto restart communication interface, send the information of cutting load simultaneously.For example, according to the action policy of safety and stability control device, under certain manner of execution, need to take the measure of excision load circuit 1, load circuit 3, load circuit 4 loads, safety and stability control device, in action outlet jump load circuit 1, load circuit 3, load circuit 4 switches, sends excision load circuit 1, load circuit 3, load circuit 4 information to power end locking prepared auto restart communication interface.
By above-mentioned example, the communication module of power end locking prepared auto restart communication interface as shown in Figure 1 receives information by optical-fiber communication channel from the port of communicating by letter with safety and stability control device; The logic processing module of power end locking prepared auto restart communication interface is resolved the information receiving, obtain after the signal of excision load circuit 1, load circuit 3, load circuit 4, if the passage pressing plate of port one, port 3, port 4 correspondences drops into, to port one, port 3, port 4, send locking prepared auto restart action message immediately; If port one, port 3, the passage pressing plate that the arbitrary port of port 4 is corresponding exit, to this port, do not send any information.
By above-mentioned example, the communication module of the load side locking prepared auto restart communication interface of load side transformer station 1 receives information by optical-fiber communication channel from the port one of power end locking prepared auto restart communication interface as shown in Figure 1; The logic processing module of load side locking prepared auto restart communication interface is carried out anti-error verification to the information receiving, comprise CRC check and message address verification, be verified as the Executive Module to load side locking prepared auto restart communication interface when correct and send locking prepared auto restart action command; The Executive Module of load side locking prepared auto restart communication interface receives after locking prepared auto restart action command, the action of driving exit relay, again by the normal opened contact closure of exit relay to connect the discharge loop of transformer station's 1 automatic switching device of standby power supply, realize the object of locking prepared auto restart action.
By above-mentioned example, as shown in Figure 1 the communication module of the load side locking prepared auto restart communication interface of load side transformer station 3 by optical-fiber communication channel the port 3 reception information from power end locking prepared auto restart communication interface; The communication module of the load side locking prepared auto restart communication interface of load side transformer station 4 is the port 4 reception information from power end locking prepared auto restart communication interface by optical-fiber communication channel.The handling process of the load side locking prepared auto restart communication interface of load side transformer station 3, load side transformer station 4 after receiving locking prepared auto restart action message is consistent with above-mentioned load side transformer station 1, does not repeat them here.
By above scheme, can be found out, a kind of system of locking automatic closing while realizing safety and stability control device action cutting load of the present invention, by the information interaction between communication interface, the demand of reliable locking automatic closing while having realized safety and stability control device action cutting load.The method of locking automatic closing while realizing safety and stability control device action cutting load of the present invention, the Load Substation going for more than 1 or 1 needs the application form of locking automatic closing when safety and stability control device action cutting load, when needing the automatic closing of a plurality of load side of locking transformer station, only need install safety and stability control device action cutting load a set of power end locking prepared auto restart communication interface, and the connection between device adopts optical-fiber communication channel, save the investment of secondary circuit and device, improved the reliability of fail safe and the power supply of electrical network, there is good economic benefit.
The above embodiment has only expressed one embodiment of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection range of patent of the present invention should be as the criterion with claims.

Claims (6)

1. while realizing stability control device action cutting load, a system for locking prepared auto restart, is characterized in that, comprising:
Power end locking prepared auto restart communication interface, be installed in power end transformer station, the stability control device of Yu Gai transformer station is connected, for receiving the excision load line information that stability control device sends, to the load side locking prepared auto restart communication interface of corresponding load side transformer station, send locking prepared auto restart action message;
Several load side locking prepared auto restart communication interfaces, each load side locking prepared auto restart communication interface is installed in Yi Ge load side transformer station, the prepared auto restart of Yu Gai transformer station is connected, for receiving the action outlet junction closure of locking prepared auto restart action message rear drive relay, connect the electric discharge locked loop of load side prepared auto restart, realize the electric discharge locking of prepared auto restart.
2. the system of locking prepared auto restart while realizing stability control device action cutting load according to claim 1, is characterized in that,
Optical fiber by 2M transmission rate between stability control device and power end locking prepared auto restart communication interface is connected and communicates, and power end locking prepared auto restart communication interface is connected and is communicated by optical-fiber communication channel between the station of 2M transmission rate with load side locking prepared auto restart communication interface.
3. the system of locking prepared auto restart while realizing stability control device action cutting load according to claim 1 and 2, is characterized in that,
Described power end locking prepared auto restart communication interface comprises power end communication module and power end logic processing module;
Described power end communication module realizes the information interaction between power end locking prepared auto restart communication interface and steady control device and load side locking prepared auto restart communication interface;
Described power end logic processing module realizes the excision load line information that described power end communication module is received to stability control device and resolves, and to the load side locking prepared auto restart communication interface of corresponding load side transformer station, sends locking prepared auto restart action message according to analysis result.
4. the system of locking prepared auto restart while realizing stability control device action cutting load according to claim 3, is characterized in that,
Described load side locking prepared auto restart communication interface comprises load side communication module, load side logic processing module and Executive Module;
Described load side communication module realizes the information interaction between load side locking prepared auto restart communication interface and power end locking prepared auto restart communication interface;
The locking prepared auto restart action message that described load side logic processing module realization is received from power end locking prepared auto restart communication interface to described load side communication module is carried out anti-error check, and will deliver to described Executive Module through the locking prepared auto restart action command of checking;
Described Executive Module receives the action of locking prepared auto restart action command rear drive exit relay, and the normal opened contact closure of exit relay is to connect the discharge loop of prepared auto restart.
5. the system of locking prepared auto restart while realizing stability control device action cutting load according to claim 1 and 2, is characterized in that,
Power end locking prepared auto restart communication interface, also for arrange and described load side locking prepared auto restart communication interface between passage drop into pressing plate, when respective channel pressing plate drops into, just excise reception and the logical process of the line information of loading.
6. the system of locking prepared auto restart while realizing stability control device action cutting load according to claim 1 and 2, is characterized in that,
The number of described load side locking prepared auto restart communication interface is 16.
CN201310752478.5A 2013-12-30 2013-12-30 Realize the system of locking prepared auto restart during stability control device action cutting load Active CN103701201B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310752478.5A CN103701201B (en) 2013-12-30 2013-12-30 Realize the system of locking prepared auto restart during stability control device action cutting load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310752478.5A CN103701201B (en) 2013-12-30 2013-12-30 Realize the system of locking prepared auto restart during stability control device action cutting load

Publications (2)

Publication Number Publication Date
CN103701201A true CN103701201A (en) 2014-04-02
CN103701201B CN103701201B (en) 2016-08-24

Family

ID=50362646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310752478.5A Active CN103701201B (en) 2013-12-30 2013-12-30 Realize the system of locking prepared auto restart during stability control device action cutting load

Country Status (1)

Country Link
CN (1) CN103701201B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107222020A (en) * 2017-06-20 2017-09-29 国家电网公司 A kind of stability control equipment and backup auto-activating device interlocking control method, apparatus and system
CN109164337A (en) * 2018-06-22 2019-01-08 国电南瑞科技股份有限公司 A kind of anti-error control method of power equipment single-board testing power input
CN114362374A (en) * 2022-03-16 2022-04-15 广东电网有限责任公司珠海供电局 Method and system for preventing contact switch from being switched on after active load shedding of distribution network

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5642104A (en) * 1991-08-29 1997-06-24 The Genlyte Group Incorporated Audible alert for automatic shutoff circuit
CN201274417Y (en) * 2008-08-19 2009-07-15 衡水供电公司 Locking remote self-start apparatus for electric grid
CN103326460A (en) * 2012-03-23 2013-09-25 鹤岗电业局 Remote stability control method and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5642104A (en) * 1991-08-29 1997-06-24 The Genlyte Group Incorporated Audible alert for automatic shutoff circuit
CN201274417Y (en) * 2008-08-19 2009-07-15 衡水供电公司 Locking remote self-start apparatus for electric grid
CN103326460A (en) * 2012-03-23 2013-09-25 鹤岗电业局 Remote stability control method and device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107222020A (en) * 2017-06-20 2017-09-29 国家电网公司 A kind of stability control equipment and backup auto-activating device interlocking control method, apparatus and system
CN109164337A (en) * 2018-06-22 2019-01-08 国电南瑞科技股份有限公司 A kind of anti-error control method of power equipment single-board testing power input
CN109164337B (en) * 2018-06-22 2020-12-01 国电南瑞科技股份有限公司 Power equipment single board test power input anti-error control method
CN114362374A (en) * 2022-03-16 2022-04-15 广东电网有限责任公司珠海供电局 Method and system for preventing contact switch from being switched on after active load shedding of distribution network

Also Published As

Publication number Publication date
CN103701201B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN103595120B (en) Many inlet wires standby electric power automatic throwing method
CN102709889B (en) Self-healing method and self-healing system for faults of power distribution network
CN101980418B (en) System for detecting secondary wiring of relay protection system in transformer substation on line
CN103124068B (en) A kind of anti-island protect system of distributed power generation grid-connected system and guard method thereof
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN108565974B (en) Self-powered remote failure protection method and system based on protection device
CN102263645A (en) Power management method and power management system for communication equipment
CN102064599A (en) Method for controlling mutual-control spare power automatic switching device based on two substations and three wires
CN203368127U (en) Spare power automatic switching control equipment for transformer substation network
CN110265976A (en) A kind of the linkage protection circuit and battery energy storage system of battery energy storage system
CN102545375B (en) Automatic switching on/off method for emergency power supply of power plant
CN103701201A (en) System for blocking spare power automatic switching device during load shedding of power system safety and stability control device
CN103762711A (en) Coal mine system power source switching method and device
CN105633917A (en) Unified power flow controller-based fault processing method and system
CN103166308B (en) A kind of bus differential protection locking prepared auto restart loop
CN104659765A (en) Channel configuration and protection scheme applied to multi-terminal radiation network of power system
CN203774871U (en) Open-loop mode operation based hybrid networking power network system
CN202084917U (en) In-situ feeder automation device
CN105356585A (en) Breaker closing and blocking loop
CN103972865A (en) Control method for preventing motor from being switched into short-circuit fault
CN201860172U (en) Automatic looped network type distribution network based on reclosers
CN104485704A (en) Multi-channel dual-redundancy intelligent power supply management system
CN103545923B (en) A kind of guard method for repair apparatus
CN103746354A (en) Distribution network fault isolation method based on transformer substation overcurrent protection
CN105429141A (en) Control method and system for substation bus from independent operation to parallel operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant